- Branch County, Coldwater City, Michigan
About this file
This document is a Project Statement from the State of Michigan Department of Technology, Management and Budget (DTMB) for the Coldwater Detachment - Roof Replacement Project (22125) and the Grand Haven Detachment - Roof Replacement Project (22126). The projects consist of complete roof membrane replacement, potential roof insulation upgrades, and replacement of any utility lines on the roof surfaces. The State is seeking a minimum 20-year roof warranty system with a 30-year option. Interested firms must submit separate cost proposals for each detachment, and the selected Professional Services Contractor (PSC) will be awarded both projects. The desired schedule includes a pre-proposal walkthrough on April 13-14, 2022, proposal submission by April 28, 2022, design kickoff on May 9, 2022, construction bidding/award in July/August 2022, and construction from September 2022 to May 2023.
The projects are located in Branch County and the cities of Coldwater and Grand Haven, Michigan. All questions must be emailed to the DTMB Project Director by April 21, 2022. Proposals must be submitted electronically through the SIGMA VSS system, with individual attachments limited to 6MB. Emailed submissions may be accepted on a case-by-case basis if SIGMA issues are encountered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Billable Rate 22125.pdf | ||
| SAMPLE Billable Rate Contract (Rev 220207).pdf | ||
| Addendum 1 22125.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 02/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
551/22125.SMD and 551/22126.SMD
PROPOSAL DUE DATE
Thursday, April 28, 2022, at 2:00 p.m., EASTERN
CLIENT AGENCY
Department of State Police
PROJECT NAME AND LOCATION
Coldwater Detachment – Roof Replacement Project (22125) Grand Haven Detachment – Roof Replacement Project (22126)
PROJECT ADDRESS (if applicable) Coldwater Detachment Address: 186 E. State St., Coldwater, MI 49036 Grand haven Detachment Address: 1622 S. Beacon Blvd., Grand Haven, MI 49417
CLIENT AGENCY CONTACT
Paul Akeo
TELEPHONE NUMBER
517.284.3154
DTMB - DCD PROJECT DIRECTOR
Scott DeKorte
TELEPHONE NUMBER
616.490.6169
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Pre-Proposal Meeting Wednesday, April 13, 2022, at 10:00 a.m., Eastern at Coldwater Detachment, 186 E.
State St., Coldwater, MI 49036
Pre-Proposal Meeting Thursday, April 14, 2022, at 10:00 a.m., Eastern at Grand Haven Detachment, 1622 S. Beacon Blvd., Grand Haven, MI 49417
Proposing firms must attend both walk-throughs
MANDATORY (Check box if Mandatory)
COVID 19 Precautions:
1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed.
PROJECT DESCRIPTION/SERVICES REQUESTED
Coldwater Detachment – Roof Replacement Project Grand Haven Detachment – Roof Replacement Project
Project consists of:
1. Complete roof membrane replacement of the main roof, and any associated canopies. Review existing roof insulation (i.e., roof cores) to potentially add roof insulation to bring roof up to current energy codes.
2. Replacement of the existing utility lines (if any) running across the roof surface.
3. Agency is looking for a 20-year minimum roof warranty system with a 30-year option.
4. Existing roof areas shall be field verified by the PSC for the bid package. Existing original drawings do NOT exist.
5. Existing roofs are sheet drained.
Phase 100: Typical SOM Study Phase 500: Typical SOM Final Design Phase 600: Typical SOM Construction Administration – Office Services Phase 700: Typical SOM Construction Administration – Field Services
Interested firms are required to submit separate cost proposals for the Coldwater Detachment and the Grand Haven Detachment in their RFP response.
The elected PSC will be awarded both projects.
Please NOTE:
•• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as bid amount.
• Please remember that individual attachments can be no larger than 6mb.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance. They can be reached by telephone at 888.734.9749 or by email at sigma-procurement-helpdesk@michigan.gov
•• Please notify the Office of Design and Construction if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov ).
•• You may be asked to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
NIGP CODES
90607
DESIRED SCHEDULE OF WORK
Issuance of RFP 4.5.22 Pre-Proposal Walkthrough 4.13.22 at 10:00 a.m., Eastern – Coldwater Detachment
4.14.22 at 10:00 a.m., Eastern – Grand Haven Detachment Addendum Issuance 4.22.22 Proposals Due 4.28.22 SOM Proposal Review 5.03.22 Contract Approval 5.05.22 Design Kickoff 5.9.22 Phase 100 May 2022 Phase 500 May / June 2022 Construction Bidding/Award July / August 2022 Construction September 2022 – May 2023 Project Closeout June 2023
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Scott DeKorte at dekortes@michigan.gov address no later than 1:00 p.m., Eastern on Thursday, April 21, 2022
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:dekortes@michigan.gov
File details come from the government source that posted it. Updated .