This document is a Project Statement issued by the Michigan Department of Technology, Management and Budget (DTMB) on behalf of the Michigan Department of Natural Resources - Parks & Recreation Division for a state contract opportunity. The contract involves providing professional architectural and engineering services to design a new beach access and upgraded sanitary sewer system lagoons at Van Buren State Park near South Haven, Michigan. The scope includes schematic design, preliminary design, final design, and construction administration services. The project is funded through the American Rescue Plan Act (ARPA) and the desired construction schedule is to start in late summer 2024. Key deliverables include 50% and 90% design submittals, value engineering, constructability reviews, and cost estimates. The PSC will be required to attend mandatory pre-proposal and pre-construction meetings and provide bi-weekly progress updates.
The budget for this work is believed to be reasonable, but a contract modification may be requested if the budget is insufficient. The PSC proposal should include all testing requirements and associated costs as reimbursable expenses. Proposals must be submitted electronically through the SIGMA VSS system by the deadline of June 8, 2023 at 2:00 p.m. Eastern. The contract award is anticipated for June 2023, with design work from July 2023 to April 2024, and construction starting in September 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 221207).pdf | ||
| RFP Billable Rate 22345.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 10/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
751/22345.JLM
PROPOSAL DUE DATE
June 8, 2023, at 2:00 p.m., EASTERN
CLIENT AGENCY
Department of Natural Resources – Parks and Recreation Division
PROJECT NAME AND LOCATION
Van Buren State Park Lagoon Rehab & Beach Access, Van Buren State Park
PROJECT ADDRESS (if applicable) 23960 Ruggles Rd, South Haven, MI 49090
CLIENT AGENCY CONTACT
Justin Gerould
TELEPHONE NUMBER
517-230-5160
DTMB - DCD PROJECT DIRECTOR
Josiah L. Meyers, P.E.
TELEPHONE NUMBER
269-213-6241
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION: Tuesday, May 16, 2023, at 10:00 a.m.
at Van Buren State Park HQ, 23960 Ruggles Rd, South Haven, MI 49090. RSVP name and email of attendees to meyersj11@michigan.gov not later than 2:00 p.m. on Friday, May 12.
MANDATORY (Check box if Mandatory)
LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov .
The email “Subject” must include (facility name, project name, date, and time of Pre-Proposal Walk Through Meeting).
PROJECT DESCRIPTION/SERVICES REQUESTED
The Department of Technology, Management and Budget (DTMB) on behalf of Michigan Department of Natural Resources – Parks & Recreation Division, is requesting professional architectural and engineering services to design a new beach access and upgraded sanitary sewer system lagoons at Van Buren State Park, MI. The funding for the above-named project is under the American Rescue Plan Act (ARPA).
Beach Walk:
Van Buren State Park is set along the Lake Michigan shoreline near South Haven, MI. The park is home to critical dune formations, a modern campground, 1 mile of sandy beach, woodland trails, and a day-use area. The day-use area offers picnic tables and grills, a picnic shelter and two modern restroom buildings.
From the restroom buildings there is a paved walk with masonry retaining walls that leads down to the beach. Due to recent high waters on Lake Michigan the end section of walk at the beach was undermined and collapsed. Since then, temporary repairs have been made to the drainage system as well as a set of wooden stairs to provide some access to the beach. The Professional Services Consultant (PSC) will provide design services to repair and improve the beach walk that will guard against future high-water events. The design shall factor in the adjacent critical dunes, ADA-compliant beach access, and DNR vehicle access. The delivery for the project will be through a construction manager that will bid and administer the project. Design work for this project should start as soon as possible, and construction is expected to start in late summer 2024.
This request is to provide Phase 300 Schematic Design, Phase 400 Preliminary Design, Phase 500 Final mailto:meyersj11@michigan.gov mailto:smithD76@michigan.gov
Design for the rebuild of the beach walk and protective measures. We anticipate 50% and 90% design submittals during both 400 & 500 phases. Value engineering, constructability review and cost estimates will be performed by the Construction Manager once under contract at each phase. Phase 600 and 700 construction administration by the PSC will be required, and the PSC will participate in the contractor selection process. Topographic survey, geotechnical report, EGLE & LARA plan review fees and are to be included as reimbursable expenses. Record construction drawings of the walk are available and will be provided to the successful firm.
Sewage Lagoons:
Van Buren SP uses a lagoon style treatment system to dispose of sanitary waste that is generated from two toilet/ shower buildings, day use restrooms and a sanitation dump station. There is a primary pond, a secondary pond, and an irrigation field. In recent years, the park could not irrigate enough to keep up with the affluent into the primary pond due to increased park use, weather impacts, and EGLE regulatory requirements. The park has had to hire sewage disposal companies to pump and transport waste to another facility at a high cost to their operating budget. Furthermore, upkeep and operation of this system has proven to be challenging as the park is usually short-staffed. The intent of this project is to analyze the current system to determine if upgrades can be made to alleviate the parks issues of manpower and lagoon capacity, or if a different system altogether is a recommended approach. The Phase 100 study shall analyze current system capacity, current and future system demand, available systems/technologies, and opinion of probable costs. The delivery for the project with be through a construction manager that will bid and administer the project. Design work for this project should start as soon as possible, and construction is desired to start in 2024.
This request is to provide Phase 100 Study, Phase 300 Schematic Design, Phase 400 Preliminary Design, and Phase 500 Final Design for the recommended sewer disposal solutions. We anticipate 50% and 90% design submittals for both 400 and 500 design phases. Value engineering, constructability review and cost estimates will be performed by the Construction Manager once under contract at each phase. Phase 600 and 700 construction administration by the PSC will be required, and the PSC will participate in the contractor selection process. Topographic survey, geotechnical report, EGLE & LARA plan review fees and are to be included as reimbursable expenses. The State will retain a professional to test for hazardous materials that may need to be abated.
Professional services shall also include, but are not limited to the items listed below:
• The PSC shall be responsible for gathering and verifying all base information required for the proper design of the project.
• Phase 100 study services for the sewage lagoons only.
• Phase 300, 400, 500 design services as required to produce schematic plans through contract document development for both the beach access and sewage lagoons.
• Phase 400 & 500 submittal of 50% and 90% contract documents for owner review.
• Phase 600 & 700 construction administration services and coordination with the Construction
Manager for both the beach access and sewage lagoons.
• Gathering all base data and design development information that shall ultimately be necessary for plans, submittals, and permit application considerations required for the Departments of Licensing and Regulatory Affairs (LARA), Environment, Great Lakes and Energy (EGLE formerly DEQ) and United States Army Corps of Engineers (USACE), and governing agency approvals. Include as reimbursable expenses.
• Provide a proposed PSC design schedule. Design schedule shall be kept up to date through the project and will be incorporated into the Construction Manager’s master schedule.
• If requested, provide up to four (4) full-size sealed hardcopy sets of contract documents, including addenda, for DTMB and DNR use.
• DTMB-DCD SESC plan review submittal
• DTMB Soil Erosion and Sedimentation Control Permitting
• Site surveying, and soil borings are to be included as a reimbursable expense.
• Be prepared to separate the beach access and sewage lagoons construction documents into separate bid packages if recommended by the Construction Manager.
The PSC proposal shall include:
• The proposal must include meetings as required to fulfill the intent of the contract. While some project team meetings may be considered in the form of computer-based meetings (e.g., Teams, Zoom, etc.), key review meetings shall be in person. For all document review meetings, required review information shall be submitted within sufficient time to allow for complete Owner review, in electronic and in hard copy formats. At a minimum, four (4) face to face meetings will be required, including but not limited to: the predesign meeting, pre bid meeting and pre-construction meetings.
• Provide a bi-weekly progress summary email to the project team, briefly documenting the prior two week’s progress by the PSC and display the initial project schedule and current schedule status.
• All testing required to verify the site conditions for the proper design are to be identified in the PSC Technical proposal, and the associated costs of testing are to be itemized in the PSC Cost proposal as reimbursements. The PSC shall indicate in their proposal any testing requirements.
• A graphic bar chart schedule (in weeks) indicating the PSC’s proposed timeline for services based on a proposed PSC contract start date of July 1, 2023. For scheduling purposes, assume fourteen
(14) calendar days each for Owner review for the documentation and recommendation.
The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, base information, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders, and communications. The budget for this work is believed to be reasonable to accommodate the services requested. However, in the event it is insufficient to fund all the work requested, it is anticipated that a contract modification may be requested at a later date.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.
• Firms should only submit one (1) attachment (being less than 6 MB) for proposal submission. The attachment is to be the technical and cost proposal combined.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be addressed on a case-by-case basis.
• Approved emailed submissions MUST be received by Design and Construction prior to the 2:00 p.m. deadline for their response to be considered responsive and responsible.
• Responses should NOT be emailed to the Project Director.
NIGP CODES
90607, 90656, 90657, 90672, 90680, 92517, 92519, 92533, 92535, 92542, 92587, 92596
DESIRED SCHEDULE OF WORK
Contract Award: June 2023 Design: July 2023 - April 2024 Bid and Award: May/June 2024 Construction: Start September 2024
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Josiah Meyers at meyersj11@michigan.gov address no later than 2:00 p.m., Eastern on Thursday, June 1, 2023.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DHHS, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)