Project_Specifications.pdf

PDF 6 MB Posted

Attached to
Towpath Repairs Federal contract opportunity
Solicitation number
140P6423B0002
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This solicitation notice seeks bids for a firm-fixed price construction contract to resurface 15,000 linear feet of towpath trail at Cuyahoga Valley National Park in Ohio. The selected contractor will provide all labor, materials and equipment to chip seal one section of trail and grind and repave seven sections totaling 7,000 linear feet with asphalt overlays ranging from 2.75 to 4 inches thick. An additional 6,000 linear feet between pavement sections will receive a 2-inch limestone screenings overlay. The solicitation number is 140P6423B0002 and the project value is between $250,000 and $500,000. The contract is set aside 100% for total small businesses and wage rates will follow Ohio requirements. The National Park Service Midwest Region is the contracting office. The closing date for bids is in early April 2023 with work expected to begin the following May.

View the file

Other files for this federal contract opportunity

Other files attached to Towpath Repairs, newest first.
File Type Posted
B08_Solicitation_-_DOL_Wage_Determination.pdf PDF
Sol_140P6423B0002.pdf PDF
Submittal_List.pdf PDF
Construction_Contract_Administration.pdf PDF
Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
Bid_Schedule_-_Towpath_Repairs.pdf PDF
Bid_Schedule_-_Towpath_Repairs.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Div. 1 V. 2022-9-6 Page | 1

Cuyahoga Valley National Park

Brecksville, OH

Towpath Repairs Cuyahoga Valley National Park

PMIS 236099

Drawing No: N/A

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

December 5, 2022

Page | 2

Table of Contents

Division 01 General Requirements Technical Specifications – Section 321216 Photographs

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

A length of 15,000 LF of Towpath Trail will be resurfaced. The type of surface will be explained in more detail listed below in Item 1.2 section B.

One section of paved surface will be chip and sealed. 7 sections of the towpath will be grinded and repaved, with 1 of those 7 sections being paved to a depth of 4” for loaded dump truck use during canal dredging. The remaining 6 sections will be grinded and repaved with 2.75-inch asphalt overlay. In-between the sections of pavement will be resurfaced and compacted with a 2” overlay of limestone screenings to a width of approximately 8’.

SECTION 01 10 00

DIVISION 1 SHORT FORM GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: The CVNP Ohio & Erie Canal towpath trail is used by over 1.5 million visitors annually and accounts for 67% percent of total visitation of the park. It is the defining cultural resource for Cuyahoga Valley National Park and the Ohio & Erie Canal National Heritage Corridor. The Park’s towpath trail is aligned directly over the historic mule path that conveyed barges through the historic canal system. Addressing the issues outlined in this project protects the historic mule path, the historic canal, and the adjoining natural resource of the Cuyahoga River that runs within close proximity to this historic path. The current Towpath surface needs to be stabilized and more sustainable to eliminate safety problems such as rutting and wash boarding that has contributed to visitor bicycle and jogging accidents. Stabilizing the existing surface with a more sustainable material will also reduce dust which can affect all users visibility which also causes accidents. Being that this section of the Towpath is in such a remote area, sustainability of this trail is vital to the safety of our visitors. With a more sustainable surface our maintenance staff will not need to visit this location as frequent and can keep maintenance vehicles off the Towpath away from the visitors. It will also provide a safer uniform trail surface which is consistently used by families with small children.

1.2 Work Covered by the Contract Documents:

A. Project Location: Cuyahoga Valley National Park, Station Road Bridge Trailhead – 9141 Riverview Rd, Brecksville, OH 44141

Page | 3

B. Work consists of: Repairing multiple sustainable surfaces along several sections of the

Towpath Trail. The images in the photograph section of this document above give a good visual of what is explained here.

1. Section A: Starting at the 4-way intersection of Station Road and the

Towpath Trail and heading North. The existing paved section will have chip + seal added to the surface for the entire length of approximately 650

ft. This section ends at the bridge of the Cuyahoga River feeder gate bridge and section B begins.

2. Section B: Starts at the Cuyahoga River feeder gate bridge and heading

North. The old pavement is in a severely hazardous condition. This section is approximately 2,400 ft in length and will be finished at a width of no less than 8 feet wide, not to exceed 9 feet. This will need grinded down to a level base that will allow for a 4” asphalt overlay that matches the grade of Section A chip + seal. The binder course should be 2.5” and the finish lift will be 1.5”. The surface for section B will also be finished with chip + seal. This is the only section that will be grinded deep enough to allow a 4” overlay. This section B specifically needs the thicker pavement to provide a more sustainable pavement surface since this area is sometimes used by dump trucks to dredge the canal. Add topsoil, grass seed, and straw to both berms on pavement edges to blend to existing grade.

3. Section C: Starting where the horse trail splits from the towpath trail at the end of Section B, remove any debris or vegetation from the existing base course at a width of approximately 8’, then have 2-inches of ODOT

703.10 Limestone screenings installed and compacted overtop the existing screened surface to an approximate width and length of 8 feet x 3,200 feet.

4. Section D: Beginning where the horse trail merges back onto the towpath at the end of section C. This section will be grinded to allow a level base and overlayed with 2.75” of asphalt and finished with chip + seal. This section is approximately 675 feet in length and will be finished at a width of no less than 8 feet wide, not to exceed 9’. The paved sections of the Towpath are applied to the areas that the horse trail merges onto the path to allow for a more sustainable surface with horse and pedestrian traffic.

Add topsoil, grass seed, and straw to both berms on pavement edges to blend to existing grade.

5. Section E: Starting where the horse trail splits from the towpath trail at the end of Section D, remove any debris or vegetation from the existing base course at a width of approximately 8’, then have 2-inches of ODOT

703.10 Limestone screenings installed and compacted overtop the

1,900 feet.

Page | 4

6. Section F: Beginning where the horse trail merges back onto the towpath at the end of section E. This section will be grinded to allow a level base and overlayed with 2.75” of asphalt and finished with chip + seal. This section is approximately 1,950 feet in length and will be finished at a width of no less than 8 feet wide, not to exceed 9’. The paved sections of the Towpath are applied to the areas that the horse trail merges onto the path to allow for a more sustainable surface with horse and pedestrian traffic.

7. Section G: Starting where the horse trail splits from the towpath trail at the end of Section F, remove any debris or vegetation from the existing base course at a width of approximately 8’, then have 2-inches of ODOT 703,10 Limestone screenings installed and compacted overtop the existing screened surface at a width of 8 feet x approximately 1,600 feet in length.

8. Section H: Beginning where the horse trail merges back onto the towpath at the end of section G. This section will be grinded to allow a level base and overlayed with 2.75” of asphalt and finished with chip + seal. This section is approximately 600 feet in length and will be finished at a width of no less than 8 feet wide, not to exceed 9’. The paved sections of the Towpath are applied to the areas that the horse trail merges onto the path to allow for a more sustainable surface with horse and pedestrian traffic.

9. Section I: Starting where the horse trail splits from the towpath trail at the end of Section H, remove any debris or vegetation from the existing base course at a width of approximately 8’, then have 2-inches of ODOT 703,10 Limestone screenings installed and compacted overtop the

1,600 feet.

10. Section J: Beginning where the horse trail merges back onto the towpath at the end of section I. This is labeled as one section but is broken down into three areas on the photograph attached for Section J above. The specs are the same for each area, there is only a break in the pavement due to a bridge that does not get paved and a concrete spillway that will not have surface work. These sections will be grinded to allow a level base and overlayed with 2.75” of asphalt and finished with chip + seal.

This section is approximately 250 feet in length and will be finished at a width of no less than 8 feet wide, not to exceed 9’. These areas have approaches to trail features and need to match the grade of the existing pavement to allow for a smooth transition to bridge tread and the spillway.

Page | 5

Edging Material:

1. Where the soil is bare topsoil shall be replaced. It is preferred that the original topsoil be stockpiled during construction and put back in place once grading and paving is complete. Where original topsoil is not available, and the Contracting Officer Representative has determined the remaining soil material is not suitable, the contractor will provide topsoil that is approved by the Contracting Officer Representative. There is an estimated total of 100 cubic topsoil needed for this project.

2. After areas that are to be seeded have been brought to grade, and immediately prior to dumping and spreading of topsoil, the subgrade shall be loosened by disking or by scarifying to a depth of at least 2-inches to permit bonding of the topsoil to the subsoil.

3. It is imperative that topsoil be of high quality as the basis of the project is the establishment of seedbed conditions conducive to maintaining permanent vegetative cover. Topsoil shall be a sandy loam, clay loam, sandy clay loam, or other soil approved by the Contracting Officer Representative. For topsoil to be considered loamy, that fraction passing the No. 10 sieve shall not contain more than 40% clay. Acceptable topsoil shall not contain less than 3% or more than 20% organic matter.

4. Topsoil shall not be a mixture of subsoil and or contain slag, cinders, stones, lumps of soil, sticks, roots, trash, or other extraneous material larger than 1½-inches in diameter.

5. The topsoil shall be uniformly distributed on designated areas. Topsoil shall not be placed while in a frozen or muddy condition or when the subgrade is excessively wet. Any irregularities in the surface resulting from adding topsoil shall be corrected in order to prevent the formation of depressions.

Seeding:

1. All grading and shaping operations shall be completed and the area to be seeded shall be reasonably smooth, free of hills and gullies before seedbed preparation. The Contracting Officer Representative shall approve the seedbed and be notified in writing or by telephone prior to initiation of seeding.

2. The area shall be disked and harrowed to a suitable seedbed. A perfectly smooth surface should be avoided. All areas to be seeded shall be free of rock and other foreign material larger than 1½-inches in any dimension. If the seedbed becomes compacted prior to seeding, it shall be re-disked or loosened to a friable condition before seeding.

3. Seed shall be drilled, hydroseeded, or broadcast with types of equipment approved by the Contracting Officer Representative that shall ensure uniform distribution of seed. Seed shall be placed into soil not less than ¼-inch and not more than ½-inch.

4. Seeding shall be done as soon as possible after seedbed preparations.

Permanent seeding shall be completed prior to October 1. No dormant seeding shall be permitted.

5. Seeding shall by supplied in the following seed mix, and shall be shown at the rate recommended by the manufacturer:

Page | 6

25% Kentucky Bluegrass 98/85 25% Creeping Red Fescue 20% Chatham Perennial Ryegrass 15% Pearl Perennial Ryegrass 10% Gettysburg Perennial Ryegrass

6. The Contracting Officers Representative reserves the right to test, reject, or approve all seed after delivery on the project.

7. All seeded areas to have at least 75% vegetative coverage to bind soils and prevent erosion and sedimentation. The Contractor shall maintain all seeded and mulched areas until final inspection.

8. Seeded or mulched areas damaged by wind, water, or other causes shall be repaired to the re-established condition prior to seeding as directed by the Contracting Officer Representative. The repairs shall be made prior to completion of the project by re-grading, re-fertilizing, re-seeding, and mulching. All damage or erosion of these areas due to Contractor's neglect shall be satisfactorily repaired at no additional cost to the Government.

9. Any areas outside the construction site where existing vegetation is removed or damaged by the Contractor in the course of this contract shall be seeded, fertilized, and mulched according to these provisions and specifications. This work shall be done at no additional cost to the Government.

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within 150 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 5 weather days.

ITEM 2 – PROTECTING EXISTING UTILITIES

2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative

(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:

A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.

B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary

Page | 7 provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

https://www.nps.gov/cuva/learn/management/superintendents-compendium.htm

A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. The Towpath Trail in this section has heavy pedestrian traffic.

The work would require the portion of trail in the project area to be closed to the public until completion. This requires notifying the public of the trail closure no less than 14 days prior to the work beginning. Once work begins it is vital that it is completed in the shortest amount of time within the 90-day window of the start/finish.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of

7 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

The following Federal holidays are observed by the National Park Service:

New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding

Friday; holidays falling on Sunday will be observed on the following Monday. The specific

Page | 8 day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

C. Define site disturbance area, including earthwork and clearing of vegetation, to:

1. No more than approximately 2 feet on either side of the Towpath Trail

D. Utilities

1. General: Cost or use charges for temporary facilities shall be included in the Contract

Sum as required.

2. Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

3. Electric Power Service: Electric power from existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

4. Waste Operation:

a. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.

b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.

E. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental

Page | 9 regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.

Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

3. Tree and Plant Protection:

a. Restore damaged areas to original condition, repairing or replacing damaged trees and plants, at no additional expense to the Government.

b. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer Representative and remove agreed-on roots and branches that interfere with construction.

c. Do not fasten ropes, cables, or guys to trees.

d. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.

5. Temporary Enclosures: Provide temporary enclosures such as snow fence as required for protection of construction in progress and completed, from access by visitors or staff, other construction operations, and similar activities.

6. Site Enclosure Fence: Before construction operations begin, furnish, and install portable chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.

a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage. Installation of a chain-link fence/gate will need to be installed at the north and south end of the project area to keep visitors out of the work zone.

7. Security Enclosure and Lockup: N/A

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage and staging area’s may be discussed at the preconstruction briefing. Staging area is located on Pine Hill Rd. just East of the towpath intersection displayed in the map above. Either side of the roadway may be used for staging as long as there is a lane open for emergency access onto the Towpath from Pine Hill Rd.

Page | 10

3.5 Preservation of Natural Features: N/A.

3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times.

1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters

2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings: NA

B. New /Existing Buildings Unoccupied: NA

3.9 Photo Documentation:

A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

B. Existing Condition Images:

1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

C. Construction Progress Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)

2. Maintain organized index for photos with date, description, etc.

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

Page | 11

D. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction.

C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

1. Immediately report all spills of hazardous materials to the CO, COR, and park.

2. Maintain a spill emergency response kit.

3. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management: N/A

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the

Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm

Page | 12

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.

5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

Page | 13

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer Representative.

C. All PPE will be serviceable at all times. At a minimum, maintain two sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE

8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Contracting Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

Page | 14

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor

i. standard clauses (SF1413).

7. Quality Control Plan.

9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.

Paint samples shall be actual paint finish drawdown for all project colors.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer and/or COR will return one copy to the

Contractor. If submittals are not approved, Contracting Officer will return all copies to

Page | 15

Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.

Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the

Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.

9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.

Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

Page | 16

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the

CO.

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

Page | 17

F. Disposition of any permits and warranties required by the specifications in this section.

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of

Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 1

SECTION 321216

ASPHALT PAVING

PART 1 - GENERAL

1.1 SCOPE OF WORK

Project Location: Cuyahoga Valley National Park – Towpath (Station Rd. to Frazee bridge) Brecksville, OH

1.2 SUMMARY

Section Includes:

1. Hot-mix asphalt paving.

2. Hot-mix asphalt overlay.

3. Cold milling of existing asphalt pavement.

4. Asphalt surface treatments.

Related Requirements:

1.3 PREINSTALLATION MEETINGS

Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to hot-mix asphalt paving including, but not limited to, the following:

a. Sources of paving materials, including capabilities and location of plant that will manufacture hot-mix asphalt.

b. Requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period.

c. Quality control of asphalt paving materials and asphalt paving construction practices.

2. Require representative of each entity directly concerned with asphalt paving to attend, including the following:

a. Contractor’s superintendent

b. Asphalt paving Subcontractor

Preinstallation Conference: Conduct conference at Project site.

3. Review methods and procedures related to surface treatments including, but not limited to, the following:

a. Sources of materials to be used.

b. Requirements for protecting treated surfaces, including restriction of traffic during installation period and for remainder of construction period.

c. Quality control of surface treatment materials and surface treatment construction practices.

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 2

4. Require representatives of each entity directly concerned with application of surface treatments to attend, including the following:

a. Contractor’s superintendent.

b. Surface treatment Subcontractor.

1.4 ACTION SUBMITTALS

Product Data: Include technical data and tested physical and performance properties.

1. Joint sealant.

2. Joint filler.

Grass seed mix.

The following seed mix shall be sown at the rate recommended by the manufacturer:

25% Kentucky Bluegrass 98/85 25% Creeping Red Fescue 20% Chatham Perennial Ryegrass 15% Pearl Perennial Ryegrass 10% Gettysburg Perennial Ryegrass

1.5 INFORMATIONAL SUBMITTALS

Qualification Data: For paving-mix manufacturer.

Material Certificates: Include statement that mixes containing recycled materials will perform equal to mixes produced from all new materials.

1. Aggregates.

2. Asphalt binder.

3. Cutback prime coat.

4. Emulsified asphalt prime coat.

5. Tack coat.

1.6 SUBMITTAL COORDINATION

Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

1.7 QUALITY ASSURANCE

Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by authorities having jurisdiction or the DOT of state in which Project is located.

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 3

1.8 FIELD CONDITIONS

Traffic Control: Install chain-link fence/gate on the north and south end of project location to deter visitor traffic from entering trail work site.

Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:

1. Prime Coat: Minimum surface temperature of 60 deg F.

2. Tack Coat: Minimum surface temperature of 60 deg F.

3. Asphalt Base Course and Binder Course: Minimum surface temperature of 40 deg F and rising at time of placement.

4. Asphalt Surface Course: Minimum surface temperature of 60 deg F at time of placement.

PART 2 - PRODUCTS

2.1 AGGREGATES

General: Use materials and gradations that have performed satisfactorily in previous installations.

Coarse Aggregate: ASTM D692/D692M, sound; angular crushed stone, crushed gravel, or cured, crushed blast-furnace slag.

Fine Aggregate: ASTM D1073 or AASHTO M 29, sharp-edged natural sand or sand prepared from stone, gravel, cured blast-furnace slag, or combinations thereof.

1. For hot-mix asphalt, limit natural sand to a maximum of 10 percent by weight of the total aggregate mass.

Mineral Filler: ASTM D242 or AASHTO M 17, rock or slag dust, hydraulic cement, or other inert material, if recommended by applicable state highway department standards.

Chip Seal

2. Limestone, expanded shale, granite, or quartzite with a soundness loss of no more than 7% by mass at the end of 5 cycles using sodium sulfate solution.

3. Aggregate gradation: ODOT 703.10, No. 9 Limestone

2.2 ASPHALT MATERIALS

Asphalt Binder: ASTM D6373 or AASHTO M 320 binder designation [PG 64-22] [PG 70-22].

Emulsified Asphalt Prime Coat: ASTM D977 or AASHTO M 140 emulsified asphalt, or ASTM D2397/D2397M or AASHTO M 208 cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.

Tack Coat: ASTM D2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 4

2.3 MIXES

Hot-Mix Asphalt: Dense-graded, hot-laid, hot-mix asphalt plant mixes approved by authorities having jurisdiction and complying with the following requirements:

1. Provide mixes with a history of satisfactory performance in geographical area where Project is located.

2. Base Course:304 Aggregate base.

3. Binder Course: 448 Asphalt Type II Medium

4. Surface Course :Chip and Seal with ODOT 703.10 Limestone #9 screenings.

2.4 SEED

Grass seed: Fresh, clean, dry, new-crop seed complying with AOSA’s “Rules for Testing Seeds” for purity and germination tolerances.

Seed Species:

1.

The following seed mix shall be sown at the rate recommended by the manufacturer:

25% Kentucky Bluegrass 98/85 25% Creeping Red Fescue 20% Chatham Perennial Ryegrass 15% Pearl Perennial Ryegrass 10% Gettysburg Perennial Ryegrass

PART 3 - EXECUTION

3.1 SITE CLEARING

Remove slabs, paving, curbs, gutters, and walks as indicated.

1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.

Remove sod and grass before stripping topsoil. Contractor to identify and determine depth of existing topsoil. Strip topsoil in a manner to prevent intermingling with underlying subsoil or other waste materials.

2. Stockpile topsoil away from edge of excavations without intermixing with subsoil or other materials. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.

3. Dispose of surplus topsoil. Surplus topsoil is that which exceeds quantity indicated to be stockpiled or reused.

Remove surplus soil material, demolished materials, and waste materials including trash and debris, and legally dispose of them off Government’s property.

3.2 EXAMINATION

Verify that subgrade is dry and in suitable condition to begin paving.

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 5

Proceed with paving only after unsatisfactory conditions have been corrected.

3.3 PREPARATION

Protection: Provide protective materials, procedures, and worker training to prevent asphalt materials from spilling, coating, or building up on curbs, driveway aprons, manholes, and other surfaces adjacent to the Work.

Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph.

2. Proof-roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.

3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by COR, and replace with compacted backfill or fill as directed.

Proceed with installation only after unsatisfactory conditions have been corrected.

3.4 COLD MILLING

Clean existing pavement surface of loose and deleterious material immediately before cold milling. Remove existing asphalt pavement by cold milling to grades and cross sections indicated.

1. Mill to a depth of 2.75 inches.

2. Mill to a uniform finished surface free of excessive gouges, grooves, and ridges.

3. Control rate of milling to prevent tearing of existing asphalt course.

4. Repair or replace curbs, driveway aprons, manholes, and other construction damaged during cold milling.

5. Excavate and trim unbound-aggregate base course, if encountered, and keep material separate from milled hot-mix asphalt.

6. Patch surface depressions deeper than 1 inch after milling, before wearing course is laid.

7. Keep milled pavement surface free of loose material and dust.

8. Do not allow milled materials to accumulate on-site.

3.5 SURFACE PREPARATION

Ensure that prepared subgrade has been proof-rolled and is ready to receive paving.

Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces.

Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq. yd.

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

Div. 32 V. 2021-10-18 ASPHALT PAVING 321216 Page | 6

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces.

3.6 HOT-MIX ASPHALT PLACEMENT

Machine place…