Project Manual_FINAL Bid No. 13.26 - Replacement of West End Firehouse Roofs.pdf

PDF 14 MB Posted

Attached to
Replacement of the West End Firehouse Roofs
Solicitation number
13.26
Issued by
Orange County, New York

About this file

This is a Project Manual for Bid No. 13.26 related to the replacement of roofing systems at the West End Firehouse, a capital project in New York. The scope of work encompasses the complete removal of the existing roofing system down to the existing deck, asbestos abatement, installation of new insulation and SBS (Styrene Butadiene Styrene) roofing system, installation of all required flashings and sheet metal trim, masonry repairs, and pointing work. The contractor must provide all labor, materials, machinery, tools, equipment, and other means of construction necessary to complete the work as shown on the plans and described in the specifications. The project manual serves as the primary bidding document and contains detailed technical requirements, specifications, and construction standards that bidders must follow to submit compliant proposals.

The manual establishes the technical framework and contractual requirements governing bid preparation and project execution. Bidders are required to comply with all specifications outlined in the manual, including details regarding material quality, installation procedures, workmanship standards, and safety requirements. The document provides the foundation for evaluating bids and ensures that all contractors understand the full scope of work, technical standards, and expectations for this roofing replacement and associated masonry work project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Newburgh 83 Broadway, Newburgh, New York 12250

Project Manual Volume 1 of 1

City of Newburgh Orange County, New York

REPLACEMENT OF THE WEST END

FIREHOUSE ROOFS

Bid No. 13.26

October 29, 2026

Vlad Potiyevsky, RA License No.: 030220

Prepared By:

LAN Associates, Engineering, Planning, Architecture, Surveying, LLP

252 Main Street Goshen, NY 10924

845-615-0350

SECTION 00 11 13 - 2

This page has been intentionally left blank.

SECTION 00 11 13 - 3

CONTRACT DOCUMENTS

for

Replacement of the West End Firehouse Roofs at 492 Broadway, Newburgh, NY 12550

City of Newburgh, Orange County, New York

BIDDER’s CHECKLIST

The following information contained in the CONTRACT DOCUMENTS must be completed by Bidder prior to Bid Submission:

Bid Prices: All blanks appropriately filled in ink or typed with both words and figures, where applicable

Signatures: All signatures (except Notary Public) to be executed in blue ink

One (1) Original and one (1) USB Digital Copy of Bid

Resolution of Board of Directors

Non-Collusion Bidding Affidavit

Bid Security required in form of bid bond or certified bank check

Bidder’s Qualification Statement with supporting data

Affidavit of Workers’ Compensation

Iranian Energy Sector Divestment

Contractor and Subcontractor Registration with NYSDOL

SECTION 00 11 13 - 4

TABLE OF CONTENTS

SECTION 001113 INVITATION FOR BIDS

SECTION 002113 INSTRUCTIONS TO CONTRACTORS

SECTION 004113 BID FORM

SECTION 004313 CERTIFIED COPY OF RESOLUTION

SECTION 004313.13 BID BOND

SECTION 004313.14 BIDDER’S QUALIFICATION QUESTIONNAIRE

SECTION 004313.15 AFFIDAVIT - WORKERS’ COMPENSATION

SECTION 004315 NON-COLLUSION BIDDING AFFIDAVIT

SECTION 004320 IRANIAN ENERGY SECTOR DIVESTMENT ACT AFFIDAVIT

SECTION 005100 NOTICE OF AWARD

SECTION 005216 STANDARD FORM OF AGREEMENT

SECTION 005500 NOTICE TO PROCEED

SECTION 006113.13 CONSTRUCTION PERFORMANCE BOND

SECTION 006113.16 CONSTRUCTION PAYMENT BOND

SECTION 006363 CHANGE ORDER FORM

SECTION 007200 GENERAL CONDITIONS

SECTION 007310 PREVAILING WAGE SCHEDULE

SECTION 011000 SUMMARY

SECTION 012600 CONTRACT MODIFICATION PROCEDURES

SECTION 012900 PAYMENT PROCEDURES

SECTION 013100 PROJECT MANAGEMENT AND COORDINATION

SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013300 SUBMITTAL PROCEDURES

SECTION 014000 QUALITY REQUIREMENTS

SECTION 014200 REFERENCES

SECTION 016000 PRODUCT REQUIREMENTS

SECTION 017300 EXECUTION

SECTION 017700 CLOSEOUT PROCEDURES

SECTION 017823 OPERATION AND MAINTENANCE DATA

SECTION 017839 PROJECT RECORD DOCUMENTS

SECTION 00 11 13 - 5

TECHNICAL SPECIFICATIONS

GENERAL REQUIREMENTS

SECTION 010100 SUMMARY OF WORK

SECTION 012500 SUBSTITUTION PROCEDURES

SECTION 013100 PROJECT MANAGEMENT AND COORDINATION

SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013233 PHOTOGRAPHIC DOCUMENTATION

SECTION 013300 SUBMITTAL PROCEDURES

SECTION 014000 QUALITY REQUIREMENTS

SECTION 016000 PRODUCT REQUIREMENTS

SECTION 017300 EXECUTION REQUIREMENTS

SECTION 017310 CUTTING AND PATCHING

SECTION 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 017700 CLOSE-OUT PROCEDURES

SECTION 017823 OPERATION AND MAINTENANCE DATA

SECTION 017839 PROJECT RECORD DOCUMENTS

EXISTING CONDITIONS

SECTION 028200 ASBESTOS ABATEMENT

MASONRY

SECTION 040120 UNIT MASONRY RESTORATION

WOOD, PLASTICS AND COMPOSITES

SECTION 061053 MISCELLANEOUS ROUGH CARPENTRY

THERMAL AND MOISTURE PROTECTION

SECTION 075216.13 SBS MODIFIED BITUMINOUS MEMBRANE ROOFING, COLD-APPLIED

SECTION 076200.02 SHEET METAL FLASHING AND TRIM

SECTION 079000 PRE-COMPRESSED EXPANSION JOINTS

PROJECT PLAN SET

T0.01 COVER SHEET

AA.100 ASBESTOS ABATEMENT FIRE HOUSE ROOF

A2.01 ROOF PLAN & TYPICAL DETAILS

A6.01 ROOF DETAILS

A7.01 EXIST. ROOF IMAGES

A7.02 EXIST. ROOF IMAGES & EMSEAL DETAILS

SECTION 00 11 13 - 6

SECTION 00 11 13 - 7

NOTICE TO BIDDERS

INVITATION FOR BIDS

for

Replacement of the West End Firehouse Roofs

Bid No. 13.26

City of Newburgh, Orange County, New York

Sealed bids will be received by Acting City Comptroller David Truong in his office located at 83 Broadway, 4th Floor, Newburgh, NY 12550 until 11:00 a.m. (local time), Tuesday, November 24, 2026, at which time they will be publicly opened and read aloud.

The City of Newburgh plans to remove and replace the existing roofs over the West End Firehouse located at 492 Broadway, Newburgh, NY 12550. All work is subject to prevailing wage rates and requires submission of original certified payrolls as a condition for payment. A Pre-Bid Site Visit Meeting has been set for Thursday, November 5, 2026 at 10:00 a.m. at the site.

Contractor attendance is strongly encouraged, but not mandatory.

The Work shall achieve Substantial Completion within one hundred eighty (180) calendar days from the date the Notice to Proceed is issued and shall be fully completed and ready for final payment within ninety (90) calendar days following Substantial Completion. The scope of work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: The removal of existing roofing system in full down to existing deck, asbestos abatement, installation of new insulation and SBS roofing system along with all required flashings and sheet metal trim. Additional work includes masonry repairs and pointing.

Complete sets of the drawings, specifications, and bid forms, becoming available to the public on Thursday, October 29, 2026 may be viewed and downloaded at no charge by visiting the Empire State Purchasing Group website at: www.BidNetDirect.com/new-york/city-of-newburgh, selecting the "Open Solicitations" tab and title of solicitation. Vendors may have to register if visiting this site for the first time. Prospective Bidders must obtain all Bid Documents, including Addenda and other Bid correspondence, from the Empire State Purchasing Group’s website in order to be considered an official Plan Holder. Bids received from Contractors that are not considered an official Plan Holder shall not be accepted by the City of Newburgh.

Bidders shall promptly notify the City of Newburgh of any errors, omissions, conflicts, ambiguity, etc. found within the contract documents. The above item and/or questions shall be submitted in writing via email to aspinelli@cityofnewburgh-ny.gov.

Interpretations or clarifications considered necessary will be issued via Addenda posted to the Empire State Purchasing Group website at www.BidNetDirect.com/new-york/city-of-newburgh. Questions must be received on or before 12:00 p.m., EST, Tuesday, November 10, 2026. Questions received after this date may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda, as required, will be issued on or before Tuesday, November 17, 2026 to BidNet for Contractor download. Where state and local requirements differ from federal, the federal requirements shall be followed.

All Bids must be made on the official Bid Form or an exact copy by reproduction thereof. All Bids must be in original form and signed in blue ink, except for a Notary Public. Photocopies will not be accepted and will result in a rejection of the Bid. Everything must be enclosed in a sealed envelope with the following clearly marked on the front of the envelope:

• Bidders name and address

• Sealed Bid #13.26 - Replacement of the West End Firehouse Roofs

• Date and Time of Bid Opening

This is a lump sum bid as described in the Instructions to Bidders. No Bidder may withdraw his or her Bid within forty-five (45) calendar days after the actual date of the opening thereof. Each Bid must be accompanied by a bid security in the amount of five

(5) percent of the base bid in accordance with the Instructions to Bidders. Successful bidders will be required to provide performance and payment bonds, proof of appropriate insurance, and execute contracts prior to commencement of work.

The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price. The successful Bidder will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 21, 1968 and published in the Federal Register (41CFR Part 60-1, 33 F.2 7804).

http://www.bidnetdirect.com/new-york/city-of-newburgh http://www.bidnetdirect.com/new-york/city-of-newburgh

SECTION 00 11 13 - 8

The City of Newburgh reserves the right to reject any and all Bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive, or Conditional Bids.

OWNER: Contact: Design Firm: Contact:

City of Newburgh Allison Spinelli LAN Associates E.P.A.S., LLP Vlad Potiyevsky, AIA 83 Broadway Assistant City Engineer 252 Main Street Project Architect Newburgh, New York 12550 (845) 569-7450 Goshen, NY 10924 (845) 615-0350

BY ORDER OF THE CITY OF NEWBURGH

By: Dated:

David Truong, Acting City Comptroller

City of Newburgh - An Equal Opportunity Employer

Justice, Equity, Diversity and Inclusion are core values to the City of Newburgh, where there is a strong commitment to establishing and maintaining an environment free of discrimination. These values are promoted through the daily practice of professionalism, respect, acceptance and understanding. As such, City residents along with women, minorities, individuals with disabilities, members of the LGBTQ community, and veterans are encouraged to apply.

MEDIA SOURCE PUBLICATION DATE

Hudson Valley Press Wednesday, October 28, 2026 Mid-Hudson Times Thursday, October 29, 2026

SECTION 00 21 13 - 1

SECTION 00 21 13

INSTRUCTIONS TO BIDDERS

PROJECT IDENTIFICATION:

Project Title: Replacement of the West End Firehouse Roofs

Bid No.: Bid No. 13.26

OWNER: City of Newburgh

Newburgh, New York 12550

Orange County

OWNER’S ARCHITECT: LAN Associates, Engineering, Planning, Architecture, Surveying, LLP

252 Main Street

Goshen, NY 10924

1. Defined Terms.

1.1 Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Bid Documents have the meanings assigned to them in the General Conditions.

Certain additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.

1.1.1 Bidder - one who submits a bid directly to OWNER as distinct from sub-bidder, who submits a bid to a Bidder.

1.1.2 Issuing Office - the office from which the Bid Documents are to be issued and where the bidding procedures are to be administered.

1.1.3 Successful Bidder - the lowest, responsible and responsive Bidder to whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.

1.1.4 Day - shall mean calendar day, all weekends and holidays included.

1.1.5 Agreement – The written contract between OWNER and CONTRACTOR covering the Work to be performed.

1.1.6 Bid – The offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the Work to be performed.

1.1.7 Bidding Documents – The advertisement or invitation to Bid, instructions to bidders, the Bid from, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids)

1.1.8 Contract Times – The number of days to the dates stated in the Agreement; to achieve substantial completion and to complete the Work so that it is ready for final payment as evidence by ARCHITECT’s written recommendation of final payment.

1.1.9 CONTRACTOR – The person, firm or corporation with whom Owner has entered into the Agreement.

1.1.10 Drawings – The drawings which show the scope, extent, and character of the Work to be furnished and performed by CONTRACTOR and which have been prepared or approved by ARCHITECT and are referred to in the Contract Documents. Shop drawings are not Drawings as so defined.

1.1.11 Effective Date of the Agreement – The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the agreement is signed and delivered by the last of the two parties to sign and deliver.

1.1.12 ARCHITECT – The person, firm or corporation named as such in the Agreement.

1.1.13 Notice of Award – The written notice by OWNER to the apparent successful bidder stating that upon compliance by the apparent successful bidder with the conditions present therein, within the time specified, SECTION 00 21 13 - 2

OWNER will sign and deliver the Agreement.

1.1.14 OWNER – The public body or authority, corporation, association, firm or person with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provided.

1.1.15 Underground Facilities – All pipelines, conduits, dusts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities which have been installed underground to furnish any of the following services or material: electricity, gases, steam, liquid petroleum products, telephone, cable television, or other communications, sewage and drainage removal, traffic or other control systems or water.

2. Copies of Bid Documents.

2.1 Complete sets of the Bid Documents may be viewed and downloaded at no charge by visiting the Empire State Purchasing Group website at: http://www.BidNetDirect.com/new-york/city-of-newburgh. Prospective Bidders must obtain all Bid Documents, including Addenda and other Bid correspondence, from the Empire State Purchasing Group’s website in order to be considered an official Plan Holder. Bids received from Contractors that are not considered an official Plan Holder shall not be accepted by the OWNER.

2.2 Complete sets of Bid Documents must be used in preparing Bids; neither OWNER nor ARCHITECT assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.

3. Qualification of Bidders.

3.1 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five (5) days after Submission deadline upon OWNER’s request detailed written evidence such as financial data, previous experience, present commitments and other such data as may be called for in the Bid Documents. Each Bid must contain evidence of Bidder’s qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract.

4. Examination of Contract Documents and Site.

4.1 It is the responsibility of each Bidder before submitting a Bid:

4.1.1 To examine thoroughly the Contract Documents and other related data identified in the Bid Documents (including “technical data” referred to below);

4.1.2 To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance, or furnishing of the Work;

4.1.3 To consider federal, state, and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;

4.1.4 To study and carefully correlate Bidder’s knowledge and observations with the Contract Documents and such other related data; and,

4.1.5 To promptly notify OWNER of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents.

4.2 Reference is made to the General Conditions for identification of:

4.2.1 Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by ARCHITECT in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the “technical data” contained in such reports but not upon other data, interpretations, opinions or information contained in such reports or otherwise relating to the subsurface conditions at the site, nor upon the completeness thereof for the purposes of bidding or construction.

4.2.2 Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by ARCHITECT in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the “technical data” contained in such drawings but not upon other data, interpretations, opinions, or information shown or indicated in such drawings or otherwise relating to such structures, nor upon the completeness thereof for the purposes of bidding or construction.

4.2.3 Copies of such reports and drawings will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon

SECTION 00 21 13 - 3

which Bidder is entitled to rely as provided in Paragraph 4.2 of the General Conditions. Bidder is responsible for any interpretation or conclusion drawn from any “technical data” or any such data, interpretations, opinions, or information.

4.3 Information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ARCHITECT by owners of such Underground Facilities or others, and the OWNER and ARCHITECT do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the General Conditions.

4.4 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Contract Documents due to differing or unanticipated conditions appear in Paragraphs 4.2 and 4.3 of the General Conditions.

4.5 Before submitting a Bid, each Bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contact Documents.

4.6 On request, OWNER will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests, and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests, and studies.

4.7 Reference is made to the General Conditions for the identification of the general nature of Work that is to be performed at the site by OWNER or others (such as utilities and other prime contractors) that relates to the work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such work.

4.8 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception of the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences, or procedures for construction (if any) that may be shown or indicated or expressly required by the Contract Documents, the Bidder has given OWNER written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Contract Documents, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

4.9 The provisions of 4.1 through 4.4 of the General Conditions, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste, or Radioactive Material covered by Paragraph 4.5 of the General Conditions.

5. Availability of Lands for Work, etc.

5.1 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the Work are identified in the Contract Documents. All additional land and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.

6. Interpretations and Addenda.

6.1 All questions about the meaning or intent of the Bid Documents are to be directed to the OWNER in writing via email to Assistant City Engineer, Allison Spinelli at aspinelli@cityofnewburgh-ny.gov on or before 12:00 p.m., Tuesday, November 10, 2026. Interpretations or clarifications considered necessary by OWNER in response to such questions will be issued by Addenda and shall be posted to the Empire State Purchasing Group website at www.BidNetDirect.com/new-york/city-of-newburgh. Questions received after this date may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda, as required, will be issued on or before Tuesday, November 17, 2026 to BidNet for Contractor download.

6.2 Addenda may also be issued to modify the Bid Documents as deemed advisable by OWNER or ARCHITECT.

SECTION 00 21 13 - 4

7. Bid Security.

7.1 Each Bid must be accompanied by a Bid Security made payable to OWNER in an amount of five (5) percent of Bidder’s maximum Bid Price in the form of a certified or bank check, or in the form of a Bid Bond (on prescribed form attached) issued by a surety meeting the requirements of 5.1 of the General Conditions.

7.2 The Bid Security of Successful Bidder will be retained until such Bidder has executed the Agreement, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid Security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within fifteen (15) days after the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh (7th) day after the Effective Date of the Agreement or the thirty-sixth (36th) day after the Bid opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven (7) days after the Bid opening.

8. Contract Times.

8.1 The number of days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment (the term “Contract Times” is defined in paragraph 1.12 of the General Conditions) are set forth in Article 3 of the Standard Form of Agreement (or incorporated therein by reference to the attached Bid Form).

9. Liquidated Damages.

9.1 Provisions for liquidated damages, if any, are set forth in the Agreement.

10. Substitute and “Or-Equal” Items.

10.1 The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or “or-equal” items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or “or-equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ARCHITECT, application for such acceptance will not be considered by ARCHITECT until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ARCHITECT is set forth in Paragraphs 6.8.1 and 6.8.2 of the General Conditions and may be supplemented in the General Requirements.

11. Subcontractors, Suppliers, and Others.

11.1 If the General Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, apparent Successful Bidder, and any other Bidder so requested, shall within five (5) days of Notice of Award submit to OWNER a list of all such Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work for which such identification is required.

An OWNER or ARCHITECT who, after due investigation reasonably believes that a Subcontractor, Supplier, other person or organization is suspended, debarred or has otherwise been declared ineligible to perform this contract, may request that the Successful Bidder submit an acceptable substitute Subcontractor, Supplier, person or organization.

If apparent Successful Bidder declines to make any such substitution, OWNER may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons and organizations.

In contracts where the Contract Price is on the basis of Cost-of-the-Work Plus a Fee, apparent Successful Bidder, prior to the Notice of Award, shall identify in writing to OWNER those portions of the Work that such Bidder proposes to subcontract and after the Notice of Award may only subcontract other portions of the Work with OWNER’s written consent.11.3 No CONTRACTOR shall be required to employ any Subcontractor, Supplier, other person or organization against whom

CONTRACTOR has reasonable objection.

12. Bid Form.

12.1 The Bid Forms are included with the Bid Documents.

12.2 The Bid Forms have been developed as fillable forms that may be filled out utilizing Adobe Acrobat. Alternatively, the Bid Form may be clearly hand written in ink or by typewriter.

SECTION 00 21 13 - 5

12.3 Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.

12.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.

12.5 All names must be typed or printed in black ink below the signature. Except for Notary Publics, all signatures must be executed in blue ink so as to distinguish an original from a copy.

12.6 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).

12.7 The address and telephone number for communications regarding the Bid must be shown.

12.8 Evidence of authority to conduct business as an out-of-state business entity in the state where the Work is to be performed shall be provided in accordance with 12.3 above. State contractor license number, if any, must also be shown.

13. Submission of Bids.

13.1 Bids shall be submitted at the time and place indicated in the Advertisement or Notice to Bidders and shall be enclosed in an opaque sealed envelope, clearly marked with the Project Title (and, if applicable, the designated portion of the Project for which the Bid is submitted) and name and address of Bidder, and accompanied by the Bid Security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation “BID ENCLOSED” on the face of it.

13.2 One (1) original and one (1) USB digital copy of all required Bid Forms shall be submitted together in same sealed envelope by Bidder which have been clearly marked with Original and Copy.

14. Modification and Withdrawal of Bids.

14.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and mailed to the City Comptroller at the address indicated in the Invitation for Bids prior to the submission deadline.

14.2 Where an unilateral error or mistake is discovered in a Bid, such Bid may be withdrawn after a showing of the following:

(1) the mistake is known or made known to the OWNER prior to the awarding of the contract or within three (3) days after the opening of the Bid, whichever period is shorter; and (2) the price Bid was based on an error of such magnitude that enforcement would be unconscionable; and (3) the Bid was submitted in good faith and the Bidder submits credible evidence that the mistake was a clerical error as opposed to a judgment error; and (4) the error in the Bid is actually due to an unintentional and substantial arithmetic error or an unintentional omission of a substantial quantity of work, labor, material, goods or services made directly in the compilation of the Bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the Bid sought to be withdrawn; and (5) it is possible to place the OWNER in status quo ante.

15. Opening of Bids.

15.1 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An abstract of the amounts of the base bids and major alternates (if any) shall be made available to Bidders for download after the opening of Bids on the Empire State Purchasing Group’s website.

16. Bids to Remain Subject to Acceptance.

16.1 All Bids will remain subject to acceptance for forty-five (45) days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid Security prior to that date.

17. Award of Contract.

17.1 To the fullest extent permitted by law OWNER reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsible or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate, to the extent permitted by law, contract terms with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be

SECTION 00 21 13 - 6

resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

17.2 In evaluating Bids, OWNER will consider the qualifications of Bidders, whether or not the Bids comply with the prescribed requirements, and any such alternates, unit prices and other data as may be requested in the Bid Form prior to the Notice of Award.

17.3 OWNER may consider the operating costs, maintenance requirements, performance data and guarantees of major item of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.

17.4 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, to perform and furnish the Work in accordance with the Contract Documents to OWNER’s satisfaction within the prescribed time.

17.5 If the contract is to be awarded, it will be awarded to lowest responsible Bidder whose evaluation by OWNER indicates the award will be in the best interests of the Project.

17.6 If the contract is to be awarded, OWNER will give Successful Bidder a Notice of Award within seven (7) days after the day of the Bid opening.

18. Contract Security.

18.1 Paragraph 5.1 of the General Conditions set forth OWNER’s requirements as to performance and payment Bonds.

When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required performance and payment Bonds.

19. Signing of Agreement.

19.1 When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within seven (7) days thereafter CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Insurances and Bonds. Within seven (7) days thereafter OWNER shall deliver one (1) fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification.

20. Pre-Bid Site Visit Meeting.

20.1 A Pre-Bid Site Visit Meeting will be held on Thursday, November 5, 2026 at 10:00 am. at 492 Broadway, Newburgh, NY 12550. Representatives of OWNER, ARCHITECT, and/or ARCHITECT’s Consultant shall be present to discuss the Project. Bidders are strongly encouraged to attend and participate in the meeting. OWNER will post on the Empire State Purchasing Group’s website such Addenda as OWNER considers necessary in response to questions arising at the meeting for all prospective Bidders to download and review. Oral statements may not be relied upon and will not be binding or legally effective.

21. Sales and Use Taxes.

21.1 The OWNER is exempt from payment of Sales and Compensating Use Taxes of the State of New York and of its cities and counties on all materials and supplies sold to the OWNER pursuant to the provisions of this Contract. Those tools, machinery, and equipment or other property leased by or to the CONTRACTOR or a SUBCONTRACTOR, or supplies and materials which even though they are consumed, are not incorporated into the completed project are not tax exempt.

The CONTRACTOR and his SUBCONTRACTORS shall be responsible to pay all applicable taxes, including Sales and Compensating Use Taxes, on such leased tools, machinery, and equipment, or other property and upon all such unincorporated supplies and materials.

22. Retainage.

22.1 Provisions concerning retainage and CONTRACTOR’S rights to deposit securities in lieu of retainage are set forth in Article 5 of the Standard Form of Agreement.

23. Iranian Energy Sector Divestment.

23.1 Bids shall be in compliance with New York State General Municipal Law Section 103-g entitled “Iranian Energy Sector Divestment”.

SECTION 00 21 13 - 7

23.2 By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies and in the case of a joint Bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief, that each Bidder is not on the list created pursuant to NYS Finance Law Section 165-a(3)(b).

The Bidder shall submit a signed, notarized and dated Iranian Energy Sector Divestment Certification with its Bid.

23.3 Said certificate is mandated by Section 103-g of the General Municipal Law. Reference the Iranian Energy Sector Divestment Certificate form included in this Bid Document.

24. Prevailing Wages

24.1 The contractor shall ensure that workers are paid the appropriate wages and supplemental (fringe) benefits. Throughout the contract, the Contractor shall obtain and pay workers in accordance with periodic wage rate schedule updates from the NYS Department of Labor (NYSDOL). Wage rate amendments and supplements are available on the NYSDOL website at www.labor.state.ny.us. All changes or clarification of labor classification(s) and applicability of prevailing wage rates shall be obtained in writing from the Office of the Director, NYSDOL Bureau of Public Work.

24.2 The NYSDOL prevailing wage rate schedule for this contract has been determined and is available on the internet. The prevailing wage rate schedule is accessed by visiting the NYSDOL website, navigating to the appropriate web page and entering the Prevailing Rate Case No. (PRC#). The PRC# is 2026029816. The wage rate schedule for this project can be found at the following link: https://apps.labor.ny.gov/wpp/showFindProject.do?method=showIt

24.3 Federal Davis Bacon Wages also apply to this project. They may be obtained at https://sam.gov/wage-determinations. A Copy of the prevailing wage rate schedule is also included herein.

25. Non-Collusive Bidding Procedures

25.1 Each Bidder is required to comply with the requirement regarding non-collusive bidding procedures and shall submit the appropriate Non-Collusive Bidding Certification and Non-Collusive Bidding Certification Bidder Information with the Bid. Knowledge of bid collusions or other questionable contract related practices shall be reported per the instructions contained in Reporting Violations of the Non-Collusive Bidding Procedures, Misconduct, or other Prohibited Contract Activities.

26. Public Work Contractor and Subcontractor Registry

26.1 Starting December 30, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered by Article 8 of the Labor Law are required to register with the New York State Department of Labor (NYSDOL) under Labor Law Section 220-i (link to registration here:

https://dol.ny.gov/contractor-and-subcontractor-landing). All contractors and subcontractors must submit proof of registration with the NYSDOL with its bid documents.

27. Public Work Electronic Payroll Submission

27.1 Starting December 31, 2025, all contractors and subcontractors working on projects subject to Article 8 of the Labor Law must submit their certified payroll through NYSDOL’s Certified Payroll system. Payrolls must be submitted at least every thirty (30) days for the length of the project. The due date for each project is calculated by the system based on the project start date and the payroll end dates provided by the contractor/subcontractor when setting up the project.

Failure to submit the required certified payroll records may result in penalties of $100/day, following a 14-day grace period. Learn more at the Certified Payroll web page and Contractor User Guide.

https://apps.labor.ny.gov/wpp/showFindProject.do?method=showIt https://sam.gov/wage-determinations https://sam.gov/wage-determinations https://dol.ny.gov/contractor-and-subcontractor-landing https://dol.ny.gov/Electronic-Payroll https://dol.ny.gov/bizserve/ep/guide/contractor

SECTION 00 21 13 - 8

SECTION 00 41 13 - 1

SECTION 00 41 13

BID FORM

Project Identification: Replacement of the West End Firehouse Roofs

Contract Identification And Number: Bid No. 13.26

Submitted To: City of Newburgh

83 Broadway - 4th Floor, Newburgh, NY 12550 Attn: Acting City Comptroller

1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicted in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. BIDDER accepts all of the terms and conditions of the Instructions to Bidders. This Bid will remain subject to acceptance for forty-five (45) days after the day of the submission deadline. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within seven

(7) days after the date of OWNER’s Notice of Award.

3. In submitting this Bid, BIDDER represents as more fully set forth in the Agreement, that:

a. BIDDER has examined and carefully studied the Notice to Bidders, Bid Documents and the following Addenda receipt of all which is hereby acknowledged:

List Addenda by Addendum Number and Date:

b. BIDDER has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work. Alternatively, in lieu of such, do solely and completely accept all risks inherent in not doing so.

c. BIDDER is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.

d. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been provided in paragraph 4.2 of the General Conditions. BIDDER accepts the determination set forth in paragraph 4.2 of the General Conditions of the extent of the “technical data” contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges that OWNER and ARCHITECT do not assume responsibility for the accuracy or completeness of information and data shown or indicted in the Bid Documents with respect to underground facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto.

BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price, and other terms and conditions of the Contract Documents.

e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.

SECTION 00 41 13 - 2

f. BIDDER has correlated the information known to BIDDER, information and observation obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

g. BIDDER has given OWNER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by OWNER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and, BIDDER has not sought by collusion to obtain for itself any advantage over any other BIDDER or over OWNER.

i. Any other representation required by Laws and Regulations.

4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s). The Lump Sum Quotation shall be the cost of the Work for the Project outlined and described in all of the Contract Documents for the work associated the Crescent Avenue Pump Station Reconstruction The City shall make the determination post bid as to how to proceed based upon the bid proposals.

LUMP SUM QUOTATION:

Written or Typed in Text Numerical

5. BIDDER agrees that the Work will be substantially complete and ready for final payment in accordance with paragraph

14.13 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.

6. The following documents are attached to and made a condition of this Bid:

a. Resolution of Board of Directors

b. Non-Collusion Bidding Affidavit

c. Required BIDDER’s Qualification Statement with supporting data

d. Affidavit of Workers’ Compensation

e. Iranian Energy Sector Divestment

7. Communications concerning this Bid shall be addressed to, the address of BIDDER indicated below:

8. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions.

SUBMITTED on:

Month Day Year

State Contractor License No.:

SECTION 00 41 13 - 3

If BIDDER is:

An Individual

Seal

By:

Individual’s Name

Doing business as

Business Address:

Phone Number:

A Partnership

By:

Firm Name

General Partner

Business Address:

A Corporation

By:

Corporation Name

State of Incorporation:

Authorized Signatory: Title:

Attestation:

Seal Secretary

Business Address:

Date qualified to do business:

A Joint Venture

By:

Individual’s Name

Address:

By:

Individual’s Name

Address:

Official Communications Address:

Official Communications Phone Number:

Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.

SECTION 00 41 13 - 4

SECTION 00 43 13 - 1

CERTIFIED COPY OF RESOLUTION

OF

BOARD OF DIRECTORS OF

Replacement of the West End Firehouse Roofs

City of Newburgh, New York

Name of Corporation

Resolved that , Authorized Signatory Title of Authorized to sign and submit the Bid of the Corporation for Name of Corporation the following project: Replacement of the West End Firehouse Roofs and to include in such Bid the Certificate as to Non-Collusion, and for any inaccuracies or misstatements in such Certificate this

Corporate Bidder shall be liable under the penalties of perjury.

The foregoing is a true and correct copy of the Resolution adopted by:

Name of Corporation

At a meeting of its Board of Directors held on the day of 20

By: Title:

This form must be completed if the Bidder is a Corporation

SECTION 00 43 13 - 2

SECTION 00 43 13.14 - 1

SECTION 00 43 13.14

BIDDER’S QUALIFICATION QUESTIONNAIRE

Replacement of the West End Firehouse Roofs

Bid No. 13.26

City of Newburgh, Orange County, New York

The undersigned guarantees the accuracy of all statements and answers herein contained. (Please print in ink).

1. How many years has your firm been in business as a Contractor?

in years:

2. List projects of this nature that you have completed in the last three (3) years, and give the name, address and telephone number of a reference from each. Also give the completion date, the original contract bid price and the completed cost of each project listed (use additional sheet, if necessary).

3. List projects presently under construction by your firm, the dollar volume of the contract and the percentage completion of the contract.

4. Work awarded to you; if so, state where and why.

5. What equipment do you own that is available for this work?

6. What equipment do you plan to rent or purchase for this work?

SECTION 00 43 13.14 - 2

7. Have you ever performed work under the direction of a Professional ARCHITECT or Registered Architect? If so, list up to three (3) such firms giving the name of the firm, its address, telephone number and the name of the project. (List most recent projects).

8. Give the name, address and telephone number of an individual who represents each of the following and whom the OWNER may contact to investigate your financial responsibility: a surety, a bank, and a major material supplier.

9. Provide a financial statement for your company. This should include a balance and income statement for your most recent fiscal year. A certified audit is preferred but not required. Use an insert sheet, if needed. Only three (3) lowest bidders shall submit this information (if requested by OWNER) to the OWNER within forty-eight (48) hours of the opening of the Bids.

10. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business, and the address of the place of business. (If a corporation, state the name of all partners. If a trade name, state the names of the individuals who do business under the trade name.) It is absolutely necessary that information be furnished.

The business is a Type of Legal Entity

The address of principal place of business is:

The names of the corporate officers, or partners, or individual doing business under a trade:

SECTION 00 43 13.15 - 1

SECTION 00 43 13.15

AFFIDAVIT - WORKERS’ COMPENSATION

Replacement of the West End Firehouse Roofs

Bid No. 13.26

City of Newburgh, Orange County, New York

STATE OF: )

) SS:

County of: )

I, of the Town, Village, City of in the County of and the State of of full age, being duly sworn according to law on my oath depose and say that:

I am , an officer of the firm of being duly sworn, deposes and says that he now carries or that he has applied for a…

This is the start of the file's text. The full file is on GovTribe.