Project Manual - SOW -Inventory - HPS2027HVAC Unit Replacement Project.docx.pdf
PDF 333 KB Posted
- Attached to
- HVAC Units Replacement
- Solicitation number
- HPS2027HVAC
- Issued by
- Harris County, Houston City, Texas
About this file
This Project Manual and Scope of Work document outlines the HVAC Units Replacement project for Harmony Public Schools (HPS), involving North Texas (Dallas-Fort Worth Area) and Central Texas (Austin) districts. The project encompasses the replacement of approximately 50 HVAC units of varying capacities across multiple school campuses. The scope includes equipment procurement, demolition of existing units, installation of new HVAC systems, electrical modifications and repairs, curb adapter installation, and plumbing drain line work. Competitive sealed proposals must be received by 3:00 p.m. CST on January 7, 2027, submitted through HPS's e-bid system or by mail to HPS Central Office at 1255 Enclave Parkway, Houston, Texas 77077. All HVAC unit replacements must be completed by April 30, 2027, with customized or oversized units due by June 30, 2027. No formal site visit or bidders' conference is specified in the documentation. Inquiries should be directed to Hayati Ugur, Director of Facilities Management, at hugur@harmonytx.org.
The project requires contractors to conduct pre-installation assessments, verify unit sizing and electrical requirements, obtain necessary permits, and provide all lifting equipment, electrical upgrades, and curb adapters. Contractors must use like-for-like brand replacements; however, equivalent approved brands (Daikin, Trane, York, Carrier) may be substituted with owner approval if lead time issues arise. The scope includes removal and proper EPA-compliant refrigerant recovery, installation of new units with electrical connections and Building Automation System integration where applicable, testing and commissioning, and on-site training for maintenance staff. Contractors must provide a one-year minimum labor warranty and transfer full manufacturer equipment warranties to HPS. All equipment must meet DOE energy efficiency standards and comply with NEC, ASHRAE, EPA, OSHA, and TDLR requirements. The document specifies detailed cleanup procedures including debris removal, hazardous waste handling, and final inspection sign-off, with all materials to be hauled to approved off-site recycling or disposal facilities. No pricing terms, set-asides, incumbent information, or funding sources are detailed in this Scope of Work document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual - Scope of Work /
Inventory List
Harmony Public Schools
RSP# HPS2027HVAC Unit Replacement Project
HVAC Units Replacement
For
Alternate 1. North Texas (Dallas – Fort Worth Area) District
Alternate 2. Central Texas (Austin) District
ISSUED BY (Owner): SUBMIT INQUIRIES TO:
Harmony Public Schools (HPS) Name: Hayati Ugur 1255 Enclave Pkwy Title: Director of Facilities Management Houston, Texas 77077 Email: hugur@harmonytx.org mailto:hugur@harmonytx.org
North Texas & Central Texas Districts HPS2027HVAC Unit Replacement Project
Harmony Public Schools (HPS), dba North TX and Central TX districts open-enrollment charter schools, will be accepting competitive sealed proposals for around fifty (50) HVAC Units replacement in different capacities located in Dallas-Fort Worth Area and Austin, Texas. The project scope of work includes purchasing the equipment, demolition, installing new HVAC Units, electrical modifications and repairs, curb adapters, and plumbing drain lines work as specified in the project documents. (#HPS2027HVAC Units Replacement).
Bid proposals must be received by 3:00 p.m. CST on January 07, 2027, preferably through Harmony’s e-bid system or through mail delivery at HPS Central Office 1255 Enclave Pkwy Houston TX 77077 and will be closed at that date and time via video conference meeting.
Referring to the bid package, HPS reserves the right to reject any or all proposals or waive any or all irregularities. For further information, please contact hugur@harmonytx.org. Proposers may log in to view the bid package and submit their responses at:
https://www.harmonytx.org/about/purchasing
Thank you for considering this opportunity with Harmony Public Schools. We look forward to receiving your proposal and potentially working together to successfully execute this project.
mailto:bderin@harmonytx.org https://www.harmonytx.org/about/purchasing
Scope of work
Project Overview:
Harmony Public Schools (HPS) will replace multiple HVAC units of varying capacities that have reached end-of-life. The selected contractor must verify unit sizing, tonnage, voltage, electrical requirements, and obtain any pertinent permits prior to installation. Contractors are also responsible for providing all lifting equipment (e.g., cranes), curb adapters, electrical upgrades, and other components required for successful installation.
All HVAC unit replacements, excluding customized units, must be completed by April 30, 2027.
Note: Replacement of customized units, including oversized units, must be completed by June 30, 2027.
This Scope of Work establishes clear expectations to ensure the smooth, safe, and efficient replacement of rooftop units (RTUs) while minimizing risks and optimizing system performance.
Conduct site inspection and verify existing conditions.
1. Pre-Installation Assessment
● Conduct site inspections to verify existing conditions.
● Assess existing rooftop units (RTUs) and confirm end-of-life status, cross-checking with the list of units provided by the Owner for verification.
● Verify tonnage, voltage, phase, and current requirements for each replacement unit.
● Evaluate building load requirements to ensure proper unit sizing.
● Inspect and measure existing curb adapters for compatibility; design or procure new adapters if necessary.
2. Electrical & Code Compliance
● Verify electrical infrastructure compatibility with new units.
● Provide new disconnects, breakers, and wiring in compliance with NEC.
● Ensure all work complies with local codes, NEC, ASHRAE, EPA, OSHA, and TDLR requirements.
● Obtain all required permits prior to work.
3. Budgeting, Procurement & Planning
● Prepare a detailed project budget, including RTUs, curb adapters, electrical upgrades, and crane services.
● Procure units and related components from reputable suppliers.
● Use like-for-like brands for replacement units; however, if lead times create delays, equivalent approved brands (Daikin, Trane, York, Carrier, etc.) may be substituted with prior Owner approval.
● Provide new thermostats per unit and zone mapping where applicable.
● Replace condensate drain lines where needed.
● Integrate new units into the campus's Building Automation System (BAS) where needed..
● Establish safety barriers and protective measures for staff, students, and property.
● Coordinate all work with school administration to minimize disruption.
4. Scheduling
● All work must be coordinated with the HPS Facilities Department.
● Installation shall occur during non-instructional hours or school breaks, unless otherwise approved.
5. Removal of Existing Units
● Safely disconnect and remove existing RTUs, including:
○ Ductwork connections
○ Refrigerant lines
○ Electrical and control wiring
● Recover refrigerants in compliance with EPA regulations.
● Properly dispose of all old equipment per federal, state, and local environmental laws.
6. Installation of New Units
● Furnish and install new RTUs, split systems, or package units as specified.
● Complete all necessary modifications to ductwork, piping, insulation, condensate drains, and curbs/adapters.
● Install new electrical connections, breakers, and disconnects.
● Integrate systems into the existing BAS where applicable.
7. Testing & Commissioning
● Start-up and balance all new units.
● Test for proper operation, airflow, temperature control, and safety functions.
● Perform functional testing with BAS integration.
● Deliver the following documentation:
○ Refrigerant logs
○ Airflow test reports
○ Manufacturer startup sheets
8. Training & Documentation
● Provide on-site training for district maintenance staff on operation and routine maintenance.
● Supply O&M manuals, warranty documents, and as-built drawings.
9. Standards, Compliance & Warranty
● All equipment shall meet DOE energy efficiency standards and Harmony Public Schools procurement guidelines.
● Contractor shall provide:
○ 1-year minimum labor warranty
○ Full manufacturer equipment warranties transferred to HPS
● Establish a routine maintenance schedule to extend lifespan and ensure optimal performance.
10. Equipment Identification Stickers Each installed unit must include a durable, waterproof sticker with:
● Unit ID (matching project documentation and maps)
● RTU Number
● Model & Serial Number
● Installation Date
● Contractor logo
Stickers shall be applied upon installation for accurate tracking and maintenance.
11. Communication & Safety
● Maintain clear communication with all stakeholders throughout the project.
● Implement and enforce safety protocols to prevent accidents or injuries.
● Conduct regular safety inspections.
12. Exclusions
● Temporary cooling during installation is excluded from this Scope of Work.
Cleanup Procedure After HVAC Unit Replacement
1. Jobsite Safety Securing
● Remove all safety barriers, caution tape, and cones once work is completed.
● Verify that all rooftop and ground work areas are clear of debris and safe for staff/students to re-enter.
2. Debris & Equipment Removal
● Old HVAC Units:
○ Lower old rooftop units safely via crane to the ground.
○ Remove units from site and transport to an approved recycling or disposal facility.
● Packaging Materials:
○ Collect all shipping crates, pallets, and packaging from new units.
○ Sort recyclable materials (cardboard, metal, plastic) as required.
● Construction Debris:
○ Remove curb cutouts, scrap metal, wires, insulation, ductwork pieces, or piping segments.
○ Clean up all fasteners, screws, nails, and sharp objects from both roof and ground.
○ The contractor shall not use campus dumpsters for disposal or recycling. All debris, old equipment, and packaging materials must be hauled off-site to an approved recycling or disposal facility.
3. Refrigerant & Hazardous Waste Handling
● Ensure all refrigerant is properly recovered and documented per EPA Section 608 regulations.
● Collect and dispose of any used oils, filters, and sealants according to state/local environmental laws.
● Maintain disposal/recycling receipts for district records.
4. Roof Surface & Work Area Cleanup
● Sweep/clear the rooftop work area of dust, insulation fibers, and debris.
● Inspect the roof membrane for damage caused by equipment movement; repair as necessary.
● Remove any leftover tools, fasteners, or materials from the roof.
5. Ground-Level Work Area Cleanup
● Remove crane mats, temporary fencing, or barricades used during the lift.
● Ensure driveways, sidewalks, and lawns are restored to pre-construction condition.
● Power-wash or sweep surfaces if oil, dirt, or dust accumulated during work.
6. Final Inspection
● Conduct a walkthrough with the Facilities Department to confirm:
○ No debris remains on the roof or ground.
○ All equipment has been removed.
○ Work areas are safe and accessible.
● Obtain sign-off from HPS Facilities that cleanup meets district standards.
7. Documentation
● Provide disposal documentation (refrigerant logs, recycling manifests, landfill receipts).
● Submit cleanup checklist with close-out package.
Equipment Identification Stickers
Each unit will be provided with a durable, waterproof identification sticker to ensure proper tracking and maintenance. The sticker will include the following information:
• Unit ID (matching the project documentation and maps)
• RTU number
• Model and Serial Number
• Installation Date
• The Contractor logo for clear vendor identification A sample design of the sticker is provided below. The final stickers will be completed and applied once the equipment has been delivered and installed.
IMPORTANT NOTES
❖If the AC unit includes both the condenser and the air handler, both units must be replaced.
❖ During the unit installation, if the technician discovers that the existing unit is newer (no need to be replaced), please inform the owner, as we may use the brand new unit for replacing the oldest equivalent unit at that campus or at another HPS campus.
Locations - ALTERNATE 1
District Name: North TX DFW
North Texas East District AASOB : Mr. Bell, dbell@harmonytx.org
North Texas East District Facilities Manager: Mr. Hopovac, dhopovac@harmonytx.org
District Campus
Name Address
Unit
Brand Serial # Model MFG
Capacity
(T)
TYPE
North
Texas
East
District Office
12005 Forestgate Dr STE 10 Dallas TX 75243
10 York N1H6878983
ZF060H10A2A
1ABA1A1A
2011 5 Packaged
North
Texas
East
HSA
Dallas High
12005 Forestgate Dr Ste 100 Dallas TX 75243
8 Goodman 1003626205 CPG1202104B 2010 10 Packaged
North
Texas
East
HSA
Dallas High
12005 Forestgate Dr Ste 100 Dallas TX 75243
10 Goodman 1003626201 CPG1202104B 2010 10 Packaged
North
Texas
East
HSA
Dallas High
12005 Forestgate Dr Ste 100 Dallas TX 75243
11 Goodman 1007743563 CPG2404004B 2010 20 Packaged
North
Texas
East
HSA
Dallas High
12005 Forestgate Dr Ste 100 Dallas TX 75243
13 Carrier 3417P40792
48TCDD14A3A
6A 2017 12.5 Packaged
North
Texas
East
HSA
Dallas High
12005 Forestgate Dr Ste 100 Dallas TX 75243
15 Goodman 1003626260 CPG1202104B 2010 10 Packaged
North
Texas
East
HSA
Elem - Dallas
11945 Forestgate Dr Dallas TX 75243 12 Carrier 3017C52631
48TCDA07A2A
2017 6 Packaged
North
Texas
East
HSI
Carrollton
1024 W Rosemeade Pkwy, Carrollton, TX 75007
12 Goodman 110262008
CPG0902103B
X 2011 7.5 Packaged
North
Texas
HSI
Carrollton
1025 W Rosemeade Pkwy, Carrollton, TX
2 Carrier 3013G50150
48HCDD11D2
M5A0B0F0 2013 10 Packaged
East 75007
North
Texas
East
HSA
Carrollton
1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007
2 Carrier 2215C66498
48TCDA06A2
M6A0F0A0 2015 5 Packaged
North
Texas
East
HSA
Carrollton
1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007
11 Carrier 2215C66497
48TCDA06A2
M6A0F0A0 2015 5 Packaged
North
Texas
East
HSA
Carrollton
1024 W Rosemeade Pkwy Bldg 2, Carrollton, TX 75007
13 Carrier 2215C66500
48TCDA06A2
M6A0F0A0 2015 5 Packaged
North
Texas
East
HSI
Dallas
8080 W President George Bush Hwy, Dallas, TX 75252
6 Trane 121610878D
YCD151F4HAA
A 2012 12.5 Packaged
North
Texas
East
HSI
Dallas
8080 W President George Bush Hwy, Dallas, TX 75252
21 Trane 1218123774
YSC090E4RLA0
GE1D1A10000
00C 2012 7.5 Packaged
North
Texas
East
HSI
Dallas
8080 W President George Bush Hwy, Dallas, TX 75252
24 Trane 121610905D
YCD151F4HAA
A 2012 12.5 Packaged
The campus -Fire Monitoring Company Name: Impact Fire
North Texas West District AASOB : Ms Knapp, aknapp@harmonytx.org
North Texas West District Facilities Manager: Ms. Moore, lmooore@harmonytx.org
District
Name Address Unit # Brand Serial # Model MFG
Capacity
(T)
TYPE
North
Texas
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
CU 6
(north building) Trane
11335W2SYA
TTA120D4
00AA
10 Split
AHU 6
(north building)
12142UOWBA
TWE120D3
00AB
North
Texas
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
CU 9
(north building) Trane 11333W6MYA
TTA120D4
00AA
10 Split
AHU 9
(north building)
CARRIER CARRIER
TWE120D3
00AB
North
Texas
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
CU 10
(north building) Trane
1133358H8YA
TTA120D4
00AA
10 Split
AHU 10
(north building)
12142TTJBA
TWE120D3
00AB
North
Texas
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
CU 14
(north building) Trane
121865MYA
TTA120D4
00AA
2012 10 Split
AHU 14
(north building)
TWE120D
300AB
Texas
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
CU 19
(north building) Trane
121911268D
YCD151F4
HAAA
2012 12.5 Split
AHU 19
(north building)
HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
RTU 10
(south building) Carrier 1814P43117
48TCDD1
2A2A 2014 10 Packaged
North
Texas HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
RTU 14
(south building) Carrier 1814C76188
48TCDD1
2A2A 2014 10 Packaged
North
Texas HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
RTU 12
(south building) Carrier 48TCDA07A
1814C761
2014 6 Packaged
North
Texas HSI-Fort
Worth
8100 S. Hulen
St., Fort
Worth, TX
76123
RTU 16
(south building) Carrier 48TCDA05A
2414C637
2014 4 Packaged
North
Texas HSA-Eul ess
701 S.
Industrial Blvd., Ste.
115, Euless, TX 76040
RTU 2 York N1D0812206
ZR090E24
P4AAA4B
2010 7.5 Packaged
North
Texas HSA-Eul ess
701 S.
Industrial Blvd., Ste.
115, Euless, TX 76040
RTU 6 York N1D0812207
ZR120E36
P4AAA4B
2010 10 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 15 Carrier 1712G40202
48TCDD1
2A2A6A0
A0A0 2012 10 Packaged
HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 17 Carrier 0412G50223
48TCDD1
2A 2012 10 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 20 Carrier 0412G50224
48TCDD1
2A 2012 10 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 25 Carrier 2313G10149
48TCDD1
2B2M 2013 10 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 26 Carrier 2313G10128
48TCDD0
8B2M 2013 7.5 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 31 Lennox
KGA092H4BS
1G 5616D00
2016 7.5 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 35 Lennox
KGB072H4B
M1G 5616F087
2016 6 Packaged
North
Texas HSI-Eule ss
701 S.
Industrial Blvd. Ste.
105, Euless, TX 76040
RTU 42 Trane 131911756L
YSC048E4
E 2013 4 Packaged
The campus -Fire Monitoring Company Name: Impact Fire/ NO BAS
Locations - ALTERNATE 2
District Name: Central Texas
Central Texas District AASOB : Mr. Agaberdiyev, agaberdiyev@harmonytx.org
Central Texas District Facilities Manager: Mr. Okur, hokur@harmonytx.org
Name Address Unit # Brand Serial # Model MFG
Capacit y(Tons)
TYPE
HS
Endeavor-A ustin
13415 Ranch Rd
620 N, Austin, TX
78717
RTU A101 Trane C11D01
YCD420B4LF0B2
CC1A000000000
00000T
2011 35 Packaged
HS
Endeavor-A ustin
13415 Ranch Rd
620 N, Austin, TX
78717
RTU C204 Trane C11D01
YCD480B4LF0B2J
C1A0000000000
0000T
2011 40 Packaged
HS
Endeavor-A ustin
13415 Ranch Rd
620 N, Austin, TX
78717
RTU D101 Trane C11H04
YCD330B4LG0B1
AC1A000000000
00000T
2011 27.5 Packaged
HS
Endeavor-A ustin
13415 Ranch Rd
620 N, Austin, TX
78717
RTU D102 Trane C11H04
YCD330B4LG0B1
AC1A000000000
00000T
2011 27.5 Packaged
HS
Endeavor-A ustin
13415 Ranch Rd
620 N, Austin, TX
78717
RTU D103 Trane C11H04
YCD330B4LG0B1
AC1A000000000
00000T
2011 27.5 Packaged
HSA-Cedar
Park
12200 Anderson
Mill Road, Austin, TX 78726
RTU 3 Daikin
FBOU15
0500222
DPS010AHHE4D
W-4 2015 10 Packaged
HS
Excellence-A ustin
2100 E Saint Elmo
Rd, Austin, TX
78744
RTU 2
Carrie r
2709413
50TCD17A2G6 2009 15 Packaged
HS
Excellence-A ustin
2100 E Saint Elmo
Rd, Austin, TX
78744
RTU 7
Carrie r
0406G1
50PGM24D6XM 2006 20 Packaged mailto:hokur@harmonytx.org
HS
Excellence-A ustin
2100 E Saint Elmo
Rd, Austin, TX
78744
RTU 13
Carrie r
1210U0
48TCED24A2K6A
2010 20 Packaged
HSA-Pfluger ville
1421 Wells Branch
Pkwy #200, Pflugerville, TX
78660
RTU 20 Trane 2311002
45L
YHC048A4RLA0
MA000A1B000B
2002 4 Packaged
HSA-Pfluger ville
1421 Wells Branch
Pkwy #200, Pflugerville, TX
78660
RTU 4 Trane 2311001
94L
YHC048A4RLA0
MA000A1B000B
2002 4 Packaged
HSA-Pfluger ville
1421 Wells Branch
Pkwy #200, Pflugerville, TX
78660
RTU 15 Trane 2301012
71L
YHC060A4RLA0
NA000A1B000B
2002 5 Packaged
HSA-Pfluger ville
1421 Wells Branch
Pkwy #200, Pflugerville, TX
78660
RTU 21 Trane 2301007
89L
YHC060A4RLA0
NA000A1B000B
2002 5 Packaged
HSA-Pfluger ville
1421 Wells Branch
Pkwy #200, Pflugerville, TX
78660
RTU 33 or
York
NNLMXX
D1EB060A46B 2002 5 Packaged
The campus -Fire Monitoring Company Name:/ BAS YES or NO Firetrol PS Inc -HS Endeavor-Austin 13415 Ranch Rd 620 N, Austin, TX 78717 / BAS YES Firetrol PS Inc HSA-Cedar Park 12200 Anderson Mill Road, Austin, TX 78726 /BAS YES Southwest Dispatch HS Excellence-Austin 2100 E Saint Elmo Rd, Austin, TX 78744 /BAS NO Impact Fire HSA-Pflugerville 1421 Wells Branch Pkwy #200, Pflugerville, TX 78660 /BAS NO
| RSP#HPS2027HVAC Unit Replacement - INVITATION TO BID (1) |
| RSP#HPS2027HVAC Unit Replacement - INVITATION TO BID.pdf |
| RSP# HPS2027HVAC Unit Replacement Project |
HVAC Units Replacement
For
Alternate 1. North Texas (Dallas – Fort Worth Area) District
Alternate 2. Central Texas (Austin) District
| Project Manual - Scope HPS2027HVAC Unit Replacement Project.docx.pdf |
| North Texas & Central Texas Districts HPS2027HVAC Unit Replacement Project |
| 1. Pre-Installation Assessment |
| 2. Electrical & Code Compliance |
| 3. Budgeting, Procurement & Planning |
| 4. Scheduling |
| 5. Removal of Existing Units |
| 6. Installation of New Units |
| 7. Testing & Commissioning |
| 8. Training & Documentation |
| 9. Standards, Compliance & Warranty |
| 10. Equipment Identification Stickers |
| 11. Communication & Safety |
| 12. Exclusions |
| Cleanup Procedure After HVAC Unit Replacement |
| 1. Jobsite Safety Securing |
| 2. Debris & Equipment Removal |
| 3. Refrigerant & Hazardous Waste Handling |
| 4. Roof Surface & Work Area Cleanup |
| 5. Ground-Level Work Area Cleanup |
| 6. Final Inspection |
| 7. Documentation |