Reroofing and Related Work - Berlin-Peck Memorial Library
This is a Project Manual and Technical Specifications document prepared by JH Architects, LLC for the Town of Berlin, Connecticut, detailing comprehensive reroofing and related work at the Berlin-Peck Memorial Library located at 234 Kensington Road, Berlin, CT. The project (Bid No. 2026-13) encompasses the removal and disposal of all existing roofing materials, installation of new asphalt shingle roofing on designated areas, installation of single-ply EPDM membrane roofing on other sections, new metal flashing, gutters and downspouts, wood blocking and structural repairs, and miscellaneous carpentry and PVC fabrication work. The specifications detail materials including GAF Timberline Ultra HD shingles, Carlisle Syntec Systems EPDM membrane roofing, copper sheet metal work, and interior finishes including painting. Sealed bids are due by 2:00 PM on Thursday, April 2, 2026, and will be received by the Director of Facilities at Berlin Town Hall, 240 Kensington Road. Bid documents are available through Advanced Reprographics, LLC beginning March 10, 2026. The contractor must commence work within ten calendar days of contract signing and complete the project in accordance with the proposal timeline. Pre-bid site visits are encouraged by appointment with Doug Solek, Director of Facilities, by emailing dsolek@berlinct.gov.
Bid security of at least five percent of the bid amount is required in the form of a certified check or bid bond from a Connecticut-authorized surety company. The selected contractor must provide 100% performance and payment bonds. The project is subject to Connecticut state contract compliance requirements, including nondiscrimination statutes and mandatory spending allocation goals: a minimum of 25% of state-funded contract value must be awarded to DAS-certified Small Business Enterprises (SBEs), with 6.25% of that amount designated for Minority-, Women-, and/or Disabled-owned Businesses (M/W/DisBE). The contractor must demonstrate good faith efforts to meet these goals and comply with prevailing wage requirements as established by the Connecticut Department of Labor. All work must comply with CONN. GEN. STAT. Sections 4a-60, 4a-60g, and 46a-68b through 46a-68f, and the contractor must be prequalified by the Connecticut Department of Administrative Services (DAS). The Town of Berlin waives all building permit fees except for the State's Education Fee, and the contractor is responsible for obtaining all other necessary permits and licenses. Bids must remain valid for 60 days from opening, and no federal excise tax or Connecticut sales tax should be included, as public buildings are exempt.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual &
Technical Specifications
REROOFING &
RELATED WORK
BERLIN PECK
MEMORIAL LIBRARY
234 KENSINGTON ROAD
BERLIN, CT
Bid No.: 2026-13
JANUARY 22, 2026
15 MASSIRIO DRIVE SUITE 101
BERLIN, CONNECTICUT
TEL 860 828 9221 FAX 860 828-9223
bhume New Stamp
Project Manual &
Technical Specifications
REROOFING &
RELATED WORK
BERLIN-PECK
MEMORIAL LIBRARY
Bid No.: 2026-13
JANUARY 22, 2026
PREPARED BY:
ARCHITECT:
JH ARCHITECTS, LLC
15 MASSIRIO DRIVE
SUITE 101
BERLIN, CT 06037
TEL 860-828-9221
INDUSTRIAL HYGIENIST:
ENVIROMED SERVICES, INC
470 MURDOCK AVENUE
MERIDEN, CT 06450
TEL 203-238-4846
TABLE OF CONTENTS
REROOFING & RELATED WORK
BERLIN-PECK MEMORIAL LIBRARY
PROJECT MANUAL
Table of Contents List of Drawings Invitation to Bid
Bidding Documents:
AIA Document A701-2018 - Instructions to Bidders Supplementary Instructions to Bidders Bid Proposal
Contract Conditions and Forms:
AIA Document A105-2017 - Standard Short Form of Agreement Between Owner & Contractor Non-Discrimination – Contract Language AIA Document A201-2017 - General Conditions of the Contract for Construction CHRO – Good Faith Efforts Plan – Long Form, effective 10/1/2025 CHRO Bid Tabulation Worksheet CHRO Form 258a - Monthly Small Contractor and Minority Business Enterprise Payment Status
Report DECD Project Sign Requirements Connecticut Department of Labor - Prevailing Wage Rates
SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01 01 00 SPECIAL CONDITIONS
01 02 00 ALLOWANCES
01 02 02 UNIT PRICES
01 04 00 PROJECT COORDINATION
01 30 00 SUBMITTALS AND PRODUCT SUBSTITUTIONS
01 74 00 WARRANTIES AND BONDS
01 77 00 CLOSEOUT PROCEDURES
DIVISION 2 – SITEWORK
02 07 00 SELECTIVE DEMOLITION
ENVIROMED ASBESTOS ROOF INSPECTION REPORT DATED OCTOBER 30, 2024
INDEX
(CONTINUED)
DIVISION 6 - WOOD AND PLASTICS
06 10 50 MISCELLANEOUS CARPENTRY
06 60 00 PLASTIC FABRICATIONS
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 31 00 SHINGLE ROOFING AND RELATED WORK
07 55 00 MEMBRANE ROOFING, SHEET METAL AND RELATED WORK
DIVISION 9 - FINISHES
09 90 00 PAINTING AND COATING
END OF TABLE OF CONTENTS
LIST OF DRAWINGS
Drawing No. Drawing Title
Cover Sheet
R-1.1 Overall Roof Plan and Details R-1.2 Overall Reflected Ceiling Exterior Soffit Plan R-2.1 Details
INVITATION TO BID
Sealed bids addressed to the Town of Berlin for the Reroofing and Related Work, Berlin Peck Memorial Library, 234 Kensington Road, Berlin, CT, will be received by Mr. Doug Solek, Director of Facilities, Room 8, Berlin Town Hall, 240 Kensington Road, Berlin, CT, 06037, no later than 2:00 PM local time on Thursday, April 2, 2026, at which time they will be publicly opened and read aloud.
Complete bid documents can be viewed and ordered through Advanced Reprographics, LLC, 50 Corporate Avenue, Plainville, CT, 06062. For viewing: Visit www.advancedrepro.net, select “Planroom”; select “Public Jobs”. Documents will be available Tuesday, March 10, 2026. To obtain an electronic or paper set of bid documents: An electronic or paper set containing all contract documents may be purchased directly from Advanced Reprographics. This is a purchase and is not refundable.
As security, each Bid must be accompanied by a Certified Check or Cashiers Check drawn upon either a State Bank and Trust Company or a National Banking Association, to the order of the Town of Berlin, or the Bid must be accompanied by a Bid Bond having as surety thereto, such Surety Company or Companies as are authorized to do business in the State of Connecticut, of an amount not less than 5% of the Bid.
All bidders will need to comply with C.G.S. Sec. 4b-91. In such cases all bidders must be pre-qualified by the State of Connecticut Department of Administrative Services (DAS).
This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification as Small Business Enterprises (“SBE”) from the Connecticut Department of Administrative Services (“DAS”). A minimum spending allocation goal of 6.25% of the state-funded portion for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses (“M/W/DisBE”). The contractor must demonstrate good faith effort to meet the 25% spending allocation goals.
The contractor who is selected to perform this State project must comply with CONN. GEN. STAT.
§§ 4a-60, 4a-60g, and 46a-68b through 46a-68f.
http://www.advancedrepro.net/
State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN.
GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the spending allocation goals.
The successful Bidder shall furnish Performance, Labor and Material Payment Bonds, each for 100% of the Contract Sum.
Bidders shall not include Federal Excise or State of Connecticut Sales Tax to which Public Buildings are exempt. After opening of the Bids, no Bid can be withdrawn for a period of sixty
(60) days.
After review of all factors, terms and conditions, including price, the Town of Berlin reserves the right to reject any or all Bids, or any part thereof, or waive defects in same, or accept any proposal deemed to be in the best interest of the Town of Berlin.
The Town of Berlin does not discriminate on the basis of sex, race, physical disability, religion or national origin.
A Pre-Bid Conference will not be held. It is recommended that all Bidders visit the site at their convenience and become familiar with existing conditions prior to bidding.
An Affirmative Action / Equal Opportunity Employer. Minority / Women’s Business Entreprises are encouraged to apply. This contract is subject to set-aside and contract compliance requirements.
Doug Solek Director of Facilities Town of Berlin
Document A701
– 2018 Instructions to Bidders
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE
REQUIREMENTS ON PUBLIC
PROCUREMENT CONTRACTS.
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIFY
REQUIREMENTS APPLICABLE TO
THIS PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.
for the following Project:
(Name, location, and detailed description)
Reroofing and Related Work Berlin Town Hall 240 Kensington Road Berlin, CT
THE OWNER:
(Name, legal status, address, and other information)
Town of Berlin 240 Kensington Road Berlin, CT
THE ARCHITECT:
(Name, legal status, address, and other information)
Jacunski Humes Architects, LLC 15 Massirio Drive, Suite 101 Berlin, CT
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDER’S REPRESENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORMATION
7 PERFORMANCE BOND AND PAYMENT BOND
8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
ARTICLE 1 DEFINITIONS
§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.
§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.
§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.
§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.
§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.
ARTICLE 2 BIDDER’S REPRESENTATIONS
§ 2.1 By submitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;
.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and
.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.
ARTICLE 3 BIDDING DOCUMENTS
§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.
§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.
§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.
§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.
§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.
§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)
§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.
§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.
§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.
§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.
§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.
§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.
§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)
§ 3.4.2 Addenda will be available where Bidding Documents are on file.
§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.
§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.
§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.
§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form.
§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.
§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.
§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.
§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:
(Insert the form and amount of bid security.)
§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning days after the opening of Bids, withdraw its Bid and request the return of its bid security.
§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:
(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)
§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.
§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.
§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.
§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.
§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:
(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)
ARTICLE 5 CONSIDERATION OF BIDS
§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.
§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST-BID INFORMATION
§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.
§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.
§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:
.1 a designation of the Work to be performed with the Bidder’s own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and
.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.
§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.
ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND
§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.
(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)
§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.
§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.
§ 7.2.3 The bonds shall be dated on or after the date of the Contract.
§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.
ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.
.4 AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, dated as indicated below:
(Insert the date of the E203-2013.)
.5 Drawings
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:12:18 ET on 12/08/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1515270455)
Number Title Date
.6 Specifications
Section Title Date Pages
.7 Addenda:
Number Date Pages
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017.)
[ ] The Sustainability Plan:
Title Date Pages
[ ] Supplementary and other Conditions of the Contract:
Document Title Date Pages
.9 Other documents listed below:
(List here any additional documents that are intended to form part of the Proposed Contract Documents.)
BERLIN PECK MEMORIAL LIBRARY SUPP. INSTRUCTION TO BIDDERS
BERLIN, CT SITB-1
SUPPLEMENTARY INSTRUCTION TO BIDDERS
1.1 GENERAL CONDITIONS
AIA Document A701, “Instructions to Bidders,” 2018 Edition, American Institute of Architects, Articles 1 through 8, are bound herein and are hereby made a part of the Contract Documents and shall apply to all Contractors and Subcontractors.
1.2 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
a. Certain Articles of the AIA Instructions to Bidders are revised or replaced by requirements of the Supplementary Instructions, listed below. Such revisions are replacements and shall take precedence over the AIA Instructions to Bidders.
b. The Following Articles, revised paragraphs and clauses have the same numerical designations occurring in the AIA Instructions to Bidders, and all additions follow in direct numbered sequence.
ARTICLE 2 - BIDDER’S REPRESENTATIONS
Add the following as paragraph 2.1.4:
2.1.4.1 Arrangements made in advance to visit the site should be by contacting Mr. Doug Solek, Director of Facilities, Town of Berlin, email: dsolek@berlinct.gov for access to the property. Visitations may be made by appointment only with Mr. Solek. Each Bidder shall visit the site of the proposed work and fully acquaint themselves with conditions relating to construction and labor so that they may fully understand the facilities, difficulties and restrictions attending the execution of the work under this Contract.
Bidders shall thoroughly examine and be familiar with the drawings and the specifications. The failure or omission of any Bidder to receive or examine any form, instrument, Addendum or other documents or to visit the site and acquaint himself with conditions there existing, shall in no way relieve any Bidder from any obligation with respect to his Bid or the Contract.
ARTICLE 3 - BIDDING DOCUMENTS
3.1.2 Delete Paragraph 3.1.2.
Add the following Paragraph:
3.2.1.1 Any conflict existing between the Drawings and the Specifications and not brought to the attention of the Architect for clarification before bids are submitted shall be resolved on the basis of furnishing the greatest quantity and/or highest quality indicated, without cost to the Contract.
Add the following Paragraph:
BERLIN, CT SITB-2
3.2.4 A Pre-Bid Conference will not be held. It is recommended that all Bidders make arrangements to visit the site at their convenience to become familiar with existing conditions prior to bidding.
3.3.4.1 After the award of the Contract, no substitutions will be considered for the brands specified except upon written request of the Contractor and written approval by the Architect and Owner’s concurrence. Substitutions shall be submitted including the entire system and/or assembly attached thereto.
3.3.5.1 Approval by the Owner and the Architect of any such substitution shall not relieve the
Contractor requesting the substitution of any responsibility for additional costs incurred by other trades for changes made necessary to accommodate the substituted item.
ARTICLE 4 - BIDDING PROCEDURE
Delete Paragraph 4.2.2 and substitute the following:
Surety Bonds, if required, shall be written on forms similar in content to AIA Document A310 and executed by a company authorized to transact business within the State of Connecticut, and the attorney-in-fact who executes the Bond on behalf of the Surety shall affix to the Bond a certified and current copy of his power of attorney.
ARTICLE 5 - CONSIDERATION OF BIDS
5.3.3 Prior to the award of a Contract, bidders must present satisfactory evidence that they have been regularly engaged in the business of doing such work as they propose to execute and that they are prepared with the necessary supervisory staff, capital, materials and machinery to conduct and complete the work to be contracted for in accordance with the drawings and specifications and to begin it promptly when ordered. Such evidence shall show that the Contractor has experience in the renovation of occupied buildings.
5.3.4 A bid may be rejected if the bidder cannot show that he has the necessary capital and experience and owns, controls or can produce the necessary plant to commence the work at the time prescribed and thereafter to prosecute and complete the work at the rate or time specified; and that he is not already obligated for the other work which would delay the commencement, prosecution, or completion of this work. A bid may also be rejected if the bidder has previously failed to complete a contract within the time required or had previously performed a similar work in an unsatisfactory manner or does not have experience in the renovation of buildings that were occupied during the course of the work.
BERLIN, CT SITB-3
ARTICLE 7 - PERFORMANCE BOND AND PAYMENT BOND
Amend Paragraph 7.1.1 to read as follows:
Successful contract bidders will be required to furnish and pay for Surety in the full amount of the Contract. This Bond shall provide 100% security for faithful performance and for payment of all persons performing labor or furnishing materials in connection with this Contract and shall be executed by a company authorized to transact business within the State of Connecticut. Cost of such bonds shall be included in the Base Bid.
7.2.5 If required, Performance Bond and Payment Bond shall remain in force in full value throughout the course of the project. No reduction in bond value shall be acceptable.
Add the following Paragraph:
7.2.6 Bids submitted in duplicate by CONTRACTORS must be made only from a copy of the
BID FORM which accompanies these Specifications and shall be made on the bidder’s official letterhead.
ADDITIONAL SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
ADD ARTICLE 9 - TIME
9.1 The Contractor to whom this Contract may be awarded will be required to commence work on the Project within ten (10) days of Contract signing. The work shall be prosecuted diligently thereafter and shall be completed in accordance with the proposal.
END OF SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
PROPOSAL
Date _________________________________
To: Mr. Doug Solek Director of Facilities Town of Berlin
#11 Town Farm Lane Berlin, CT 06037
Pursuant to and in compliance with your “Invitation to Bid” relating thereto, the undersigned, (Name of Firm) having visited the site and carefully examined the Drawings, Contract Documents, and Project Manual and Technical Specifications dated January 22, 2026, together with all Addenda issued and received prior to the scheduled closing time for receipt of Bids as prepared by the Architect;
JH Architects, LLC, 15 Massirio Drive, Suite 101, Berlin, CT; hereby offers and agrees as follows:
To provide all labor, materials, equipment, appliances and whatsoever else necessary to construct and properly finish all work in connection with the, REROOFING AND RELATED WORK
234 KENSINGTON ROAD
Berlin, Connecticut, to the satisfaction of the Architect and the Owner for the Base Bid Lump Sum of:
-2-
UNIT PRICES
Should the amount of improvements required to be increased due to special considerations found at the site, or because of a request of the Owner, the undersigned agrees that the following supplemental UNIT PRICES will be the basic price in place for computing the EXTRA or CREDIT. Each UNIT PRICE shall include all equipment, tools, labor, permits, fees, etc., incidental to the installation and completion of the work involved:
1. Replacement of Plywood Roof Deck $ ___________________ per sq. ft.
2. Replacement of Wood Blocking $ ___________________ per bd. ft.
ALLOWANCES
1. Plywood Roof Deck: Included in this proposal is a total of 384 sq. ft. new wood deck furnished and installed to match existing. The actual amount of existing wood roof deck removed and replaced shall be adjusted in accordance with the UNIT PRICE for this work.
2. Wood Blocking: Included in this proposal is a total of 140 board feet of new roof wood blocking, to replace existing deteriorated wood blocking, furnished and installed to match existing. The actual amount of existing wood blocking removed and replaced shall be adjusted in accordance with the UNIT PRICE for this work.4
If awarded this Contract, we will execute an Agreement with the Town of Berlin, Owner of the property.
If awarded the Contract, the undersigned agrees that the work will commence forthwith and shall be substantially complete within _______ calendar days.
-3-
The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on this project. The Bid includes Addenda listed below and they are hereby acknowledged:
Addendum # ___ Dated ________________
Enclosed herewith, is the Bid Security in the form of:
Bid Bond ( ) Certified Check ( ) in the amount of: ($ )
COMPANY NAME: ________________________________________
ADDRESS: ________________________________________
BY: ________________________________________
(authorized signature, officer of bidder’s company)
(above name typewritten)
TITLE: ________________________________________
TELEPHONE: ________________________________________
E-MAIL: ________________________________________
Document A201
– 2017 General Conditions of the Contract for Construction
Init.
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:56:30 ET on 12/09/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA48)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary Conditions.
for the following PROJECT:
(Name and location or address) Reroofing and Related Work Berlin Peck Memorial Library 234 Kensington Road Berlin, CT
THE OWNER:
(Name, legal status and address) Town of Berlin 240 Kensington Road Berlin, Connecticut 06037
THE ARCHITECT/ENGINEER:
Jacunski Humes Architects, LLC 15 Massirio Drive Suite 101 (Paragraph Deleted)
Berlin, CT 06037
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ARCHITECT
5 SUBCONTRACTORS
6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 INSURANCE AND BONDS
12 UNCOVERING AND CORRECTION OF WORK
Init.
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:56:30 ET on 12/09/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA48)
13 MISCELLANEOUS PROVISIONS
14 TERMINATION OR SUSPENSION OF THE CONTRACT
15 CLAIMS AND DISPUTES
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:56:30 ET on 12/09/2024 under Order No.2114457289 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA48)
INDEX
(Topics and numbers in bold are Section headings.)
Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2 Addenda 1.1.1 Additional Costs, Claims for 3.7.4, 3.7.5, 10.3.2, 15.1.5 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10 Approvals 2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1 Arbitration 8.3.1, 15.3.2, 15.4
ARCHITECT
Architect, Definition of 4.1.1 Architect, Extent of Authority 2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2, 14.2.2, 14.2.4, 15.1.4, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.4, 9.6.4, 15.1.4, 15.2 Architect’s Additional Services and Expenses 2.5, 12.2.1, 13.4.2, 13.4.3, 14.2.4 Architect’s Administration of the Contract 3.1.3, 3.7.4, 15.2, 9.4.1, 9.5 Architect’s Approvals
2.5, 3.1.3, 3.5, 3.10.2, 4.2.7 Architect’s Authority to Reject Work 3.5, 4.2.6, 12.1.2, 12.2.1 Architect’s Copyright 1.1.7, 1.5 Architect’s Decisions 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.4.2, 15.2 Architect’s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.4 Architect’s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.4.2 Architect’s Interpretations 4.2.11, 4.2.12 Architect’s Project Representative 4.2.10 Architect’s Relationship with Contractor 1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.3.2, 13.4, 15.2 Architect’s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3 Architect’s Representations 9.4.2, 9.5.1, 9.10.1 Architect’s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Asbestos 10.3.1 Attorneys’ Fees 3.18.1, 9.6.8, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1 Binding Dispute Resolution 8.3.1, 9.7, 11.5, 13.1, 15.1.2, 15.1.3, 15.2.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.3.3, 15.4.1 Bonds, Lien 7.3.4.4, 9.6.8, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.4.4, 9.6.7, 9.10.3, 11.1.2, 11.1.3, 11.5 Building Information Models Use and Reliance 1.8 Building Permit 3.7.1 Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .