Project Manual - SOW -Inventory - HPS2027HVAC Unit Replacement Project.docx.pdf

PDF 333 KB Posted

Attached to
HVAC Units Replacement
Solicitation number
HPS2027HVAC
Issued by
Harris County, Houston City, Texas

About this file

This Project Manual and Scope of Work document outlines the HVAC Units Replacement project for Harmony Public Schools (HPS), involving North Texas (Dallas-Fort Worth Area) and Central Texas (Austin) districts. The project encompasses the replacement of approximately 50 HVAC units of varying capacities across multiple school campuses. The scope includes equipment procurement, demolition of existing units, installation of new HVAC systems, electrical modifications and repairs, curb adapter installation, and plumbing drain line work. Competitive sealed proposals must be received by 3:00 p.m. CST on January 7, 2027, submitted through HPS's e-bid system or by mail to HPS Central Office at 1255 Enclave Parkway, Houston, Texas 77077. All HVAC unit replacements must be completed by April 30, 2027, with customized or oversized units due by June 30, 2027. No formal site visit or bidders' conference is specified in the documentation. Inquiries should be directed to Hayati Ugur, Director of Facilities Management, at hugur@harmonytx.org.

The project requires contractors to conduct pre-installation assessments, verify unit sizing and electrical requirements, obtain necessary permits, and provide all lifting equipment, electrical upgrades, and curb adapters. Contractors must use like-for-like brand replacements; however, equivalent approved brands (Daikin, Trane, York, Carrier) may be substituted with owner approval if lead time issues arise. The scope includes removal and proper EPA-compliant refrigerant recovery, installation of new units with electrical connections and Building Automation System integration where applicable, testing and commissioning, and on-site training for maintenance staff. Contractors must provide a one-year minimum labor warranty and transfer full manufacturer equipment warranties to HPS. All equipment must meet DOE energy efficiency standards and comply with NEC, ASHRAE, EPA, OSHA, and TDLR requirements. The document specifies detailed cleanup procedures including debris removal, hazardous waste handling, and final inspection sign-off, with all materials to be hauled to approved off-site recycling or disposal facilities. No pricing terms, set-asides, incumbent information, or funding sources are detailed in this Scope of Work document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual - Scope of Work /

Inventory List

Harmony Public Schools

RSP# HPS2027HVAC Unit Replacement Project

HVAC Units Replacement

For

Alternate 1. North Texas (Dallas – Fort Worth Area) District

Alternate 2. Central Texas (Austin) District

ISSUED BY (Owner): SUBMIT INQUIRIES TO:

Harmony Public Schools (HPS) Name: Hayati Ugur 1255 Enclave Pkwy Title: Director of Facilities Management Houston, Texas 77077 Email: hugur@harmonytx.org mailto:hugur@harmonytx.org

North Texas & Central Texas Districts HPS2027HVAC Unit Replacement Project

Harmony Public Schools (HPS), dba North TX and Central TX districts open-enrollment charter schools, will be accepting competitive sealed proposals for around fifty (50) HVAC Units replacement in different capacities located in Dallas-Fort Worth Area and Austin, Texas. The project scope of work includes purchasing the equipment, demolition, installing new HVAC Units, electrical modifications and repairs, curb adapters, and plumbing drain lines work as specified in the project documents. (#HPS2027HVAC Units Replacement).

Bid proposals must be received by 3:00 p.m. CST on January 07, 2027, preferably through Harmony’s e-bid system or through mail delivery at HPS Central Office 1255 Enclave Pkwy Houston TX 77077 and will be closed at that date and time via video conference meeting.

Referring to the bid package, HPS reserves the right to reject any or all proposals or waive any or all irregularities. For further information, please contact hugur@harmonytx.org. Proposers may log in to view the bid package and submit their responses at:

https://www.harmonytx.org/about/purchasing

Thank you for considering this opportunity with Harmony Public Schools. We look forward to receiving your proposal and potentially working together to successfully execute this project.

mailto:bderin@harmonytx.org https://www.harmonytx.org/about/purchasing

Scope of work

Project Overview:

Harmony Public Schools (HPS) will replace multiple HVAC units of varying capacities that have reached end-of-life. The selected contractor must verify unit sizing, tonnage, voltage, electrical requirements, and obtain any pertinent permits prior to installation. Contractors are also responsible for providing all lifting equipment (e.g., cranes), curb adapters, electrical upgrades, and other components required for successful installation.

All HVAC unit replacements, excluding customized units, must be completed by April 30, 2027.

Note: Replacement of customized units, including oversized units, must be completed by June 30, 2027.

This Scope of Work establishes clear expectations to ensure the smooth, safe, and efficient replacement of rooftop units (RTUs) while minimizing risks and optimizing system performance.

Conduct site inspection and verify existing conditions.

1. Pre-Installation Assessment

● Conduct site inspections to verify existing conditions.

● Assess existing rooftop units (RTUs) and confirm end-of-life status, cross-checking with the list of units provided by the Owner for verification.

● Verify tonnage, voltage, phase, and current requirements for each replacement unit.

● Evaluate building load requirements to ensure proper unit sizing.

● Inspect and measure existing curb adapters for compatibility; design or procure new adapters if necessary.

2. Electrical & Code Compliance

● Verify electrical infrastructure compatibility with new units.

● Provide new disconnects, breakers, and wiring in compliance with NEC.

● Ensure all work complies with local codes, NEC, ASHRAE, EPA, OSHA, and TDLR requirements.

● Obtain all required permits prior to work.

3. Budgeting, Procurement & Planning

● Prepare a detailed project budget, including RTUs, curb adapters, electrical upgrades, and crane services.

● Procure units and related components from reputable suppliers.

● Use like-for-like brands for replacement units; however, if lead times create delays, equivalent approved brands (Daikin, Trane, York, Carrier, etc.) may be substituted with prior Owner approval.

● Provide new thermostats per unit and zone mapping where applicable.

● Replace condensate drain lines where needed.

● Integrate new units into the campus's Building Automation System (BAS) where needed..

● Establish safety barriers and protective measures for staff, students, and property.

● Coordinate all work with school administration to minimize disruption.

4. Scheduling

● All work must be coordinated with the HPS Facilities Department.

● Installation shall occur during non-instructional hours or school breaks, unless otherwise approved.

5. Removal of Existing Units

● Safely disconnect and remove existing RTUs, including:

○ Ductwork connections

○ Refrigerant lines

○ Electrical and control wiring

● Recover refrigerants in compliance with EPA regulations.

● Properly dispose of all old equipment per federal, state, and local environmental laws.

6. Installation of New Units

● Furnish and install new RTUs, split systems, or package units as specified.

● Complete all necessary modifications to ductwork, piping, insulation, condensate drains, and curbs/adapters.

● Install new electrical connections, breakers, and disconnects.

● Integrate systems into the existing BAS where applicable.

7. Testing & Commissioning

● Start-up and balance all new units.

● Test for proper operation, airflow, temperature control, and safety functions.

● Perform functional testing with BAS integration.

● Deliver the following documentation:

○ Refrigerant logs

○ Airflow test reports

○ Manufacturer startup sheets

8. Training & Documentation

● Provide on-site training for district maintenance staff on operation and routine maintenance.

● Supply O&M manuals, warranty documents, and as-built drawings.

9. Standards, Compliance & Warranty

● All equipment shall meet DOE energy efficiency standards and Harmony Public Schools procurement guidelines.

● Contractor shall provide:

○ 1-year minimum labor warranty

○ Full manufacturer equipment warranties transferred to HPS

● Establish a routine maintenance schedule to extend lifespan and ensure optimal performance.

10. Equipment Identification Stickers Each installed unit must include a durable, waterproof sticker with:

● Unit ID (matching project documentation and maps)

● RTU Number

● Model & Serial Number

● Installation Date

● Contractor logo

Stickers shall be applied upon installation for accurate tracking and maintenance.

11. Communication & Safety

● Maintain clear communication with all stakeholders throughout the project.

● Implement and enforce safety protocols to prevent accidents or injuries.

● Conduct regular safety inspections.

12. Exclusions

● Temporary cooling during installation is excluded from this Scope of Work.

Cleanup Procedure After HVAC Unit Replacement

1. Jobsite Safety Securing

● Remove all safety barriers, caution tape, and cones once work is completed.

● Verify that all rooftop and ground work areas are clear of debris and safe for staff/students to re-enter.

2. Debris & Equipment Removal

● Old HVAC Units:

○ Lower old rooftop units safely via crane to the ground.

○ Remove units from site and transport to an approved recycling or disposal facility.

● Packaging Materials:

○ Collect all shipping crates, pallets, and packaging from new units.

○ Sort recyclable materials (cardboard, metal, plastic) as required.

● Construction Debris:

○ Remove curb cutouts, scrap metal, wires, insulation, ductwork pieces, or piping segments.

○ Clean up all fasteners, screws, nails, and sharp objects from both roof and ground.

○ The contractor shall not use campus dumpsters for disposal or recycling. All debris, old equipment, and packaging materials must be hauled off-site to an approved recycling or disposal facility.

3. Refrigerant & Hazardous Waste Handling

● Ensure all refrigerant is properly recovered and documented per EPA Section 608 regulations.

● Collect and dispose of any used oils, filters, and sealants according to state/local environmental laws.

● Maintain disposal/recycling receipts for district records.

4. Roof Surface & Work Area Cleanup

● Sweep/clear the rooftop work area of dust, insulation fibers, and debris.

● Inspect the roof membrane for damage caused by equipment movement; repair as necessary.

● Remove any leftover tools, fasteners, or materials from the roof.

5. Ground-Level Work Area Cleanup

● Remove crane mats, temporary fencing, or barricades used during the lift.

● Ensure driveways, sidewalks, and lawns are restored to pre-construction condition.

● Power-wash or sweep surfaces if oil, dirt, or dust accumulated during work.

6. Final Inspection

● Conduct a walkthrough with the Facilities Department to confirm:

○ No debris remains on the roof or ground.

○ All equipment has been removed.

○ Work areas are safe and accessible.

● Obtain sign-off from HPS Facilities that cleanup meets district standards.

7. Documentation

● Provide disposal documentation (refrigerant logs, recycling manifests, landfill receipts).

● Submit cleanup checklist with close-out package.

Equipment Identification Stickers

Each unit will be provided with a durable, waterproof identification sticker to ensure proper tracking and maintenance. The sticker will include the following information:

• Unit ID (matching the project documentation and maps)

• RTU number

• Model and Serial Number

• Installation Date

• The Contractor logo for clear vendor identification A sample design of the sticker is provided below. The final stickers will be completed and applied once the equipment has been delivered and installed.

IMPORTANT NOTES

❖If the AC unit includes both the condenser and the air handler, both units must be replaced.

❖ During the unit installation, if the technician discovers that the existing unit is newer (no need to be replaced), please inform the owner, as we may use the brand new unit for replacing the oldest equivalent unit at that campus or at another HPS campus.

Locations - ALTERNATE 1

District Name: North TX DFW

North Texas East District AASOB : Mr. Bell, dbell@harmonytx.org

North Texas East District Facilities Manager: Mr. Hopovac, dhopovac@harmonytx.org

District Campus

Name Address

Unit

Brand Serial # Model MFG

Capacity

(T)

TYPE

North

Texas

East

District Office

12005 Forestgate Dr STE 10 Dallas TX 75243

10 York N1H6878983

ZF060H10A2A

1ABA1A1A

2011 5 Packaged

North

Texas

East

HSA

Dallas High

12005 Forestgate Dr Ste 100 Dallas TX 75243

8 Goodman 1003626205 CPG1202104B 2010 10 Packaged

North

Texas

East

HSA

Dallas High

12005 Forestgate Dr Ste 100 Dallas TX 75243

10 Goodman 1003626201 CPG1202104B 2010 10 Packaged

North

Texas

East

HSA

Dallas High

12005 Forestgate Dr Ste 100 Dallas TX 75243

11 Goodman 1007743563 CPG2404004B 2010 20 Packaged

North

Texas

East

HSA

Dallas High

12005 Forestgate Dr Ste 100 Dallas TX 75243

13 Carrier 3417P40792

48TCDD14A3A

6A 2017 12.5 Packaged

North

Texas

East

HSA

Dallas High

12005 Forestgate Dr Ste 100 Dallas TX 75243

15 Goodman 1003626260 CPG1202104B 2010 10 Packaged

North

Texas

East

HSA

Elem - Dallas

11945 Forestgate Dr Dallas TX 75243 12 Carrier 3017C52631

48TCDA07A2A

2017 6 Packaged

North

Texas

East

HSI

Carrollton

1024 W Rosemeade Pkwy, Carrollton, TX 75007

12 Goodman 110262008

CPG0902103B

X 2011 7.5 Packaged

North

Texas

HSI

Carrollton

1025 W Rosemeade Pkwy, Carrollton, TX

2 Carrier 3013G50150

48HCDD11D2

M5A0B0F0 2013 10 Packaged

East 75007

North

Texas

East

HSA

Carrollton

1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007

2 Carrier 2215C66498

48TCDA06A2

M6A0F0A0 2015 5 Packaged

North

Texas

East

HSA

Carrollton

1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007

11 Carrier 2215C66497

48TCDA06A2

M6A0F0A0 2015 5 Packaged

North

Texas

East

HSA

Carrollton

1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007

13 Carrier 2215C66500

48TCDA06A2

M6A0F0A0 2015 5 Packaged

North

Texas

East

HSI

Dallas

8080 W President George Bush Hwy, Dallas, TX 75252

6 Trane 121610878D

YCD151F4HAA

A 2012 12.5 Packaged

North

Texas

East

HSI

Dallas

8080 W President George Bush Hwy, Dallas, TX 75252

21 Trane 1218123774

YSC090E4RLA0

GE1D1A10000

00C 2012 7.5 Packaged

North

Texas

East

HSI

Dallas

8080 W President George Bush Hwy, Dallas, TX 75252

24 Trane 121610905D

YCD151F4HAA

A 2012 12.5 Packaged

The campus -Fire Monitoring Company Name: Impact Fire

North Texas West District AASOB : Ms Knapp, aknapp@harmonytx.org

North Texas West District Facilities Manager: Ms. Moore, lmooore@harmonytx.org

District

Name Address Unit # Brand Serial # Model MFG

Capacity

(T)

TYPE

North

Texas

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

CU 6

(north building) Trane

11335W2SYA

TTA120D4

00AA

10 Split

AHU 6

(north building)

12142UOWBA

TWE120D3

00AB

North

Texas

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

CU 9

(north building) Trane 11333W6MYA

TTA120D4

00AA

10 Split

AHU 9

(north building)

CARRIER CARRIER

TWE120D3

00AB

North

Texas

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

CU 10

(north building) Trane

1133358H8YA

TTA120D4

00AA

10 Split

AHU 10

(north building)

12142TTJBA

TWE120D3

00AB

North

Texas

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

CU 14

(north building) Trane

121865MYA

TTA120D4

00AA

2012 10 Split

AHU 14

(north building)

TWE120D

300AB

Texas

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

CU 19

(north building) Trane

121911268D

YCD151F4

HAAA

2012 12.5 Split

AHU 19

(north building)

HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

RTU 10

(south building) Carrier 1814P43117

48TCDD1

2A2A 2014 10 Packaged

North

Texas HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

RTU 14

(south building) Carrier 1814C76188

48TCDD1

2A2A 2014 10 Packaged

North

Texas HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

RTU 12

(south building) Carrier 48TCDA07A

1814C761

2014 6 Packaged

North

Texas HSI-Fort

Worth

8100 S. Hulen

St., Fort

Worth, TX

76123

RTU 16

(south building) Carrier 48TCDA05A

2414C637

2014 4 Packaged

North

Texas HSA-Eul ess

701 S.

Industrial Blvd., Ste.

115, Euless, TX 76040

RTU 2 York N1D0812206

ZR090E24

P4AAA4B

2010 7.5 Packaged

North

Texas HSA-Eul ess

701 S.

Industrial Blvd., Ste.

115, Euless, TX 76040

RTU 6 York N1D0812207

ZR120E36

P4AAA4B

2010 10 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 15 Carrier 1712G40202

48TCDD1

2A2A6A0

A0A0 2012 10 Packaged

HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 17 Carrier 0412G50223

48TCDD1

2A 2012 10 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 20 Carrier 0412G50224

48TCDD1

2A 2012 10 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 25 Carrier 2313G10149

48TCDD1

2B2M 2013 10 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 26 Carrier 2313G10128

48TCDD0

8B2M 2013 7.5 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 31 Lennox

KGA092H4BS

1G 5616D00

2016 7.5 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 35 Lennox

KGB072H4B

M1G 5616F087

2016 6 Packaged

North

Texas HSI-Eule ss

701 S.

Industrial Blvd. Ste.

105, Euless, TX 76040

RTU 42 Trane 131911756L

YSC048E4

E 2013 4 Packaged

The campus -Fire Monitoring Company Name: Impact Fire/ NO BAS

Locations - ALTERNATE 2

District Name: Central Texas

Central Texas District AASOB : Mr. Agaberdiyev, agaberdiyev@harmonytx.org

Central Texas District Facilities Manager: Mr. Okur, hokur@harmonytx.org

Name Address Unit # Brand Serial # Model MFG

Capacit y(Tons)

TYPE

HS

Endeavor-A ustin

13415 Ranch Rd

620 N, Austin, TX

78717

RTU A101 Trane C11D01

YCD420B4LF0B2

CC1A000000000

00000T

2011 35 Packaged

HS

Endeavor-A ustin

13415 Ranch Rd

620 N, Austin, TX

78717

RTU C204 Trane C11D01

YCD480B4LF0B2J

C1A0000000000

0000T

2011 40 Packaged

HS

Endeavor-A ustin

13415 Ranch Rd

620 N, Austin, TX

78717

RTU D101 Trane C11H04

YCD330B4LG0B1

AC1A000000000

00000T

2011 27.5 Packaged

HS

Endeavor-A ustin

13415 Ranch Rd

620 N, Austin, TX

78717

RTU D102 Trane C11H04

YCD330B4LG0B1

AC1A000000000

00000T

2011 27.5 Packaged

HS

Endeavor-A ustin

13415 Ranch Rd

620 N, Austin, TX

78717

RTU D103 Trane C11H04

YCD330B4LG0B1

AC1A000000000

00000T

2011 27.5 Packaged

HSA-Cedar

Park

12200 Anderson

Mill Road, Austin, TX 78726

RTU 3 Daikin

FBOU15

0500222

DPS010AHHE4D

W-4 2015 10 Packaged

HS

Excellence-A ustin

2100 E Saint Elmo

Rd, Austin, TX

78744

RTU 2

Carrie r

2709413

50TCD17A2G6 2009 15 Packaged

HS

Excellence-A ustin

2100 E Saint Elmo

Rd, Austin, TX

78744

RTU 7

Carrie r

0406G1

50PGM24D6XM 2006 20 Packaged mailto:hokur@harmonytx.org

HS

Excellence-A ustin

2100 E Saint Elmo

Rd, Austin, TX

78744

RTU 13

Carrie r

1210U0

48TCED24A2K6A

2010 20 Packaged

HSA-Pfluger ville

1421 Wells Branch

Pkwy #200, Pflugerville, TX

78660

RTU 20 Trane 2311002

45L

YHC048A4RLA0

MA000A1B000B

2002 4 Packaged

HSA-Pfluger ville

1421 Wells Branch

Pkwy #200, Pflugerville, TX

78660

RTU 4 Trane 2311001

94L

YHC048A4RLA0

MA000A1B000B

2002 4 Packaged

HSA-Pfluger ville

1421 Wells Branch

Pkwy #200, Pflugerville, TX

78660

RTU 15 Trane 2301012

71L

YHC060A4RLA0

NA000A1B000B

2002 5 Packaged

HSA-Pfluger ville

1421 Wells Branch

Pkwy #200, Pflugerville, TX

78660

RTU 21 Trane 2301007

89L

YHC060A4RLA0

NA000A1B000B

2002 5 Packaged

HSA-Pfluger ville

1421 Wells Branch

Pkwy #200, Pflugerville, TX

78660

RTU 33 or

York

NNLMXX

D1EB060A46B 2002 5 Packaged

The campus -Fire Monitoring Company Name:/ BAS YES or NO Firetrol PS Inc -HS Endeavor-Austin 13415 Ranch Rd 620 N, Austin, TX 78717 / BAS YES Firetrol PS Inc HSA-Cedar Park 12200 Anderson Mill Road, Austin, TX 78726 /BAS YES Southwest Dispatch HS Excellence-Austin 2100 E Saint Elmo Rd, Austin, TX 78744 /BAS NO Impact Fire HSA-Pflugerville 1421 Wells Branch Pkwy #200, Pflugerville, TX 78660 /BAS NO

RSP#HPS2027HVAC Unit Replacement - INVITATION TO BID (1)
RSP#HPS2027HVAC Unit Replacement - INVITATION TO BID.pdf
RSP# HPS2027HVAC Unit Replacement Project

HVAC Units Replacement

For

Alternate 1. North Texas (Dallas – Fort Worth Area) District

Alternate 2. Central Texas (Austin) District

Project Manual - Scope HPS2027HVAC Unit Replacement Project.docx.pdf
North Texas & Central Texas Districts HPS2027HVAC Unit Replacement Project
1. Pre-Installation Assessment
2. Electrical & Code Compliance
3. Budgeting, Procurement & Planning
4. Scheduling
5. Removal of Existing Units
6. Installation of New Units
7. Testing & Commissioning
8. Training & Documentation
9. Standards, Compliance & Warranty
10. Equipment Identification Stickers
11. Communication & Safety
12. Exclusions
Cleanup Procedure After HVAC Unit Replacement
1. Jobsite Safety Securing
2. Debris & Equipment Removal
3. Refrigerant & Hazardous Waste Handling
4. Roof Surface & Work Area Cleanup
5. Ground-Level Work Area Cleanup
6. Final Inspection
7. Documentation