This is a Project Manual for a state construction contract issued by the California Department of General Services (DGS) Real Estate Services Division for the Potrero Fire Station Facility Replacement project, a joint effort between DGS and the Department of Forestry & Fire Protection (CAL FIRE) in San Diego County. The project involves constructing a new fire station on a 7-acre site with multiple buildings including a 12-bed barracks/mess hall, 3-bay apparatus building, generator/pump storage building, fuel dispensing system, vehicle wash rack, hose wash rack, 60,000-gallon water storage tank, and flammable storage building, along with comprehensive site work including clearing, grading, drainage, paving, utilities, wells, septic system, electrical, irrigation, fencing, and landscaping. Sealed bids are due before 2:00 p.m. on December 15, 2026, with public bid opening on December 16, 2026, at 10:00 a.m. A mandatory pre-bid site inspection is required on December 1, 2026, at 10:00 a.m. at 1230 Round Potrero Road, Potrero, CA 91963. Contractors must possess a valid California State License Classification A or B, with C-16 Fire Protection specialty contractor and C-57 Well Drilling specialty contractor licenses required either by the prime contractor or first-tier subcontractors. Contract award is expected within 90 days of bid opening.
The bid shall be submitted on a lump-sum basis and must include all costs for labor, materials, equipment, bonds, insurance, and sales tax. The project requires 3% Disabled Veteran Business Enterprise (DVBE) participation as a mandatory set-aside, with a DVBE Incentive available for bidders exceeding the minimum requirement ranging from 1% to 5% in value. A 5% Small Business preference applies to certified small businesses, and non-small businesses may claim preference by committing to subcontract at least 25% of the net bid price to certified small businesses. Bidders must submit a Bidder's Bond or other security equal to 10% of the bid amount. Prevailing wage rates as determined by the Department of Industrial Relations for August 2026 apply. The contract requires 100% performance and payment bonds. Award of the contract is subject to availability of funds through the State's normal budget process and/or transfer of funds through the Architecture Revolving Fund.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Manual_Book_II_of_II.pdf | ||
| Bid_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book I of II
INTRODUCTORY INFORMATION
BIDDING REQUIREMENTS
CONTRACTING REQUIREMENTS
SPECIFICATIONS – DIVISION 01
FOR:
POTRERO FIRE STATION – FACILITY
REPLACEMENT
DEPARTMENT OF FORESTRY & FIRE (CAL FIRE)
POTRERO, SAN DIEGO COUNTY, CALIFORIA
Victoria Chua, Project Director II West Sacramento, California
State of California March 7, 2025
DGS000000139817
PROJECT TITLE PAGE
RESDMSTR: 02/03/2014v1 00 01 01 - 1 DGS000000139817
DOCUMENT 00 01 01
PROJECT TITLE PAGE
Title : POTRERO FIRE STATION – FACILITY
REPLACEMENT
Client Agency : DEPARTMENT OF FORESTRY & FIRE (CAL
FIRE)
Location : 1230 ROUND POTRERO ROAD
POTRERO, CA 91963
Project Number : DGS000000139817
Project Director : Victoria Chua State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 926-9750 Email: Victoria.chua@dgs.ca.gov
Architect : State of California Department of General Services
Weizhong (John) Zhu Telephone Number: (279) 946-7717 Email: john.zhu@dgs.ca.gov
CERTIFICATIONS PAGE
RESDMSTR: 02/03/2014v1 00 01 05 - 1 DGS000000139817
DOCUMENT 00 01 05
PROJECT TITLE : Potrero Fire Station – Facility Replacement
CLIENT AGENCY : Department of Forestry & Fire Protection (CAL FIRE)
LOCATION : POTRERO, SAN DIEGO COUNTY, CALIFORNIA
PROJECT NO. : DGS000000139817
ARCHITECT AND ENGINEERS:
Weizhong Zhu
DGS/RESD/PMDB
Cory Bannon
BKF
Steven N. Lang
MIG
ARCHITECT CIVIL ENGINEER LANDSCAPE ARCHITECT
Marshall Roberts
Robert Nolan, PE
LEED AP, CEM, CMVP, PF
Tommy Lee
STRUCTURAL ENGINEER MECHANICAL / PLUMBING
ENGINEER
ELECTRICAL ENGINEER
RESDMSTR: 02/03/2014v1 00 01 05 - 1 DGS000000139817
DOCUMENT 00 01 05
CLIENT AGENCY : Department of Forestry & Fire Protection (CALFIRE)
LOCATION : POTRERO, SAN DIEGO COUNTY, CALIFORNIA
PROJECT NO. : DGS000000139817
REGULATORY REVIEWS:
DSA ACCESS COMPLIANCE
OSFM
SEALS PAGE
12/20/2024: WZ 00 01 07 - 1 DGS000000139817
DOCUMENT 00 01 07
SEALS PAGE
CLIENT AGENCY: Department of Forestry & Fire Protection (CAL FIRE)
PROJECT LOCATION: Round Potrero Road Potrero, CA 91963 San Diego County
ARCHITECT AND ENGINEERS:
ARCHITECT CIVIL ENGINEER LANDSCAPE ARCHITECT
STRUCTURAL ENGINEER MECHNICAL / PLUMBING ELECTRICAL ENGINEER
END OF DOCUMENT 00 01 07
Signature
Renewal Date
Date
02-28-2027
09-30-2025
O
SC
AR
JOHNSON NO . 648
L I C
EN
SED LA NDSCA PE ARCH
I T
EC
T
S T
A
T E O F C A L I F O R N I A
WEIZHONG ZHU
C-40565
S TAT E O F CA L I F O R N IA
L IC
ENSED A RCHITECT
REN. 03/31/27
09/30/2025 Exp. 09/30/27 09/30/2025 09/30/2025
09/30/2025 09/30/2025 09/30/2025
Weizhong Zhu
DGS/RESD/PMDB
Cory Bannon
BKF
Steven N Lang
MIG
Robert Nolan, PE
LEED AP, CEM, CMVP, PF
Tommy Lee
TABLE OF CONTENTS
RESDMSTR: 6/20/2025 00 01 10 - 1 DGS000000139817
DOCUMENT 00 01 10
TABLE OF CONTENTS
BOOK I
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 only 00 01 07 Seals Page .................................................................................... 1 only 00 01 10 Table of Contents .......................................................................... 1 through 7 00 01 15 List of Drawings ............................................................................. 1 through 6
BIDDING REQUIREMENTS
Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 8 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3
00 31 32 Geotechnical Data ......................................................................... 1 only 00 41 00 Bid Form (Sample) ........................................................................ 1 through 10 00 43 13 Bidder’s Bond ................................................................................ 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2
00 45 46 Payee Data Record ....................................................................... 1 through 2
CONTRACTING REQUIREMENTS
Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 13 00 91 13 Addenda ........................................................................................ 1 through 3
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
RESDMSTR: 6/20/2025 00 01 10 - 2 DGS000000139817
Section 01 10 00 Summary ....................................................................................... 1 through 4 01 25 00 Substitution Procedures ................................................................. 1 through 2 01 29 00 Payment Procedures ..................................................................... 1 through 3 01 31 00 Project Management and Coordination .......................................... 1 through 8
01 32 00 Construction Progress Documentation .......................................... 1 through 8 01 32 33 Photographic Documentation ........................................................ 1 through 5 01 33 00 Submittal Procedures .................................................................... 1 through 8 01 33 29.08 Buy Clean California Act Requirements ......................................... 1 through 2 01 40 00 Quality Requirements .................................................................... 1 through 6 01 50 00 Temporary Facilities and Controls ................................................. 1 through 11 01 57 23 Temporary Storm Water Pollution Control ..................................... 1 through 4 01 60 00 Product Requirements ................................................................... 1 through 5 01 64 00 Owner-furnished Products ............................................................. 1 through 2 01 73 00 Execution ...................................................................................... 1 through 6 01 74 19 Construction Waste Management and Disposal ............................ 1 through 5 Form 01 74 19.01 Construction Waste Estimate......................................................... 1 only 01 74 19.02 Waste Management Report ........................................................... 1 through 2 Section 01 74 20 Recycled Content Certification ....................................................... 1 through 4 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 3 01 74 20.01 Recycled Content Certification Worksheet ..................................... 1 through 3 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) ...................................................................................................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary .... 1 through 2 Section 01 75 00 Starting and Adjusting ................................................................... 1 through 3 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Section 01 79 00 Demonstration and Training .......................................................... 1 through 5 01 91 13 General Commissioning Requirements ......................................... 1 through 16
BOOK II
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 19 Selective Demolition ...................................................................... 1 through 3
DIVISION 03 – CONCRETE
Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 4 03 30 00 Cast-in-Place Concrete.................................................................. 1 through 13 03 35 43 Polished Concrete Finishing .......................................................... 1 through 4
DIVISION 04 – MASONRY
Section 04 22 00 Concrete Unit Masonry .................................................................. 1 through 7 04 43 13.16 Adhered Stone Masonry Veneer .................................................... 1 through 11
DIVISION 05 – METALS
RESDMSTR: 6/20/2025 00 01 10 - 3 DGS000000139817
Section 05 12 00 Structural Steel Framing ................................................................ 1 through 8 05 50 00 Metal Fabrications ......................................................................... 1 through 10 05 53 19 Expanded Metal Gratings .............................................................. 1 through 3
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Section 06 10 00 Rough Carpentry ........................................................................... 1 through 10 06 16 00 Sheathing ...................................................................................... 1 through 3 06 17 53 Shop-Fabricated Wood Trusses .................................................... 1 through 7 06 18 00 Glued Laminated Construction ...................................................... 1 through 5 06 20 13 Exterior Finish Carpentry ............................................................... 1 through 7 06 20 23 Interior Finish Carpentry ................................................................ 1 through 9 06 40 23 Interior Architectural Woodwork ..................................................... 1 through 12 06 41 13 Wood-Faced Architectural Cabinets .............................................. 1 through 11 06 46 00 Wood Trim ..................................................................................... 1 through 6 06 64 00 Plastic Paneling ............................................................................. 1 through 4
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 13 26 Self-Adhering Sheet Waterproofing ............................................... 1 through 4 07 19 00 Water Repellents ........................................................................... 1 through 5 07 21 00 Thermal Insulation ......................................................................... 1 through 8 07 25 00 Weather Barriers ........................................................................... 1 through 4 07 26 00 Vapor Retarders ............................................................................ 1 through 3 07 41 13.16 Standing-Seam Metal Roof Panels ................................................ 1 through 11 07 42 93 Soffit Panels .................................................................................. 1 through 8 07 46 46 Fiber-Cement Siding ...................................................................... 1 through 5 07 62 00 Sheet Metal Flashing and Trim ...................................................... 1 through 13 07 72 00 Roof Accessories ........................................................................... 1 through 11 07 84 13 Penetration Firestopping ................................................................ 1 through 7 07 84 43 Joint Firestopping .......................................................................... 1 through 6 07 92 00 Joint Sealants ................................................................................ 1 through 10
DIVISION 08 – OPENINGS
Section 08 11 13 Hollow Metal Doors and Frames .................................................... 1 through 13 08 31 13 Access Doors and Frames ............................................................ 1 through 5 08 31 13.53 Security Access Doors and Frames ............................................... 1 through 3 08 33 23 Overhead Coiling Doors ................................................................ 1 through 9 08 53 13 Vinyl Windows ............................................................................... 1 through 6 08 71 00 Door Hardware .............................................................................. 1 through 21 08 80 00 Glazing .......................................................................................... 1 through 11 08 83 00 Mirrors ........................................................................................... 1 through 6 08 91 19 Fixed Louvers ................................................................................ 1 through 7
DIVISION 09 – FINISHES
Section 09 29 00 Gypsum Board .............................................................................. 1 through 11 09 30 13 Ceramic Tiling ............................................................................... 1 through 16 09 51 23 Acoustic Tile Ceilings .................................................................... 1 through 4
RESDMSTR: 6/20/2025 00 01 10 - 4 DGS000000139817
09 65 13 Resilient Base and Accessories ..................................................... 1 through 6 09 65 66 Resilient Athletic Flooring .............................................................. 1 through 7 09 91 13 Exterior Painting ............................................................................ 1 through 9 09 91 23 Interior Painting ............................................................................. 1 through 10 09 93 00 Staining and Transparent Finishing ............................................... 1 through 8
DIVISION 10 – SPECIALTIES
Section 10 14 19 Dimensional Letter Signage ........................................................... 1 through 8 10 14 23 Panel Signage ............................................................................... 1 through 11 10 26 00 Wall and Door Protection ............................................................... 1 through 6 10 28 00 Toilet, Bath, and Laundry Accessories ........................................... 1 through 5 10 44 13 Fire Protection Cabinets ................................................................ 1 through 6 10 44 16 Fire Extinguishers .......................................................................... 1 through 3 10 51 13 Metal Lockers ................................................................................ 1 through 5 10 56 26 Mobile Storage Shelving ................................................................ 1 through 3 10 75 16 Ground-Set Flagpoles ................................................................... 1 through 4
DIVISION 11 – EQUIPMENT
Section 11 20 00 Commercial Equipment ................................................................. 1 through 7 11 31 00 Residential Appliances .................................................................. 1 through 7
DIVISION 12 – FURNISHINGS
Section 12 24 13 Roller Window Shades .................................................................. 1 through 6 12 36 61 Simulated Stone Countertops ........................................................ 1 through 3
FACILITY SERVICES SUBGROUP
DIVISION 21 – FIRE SUPPRESSION
Section 21 05 17 Sleeves and Sleeve Seals for Fire-Suppression Piping ................. 1 through 5 21 05 18 Escutcheons for Fire-Suppression Piping ...................................... 1 through 2 21 05 23 General-Duty Valves for Water-Based Fire-Suppression Piping .... 1 through 9 21 05 29 Hangers and Supports for Piping and Equipment .......................... 1 through 8 21 05 48 Vibration and Seismic Controls for Fire-Suppression Piping and Equipment 1 through 10 21 05 53 Identification and Piping, Equipment and Ducts ............................. 1 through 6 21 07 00 Fire-Suppression Systems Insulation ............................................. 1 through 6 21 13 16 Dry-Pipe Sprinkler Systems ........................................................... 1 through 17 21 31 16 Diesel-Drive, Centrifugal Fire Pumps ............................................. 1 through 12 21 34 13 Pressure-Maintenance Pumps ....................................................... 1 through 4
RESDMSTR: 6/20/2025 00 01 10 - 5 DGS000000139817
DIVISION 22 – PLUMBING
Section 22 05 17 Sleeve and Sleeve Seals for Piping ............................................... 1 through 6 22 05 18 Escutcheons for Plumbing Piping ................................................. 1 through 3 22 05 19 Meters and Gages for Plumbing Piping ........................................ 1 through 7 22 05 23.12 Ball Valves for Plumbing Piping .................................................... 1 through 6 22 05 23.14 Check Valves for Plumbing Piping ................................................ 1 through 7 22 05 23.15 Gate Valves for Plumbing Piping .................................................. 1 through 4 22 05 29 Hangers and Supports for Plumbing Piping and Equipment ......... 1 through 14 22 05 53 Identification for Plumbing Piping and Equipment ......................... 1 through 7 22 05 93 Testing, Adjusting, and Balancing for Plumbing ............................ 1 through 11 22 07 19 Piping Insulation ........................................................................... 1 through 13 22 11 13 Facility Water Distribution Piping .................................................. 1 through 12 22 11 16 Domestic Water Piping ................................................................. 1 through 10 22 11 19 Domestic Water Piping Specialties ............................................... 1 through 9 22 11 23.13 Domestic-Water Packaged Booster Pumps .................................. 1 through 10 22 11 23.21 Inline, Domestic Water Pumps ...................................................... 1 through 4 22 12 19 Facility Ground-Mounted, Potable-Water Storage Tanks .............. 1 through 9 22 13 13 Facility Sanitary Sewers ............................................................... 1 through 8 22 13 16 Sanitary Waste and Vent Piping ................................................... 1 through 10 22 15 13 General Service Compressed-Air Piping ...................................... 1 through 9 22 15 19 General Service Packaged Air Compressors and Receivers ........ 1 through 5 22 32 00 Domestic Water Filtration Equipment ............................................ 1 through 18 22 34 00 Fuel-Fired, Domestic-Water Heaters ............................................ 1 through 8 22 41 00 Plumbing Fixtures ......................................................................... 1 through 6 22 45 00 Emergency Plumbing Fixtures ...................................................... 1 through 6
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
Section 23 25 29 Hangers and Supports for HVAC Piping and Equipment ............... 1 through 13 23 05 53 Identification for HVAC Piping and Equipment ............................... 1 through 8
23 05 93 Testing, Adjusting, and Balancing for HVAC .................................. 1 through 13 23 07 13 Duct Insulation ............................................................................... 1 through 16 23 07 19 HVAC Piping Insulation ................................................................. 1 through 17 23 09 93.11 Sequence of Operations for Engine Exhaust System Controls ...... 1 through 5 23 11 26 Facility Liquefied-Petroleum Gas Piping ........................................ 1 through 15 23 25 16.13 Positive-Pressure Engine Exhaust System .................................... 1 through 7 23 31 13 Metal Ducts ................................................................................... 1 through 11 23 33 00 Air Duct Accessories ..................................................................... 1 through 8 23 33 46 Flexible Ducts ................................................................................ 1 through 3 23 34 23 HVAC Power Ventilators ................................................................ 1 through 6 23 37 13 Diffusers, Registers, and Grilles .................................................... 1 through 2 23 37 23 HVAC Gravity Ventilators .............................................................. 1 through 5 23 41 00 Particular Air Filtration ................................................................... 1 through 5 23 81 26 Split-System Air-Conditioners ........................................................ 1 through 6 23 81 29 Variable-Refrigerant-Flow HVAC Systems ..................................... 1 through 29
DIVISION 26 – ELECTRICAL
RESDMSTR: 6/20/2025 00 01 10 - 6 DGS000000139817
Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables .................. 1 through 4 26 05 26 Grounding and Bonding for Electrical Systems .............................. 1 through 6 26 05 29 Hangers and Supports for Electrical Systems ................................ 1 through 4 26 05 33 Raceways and Boxes for Electrical Systems ................................. 1 through 9 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling .... 1 through 5 26 05 48.16 Seismic Controls for Electrical Systems ......................................... 1 through 5 26 05 53 Identification for Electrical Systems ............................................... 1 through 7 26 05 73.13 Short-Circuit Studies ...................................................................... 1 through 6 26 05 73.16 Coordination Studies ..................................................................... 1 through 11 26 05 73.19 Arc-Flash Hazard Analysis ............................................................ 1 through 8 26 09 23 Lighting Control Devices ................................................................ 1 through 3 26 24 13 Switchboards ................................................................................. 1 through 6 26 24 16 Panelboards .................................................................................. 1 through 7 26 26 53 Electric Vehicle Service Equipment – Level 2 ................................ 1 through 5 26 27 13 Electricity Metering ........................................................................ 1 through 4 26 27 26 Wiring Devices .............................................................................. 1 through 4 26 28 16 Enclosed Switches and Circuit Breakers ....................................... 1 through 5 26 31 00 Photovoltaic Collectors .................................................................. 1 through 9 26 32 13 Engine Generators ........................................................................ 1 through 22 26 32 90 Manual Transfer Switches with Integrated Quick Connects Enclosure 1 through 5 26 36 00 Transfer Switches .......................................................................... 1 through 13 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits ........... 1 through 3 26 51 19 LED Interior Lighting ...................................................................... 1 through 4 26 52 13 Emergency and Exit Lighting ......................................................... 1 through 4 26 56 13 Lighting Poles and Standards ........................................................ 1 through 3 26 56 19 LED Exterior Lighting ..................................................................... 1 through 3
DIVISION 27 – COMMUNICATIONS
Section 27 05 26 Grounding an Bonding for Communications Systems .................... 1 through 9 27 05 28 Pathways for Communications System .......................................... 1 through 15 27 05 29 Hangers and Supports for Communications System ...................... 1 through 6 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 1 through 5 27 15 00 Communications Horizontal Cabling .............................................. 1 through 13
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
Section 28 05 13 Conductors and Cables for Electronic Safety and Security ............ 1 through 10 28 05 26 Grounding and Bonding for Electronic Safety and Security ............ 1 through 4 28 31 11 Digital, Addressable Fire-Alarm System ........................................ 1 through 26
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 31 – EARTHWORK
Section 31 10 00 Site Clearing .................................................................................. 1 through 4 31 20 00 Earth Moving ................................................................................. 1 through 15 31 23 33 Excavating, Backfilling and Compacting for Utilities ....................... 1 through 8 31 25 13 Storm Water Pollution Prevention Plan .......................................... 1 through 4 31 50 00 Excavation Support and Protection ................................................ 1 through 4
RESDMSTR: 6/20/2025 00 01 10 - 7 DGS000000139817
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 01 30 Operation and Maintenance of Site Improvements ........................ 1 through 6 32 13 13 Concrete Paving ............................................................................ 1 through 12 32 13 15 Concrete Paving For Accessible Routes ........................................ 1 through 8 32 17 13 Parking Bumpers ........................................................................... 1 through 2 32 17 23 Pavement Markings ....................................................................... 1 through 6 32 17 26 Tactile Warning Surfacing .............................................................. 1 through 3 32 31 19.53 Decorative Metal Security Fences and Gates ................................ 1 through 11 32 33 00 Site Furnishings ............................................................................. 1 through 3 32 84 00 Irrigation System............................................................................ 1 through 17 32 90 00 Landscape Planting ....................................................................... 1 through 12 32 91 13 Soil Preparation ............................................................................. 1 through 18 32 91 19 Landscape Grading ....................................................................... 1 through 3
DIVISION 33 – UTILITIES
Section 33 09 10 Instrumental and Control for Water Utilities .................................... 1 through 6 33 10 00 Facility Water Distribution .............................................................. 1 through 16 33 11 13 Potable Water Supply Wells .......................................................... 1 through 6 33 21 00 Water Supply Wells ....................................................................... 1 through 8 33 30 00 Facility Sanitary Sewers ................................................................ 1 through 8 33 34 13 Septic Tanks .................................................................................. 1 through 4 33 42 00 Stormwater Conveyance ............................................................... 1 through 11 33 46 00 Subdrainage .................................................................................. 1 through 4 33 52 00 LPG Distribution System ................................................................ 1 through 3 33 56 13 Aboveground Fuel Storage Tank ................................................... 1 through 11 33 56 18 Storm Drain Insert ......................................................................... 1 through 2
APPENDICIES
DSA103-22 LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
GEOTECHNICAL ENGINEERING AND GEOHAZARDS REPORT 2/21/19
GEOTECHNICAL ENGINEERING REPORT UPDATE 5/22/23
GEOTECHNICAL SUMMARY REPORT – ONSITE WATER WELLS 9/21/20
GEOTECHNICAL SUMMARY REPORT – ONSITE WATER WELL MW-2 5/23/23
END OF DOCUMENT
LIST OF DRAWINGS
RESDMSTR: 02/03/2014 00 01 15 - 1 DGS000000013817
DOCUMENT 00 01 15
Sheet Number Description
GENERAL
G001 TITLE SHEET AND PROJECT INFORMATION
G002 SHEET INDEX AND GENERAL NOTES
G010 CALGREEN NON-RESIDENTIAL TIER-1 CHECKLIST
G011 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –
SHEET 1 (AIA)
G012 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –
SHEET 2 (AIA)
G013 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –
SHEET 3 (AIA)
G014 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –
SHEET 4 (AIA)
G015 CEQA – FINAL INITIAL STUDY & MITIGATION NEGATIVE
DECLARATION
G020 ARCHITECTURAL ILLUSTRATIVE SITE PLAN – ACCESSIBILITY &
PARKING
G021 ARCHITECTURAL ILLUSTRATIVE SITE PLAN – FIRE & LIFE SAFETY
G031 CODE ANALYSIS, BUILDING DATA & ACCESSIBILITY ANALYSIS
G032 BUILDING A OCCUPANCY ANALYSIS & EXIT PLAN 12
CIVIL
C001 CIVIL PROJECT INFORMATION
C011 EXISTING SITE SURVEY
C021 FACILITY SITE DEMOLISTION PLAN
C101 SITE IMPROVEMENT PLAN
C102 FACILITY SITE IMPROVEMENT PLAN
C103 FRONTAGE IMPROVEMENT PLAN
C201 FACILITY SITE LAYOUT PLAN
C301 SITE GRADING PLAN
C302 PARTIAL SITE GRADING PLAN VIEWS
C303 PARTIAL SITE GRADING PLAN VIEWS
C304 PARTIAL SITE GRADING PLAN VIEWS
C305 PARTIAL SITE GRADING PLAN VIEWS
C321 SITE GRADING SECTIONS
C401 SITE UTILITIES PLAN
C501 EROSION AND SEDIMENT CONTROL PLAN
C502 CIVIL SITE DETAILS
C511 CIVIL SITE DETAILS
C512 CIVIL FLATWORK DETAILS
C513 CIVIL FENCING AND WALL DETAILS
C541 CIVIL UTILITY DETAILS
C542 CIVIL UTILITY DETAILS
C543 CIVIL UTILITY DETAILS
RESDMSTR: 02/03/2014 00 01 15 - 2 DGS000000013817
C544 CIVIL UTILITY DETAILS
C546 CIVIL UTILITY DETAILS
C547 LPG TANK
C548 ABOVEGROUND FUEL STORAGE TANK AND DETAILS
C549 AST INFORMATION, NOTES, AND DETAILS
C551 SITE ACCESSIBILITY DETAILS
C552 SITE ACCESSIBILITY DETAILS
LANDSCAPE
LI-01 IRRIGATION PLAN
LI-02 IRRIGATION DETAILS
LI-03 IRRIGATION CALCS & GENERAL NOTES
LP-01 PLANTING PLAN
LP-02 PLANTING DETAILS
ARCHITECTURE
A001 ARCHITECTURAL ABBREVIATIONS, MATERIALS, AND SYMBOLS
AA110 BUILDING A- CONCRETE SLAB PLAN
AA111 BUILDING A FLOOR PLAN – DIMENSION
AA112 BUILDING A FLOOR PLAN – ANNOTATION PLAN
AA113 BUILDING A FLOOR PLAN – SIGNAGE PLAN
AA121 BUILDING A – REFLECTED CEILING PLAN
AA122 BUILDING A – ATTIC PLAN & VENTILATION CALCULATION
AA131 BUILDING A – ROOF PLAN
AA211 BUILDING A – EXTERIOR ELEVATIONS
AA212 BUILDING A – EXTERIOR ELEVATIONS
AA311 BUILDING A – BUILDING SECTIONS
AA312 BUILDING A – BUILDING SECTIONS
AA321 BUILDING A – WALL SECTIONS
AA322 BUILDING A – WALL SECTIONS
AA411 BUILDING A – ENLARGED FLOOR PLAN @ APPARATUS BAY &
WORK ROOM
AA412 BUILDING A – ENLARGED FLOOR PLAN @ OFFICE & MESS HALL
AA413 BUILDING A – ENLARGES FLOOR PLAN @ BEDROOMS,
BATHROOMS & LAUNDRY
AA420 BUILDING A – INTERIOR ELEVATIONS
AA421 BUILDING A – INTERIOR ELEVATIONS
AA422 BUILDING A – INTERIOR ELEVATIONS
AA423 BUILDING A – INTERIOR ELEVATIONS
AA424 BUILDING A – INTERIOR ELEVATIONS
AA425 BUILDING A – INTERIOR ELEVATIONS
AA501 FIRE RATED ASSEMBLY DETAILS
AA502 FIRE RATED ASSEMBLY – PENETRATION FIRESTOP SYSTEMS
AA503 WALL TYPES & SCHEDULE
AA511 ACCESSIBILITY DETAILS – DOOR AND FLOOR CLEARANCE
AA512 ACCESSIBILITY DETAILS – PLUMBING FIXTURES
AA513 ACCESSIBILITY DETAILS – SIGNAGE
AA514 ACCESSIBILITY DETAILS – MISCELLANEOUS
AA520 EXTERIOR DETAILS – SILL @ CONCRETE SLAB & CURB
AA521 EXTERIOR DETAILS – CEMENT PLASTER DETAILS (WOOD
FRAMING) & RAIN GUTTER
RESDMSTR: 02/03/2014 00 01 15 - 3 DGS000000013817
AA522 EXTERIOR DETAILS – DOOR & STOREFRONT, TYP. FLASHING
DETAILS
AA523 EXTERIOR DETAILS – WINDPWS & OVERHEAD GARAGE DOOR
AA524 EXTERIOR DETAILS – METAL ROOFING W/ STANDING SEAM
AA525 EXTERIOR DETAILS – METAL ROOFING, DECO. COLUMNS, &
CEILING DETAILS
AA531 INTERIOR DETAILS – TYPICAL DOOR, SHOWER, GRAB BAR, &
CEILING DETAILS
AA532 INTERIOR DETAILS – CASEWORKS, LOCKRE & WARDROBE
AA533 INTERIOR DETAILS – CASEWORKS, WAINSCOTING, LOCKER &
OTHERS
AA621 DOOR AND FRAME SCHEDULE & HARDWARE GROUPS
AA622 WINDOW/LOUVER & ROOM FINISH SCHEDULE & NOTES
AA623 SIGNAGE SCHEDULE & STATION MONUMENT SIGN
AB111 BUILDING B – PUMP AND STORAGE FLOOR PLANS
AB112 BUILDING B – PUMP & STORAGE ROOF PLAN & EXTERIOR
ELEVATION
AB113 BUILDING B – PUMP & STORAGE EXTERIOR ELEVATIONS AND
SECTION
AC111 BUILDING C – GENERATOR AND STORAGE FLOOR PLAN
AC112 BUILDING C – GENERATOR AND STORAGE EXTERIOR
AC113 BUILDING C – GENERATOR AND STORAGE BUILDING SECTIONS
AD111 BUILDING D – TRASH ENCLOSURE FLOOR & ROOF PLAN,
ELEVATIONS
STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
S531 CONCRETE TYPICAL DETAILS
S532 CONCRETE TYPICAL DETAILS
S541 CMU TYPICAL DETAILS
S561 WOOD FRAMING SCHEDULE
S562 WOOD WALL FRAMING TYPICAL DETAILS
S563 WOOD SHEARWALL AND DIAPHRAGM DETAILS
S564 TYPICAL WOOD DETAILS
S565 TYPICAL WOOD DETAILS ROOF JOIST FRAMING
SA111 BUILDING A FOUNDATION PLAN
SA113 BUILDING A ROOF FRAMING PLAN
SA261 BUILDING A WOOD FRAMING ELEVATIONS
SA262 BUILDING A WOOD FRAMING ELEVATIONS
SA311 BUILDING A STRUCTURAL BUILDING SECTIONS
SA312 BUILDING A STRUCTURAL BUILDING SECTIONS
SA313 BUILDING A STRUCTURAL BUILDING SECTIONS
SA314 BUILDING A STRUCTURAL BUILDING SECTIONS
SA401 ENLARGES PLANS
SA531 BUILDING A CONCRETE DETAILS
SA561 BUILDING A WOOD DETAILS
SA562 BUILDING A WOOD DETAILS
SA563 BUILDING A WOOD DETAILS
SA564 BUILDING A WOOD DETAILS
SA661 BLDG A TRUSS PROFILES
SA662 BLDG A TRUSS PROFILES
RESDMSTR: 02/03/2014 00 01 15 - 4 DGS000000013817
SB101 BUILDING B FOUNDATION AND ROOF FRAMING PLANS
SB201 BUILDING B STRUCTURAL BUILDING SECTIONS
SB301 BUILDING B CMU FRAMING ELEVATIONS
SC101 BUILDING C FOUNDATION AND ROOF FRAMING PLANS
SC201 BUILDING C STRUCTURAL BUILDING SECTIONS
SC301 BUILDING C CMU FRAMING ELEVATIONS
SBC561 BUILDINGS B AND C DETAILS
SD111 BUILDING D TRASH ENCLOSURE
SE111 PHOTOVOLTAIC CANOPY FOUNDATION PLAN
SE311 SITE IMPROVEMENT SECTION AND DETAILS
MECHANICAL & PLUMBING
M001 MECHANICAL SYMBOLS AND NOTES
MA021 MECHANICAL EQUIPMENT SCHEDULES
MA121 BUILDING A – MECHANICAL PLAN
MA122 BUILDING A – MECHANICAL PLAN
MB121 BUILDING B – MECHANICAL PLAN AND SCHEDULE
MC121 BUILDING C – MECHANICAL PLAN AND SCHEDULE
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M505 MECHANICAL DETAILS
M506 MECHANICAL DETAILS
M601 MECHANICAL TITLE 24 COMPLIANCE
M602 MECHANICAL TITLE 24 COMPLIANCE
M603 MECHANICAL TITLE 24 COMPLIANCE
M604 MECHANICAL TITLE 24 COMPLIANCE
M605 MECHANICAL TITLE 24 COMPLIANCE
PLUMBING
P001 PLUMBING SYMBOLS AND NOTES
PA021 PLUMBING CALCULATION
PA022 PLUMBING CALCULATION
PA023 PLUMBING EQUIPMENT SCHEDULE
PA024 PLUMBING EQUIPMENT SCHEDULE
PA121 BUILDING A – PLUMBING FLOOR PLAN – HW, CW, AIR
PA122 BUILDING A – PLUMBING FLOOR PLAN – HW, CW, AIR
PA123 BUILDING A – PLUMBING FLOOR PLAN – SS, V, LPG, CD
PA124 BUILDING A – PLUMBING FLOOR PLAN – SS, V, LPG, CD
PB121 BUILDING B – PLUMBING PLAN AND SCHEDULE
PC021 PLUMBNG CALCULATION AND SCHEDULE
PC121 BUILDING C – PLUMBING PLAN
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P503 PLUMBING DETAILS
P504 PLUMBING DETAILS
RESDMSTR: 02/03/2014 00 01 15 - 5 DGS000000013817
ELECTRICAL
E001 ELECTRICAL LEGEND
E002 GENERAL NOTES, MEP. SEISMIC CERT., ABBREVIATIONS
E011 TITLE 24 COMPLIANCE FORMS
E012 TITLE 24 COMPLIANCE FORMS
E101 ELECTRICAL SITE PLAN
E102 SITE LIGHTING PHOTOMETRIC ANALYSIS PLAN
E103 ELECTRICAL PHOTOVOLTAIC PLAN
EA121 BUILDING A – POWER PLAN
EA122 BUILDING A – POWER PLAN
EA131 BUILDING A – LIGHTING PLAN
EA132 BUILDING A – LIGHTING PLAN
EA133 BUILDING A – ATTIC CATWALK ENTRY LIGHTING PLAN
EA134 BUILDING A – PHOTOMETRIC ANALYSIS PLAN
EA141 BUILDING A – COMMUNICATION AND SIGNAL PLAN
EA142 BUILDING A – COMMUNICATION AND SIGNAL PLAN
EB121 BUILDING B – POWER PLAN
EB131 BUILDING B – LIGHTING PLAN
EB141 BUILDING B – COMMUNICATION PLAN
EC121 BUILDING C – POWER PLAN
EC131 BUILDING C – LIGHTING PLAN
EC141 BUILDING C – COMMUNICATION PLAN
E421 ENLARGED FUEL DISPENSING AREA PLAN
E521 ELECTRICAL DETAILS 1
E522 ELECTRICAL DETAILS 2
E523 ELECTRICAL DETAILS 3
E524 ELECTRICAL DETAILS 4
E525 ELECTRICAL DETAILS 5
E526 ELECTRICAL DETAILS 6
E527 ELECTRICAL DETAILS 7
E528 ELECTRICAL DETAILS 7
E601 SINGLE LINE DIAGRAM
E602 PHOTOVOLTAIC SINGLE LINE DIAGRAM
E621 PANEL SCHEDULES
E622 PULL BOX AND CABLE SCHEDULES
E631 LIGHTING FIXTURE SCHEDULES
E632 LIGHTING DIAGRAMS AND SCHEMATICS
FIRE ALARM
FA001 FIRE ALARM LEGEND AND ABBREVIATIONS
FA002 FIRE ALARM RISER DIAGRAM
FA101 FIRE ALARM SITE PLAN
FAA121 BUILDING A – FIRE ALARM PLAN
FAB121 BUILDING B – FIRE ALARM PLAN
FAC121 BUILDING C – FIRE ALARM PLAN
RESDMSTR: 02/03/2014 00 01 15 - 6 DGS000000013817
FIRE SUPPRESSION
FSA121 BUILDING A – FIRE SPRINKLER PLAN
FSB121 BUILDING B – FIRE SPRINKLER PLAN
FSC121 BUILDING C – FIRE SPRINKLER PLAN
PC DRAWINGS
PC1.1 GENERAL NOTES
PC1.2 GENERAL NOTES & PC OPTIONS
PC2.2 OFFSET STRUCTURE PLAN AND SECTION
PC2.3 PURLIN ELEVATION & SCHEDULE
PC3.1 FOUNDATION DETAILS
PC4.1 FRAMING DETAILS
PC4.2 FRAMING DETAILS
PC4.3 FRAMING DETAILS
INVITATION FOR BIDS
RESDMSTR: 10/01/2025 00 11 00 - 1 DGS000000139817
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
DOCUMENT 00 11 00
SEALED BIDS: DGS will receive sealed bids at 707 Third Street, West Sacramento, California 95605, before 2:00 P.M., December 15, 2026. Bids received after this date/time will not be considered received on time.
A public bid opening will be held on December 16, 2026 at 10:00 A.M. at 707 Third Street, West Sacramento, CA 95605. Bidders may attend virtually or in person. Bidders attending the bid opening in-person will need to meet and sign in at the security guard station in the lobby at the mailing address below. At the public bid opening, all bids received before 2:00 P.M., December 15, 2026 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders.
The bid opening may be attended virtually via the following link:
Join: https://teams.microsoft.com/meet/294387264568661?p=3iHHS0mZsbrmQuh7Cm Meeting ID: 294 387 264 568 661 Passcode: EP6y5sP6
HAND DELIVERED BIDS: Shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby at 707 3rd Street in West Sacramento. The Drop Box will be opened at 2:00 p.m. Tuesday through Thursday and bids/proposals in the box will be certified as being received before 2:00 p.m.
that day.
If mailing bids, ensure the outside of the mailing reads:
ATTENTION: PAVAN RANDHAWA
POTRERO FIRE STATION-FACILITY REPLACEMENT
DEPARTMENT OF FORESTRY & FIRE
ROUDN POTRERO ROAD
POTRERO, CALIFORNIA 91963
0000000000000000000139817
DO NOT OPEN
DEPARTMENT OF GENERAL SERVICES
OFFICE OF BUSINESS AND ACQUISITION SERVICES
707 3RD STREET, MS 508, WEST SACRAMENTO, CA 95605
The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date.
Scope of Work: Major components of Project Work consist of constructing a standard 2-engine fire station on newly acquired 7 acre+/- site consisting of a 12-bed barracks/mess-hall, 3-bay apparatus building, and a generator/pump storage building with generator. Project site also includes a fuel dispensing system and fuel vault, vehicle wash rack, hose wash rack, 60,000-gallon water storage tank with pumphouse, and flammable storage building. Site work includes clearing, grading, drainage, paving, walkways, curbs, roads, well drilling and domestic water system with tank storage, septic https://teams.microsoft.com/meet/294387264568661?p=3iHHS0mZsbrmQuh7Cm
RESDMSTR: 10/01/2025 00 11 00 - 2 DGS000000139817
system, electrical, telephone, irrigation, lighting, fencing, landscaping, all utilities and all appurtenances.
This will be an essential services building.
License: Contractors' State License Classification required to bid Project is A or B. Refer to Document 00 22 00, Supplementary Instructions to Bidders, Subparagraph 2.1.3 and 2.1.4, regarding performance of work of a Fire Protection specialty contractor license classification C-16 and Well Drilling specialty contractor license classification C-57.
Certificate of Reported Compliance (CRC) – Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.
More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
Generative Artificial Intelligence (GenAI): The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
Bidder must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
Government Code § 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
Availability of Funds: Award of this contract is subject to the availability of funds through the State’s normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund.
Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended the MANDATORY pre-bid site inspection tour on December 1, 2026, at 10:00 A.M., at which time representatives of the State and prospective bidders shall meet at 1230 Round Potrero Road, Potrero, CA 91960 The State’s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid.
Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
RESDMSTR: 10/01/2025 00 11 00 - 3 DGS000000139817
it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Bidder’s bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
Drawings and Project Manual: Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov. Click on “Start Search”. In the Event Name field, enter the project number and click “Search”. While viewing the Event Details, click on “View Event Package” to view bid forms.
It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.
Bid: Submit on Lump Sum basis as set forth in Bid Forms.
DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual.
DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5.
Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5
Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6
Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.
Non-Discrimination Program (Government Code § 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
Labor Code: Pursuant to Labor Code § 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code § 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed. Copies of the general prevailing rate of per diem wages are available from the Department of Industrial Relations, Labor Statistics & Research Division, P.O. Box 420603, San Francisco, CA 94142, (415) 703-4780; or general prevailing rate of per diem may be accessed on the internet at Department of Industrial Relations website (https://www.dir.ca.gov) for the August 2026 published general prevailing rate of per diem wages for this contract. Copies of the general prevailing rate of per diem wages are on file at DGS’ principal office, which shall be made available to any interested party on request. Note that when the general prevailing rate of per diem determination shows an expiration date (noted by a double asterisk**), to expire during the term of the contract, the Contractor must call or write the DIR to obtain the new rates and incorporate them in this contract for submittal of bid. The Contractor is responsible to comply with the Labor Code Sections and general prevailing rate of per diem determinations, including all the guidelines and the fine print in the general prevailing rate of per diem determinations. Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
Labor Compliance Monitoring and Enforcement: This project is subject to monitoring and http://www.caleprocure.ca.gov/ https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx https://www.dir.ca.gov/
RESDMSTR: 10/01/2025 00 11 00 - 4 DGS000000139817
enforcement by the Department of Industrial Relations (DIR), Compliance Monitoring Unit. All Contractors and subcontractors, regardless of tier, shall be required to comply with the Monitoring and Enforcement Program, including, but not limited to, contractor registration, submittal of electronic certified payroll reports directly to the DIR as applicable and cooperation with on-site monitoring by DIR personnel. Refer to Labor Code § 1771.4 et seq. and the General Conditions of the Contract for Construction, Document 00 72 00, Article 3.3.3 for more information.
Minimum wage rates in accordance with latest Secretary of Labor decision and modifications thereto that are in effect in the area where this Project is located, as of the date the Contract is awarded, shall be part of the Contract. In the event that the current Secretary of Labor Decision should expire prior to Contract award, the new decision which is promulgated by the Secretary of Labor to replace it shall become effective in lieu thereof.
Where there is a difference between wage rates, including Health and Welfare Funds and similar contributions, as determined by the Secretary of Labor and those determined by the Department of Industrial Relations for similar classifications of labor, Contractor and subcontractors shall pay not less than the wage rate which is highest of the two.
INSTRUCTIONS TO BIDDERS
RESDMSTR: 10/16/2026 00 21 00 DGS000000139817
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
DOCUMENT 00 21 00
Index
Article Page
1. General
2. Competence of Bidders
3. Examination of Bid Documents and Site
4. Discrepancies or Errors and Addenda
5. Bidding Documents
6. Submission of Bids
7. Withdrawal of Bids
8. Public Opening of Bids
9. Rejection of Irregular Bids
10. Competitive Bidding
11. Award of Contract
12. Substitution of Alternative Materials,…