Project Manual--SG-695-241-003.pdf

PDF 1 MB Posted

Attached to
SG-695-241-003--Sidewalk & Patio Replacement, Dix Building--Catonsville, MD
Solicitation number
BPM042156
Issued by
Baltimore County, Chesapeake Landing CDP, Maryland

About this file

This document is a Project Manual for the replacement of sidewalks and patio at the Dix Building of the Spring Grove Hospital Center in Catonsville, Maryland. The project, managed by the Maryland Department of General Services, requires the successful contractor to provide all labor, equipment, tools, materials, and supplies for the replacement of approximately 4,322 square feet of sidewalks and patio. The work must be completed within 60 calendar days from the notice to proceed and is subject to state and local building codes, as well as industry standards. The contract will be awarded to the responsible bidder who submits the lowest responsive evaluated total bid, though the Department reserves the right to award based on fund availability. Bidders are encouraged to attend a pre-bid conference and site visit prior to submitting their bids.

The project manual provides detailed specifications for the concrete and related materials, construction methods, testing requirements, and environmental controls. It also outlines the contractor's responsibilities regarding coordination with the Spring Grove Hospital Center, maintaining a clean and safe work site, and addressing any hazardous materials encountered during the project. The contract will be subject to applicable prevailing wage rates, as well as Minority Business Enterprise (MBE) and Veteran-owned Small Business Enterprise (VSBE) participation requirements, if applicable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

SIDEWALK & PATIO REPLACEMENT

AT

SPRING GROVE HOSPITAL CENTER

DIX BUILDING

55 WADE AVE

CATONSVILLE, MARYLAND, 21228

FOR THE

DEPARTMENT OF GENERAL SERVICES

DGS PROJECT NO. SG-695-241-003

PROJECT COST CLASSIFICATION A

January 18, 2024

NOTICE:

“Minority Business Enterprises are Encouraged to Respond to this Solicitation”

STATE OF MARYLAND

DEPARTMENT OF GENERAL SERVICES

Atif Chaudhry, Secretary 301 West Preston Street, Room 1405 Baltimore, MD 21201

BOARD OF PUBLIC WORKS

Wes Moore, Governor Brooke E. Lierman, Comptroller Dereck E. Davis , Treasurer

TABLE OF CONTENTS

Division Section Title Page Numbers

DIVISION 0 - PROCUREMENT & CONTRACTING REQUIREMENTS

Notice To Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment) Instructions to Bidders for Construction Projects (July 1, 2022) (eMaryland Marketplace

Advantage attachment) General Conditions for Construction Contracts (July 1, 2022) (eMaryland Marketplace

Advantage attachment) Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment) Payment of Employee Health Care Expenses Certification (eMaryland Marketplace Advantage attachment) Contractors Questionnaire (eMaryland Marketplace Advantage attachment) Bid Bond, if applicable (eMaryland Marketplace Advantage attachment) Minority Business Enterprise Forms Attachment D (February 5, 2021), if applicable (eMaryland

Marketplace Advantage attachment) Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022), if applicable (eMaryland Marketplace Advantage attachment) List of Prevailing Wage Rates, if applicable (eMaryland Marketplace Advantage attachment) Corporate Diversity Addendum, if applicable (eMaryland Marketplace attachment) Addenda, if any (eMaryland Marketplace Advantage attachment) List of Drawings (eMaryland Marketplace Advantage attachment) Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14-

302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).

DIVISION 01 - GENERAL REQUIREMENTS

011100 SUMMARY OF WORK 011100 – 1 – 2

CONCRETE STANDARDS 1-5

CONTRACTOR GUIDELINES 1-4

Summary of Work Section 011100

SECTION 011100

SUMMARY OF WORK

PROJECT # SG-695-241-003

A. General Scope of Work:

The successful contractor shall provide all labor, equipment, tools, materials and supplies required for replacement of sidewalks & Patio @ the Dix Bldg @ Spring Grove Hospital Center in according with the terms, conditions and specifications.

B. Description of Work:

1. Work consists of removal existing sidewalks and patio and pouring new concrete sidewalks and patio in the same locations and same sizes with slope away from building, Approximately 4,322 sq ft, per local and state building codes and current industry standards.

2. All new expansion joints around foundation of building are to be sealed with SikaFlex Self- Leveling Sealant or equal, larger gaps should be filled with appropriate backer rod material before installation of sealant.

3. All work shall be accomplished within sixty (60) calendar days from the date designated by the notice to proceed.

C. Site Conditions:

1. This building will be occupied and remain in operation during the construction period.

Coordinate all construction operations with the Spring Grove Hospital Center & DGS. Plan and execute all work to minimize interference with the normal function of the Owner’s facilities.

2. The site and all areas of construction activity which are occupied by the Owner’s operations shall be kept clean of construction debris and dirt on a continuous basis and all areas and items left in a safe condition for occupancy. Remove all debris and surplus materials on a daily basis. At completion of the work, remove all debris and surplus materials and leave the site completely clean.

3. All agreed upon schedules shall be placed in writing with copies to the Owner’s representative.

4. Limit use of the premises to areas affected by construction activities. Keep all driveway and parking areas clear of material, debris and equipment at all times so as not to interfere with the usual traffic or emergency vehicles serving the facility.

5. Cooperate with the Owner during construction operations to minimize conflicts and facilitate Owner’s usage. Perform the work so as not to interfere with the Owner’s operation.

Conform to the Owner’s security procedures for access to the building and site, also for control of the work area, tools and materials.

6. If hazardous materials are encountered during construction, removal or demolition operations, comply with applicable regulations, laws and ordinances concerning removal, handling and protection against exposure or environmental pollution.

Summary of Work Section 011100

7. Perform all tasks involving utilization of products which emit noxious fumes so far as to prevent fumes from entering the building. Provide proper ventilation to remove hazardous fumes.

8. If it becomes necessary to produce excessive noise during the construction operations, the Contractor shall so advise the Owner and times shall be scheduled at the Owner’s convenience.

9. Prior to any construction activity, Contractor shall take pictures of the existing conditions of the building, interior equipment and adjacent elements that may be misconstrued as damage related to construction operations. Photographs inside the building are subject to the security requirements of the facility.

10. The Contractor shall leave no area unsafe or unsecured at the end of the workday.

11. It shall be the Contractor’s responsibility, to field verify all existing conditions and dimensions prior to submitting bids.

I. Basis of Award:

1. This contract will be awarded to the responsible bidder who submits the lowest responsive evaluated total bid. However, the Department of General Services reserves the right to award the contract based on fund availability.

J. Hours and Point of Contact:

1. The work hours of the facility are Monday through Friday, 7:00 AM to 5:00 PM.

2. The DGS Project Manager is Kenneth Langkam, 410-767-4436.

3. Site visits are encouraged for all bidders prior to submitting bid (Pre-Bid Meeting). No unannounced site visits will be permitted.

CONCRETE STANDARDS

1.1

A.

B.

C.

D.

1.2

A.

REFERENCE STANDARDS

The current editions of the applicable American Concrete Institute (ACI) publications, to the extent applicable in each reference.

The current editions of the applicable American Society for Testing and Materials (ASTM) specifications, to the extent applicable in each reference.

Concrete Reinforcing Steel Institute (CRSI) Manual of Standard Practices.

The current edition of the applicable ADA Standards for Accessible Design, to the extent applicable in each reference.

ENVIRONMENT AL CONTROLS

Rinsing out of the transit mix trucks, washing or wetting of concrete, site cleanup, or other activities related to water at the site shall be in strict conformance with all EPA requirements for the prevention of water runoff to storm water sewers or creeks.

PART 2: PRODUCTS

2.1 MATERIALS

A. Forms

1. Earth forms will not be permitted for concrete paving.

2. Provide wood or metal framework, including adequate bracing, to the lines and grades. Follow industry standard for vertical and alignment tolerances.

3. Wood forms shall be of good grade lumber, sound and free of warp.

4. A nominal 2" minimum thickness is required unless extremely short radii of curves require thinner forms.

B. Cement

1. Cement shall conform to one of the following:

Type/ASTM # Description

IA/Cl50 Standard Portland Cement

IIA/C150 Provides moderate sulfate resistance or moderate heat of hydration

a. Only 1 type and brand of cement will be permitted in any one structure.

C. Fly-ash

1. Conform to ASTM C618, Class F. Class F fly-ash is generally the best class of fly-ash to use but the source and quality should always be checked carefully.

2. Fly-ash shall be produced from a single, known and consistent source.

3. The amount of fly-ash used shall be no greater than 20% by volume of the specified cement volume.

D. Concrete

1. Aggregates shall conform to ASTM C30, uniformly graded and clean.

2. Type 'A' - Latimore

a. Coarse Aggregate: Crushed rock or washed gravel with minimum size #4 and maximum size between

¾" and 1½".

b. Fine Aggregate: Natural washed sand or hard, durable particles varying from fine particles passing¾" screen, of which at least 12% shall pass a 50 mesh screen.

c. Exposed Aggregate: Latimore concrete mix #3201 + 250 rock - 250 sand. 5 bag mix with native brown, l" river rock.

3. Type 'B' -RediMix: To order call (817) 835-4000.

a. Coarse Aggregate: RediMix Chatfield - ¾" Pea Gravel.

b. Fine Aggregate: RediMix - concrete sand.

c. Exposed Aggregate: RediMix.

d. Additives: 322 N Water Reduce (3.00 fl. oz./100 lb.) and air entraining agent (0.25 fl. oz.lib.).

4. Type 'C' -Light Brushed Gray Concrete: ASTM Cl 50, Type 1.

a. Aggregates: ASTM C33. Refer to Portland Cement Concrete Pacing (32 13 13).

5. Compressive Strength: Not less than 3000 psi, or as specified, at 28 days after placement.

6. Slump: not to exceed 4".

E. Mixing water shall be potable.

F. Admixtures

1. The use of a super plasticizer is recommended, especially where waterproofing is required since it helps to produce a denser, more water-resistant concrete.

G. Reinforcement

1. Fabricate reinforcement to the required shapes and dimensions, with fabrication tolerances complying with the CRSI "Manual of Standard Practices." Comply with the following requirements:

a. Rebar: ASTM A615, Grade 60, No. 3 rebar@ 18 O.C.E.W. will be used on all sidewalks.

b. Welded Wire Fabric: ASTM Al 85, in flat sheets only.

c. Bending: ACI 318

d. Dowels and Sleeves: Plain round bar dowels, conforming to reinforcing steel requirements coats with bituminous paint on one half of length. Provide sleeves where required, closed at one end, and allowing one inch movement at closed end.

H. Water stops

l. Water stops shall be manufactured with wire embedded in them in order to allow them to be tied off more securely during concrete placement.

2. Spliced should be fused or "welded" in accordance with the material chosen and the manufacture's recommendations.

3. Where "adhesive" or "rope" water stops are specified, the products shall have a proven life consistent with expected life of the structure being designed.

2.2 Proportioning of Concrete

A. Select proportions of ingredients to produce a concrete having proper workability, durability, strength and appearance. Proportion ingredients to produce a mixture that will work readily into comers and angles of forms and around reinforcement by methods of placing and consolidation employed on the project.

B. The maximum recommended allowable water/cement or water/cement-pozzolan ration shall not exceed 0.47.

C. Air entrainment shall be 5% +/- 1%, unless required otherwise.

PART 3: EXECUTION

3.1 SURFACE CONDITIONS

A. Contractor shall examine areas and conditions under which this work will be provided and correct all conditions detrimental to the timely and proper completion of the work.

B. Contractor shall not proceed with work until unsatisfactory conditions are corrected and approved by a UT Dallas Engineer or Architect.

3.2 RINSING TRUCKS

A. Rinsing of transit mix trucks or other concrete mixing devices shall be off of the Owner's site. lfrinsed in a contained area onsite, runoff must be prevented until concrete dries, at which time it must be removed as solid debris.

3.3 PLACEMENT OF BASE COURSE

A. Sand Cushion:

1. A minimum of 4" of cushion sand shall be used beneath concrete sidewalks.

2. Spread and compact specified sand cushion to a least 95% of Standard Proctor Maximum Dry Density.

3. Use limited amounts of water, only as needed, to achieve the specified compaction.

4. Correct deviations in the base course by removing materials, replacing with new materials, and reworking or compacting again as required.

3.4 CONSTRUCTION JOINTS

A. Contractor responsible for developing a construction joint plan, to be approved by UT Dallas Engineer or Architect, prior to construction.

B. 100% of reinforcing shall be continuous across construction joints.

3.5 CONTROL JOINTS

A. Control joints are herein described as joints that are designed to allow for movement either from contraction or expans10n.

I. Control joints should be placed at 10' spacing and around immovable objects.

B. Contraction joints.

1. 50% ofreinforcing shall be continuous across contraction joints.

2. If saw-cutting of contraction joints is allowed, the following shall be adhered to:

a. During hot and dry periods, saw-cutting should occur within 4 to 12 hours of concrete placement.

b) During cool and moist periods, saw-cutting should occur within 24 hours of concrete placement.

c) Where applicable, use water stops to assure water-tightness.

C. Expansion joints.

1. SL-1 sealant shall be used as expansion joints.

2. Expansion joints should be placed at 40' spacing and around immovable objects.

3. Where applicable, use water stops to assure water-tightness.

3.6 INSTALLATION

A. Upon completion of installation of base course and formwork, install reinforcement in middle of pavement thickness. Steel shall be free of rust, mill scale, dirt or oil.

B. Transit mix concrete in accordance with ASTM C94. Do not use concrete that has stood over 30 minutes after leaving the mixer, or concrete that is not placed within 60 minutes after water is introduced into the mix.

C. Place concrete in accordance with ACI 304.

3.7 PLACING AND FINISHING

A. Placing: Deposit concrete so that specified thickness will be obtained after vibrating and finishing operations.

Minimize handling to prevent segregation. Consolidate concrete by suitable means to prevent formation of voids or honeycombs. Exercise care to prevent disturbance of forms.

B. Finishing: After consolidation and screening, float concrete level to within a tolerance of¼" in 1O'. Use a straight edge to level and test surface in longitudinal direction to required grade. Cut down high spots and fill low spots.

1. Medium Broom Finish: Draw a soft bristle broom across concrete surface perpendicular to line of traffic to provide a uniform line texture finish.

2. Exposed Aggregate Finish: After completing float finish, uniformly spread 25 lbs. of dampened aggregate per 100 sq. ft. of surface. Pack aggregate flush with surface using a steel trowel, but do not force below surface. After curing, lightly work surface with a steel wire brush or an abrasive stone and water to expose aggregate.

3.8 CURING AND PROTECTION

A. Apply membrane curing compound at a uniform rate of approximately 200 sq. ft. per gallon, or as recommended by manufacturer, as soon as finishing operation has been completed and concrete has lost its water sheen.

B. Protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury for a period of 4 days after placing.

1. Cold weather temperature: conform to ACI 306.

2. Hot weather temperature: conform to ACI 305.

3. Spray concrete with water and wrap in plastic to contain water in the mix, if deemed necessary by

Contractor.

C. Do not allow pedestrians on concrete for a minimum period of 4 days after placing.

3.9 TESTING AND CONTROL

A. The Contractor is responsible for preparing and testing the initial mix design for each class of concrete specified.

B. The Contractor is also responsible for testing the mix design for each class of concrete for which the material source has been changed.

C. Field test cylinders during construction

1. Mold four cylinders for each set of tests specified.

2. Test 1 specimen at 7 days and 2 at 28 days, according to ASTM C39. If one or both of the 28-day tests indicate a compressive strength bellowed the required strength, the 4th specimen shall be tested at 56 days.

3.10 NON-COMPLIANCE (TEST RESULTS)

A. Should any of the tests indicate that concrete characteristics are not in compliance with these specifications, the burden of proof remains with the Contractor, subject to:

1. Contractor selection and submission of the laboratory for Owner acceptance.

2. Acceptance by Owner of the quality and nature of tests.

B. If tests confirm that the concrete characteristics comply with the specifications, the Owner will pay the cost of the test.

1. If tests reveal non-compliance, the Contractor will pay for the cost of that particular test and all future tests necessary to eventually confirm compliance with the required concrete specifications.

2. Proof of noncompliance with these specifications will make the Contractor liable for any corrective action, including complete removal and replacement of concrete. In addition, all costs as a result of delays due to additional testing will be at the Contractor's expense, with no extension of contract length.

END OF SECTION 03 30 00

GUIDELINE: D

CONTRACTOR GUIDELINES

SPRING GROVE HOSPITAL CENTER

Coversheet
Summary
Concrete Standards
SGHC - Guideline D - Contractor Guidelines SGHC 2022

File details come from the government source that posted it. Updated .