Project Statement 17428.pdf
PDF 109 KB Posted
- Solicitation number
- RFP 171 180000002498 3
- Issued by
- Oceana County, Michigan
About this file
This is a Project Statement issued by the State of Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division on behalf of the Natural Resources - Parks & Recreation Division for programming design services at two boating access sites. The project encompasses Phase 100 study through Phase 400 preliminary design reevaluations of existing recreational facilities at Newaygo State Park (located at 2793 Beech Street, Newaygo, Michigan) and High Rollway Boating Access Site in Brooks Township, Newaygo County. The scope of work includes vehicle circulation analysis, parking design, access routes, water access evaluation, possible dredging assessment, and launch location identification, with all required site and topographic survey work to be provided by the selected firm. The preliminary designs must address changing and growing recreational needs at each site. A mandatory pre-bid walk-through inspection is scheduled for Tuesday, May 15, 2018 at 1:30 p.m. at Newaygo State Park. Proposals are due Thursday, May 31, 2018 at 2:00 p.m. EST, with questions accepted until Thursday, May 24, 2018 at 12:00 p.m. All deliverables must be completed by November 1, 2018. The project is indexed under NIGP codes 90607, 90638, 90642, 90656, 90672, 92517, 92533, and 92548.
The Project Statement does not contain specific pricing information, cost proposals, or funding source details. All work must comply with applicable federal codes and standards administered by the EPA, OSHA, and DOT, as well as state agencies including the Department of Community Health, Department of Environmental Quality, Department of Natural Resources, and Michigan Occupational Safety and Health Administration. Contractor and vendor representatives attending the mandatory pre-bid walk-through meeting must submit a Lien Request form to Tracy Falor (FalorT@michigan.gov) at least five business days prior to the meeting date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-427 (R 10/17)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
P.O. Box 30026 Lansing, Michigan 48909
FILE NUMBER
751/17428.GAG
INDEX NUMBER(S)
55120 & 55010
PROPOSAL DUE DATE
Thursday, May 31, 2018 at 2:00 pm EST
CLIENT AGENCY
Natural Resources – Parks & Recreation Division
PROJECT NAME AND LOCATION
Newaygo State Park & High Rollway - Boating Access Sites Programming Design PROJECT ADDRESS (if applicable) Newaygo State Park, 2793 Beech Street, Newaygo MI, 49337 High Rollway – Thornapple BAS: Brooks Township, Newaygo County, Coordinates: Lat: 43.414863, Long: -85.719017
CLIENT AGENCY CONTACT
Annamarie Bauer
TELEPHONE NUMBER
o:231-775-9727
DTMB - DCD PROJECT DIRECTOR
Jerry Gregorski
TELEPHONE NUMBER
231-557-9043
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Tuesday, May 15, 2018 at 1:30 pm Newaygo State Park, 2793 Beech Street, Newaygo MI, 49337
MANDATORY (Check box if Mandatory)
LLEEIINN CCHHEECCKK ((DDeepptt.. ooff CCoorrrreeccttiioonnss OONNLLYY)) AAllll ccoonnttrraaccttoorr//vveennddeerr rreepprreesseennttaattiivveess aatttteennddiinngg aa PPrree--BBiidd WWaallkk TThhrroouugghh MMeeeettiinngg mmuusstt ssuubbmmiitt aa VVeennddeerr//CCoonnttrraaccttoorr LLEEIINN RReeqquueesstt ffiivvee bbuussiinneessss ddaayyss pprriioorr ttoo tthhee mmeeeettiinngg ddaattee,, ((SSeeee tthhee aattttaacchheedd
VVeennddeerr//CCoonnttrraaccttoorr LLEEIINN RReeqquueesstt ffoorrmm)).. SSeenndd tthhee LLEEIINN RReeqquueesstt ffoorrmm,, ffiilllleedd oouutt aanndd ssiiggnneedd,, bbyy eemmaaiill ttoo TTrraaccyy FFaalloorr aatt eemmaaiill aaddddrreessss:: FFaalloorrTT@@mmiicchhiiggaann..ggoovv.. TThhee eemmaaiill ““SSuubbjjeecctt”” mmuusstt iinncclluuddee ((FFaacciilliittyy NNaammee,, PPrroojjeecctt NNaammee,, DDaattee && TTiimmee ooff PPrree--BBiidd
WWaallkk TThhrroouugghh MMeeeettiinngg))..
PROJECT DESCRIPTION/SERVICES REQUESTED
Programming design for two boating access sites. Work to Include phase 100 study through 400 preliminary design reevaluations of existing recreational facilities. Includes vehicle circulation, parking, access routes, access to the water, possible dredging and launch locations. Proposal should include all site and topographic survey work required.
Preliminary designs must meet changing and growing recreational needs at each site.
NIGP CODES
90607, 90638, 90642, 90656, 90672, 92517, 92533, 92548
DESIRED SCHEDULE OF WORK
Deliverables completed by November 1, 2018 ACCEPTING RFP QUESTIONS UNTIL: Thursday, May 24, 2018 at 12:00 pm
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)
Attachment(s)
None mailto:FalorT@michigan.gov
File details come from the government source that posted it. Updated .