This is a Project Manual and Bid Document for the City of Mont Belvieu, Texas (Contract No. FC-072) for the construction of a new Solid Waste Management Complex. The project encompasses site development, utility improvements, paving, drainage, fencing, security gates, and associated infrastructure, including a new administration building (1,500 SF), a storage and wash building (2,000 SF), heavy-duty concrete pavement for vehicle circulation and equipment storage, parking areas, sidewalks, site lighting, security fencing, automated access gates, utility extensions, and stormwater management improvements. Additional work includes a fueling station canopy (26'x50'), a large asset vehicle canopy (200'x50'), bollards, traffic control features, pavement markings, signage, ADA-compliant accessibility improvements, and erosion control measures. The bid package includes approximately 70 line items covering mobilization, site work, SWPPP compliance, parking and paving, storm drainage, utilities, fencing, masonry walls, gates, and specialized structures. A non-mandatory pre-bid conference was held on July 2, 2026, at 2:00 PM. Sealed bids were due by 2:00 PM on Thursday, July 9, 2026, at City Hall, 1 Town Center Boulevard, Mont Belvieu, Texas 77580, with public opening and reading immediately thereafter. The successful bidder must achieve Substantial Completion within 360 calendar days and Final Completion within 390 calendar days from the Notice to Proceed.
The contract is awarded based on a best-value competitive bidding method using five scoring criteria: Bid Price (50 points), contractor's previous work within Mont Belvieu (15 points), superintendent's history on similar projects (10 points), past project references (15 points), and contractor's office location (10 points). Bid security of 5% of the total bid amount is required in the form of a certified check, cashier's check, or bid bond. Performance and Payment Bonds of 100% of the contract price are required from an acceptable surety with a rating of at least B from Best's Key Rating Guide. The City reserves the right to adjust quantities on this unit price contract; actual payment will be based on field-measured quantities completed. Liquidated damages are assessed at $1,000 per day for each day exceeding the contract completion times. Progress payments are made monthly at 95% of completed work with 5% retainage; retainage is released upon final completion and acceptance. The Owner is exempt from state sales and use taxes. All unit prices submitted by the successful bidder shall govern throughout the project duration regardless of material, labor, or equipment cost fluctuations, with no negotiation or price adjustments permitted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Mont Belvieu
CONTRACT NO. FC - 072 JOB NO. FC - 072
PROJECT MANUAL AND BID
FOR
SOLID WASTE MANAGEMENT COMPLEX
NOTICE TO BIDDER: ALL BIDS ARE TO BE SUBMITTED TO THE CITY OF MONT BELVIEU, 1 Town
Center Blvd., MONT BELVIEU, TEXAS, BY 2:00 P.M. ON THURSDAY, JULY 9TH, 2026.
BIDDER IS REQUIRED TO FILL IN ALL INFORMATION BELOW:
BIDDER (Company Name): _______________________________________________________
TOTAL AMOUNT OF BASE BID (Project Total): _______________________________________
Date Signed: JULY 6TH, 2026
CITY OF MONT BELVIEU
CHAMBERS COUNTY, TEXAS
PROJECT MANUAL
FC - 072
Joey McWilliams
MAYOR
Mike Pomykal
CITY COUNCIL POSITION 1/ MAYOR PRO-TEM
Mickey Bertrand
CITY COUNCIL POSITION 2
Arnold Peters
CITY COUNCIL POSITION 3
Tim Duree, Mayor Pro Tem
CITY COUNCIL POSITION 4
Don Price
CITY COUNCIL POSITION 5
Jabo Leonard
CITY COUNCIL POSITION 6
Brian Winningham
CITY MANAGER
Francisco Carrillo, PE, CFM
ENGINEERING DIRECTOR/CITY ENGINEER
Bill Thompson, CFM, CPWP-M
DIRECTOR OF PUBLIC WORKS
JUNE 2026
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
Plan Set Index
Notice to Bidders
Instructions to Bidders
Non-Collusion Affidavit
Subcontractors and Major Suppliers Form
Statement of Qualifications
Bid Form
Scoring Criteria
Bid Bond
Anti-Collusion and No Conflict of Interest
Notice of Award
Stipulated Price Agreement
Notice to Proceed
Bond Company Information
Performance Bond
Payment Bond
Certificate of Substantial Completion
General Conditions
Supplementary Conditions
HB-89 Verification Form
Texas Form 1295 – Certificate of Interested Parties
Plan Set Index
SHEET DRAWING NAME
SITE:
L100 COVER SHEET
L101 GENERAL NOTES
L102 OVERALL SITE PLAN
L201 LAYOUT / DIMENSION CONTROL PLAN
L202 LAYOUT / DIMENSION CONTROL PLAN
L301 ENLARGEMENT PLAN
L302 ENLARGEMENT PLANS
L401 PAVING / HARDSCAPE DETAILS
L402 PAVING / HARDSCAPE DETAILS
L403 PAVING / HARDSCAPE DETAILS
L404 NORTH GATE DETAILS
L405 SOUTH GATE DETAILS
L501 OVERALL PAVING PLAN
C101 GRADING & DRAINAGE (SHEET 1 OF 6)
C102 GRADING & DRAINAGE (SHEET 2 0F 6)
C103 GRADING & DRAINAGE (SHEET 3 OF 6)
C104 GRADING & DRAINAGE (SHEET 4 OF 6)
C105 GRADING & DRAINAGE (SHEET 5 OF 6)
C106 GRADING & DRAINAGE (SHEET 6 OF 6)
C107 EXISTING DRAINAGE AREA MAP
C108 EXISTING DRAINAGE CALCULATIONS
C109 PROPOSED DRAINAGE AREA MAP
C110 PROPOSED DRAINAGE CALCULATIONS
C111 DETENTION POND EXPANSION PLAN AND DETAILS
C112 UTILITY PLAN
C113 8" SANITARY SEWER PLAN & PROFILE
C114 PROPOSED MEDIAN CROSSING/TURN LANE
C115 HYDRAULIC CALCULATIONS
C116 PAVEMENT STANDARDS
C117 SANITARY SEWER STANDARDS
C118 SANITARY SEWER STANDARDS
C119 SANITARY SEWER STANDARDS
C120 STORM SEWER STANDARDS
C121 STORM SEWER STANDARDS
C122 TRAFFIC CONTROL PLAN STANDARDS
E0 SPECIFICATIONS
E1 ELECTRICAL SITE PLAN
P1 PLUMBING OVERALL FLOOR PLAN
P2 PLUMBING SCHEDULE, NOTES, & DETAILS
MAIN BUILDING:
G002 GENERAL NOTES AND LEGENDS
G002.1 ABBREVIATIONS
G003.A PROJECT INFORMATION AND CODE ANALYSIS
G004 LIFE SAFETY PLAN
G101 ACCESSIBILITY GUIDELINES
G102 ACCESSIBILITY GUIDELINES
G103 ACCESSIBILITY GUIDELINES
A101 OVERALL FLOOR PLAN - MAIN BUILDING
A101.1 OVERALL RCP
A103 ROOF PLAN
A301 EXTERIOR ELEVATIONS
A302 EXTERIOR ELEVATIONS
A401 BUILDING SECTIONS
A411 WALL SECTIONS
A421 WALL SECTION DETAILS
A501 ENLARGED RESTROOM PLANS
A502 ENLARGED BREAKROOM PLANS
A701 ENLARGED PLAN DETAILS
A751 DOOR AND WINDOW DETAILS
A801 DOOR SCHEDULE & DOOR TYPE LEGEND
A811 WALL PARTITION SCHEDULE
A900 RENDERING
S0-0 COVER SHEET (STRUCTURAL)
S0-1 GENERAL NOTES
S0-2 INSPECTIONS
S1-1 FOUNDATION PLANS
SD1-1 FOUNDATION DETAILS
M101 HVAC FLOOR PLAN
M201 HVAC NOTES & SCHEDULES
M202 HVAC DETAILS
M203 HVAC COMCHECK
M204 HVAC COMCHECK
E100 SPECIFICATIONS
E101 OVERALL FLOOR PLAN - MAIN BUILDING - LIGHTING
E102 OVERALL FLOOR PLAN - MAIN BUILDING - POWER
E103 COMCHECK REPORT
P101 PLUMBING SANITARY FLOOR PLAN - MAIN BUILDING
P102 PLUMBING WATER FLOOR PLAN - MAIN BUILDING
P201 PLUMBING SCHEDULE, NOTES & DETAILS - MAIN BUILDING
WASH BUILDING:
G002 GENERAL NOTES AND LEGENDS
G002.1 ABBREVIATIONS
G003.A PROJECT INFORMATION AND CODE ANALYSIS
G004 LIFE SAFETY PLAN
G101 ACCESSIBILITY GUIDELINES
G102 ACCESSIBILITY GUIDELINES
G103 ACCESSIBILITY GUIDELINES
A101 OVERALL FLOOR PLAN - WASH BUILDING
A101.1 OVERALL RCP
A103 ROOF PLAN
A301 EXTERIOR ELEVATIONS
A302 EXTERIOR ELEVATIONS
A401 BUILDING SECTIONS
A411 WALL SECTIONS
A421 WALL SECTION DETAILS
A501 ENLARGED RESTROOM PLANS & INTERIOR ELEVATIONS
A801 DOOR SCHEDULE & DOOR TYPE LEGEND
A811 WALL PARTITION SCHEDULE
S0-0 COVER SHEET (STRUCTURAL)
S0-1 GENERAL NOTES
S0-2 INSPECTIONS
S1-1 FOUNDATION PLANS
SD1-1 FOUNDATION DETAILS
M101 HVAC FLOOR PLAN
M201 HVAC NOTES & SCHEDULES
M202 HVAC DETAILS
M203 HVAC COMCHECK
M204 HVAC COMCHECK
E100 SPECIFICATIONS
E101 OVERALL FLOOR PLAN - WASH BUILDING - POWER
E102 OVERALL FLOOR PLAN - MAIN BUILDING - LIGHTING
E103 COMCHECK REPORT
P101 PLUMBING FLOOR PLAN - WASH BUILDING
P102 PLUMBING COMPRESSED AIR FLOOR PLAN - WASH BUILDING
P201 PLUMBING RISERS
P301 PLUMBING SCHEDULE, NOTES & DETAILS
NOTICE TO BIDDERS
Sealed proposals addressed to the City of Mont Belvieu will be received at the Mont Belvieu City Hall, 1
Town Center, Mont Belvieu, Texas 77580, attention Allison Dunning, City Secretary: for furnishing all necessary materials, equipment, superintendence, and labor for the construction of the Solid Waste
Management Complex, until 2:00 PM on Thursday, JULY 9th, 2026. Bids will, immediately thereafter, be publicly opened and read aloud in the City of Mont Belvieu City Council Chambers, 1 Town Center
Blvd., Mont Belvieu, Tx. Any bids received after closing time will be returned unopened.
The project consists of the construction of a new Solid Waste Management Complex for the City of Mont
Belvieu, including site development, utility improvements, paving, drainage, fencing, security gates, and associated site infrastructure. Major project components include construction of a new administration building, a storage and wash building, heavy-duty concrete pavement for vehicle circulation and equipment storage, parking areas, sidewalks, site lighting, security fencing and automated access gates, utility extensions, and stormwater management improvements.
Additional work includes construction of a fueling station area with canopy and associated site improvements, installation of bollards and traffic control features, pavement markings and signage, ADA-compliant accessibility improvements, erosion control measures, grading, and restoration of all disturbed areas.
Each proposal shall be accompanied by a bid guarantee of not less than 5% of total bid amount, as a guarantee that the bidder will enter into a contract and execute the required bonds within ten days after notice of award. At the option of the bidder, the guarantee may be one of the following:
a. Cashier's check or certified check upon a national or state bank, payable to the City of Mont
Belvieu.
b. Negotiable U.S. Government bonds (at par value).
c. Bid bond from a surety company listed in the latest issue of U.S. Treasury Circular 570, such bid bond being within the maximum amount specified for such company in that publication.
Bids without such guarantee will not be considered.
Any questions and communication related to this project shall be directed to the following City contact:
Judah Neu
Project Manager, City of Mont Belvieu jneu@montbelvieu.net
This shall be the bidder’s sole point of contact in all matters related to the project. Any attempt by bidder to obtain information related to the project by any other means shall be considered bidder misconduct and is basis for bidder disqualification.
Award of this contract will be based on the best-value competitive bidding method. The City may use the following criteria to evaluate each bid: bid price, bidder’s experience and reputation, bidder’s references’ feedback, quality of the bidder’s services, bidder’s safety record, bidder’s proposed personnel, and any other relevant factors specific to the project. The right is reserved as the interest of the Owner may require, to reject any or all bids, and to waive any informality in bids received. The Contract will be awarded based on the Scoring Criteria contained in Document 00202. A copy of the specific Scoring Criteria for this project is included in the bidding documents. The successful bidder must furnish Performance Bond and Payment
Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner. Owner reserves the right to award the contract at any time within sixty (60) days after bid opening.
A Non-Mandatory Pre-Bid Conference will be held to review the scope of work. The Pre-Bid Conference will be held on Thursday, July 2nd, at 2:00 PM at City Hall, 1 Town Center Blvd., Mont Belvieu, Texas.
Attendance by each prospective bidder or its representative at the pre-bid conference is NOT
MANDITORY.
Equal Opportunity in Employment – all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60.
The Contract Documents, Specifications, and Plans may be examined at the following locations:
A Complete set of the bidding documents are on file at www.civcastusa.com. There is no cost to view the plans, and printing can be done through the website. Sets of hard copies of Bidding Documents will not be sold. Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
First Publication: June 25, 2026 Second Publication: July 2, 2026
EJCDC C-200 Suggested Instructions to Bidders for Construction Contracts Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
00200 – i
TABLE OF CONTENTS
ARTICLE 1 - DEFINED TERMS
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
ARTICLE 5 - PRE-BID CONFERENCE
ARTICLE 6 - SITE AND OTHER AREAS
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
ARTICLE 8 - BID SECURITY
ARTICLE 9 - CONTRACT TIMES
ARTICLE 10 - LIQUIDATED DAMAGES
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 13 - PREPARATION OF BID
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
ARTICLE 15 - SUBMITTAL OF BID
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
ARTICLE 17 - OPENING OF BIDS
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
ARTICLE 21 - SIGNING OF AGREEMENT
ARTICLE 22 - SALES AND USE TAXES
ARTICLE 23 - RETAINAGE
ARTICLE 24 – PROJECT MANAGEMENT SOFTWARE
ARTICLE 25 – TEXAS ETHICS COMMISSION FORM 1295
00200 – ii
INSTRUCTIONS TO BIDDERS
TABLE OF ARTICLES (Alphabetical by Subject)
Subject Article
Award of Contract
Basis of Bid; Comparison of Bids
Bid Security
Bids to Remain Subject to Acceptance
Contract Security and Insurance
Contract Times
Copies of Bidding Documents
Defined Terms
Examination of Bidding Documents, Other Related Data, and Site
Interpretations and Addenda
Liquidated Damages
Modification and Withdrawal of Bid
Opening of Bids
Pre-Bid Conference
Preparation of Bid
Qualifications of Bidders
Retainage
Sales and Use Taxes
Signing of Agreement
Site and Other Areas
Subcontractors, Suppliers and Others
Submittal of Bid
Substitute or “Or-Equal” Items
00200 – 1
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and
Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered: 1 Town Center Bvd., Mont Belvieu, Texas77580. B. Additional Items –
Various additional items that may be used during this contract.
C. Engineer – The word “Engineer” shall be understood as referring to the City of Mont Belvieu Engineering, Engineer of the Owner, or such other Engineer, as may be authorized by said Owner to act in any particular position.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete set of the bidding documents are on file at www.civcastusa.com. There is no cost to view the plans, and printing can be done through the website. Sets of hard copies of Bidding Documents will not be sold.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 Each proposal must be accompanied by a statement of the qualification of the bidder to properly execute the work shown in the plan set.
3.02 Each proposal must be accompanied by a statement of the financial condition of the bidder as reflected by his most recently prepared statement. Submit in a sealed envelope marked, "Financial Statement of (name of bidder) for FC-027-04 CITY HALL SITE WORK, City of Mont Belvieu. This statement will be examined only if the bidder's proposal is actively considered for award.
3.03 The bidder shall submit with his bid the name, address, and telephone number of a person, firm, or corporation who has agreed to execute the required payment and performance bonds in the event that this contract is awarded to the bidder. A form is included in these contract documents for that purpose.
Such surety company shall be authorized to operate in Texas, shall have all necessary authorization and resources required to issue payment and performance bonds required for the amount of the contract, and shall have a rating of at least B from Best's Key Rating Guide.
3.04 Each bidder submitting a bid for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto, an affidavit substantially in the form provided in the Contract
Documents, to the effect that he has not entered into a collusive agreement with any other person, firm, or corporation in regard to any Bid submitted. Before executing any subcontract, the successful Bidder shall submit the name of any proposed subcontractor for prior approval along with an affidavit substantially in the form provided in the Contract Documents.
http://www.civcastusa.com/
00200 – 2
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 Subsurface and Physical Conditions
A.The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site
(except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any Bidder on request.
Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions has been identified and established in Paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
4.02 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding
Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General
Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any
Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.03 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.04 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.05 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any
Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C.become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
E. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
00200 – 3
F. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
G. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the
Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the
Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the
Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by
Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A Non-Mandatory Pre-Bid conference will be held at 2:00 P.M. local time on July 2nd, 2026 at 1 Town Center
Blvd., Mont Belvieu. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are recommended to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.
Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by
Addenda and emailed via Civcast to all parties recorded by Engineer as having received the Bidding Documents.
Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or
Engineer.
00200 – 4
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price and in the form of a certified check or bank money order or a Bid bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding
Documents, or those substitutes or “or-equal” materials and equipment approved by Engineer and identified by
Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or-equal” item. No item of material or equipment will be considered by Engineer as a substitute or “or-equal” unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph 6.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the
00200 – 5 apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to
Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute,
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom
Contractor has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
13.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each bid item and additional item listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.
13.06 A Bid by an individual shall show the Bidder’s name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown below the signature.
13.08 All names shall be typed or printed in ink below the signatures.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid shall be shown.
00200 – 6
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the
Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
13.12 Name of bidder and total bid price must be on cover sheet of bid documents.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B.The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph
11.03 of the General Conditions.
C.Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General Conditions.
ARTICLE 15 - SUBMITTAL OF BID
15.01 The Bid Package is to be completed and submitted with the following data:
A. Signed Bid Proposal with Addenda Acknowledgements
B. Bid Bond
C. Bid Opening Sheet
D. One Year Maintenance Bond
E. Qualification Statement
F. Financial Statement
G. Bonding Company Information
H. Non-collusion affidavit for Prime Contractor
IF ANY OF THE ABOVE ITEMS ARE NOT SUBMITTED WITH THE BID, THE BID WILL BE CONSIDERED
NON-RESPONSIVE AND WILL NOT BE READ.
15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the
Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of
Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to City of Mont Belvieu, P.O. Box
1048, Mont Belvieu, TX 77580, Attention: City Secretary. Physical address is 1 Town Center Blvd..
00200 – 7
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of
Bids.
16.02 If within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
00200 – 8
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed
Agreement to Owner, it shall be accompanied by such bonds.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-6.10 of the Supplementary Conditions for additional information.
ARTICLE 23 - RETAINAGE
23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24 – PROJECT MANAGEMENT SOFTWARE
24.01 The City of Mont Belvieu uses an internet-based software called ManageIT to maintain consistent administrative and technical control for its projects throughout the City. The Contractor must have access to a computer and will be required to use ManageIT on this project in accordance with procedures provided (the User's Guide and Quick
Reference Guide in Construct-It under Help link) by the City. ManageIT stores electronic project correspondence and related project documents such as RFI's (requests for information) and submittals. ManageIT provides the ability to
00200 – 9 view contract bid items/pay estimate status, submittal status, RFI status, and change order history, etc. At no cost to the Contractor, the City will provide system login account(s) and provide training for Contractor personnel. The
Contractor must update ManageIT with any new or changed information within 24 hours of that information becoming known to Contractor.
ARTICLE 25 – TEXAS ETHICS COMMISSION FORM 1295
Effective January 1, 2016, pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”), the City may not award the contract to a bidder unless the bidder has provided to the City a completed, signed and notarized TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission
(the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the
TEC’s website (https://www.ethics.state.tx.us/tec/1295-Info.htm), assigned a certificate number, printed, signed and notarized, and provided to the City. The TEC Form 1295 may accompany the bid or may be submitted separately but must be provided to the City prior to the award of the contract. For purposes of completing the TEC Form 1295, the entity’s name is City of Mont Belvieu; the contract ID number is FC-027-04; and the description of goods and services is City Hall Site Work. Neither the City nor its consultants have the ability to verify the information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295.
NOTE: BIDS NOT ACCOMPANIED BY THIS AFFIDAVIT WILL NOT
BE CONSIDERED.
NON-COLLUSION
AFFIDAVIT
STATE OF TEXAS}
COUNTY OF CHAMBERS}
BEFORE ME, the undersigned authority, on this day personally appeared
, known to me to be the person whose name is subscribed to the following, who upon oath, says:
I am the Manager, Secretary or other agent or officer or Principal of the Bidder in the matter of the bids to which this affidavit is attached, and I have full knowledge of the relations of the Bidder with the other firms in this same line of business, and the Bidder is not a member of any trust, pool or combination to control the price of supplies bid on, or to influence any person to bid or not to bid thereon.
I further affirm that the Bidder has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the submitted bid.
Affiant
SWORN TO AND SUBSCRIBED BEFORE ME by the above Affiant, who on oath states that the facts contained in the above are true and correct, this _____________Day of ___________________, 2026.
Notary Public in and for
County, Texas
Name of Bidder
Signed by
(Sign Name in Writing) (Title)
Address
(Zip Code)
Telephone Number: Date:
The City of Mont Belvieu does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability in employment or in the provision of services.
SUBCONTRACTORS AND MAJOR SUPPLIERS FORM
Subcontractors and type of work to be performed:
Local subcontractors (Principal business location in Chambers County):
Major Suppliers:
Suppliers (Principal business location in Chambers County):
QUALIFICATION STATEMENT
Submitted to:_____________________________________________________________(Corporation)
By:___________________________________________________________________(Co-partnership)
(An Individual)
Principal Office:
The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers.
1. How many years has your organization been in business as a general contractor under your present business name?
2. How many years' experience in this type of construction work has your organization had...
(a) As a general contractor?
(b) As a sub-contractor?
3. What projects has your organization completed?
Contract Amount Class of Work Date Completed Name and Address of Owner
4. Have you ever failed to complete any work awarded to you?
If so, where and why?
5. In what manner have you inspected this proposed work?
6. Explain your plan or layout for performing the proposed work.
7. The work, if awarded to you, will have the personal supervision of whom?
(a) For administrative management
(b) For construction superintendence
8. What portions of the work do you intend to sub-let? State names and addresses of sub-contractors, and general portion to be performed by each in this project.
9. What equipment do you own that is available for the proposed work?
Quan. Item Description, Size, Capacity
Condition Present
Location
10. Have you received firm offers for all major items of equipment within prices used in preparing your proposal?
11. List the construction projects your organization has under way at this date.
Contract Amount Class of Work Percent Complete Name of Address of Owner or
Contracting Officer
Dated at _____________this day of _______________________________, 20 .
BIDDER: .
BY: .
ADDRESS: .
PHONE: .
Attest:
Secretary of Corporation
Bidder's Signature
(Seal) If Bidder is a Corporation
EJCDC C-410 Suggested Bid Form for Construction Contracts
BID FORM
CITY OF MONT BELVIEU
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
The City of Mont Belvieu 1 Town Center Blvd.
Mont Belvieu, Texas 77580
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding
Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all drawings of physical conditions which have been identified in SC-4.02
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground
Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding
Documents.
F. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
J. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.
ARTICLE 4 – FURTHER REPRESENTATIONS
4.01 Bidder further represents that:
A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Base Bid Items
No. Description Qty Unit Unit Price Unit Total
MOBILIZATION & CONTINGENCY
1 Mobilization cost, including payment bond, performance bond, insurance and moving equipment to project, all in strict accordance with plan and specifications; NOT TO
EXCEED 3% OF TOTAL PROJECT BID
1 LS $
2 Owner's Contingency 1 LS $100,000.00 $100,000.00
SITE WORK
3 Construction Survey 1 LS $
4 Construction Project Sign 1 LS $
5 Earthwork, including Roadway Excavation and Site Grading, Complete in Place
6 Detention Pond Excavation & Embankment, Complete in Place 2,000 CY $
7 Demolition and Disposal 1 LS $
8 Site Restoration (Landscape Grading, Hydroseeding) of Disturbed Areas
SWPPP
9 Reinforced Filter Fabric Barrier (Install), Complete in Place. 820 LF $ $
Reinforced Filter Fabric Barrier (Remove). 820 LF $ $
11 Stabilized Construction Exit, Including
Removal 1 EA $ $
12 SWPPP Compliance 1 LS $
PARKING & PAVING
13 Lime Stabilized Subgrade (8"), Complete in
Place 11,829 SY $ $
14 Lime Slurry for Subgrade Stabilization, Complete in Place 449 TON $ $
15 Concrete Pavement(JRCP) 9-inch, Complete in Place 686 SY $ $
16 Concrete Pavement(JRCP) 7-inch, Complete in Place 8,650 SY $ $
17 Concrete Pavement(JRCP) 6-inch, Complete in Place 950 SY $ $
18 Median Truck Apron, 6-inch, Complete in
Place 15 SY $ $
19 Concrete Pavement Walkway, 4-inch, Complete in Place 185 SY $ $
20 Pavers - Keystone Holland (60mm, 3"x9"), Including 4" Concrete Subslab with Sand
Cushion 364 SF $ $
21 6"x8" Concrete Ribbon Curb 14 LF $ $
22 Reinforced Concrete Curb, Complete in Place
2,020 LF $ $
23 Prefabricated Concrete Wheel Stops 9 EA $ $
24 Embedded 6-Inch Dia. Steel Bollard 12 EA $ $
25 Surface-Mounted 6-Inch Dia. Steel Bollard
51 EA $ $
26 Permanent Traffic Control Devices, including
Traffic Buttons, Street Signs, Traffic Signs, Pavement Striping, and Removal/Relocation of Existing Traffic Control Devices and
Striping, Complete in Place.
1 LS $ $
27 Accessible Parking Sign (Custom) 1 EA $ $
28 ADA Ramp(s), Complete in Place 3 EA $ $
SITE STORM DRAINAGE
29 High Performance Polypropylene (HP) Storm
Sewer Pipe (12"), Complete in Place
73 LF $
30 High Performance Polypropylene (HP) Storm
Sewer Pipe (18"), Complete in Place
1,371 LF $
31 Inlet (Type A), Complete in Place 15 EA $
32 Inlet (Type C), Complete in Place 2 EA $
33 Catch Basin (Type A, CB-14), Complete in
Place 2 EA $
UTILITIES
34 Swift Drain 200 Series 8 Inch Wide Pre-
Sloped Heavy Duty Trench System, Complete in Place 1 LS $
35 4" PVC SDR 35 Sanitary Sewer Service by
Open Cut Construction, Complete in Place
28 LF $
36 6" PVC SDR 35 Sanitary Sewer Service by
20 LF $
37 4" Cleanout 2 EA $
38 6" Cleanout 1 EA $
39 1000 Gallon Concrete Holding Tank, Two-
Chambers, Traffic Rated, 6" In/Out, Bedding, Setting, Backfill, Comlete in Place.
2 EA $
40 750 Gallon Concrete Grease Interceptor, Traffic Rated, 6" In/Out, Bedding, Setting, Backfill, Comlete in Place.
1 EA $
41 8" PVC SDR 35 Sanitary Sewer Service by
464 LF $
42 Sanitary Sewer Manhole, Complete in Place
3 EA $
43 8" Core into Existing Sanitary Sewer Manhole
(Including Boot) 1 EA $
44 Sanitary Sewer 16" Steel Casing 8" PVC by
Trenchless 100 LF $
45 16"x6" Tap, Sleeve & Valve (TS&V), Complete in place 1 EA $
46 1" Water Meter, Complete in place 1 EA $
47 2" Water Meter, Complete in place 2 EA $
48 2" Backflow Preventor in Strong Box
Alum…