This is a Project Manual for a state construction contract issued by the California Department of General Services (DGS) Real Estate Services Division for the Potrero Fire Station Facility Replacement project, a joint effort between DGS and the Department of Forestry & Fire Protection (CAL FIRE) in San Diego County. The project involves constructing a new fire station on a 7-acre site with multiple buildings including a 12-bed barracks/mess hall, 3-bay apparatus building, generator/pump storage building, fuel dispensing system, vehicle wash rack, hose wash rack, 60,000-gallon water storage tank, and flammable storage building, along with comprehensive site work including clearing, grading, drainage, paving, utilities, wells, septic system, electrical, irrigation, fencing, and landscaping. Sealed bids are due before 2:00 p.m. on December 15, 2026, with public bid opening on December 16, 2026, at 10:00 a.m. A mandatory pre-bid site inspection is required on December 1, 2026, at 10:00 a.m. at 1230 Round Potrero Road, Potrero, CA 91963. Contractors must possess a valid California State License Classification A or B, with C-16 Fire Protection specialty contractor and C-57 Well Drilling specialty contractor licenses required either by the prime contractor or first-tier subcontractors. Contract award is expected within 90 days of bid opening.

The bid shall be submitted on a lump-sum basis and must include all costs for labor, materials, equipment, bonds, insurance, and sales tax. The project requires 3% Disabled Veteran Business Enterprise (DVBE) participation as a mandatory set-aside, with a DVBE Incentive available for bidders exceeding the minimum requirement ranging from 1% to 5% in value. A 5% Small Business preference applies to certified small businesses, and non-small businesses may claim preference by committing to subcontract at least 25% of the net bid price to certified small businesses. Bidders must submit a Bidder's Bond or other security equal to 10% of the bid amount. Prevailing wage rates as determined by the Department of Industrial Relations for August 2026 apply. The contract requires 100% performance and payment bonds. Award of the contract is subject to availability of funds through the State's normal budget process and/or transfer of funds through the Architecture Revolving Fund.

View the file

Other files

File Type Posted
Project_Manual_Book_II_of_II.pdf PDF
Bid_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES

REAL ESTATE SERVICES DIVISION

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

PROJECT MANUAL – Book I of II

INTRODUCTORY INFORMATION

BIDDING REQUIREMENTS

CONTRACTING REQUIREMENTS

SPECIFICATIONS – DIVISION 01

FOR:

POTRERO FIRE STATION – FACILITY

REPLACEMENT

DEPARTMENT OF FORESTRY & FIRE (CAL FIRE)

POTRERO, SAN DIEGO COUNTY, CALIFORIA

Victoria Chua, Project Director II West Sacramento, California

State of California March 7, 2025

DGS000000139817

PROJECT TITLE PAGE

RESDMSTR: 02/03/2014v1 00 01 01 - 1 DGS000000139817

DOCUMENT 00 01 01

PROJECT TITLE PAGE

Title : POTRERO FIRE STATION – FACILITY

REPLACEMENT

Client Agency : DEPARTMENT OF FORESTRY & FIRE (CAL

FIRE)

Location : 1230 ROUND POTRERO ROAD

POTRERO, CA 91963

Project Number : DGS000000139817

Project Director : Victoria Chua State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 926-9750 Email: Victoria.chua@dgs.ca.gov

Architect : State of California Department of General Services

Weizhong (John) Zhu Telephone Number: (279) 946-7717 Email: john.zhu@dgs.ca.gov

CERTIFICATIONS PAGE

RESDMSTR: 02/03/2014v1 00 01 05 - 1 DGS000000139817

DOCUMENT 00 01 05

PROJECT TITLE : Potrero Fire Station – Facility Replacement

CLIENT AGENCY : Department of Forestry & Fire Protection (CAL FIRE)

LOCATION : POTRERO, SAN DIEGO COUNTY, CALIFORNIA

PROJECT NO. : DGS000000139817

ARCHITECT AND ENGINEERS:

Weizhong Zhu

DGS/RESD/PMDB

Cory Bannon

BKF

Steven N. Lang

MIG

ARCHITECT CIVIL ENGINEER LANDSCAPE ARCHITECT

Marshall Roberts

Robert Nolan, PE

LEED AP, CEM, CMVP, PF

Tommy Lee

STRUCTURAL ENGINEER MECHANICAL / PLUMBING

ENGINEER

ELECTRICAL ENGINEER

RESDMSTR: 02/03/2014v1 00 01 05 - 1 DGS000000139817

DOCUMENT 00 01 05

CLIENT AGENCY : Department of Forestry & Fire Protection (CALFIRE)

LOCATION : POTRERO, SAN DIEGO COUNTY, CALIFORNIA

PROJECT NO. : DGS000000139817

REGULATORY REVIEWS:

DSA ACCESS COMPLIANCE

OSFM

SEALS PAGE

12/20/2024: WZ 00 01 07 - 1 DGS000000139817

DOCUMENT 00 01 07

SEALS PAGE

CLIENT AGENCY: Department of Forestry & Fire Protection (CAL FIRE)

PROJECT LOCATION: Round Potrero Road Potrero, CA 91963 San Diego County

ARCHITECT AND ENGINEERS:

ARCHITECT CIVIL ENGINEER LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER MECHNICAL / PLUMBING ELECTRICAL ENGINEER

END OF DOCUMENT 00 01 07

Signature

Renewal Date

Date

02-28-2027

09-30-2025

O

SC

AR

JOHNSON NO . 648

L I C

EN

SED LA NDSCA PE ARCH

I T

EC

T

S T

A

T E O F C A L I F O R N I A

WEIZHONG ZHU

C-40565

S TAT E O F CA L I F O R N IA

L IC

ENSED A RCHITECT

REN. 03/31/27

09/30/2025 Exp. 09/30/27 09/30/2025 09/30/2025

09/30/2025 09/30/2025 09/30/2025

Weizhong Zhu

DGS/RESD/PMDB

Cory Bannon

BKF

Steven N Lang

MIG

Robert Nolan, PE

LEED AP, CEM, CMVP, PF

Tommy Lee

TABLE OF CONTENTS

RESDMSTR: 6/20/2025 00 01 10 - 1 DGS000000139817

DOCUMENT 00 01 10

TABLE OF CONTENTS

BOOK I

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 only 00 01 07 Seals Page .................................................................................... 1 only 00 01 10 Table of Contents .......................................................................... 1 through 7 00 01 15 List of Drawings ............................................................................. 1 through 6

BIDDING REQUIREMENTS

Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 8 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3

00 31 32 Geotechnical Data ......................................................................... 1 only 00 41 00 Bid Form (Sample) ........................................................................ 1 through 10 00 43 13 Bidder’s Bond ................................................................................ 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2

00 45 46 Payee Data Record ....................................................................... 1 through 2

CONTRACTING REQUIREMENTS

Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 13 00 91 13 Addenda ........................................................................................ 1 through 3

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 - GENERAL REQUIREMENTS

RESDMSTR: 6/20/2025 00 01 10 - 2 DGS000000139817

Section 01 10 00 Summary ....................................................................................... 1 through 4 01 25 00 Substitution Procedures ................................................................. 1 through 2 01 29 00 Payment Procedures ..................................................................... 1 through 3 01 31 00 Project Management and Coordination .......................................... 1 through 8

01 32 00 Construction Progress Documentation .......................................... 1 through 8 01 32 33 Photographic Documentation ........................................................ 1 through 5 01 33 00 Submittal Procedures .................................................................... 1 through 8 01 33 29.08 Buy Clean California Act Requirements ......................................... 1 through 2 01 40 00 Quality Requirements .................................................................... 1 through 6 01 50 00 Temporary Facilities and Controls ................................................. 1 through 11 01 57 23 Temporary Storm Water Pollution Control ..................................... 1 through 4 01 60 00 Product Requirements ................................................................... 1 through 5 01 64 00 Owner-furnished Products ............................................................. 1 through 2 01 73 00 Execution ...................................................................................... 1 through 6 01 74 19 Construction Waste Management and Disposal ............................ 1 through 5 Form 01 74 19.01 Construction Waste Estimate......................................................... 1 only 01 74 19.02 Waste Management Report ........................................................... 1 through 2 Section 01 74 20 Recycled Content Certification ....................................................... 1 through 4 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 3 01 74 20.01 Recycled Content Certification Worksheet ..................................... 1 through 3 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) ...................................................................................................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary .... 1 through 2 Section 01 75 00 Starting and Adjusting ................................................................... 1 through 3 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Section 01 79 00 Demonstration and Training .......................................................... 1 through 5 01 91 13 General Commissioning Requirements ......................................... 1 through 16

BOOK II

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITIONS

Section 02 41 19 Selective Demolition ...................................................................... 1 through 3

DIVISION 03 – CONCRETE

Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 4 03 30 00 Cast-in-Place Concrete.................................................................. 1 through 13 03 35 43 Polished Concrete Finishing .......................................................... 1 through 4

DIVISION 04 – MASONRY

Section 04 22 00 Concrete Unit Masonry .................................................................. 1 through 7 04 43 13.16 Adhered Stone Masonry Veneer .................................................... 1 through 11

DIVISION 05 – METALS

RESDMSTR: 6/20/2025 00 01 10 - 3 DGS000000139817

Section 05 12 00 Structural Steel Framing ................................................................ 1 through 8 05 50 00 Metal Fabrications ......................................................................... 1 through 10 05 53 19 Expanded Metal Gratings .............................................................. 1 through 3

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

Section 06 10 00 Rough Carpentry ........................................................................... 1 through 10 06 16 00 Sheathing ...................................................................................... 1 through 3 06 17 53 Shop-Fabricated Wood Trusses .................................................... 1 through 7 06 18 00 Glued Laminated Construction ...................................................... 1 through 5 06 20 13 Exterior Finish Carpentry ............................................................... 1 through 7 06 20 23 Interior Finish Carpentry ................................................................ 1 through 9 06 40 23 Interior Architectural Woodwork ..................................................... 1 through 12 06 41 13 Wood-Faced Architectural Cabinets .............................................. 1 through 11 06 46 00 Wood Trim ..................................................................................... 1 through 6 06 64 00 Plastic Paneling ............................................................................. 1 through 4

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 13 26 Self-Adhering Sheet Waterproofing ............................................... 1 through 4 07 19 00 Water Repellents ........................................................................... 1 through 5 07 21 00 Thermal Insulation ......................................................................... 1 through 8 07 25 00 Weather Barriers ........................................................................... 1 through 4 07 26 00 Vapor Retarders ............................................................................ 1 through 3 07 41 13.16 Standing-Seam Metal Roof Panels ................................................ 1 through 11 07 42 93 Soffit Panels .................................................................................. 1 through 8 07 46 46 Fiber-Cement Siding ...................................................................... 1 through 5 07 62 00 Sheet Metal Flashing and Trim ...................................................... 1 through 13 07 72 00 Roof Accessories ........................................................................... 1 through 11 07 84 13 Penetration Firestopping ................................................................ 1 through 7 07 84 43 Joint Firestopping .......................................................................... 1 through 6 07 92 00 Joint Sealants ................................................................................ 1 through 10

DIVISION 08 – OPENINGS

Section 08 11 13 Hollow Metal Doors and Frames .................................................... 1 through 13 08 31 13 Access Doors and Frames ............................................................ 1 through 5 08 31 13.53 Security Access Doors and Frames ............................................... 1 through 3 08 33 23 Overhead Coiling Doors ................................................................ 1 through 9 08 53 13 Vinyl Windows ............................................................................... 1 through 6 08 71 00 Door Hardware .............................................................................. 1 through 21 08 80 00 Glazing .......................................................................................... 1 through 11 08 83 00 Mirrors ........................................................................................... 1 through 6 08 91 19 Fixed Louvers ................................................................................ 1 through 7

DIVISION 09 – FINISHES

Section 09 29 00 Gypsum Board .............................................................................. 1 through 11 09 30 13 Ceramic Tiling ............................................................................... 1 through 16 09 51 23 Acoustic Tile Ceilings .................................................................... 1 through 4

RESDMSTR: 6/20/2025 00 01 10 - 4 DGS000000139817

09 65 13 Resilient Base and Accessories ..................................................... 1 through 6 09 65 66 Resilient Athletic Flooring .............................................................. 1 through 7 09 91 13 Exterior Painting ............................................................................ 1 through 9 09 91 23 Interior Painting ............................................................................. 1 through 10 09 93 00 Staining and Transparent Finishing ............................................... 1 through 8

DIVISION 10 – SPECIALTIES

Section 10 14 19 Dimensional Letter Signage ........................................................... 1 through 8 10 14 23 Panel Signage ............................................................................... 1 through 11 10 26 00 Wall and Door Protection ............................................................... 1 through 6 10 28 00 Toilet, Bath, and Laundry Accessories ........................................... 1 through 5 10 44 13 Fire Protection Cabinets ................................................................ 1 through 6 10 44 16 Fire Extinguishers .......................................................................... 1 through 3 10 51 13 Metal Lockers ................................................................................ 1 through 5 10 56 26 Mobile Storage Shelving ................................................................ 1 through 3 10 75 16 Ground-Set Flagpoles ................................................................... 1 through 4

DIVISION 11 – EQUIPMENT

Section 11 20 00 Commercial Equipment ................................................................. 1 through 7 11 31 00 Residential Appliances .................................................................. 1 through 7

DIVISION 12 – FURNISHINGS

Section 12 24 13 Roller Window Shades .................................................................. 1 through 6 12 36 61 Simulated Stone Countertops ........................................................ 1 through 3

FACILITY SERVICES SUBGROUP

DIVISION 21 – FIRE SUPPRESSION

Section 21 05 17 Sleeves and Sleeve Seals for Fire-Suppression Piping ................. 1 through 5 21 05 18 Escutcheons for Fire-Suppression Piping ...................................... 1 through 2 21 05 23 General-Duty Valves for Water-Based Fire-Suppression Piping .... 1 through 9 21 05 29 Hangers and Supports for Piping and Equipment .......................... 1 through 8 21 05 48 Vibration and Seismic Controls for Fire-Suppression Piping and Equipment 1 through 10 21 05 53 Identification and Piping, Equipment and Ducts ............................. 1 through 6 21 07 00 Fire-Suppression Systems Insulation ............................................. 1 through 6 21 13 16 Dry-Pipe Sprinkler Systems ........................................................... 1 through 17 21 31 16 Diesel-Drive, Centrifugal Fire Pumps ............................................. 1 through 12 21 34 13 Pressure-Maintenance Pumps ....................................................... 1 through 4

RESDMSTR: 6/20/2025 00 01 10 - 5 DGS000000139817

DIVISION 22 – PLUMBING

Section 22 05 17 Sleeve and Sleeve Seals for Piping ............................................... 1 through 6 22 05 18 Escutcheons for Plumbing Piping ................................................. 1 through 3 22 05 19 Meters and Gages for Plumbing Piping ........................................ 1 through 7 22 05 23.12 Ball Valves for Plumbing Piping .................................................... 1 through 6 22 05 23.14 Check Valves for Plumbing Piping ................................................ 1 through 7 22 05 23.15 Gate Valves for Plumbing Piping .................................................. 1 through 4 22 05 29 Hangers and Supports for Plumbing Piping and Equipment ......... 1 through 14 22 05 53 Identification for Plumbing Piping and Equipment ......................... 1 through 7 22 05 93 Testing, Adjusting, and Balancing for Plumbing ............................ 1 through 11 22 07 19 Piping Insulation ........................................................................... 1 through 13 22 11 13 Facility Water Distribution Piping .................................................. 1 through 12 22 11 16 Domestic Water Piping ................................................................. 1 through 10 22 11 19 Domestic Water Piping Specialties ............................................... 1 through 9 22 11 23.13 Domestic-Water Packaged Booster Pumps .................................. 1 through 10 22 11 23.21 Inline, Domestic Water Pumps ...................................................... 1 through 4 22 12 19 Facility Ground-Mounted, Potable-Water Storage Tanks .............. 1 through 9 22 13 13 Facility Sanitary Sewers ............................................................... 1 through 8 22 13 16 Sanitary Waste and Vent Piping ................................................... 1 through 10 22 15 13 General Service Compressed-Air Piping ...................................... 1 through 9 22 15 19 General Service Packaged Air Compressors and Receivers ........ 1 through 5 22 32 00 Domestic Water Filtration Equipment ............................................ 1 through 18 22 34 00 Fuel-Fired, Domestic-Water Heaters ............................................ 1 through 8 22 41 00 Plumbing Fixtures ......................................................................... 1 through 6 22 45 00 Emergency Plumbing Fixtures ...................................................... 1 through 6

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Section 23 25 29 Hangers and Supports for HVAC Piping and Equipment ............... 1 through 13 23 05 53 Identification for HVAC Piping and Equipment ............................... 1 through 8

23 05 93 Testing, Adjusting, and Balancing for HVAC .................................. 1 through 13 23 07 13 Duct Insulation ............................................................................... 1 through 16 23 07 19 HVAC Piping Insulation ................................................................. 1 through 17 23 09 93.11 Sequence of Operations for Engine Exhaust System Controls ...... 1 through 5 23 11 26 Facility Liquefied-Petroleum Gas Piping ........................................ 1 through 15 23 25 16.13 Positive-Pressure Engine Exhaust System .................................... 1 through 7 23 31 13 Metal Ducts ................................................................................... 1 through 11 23 33 00 Air Duct Accessories ..................................................................... 1 through 8 23 33 46 Flexible Ducts ................................................................................ 1 through 3 23 34 23 HVAC Power Ventilators ................................................................ 1 through 6 23 37 13 Diffusers, Registers, and Grilles .................................................... 1 through 2 23 37 23 HVAC Gravity Ventilators .............................................................. 1 through 5 23 41 00 Particular Air Filtration ................................................................... 1 through 5 23 81 26 Split-System Air-Conditioners ........................................................ 1 through 6 23 81 29 Variable-Refrigerant-Flow HVAC Systems ..................................... 1 through 29

DIVISION 26 – ELECTRICAL

RESDMSTR: 6/20/2025 00 01 10 - 6 DGS000000139817

Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables .................. 1 through 4 26 05 26 Grounding and Bonding for Electrical Systems .............................. 1 through 6 26 05 29 Hangers and Supports for Electrical Systems ................................ 1 through 4 26 05 33 Raceways and Boxes for Electrical Systems ................................. 1 through 9 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling .... 1 through 5 26 05 48.16 Seismic Controls for Electrical Systems ......................................... 1 through 5 26 05 53 Identification for Electrical Systems ............................................... 1 through 7 26 05 73.13 Short-Circuit Studies ...................................................................... 1 through 6 26 05 73.16 Coordination Studies ..................................................................... 1 through 11 26 05 73.19 Arc-Flash Hazard Analysis ............................................................ 1 through 8 26 09 23 Lighting Control Devices ................................................................ 1 through 3 26 24 13 Switchboards ................................................................................. 1 through 6 26 24 16 Panelboards .................................................................................. 1 through 7 26 26 53 Electric Vehicle Service Equipment – Level 2 ................................ 1 through 5 26 27 13 Electricity Metering ........................................................................ 1 through 4 26 27 26 Wiring Devices .............................................................................. 1 through 4 26 28 16 Enclosed Switches and Circuit Breakers ....................................... 1 through 5 26 31 00 Photovoltaic Collectors .................................................................. 1 through 9 26 32 13 Engine Generators ........................................................................ 1 through 22 26 32 90 Manual Transfer Switches with Integrated Quick Connects Enclosure 1 through 5 26 36 00 Transfer Switches .......................................................................... 1 through 13 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits ........... 1 through 3 26 51 19 LED Interior Lighting ...................................................................... 1 through 4 26 52 13 Emergency and Exit Lighting ......................................................... 1 through 4 26 56 13 Lighting Poles and Standards ........................................................ 1 through 3 26 56 19 LED Exterior Lighting ..................................................................... 1 through 3

DIVISION 27 – COMMUNICATIONS

Section 27 05 26 Grounding an Bonding for Communications Systems .................... 1 through 9 27 05 28 Pathways for Communications System .......................................... 1 through 15 27 05 29 Hangers and Supports for Communications System ...................... 1 through 6 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 1 through 5 27 15 00 Communications Horizontal Cabling .............................................. 1 through 13

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

Section 28 05 13 Conductors and Cables for Electronic Safety and Security ............ 1 through 10 28 05 26 Grounding and Bonding for Electronic Safety and Security ............ 1 through 4 28 31 11 Digital, Addressable Fire-Alarm System ........................................ 1 through 26

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 31 – EARTHWORK

Section 31 10 00 Site Clearing .................................................................................. 1 through 4 31 20 00 Earth Moving ................................................................................. 1 through 15 31 23 33 Excavating, Backfilling and Compacting for Utilities ....................... 1 through 8 31 25 13 Storm Water Pollution Prevention Plan .......................................... 1 through 4 31 50 00 Excavation Support and Protection ................................................ 1 through 4

RESDMSTR: 6/20/2025 00 01 10 - 7 DGS000000139817

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 01 30 Operation and Maintenance of Site Improvements ........................ 1 through 6 32 13 13 Concrete Paving ............................................................................ 1 through 12 32 13 15 Concrete Paving For Accessible Routes ........................................ 1 through 8 32 17 13 Parking Bumpers ........................................................................... 1 through 2 32 17 23 Pavement Markings ....................................................................... 1 through 6 32 17 26 Tactile Warning Surfacing .............................................................. 1 through 3 32 31 19.53 Decorative Metal Security Fences and Gates ................................ 1 through 11 32 33 00 Site Furnishings ............................................................................. 1 through 3 32 84 00 Irrigation System............................................................................ 1 through 17 32 90 00 Landscape Planting ....................................................................... 1 through 12 32 91 13 Soil Preparation ............................................................................. 1 through 18 32 91 19 Landscape Grading ....................................................................... 1 through 3

DIVISION 33 – UTILITIES

Section 33 09 10 Instrumental and Control for Water Utilities .................................... 1 through 6 33 10 00 Facility Water Distribution .............................................................. 1 through 16 33 11 13 Potable Water Supply Wells .......................................................... 1 through 6 33 21 00 Water Supply Wells ....................................................................... 1 through 8 33 30 00 Facility Sanitary Sewers ................................................................ 1 through 8 33 34 13 Septic Tanks .................................................................................. 1 through 4 33 42 00 Stormwater Conveyance ............................................................... 1 through 11 33 46 00 Subdrainage .................................................................................. 1 through 4 33 52 00 LPG Distribution System ................................................................ 1 through 3 33 56 13 Aboveground Fuel Storage Tank ................................................... 1 through 11 33 56 18 Storm Drain Insert ......................................................................... 1 through 2

APPENDICIES

DSA103-22 LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS

GEOTECHNICAL ENGINEERING AND GEOHAZARDS REPORT 2/21/19

GEOTECHNICAL ENGINEERING REPORT UPDATE 5/22/23

GEOTECHNICAL SUMMARY REPORT – ONSITE WATER WELLS 9/21/20

GEOTECHNICAL SUMMARY REPORT – ONSITE WATER WELL MW-2 5/23/23

END OF DOCUMENT

LIST OF DRAWINGS

RESDMSTR: 02/03/2014 00 01 15 - 1 DGS000000013817

DOCUMENT 00 01 15

Sheet Number Description

GENERAL

G001 TITLE SHEET AND PROJECT INFORMATION

G002 SHEET INDEX AND GENERAL NOTES

G010 CALGREEN NON-RESIDENTIAL TIER-1 CHECKLIST

G011 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –

SHEET 1 (AIA)

G012 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –

SHEET 2 (AIA)

G013 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –

SHEET 3 (AIA)

G014 2022 CALGREEN – NONRESIDENTIAL MANDATORY MEASURES –

SHEET 4 (AIA)

G015 CEQA – FINAL INITIAL STUDY & MITIGATION NEGATIVE

DECLARATION

G020 ARCHITECTURAL ILLUSTRATIVE SITE PLAN – ACCESSIBILITY &

PARKING

G021 ARCHITECTURAL ILLUSTRATIVE SITE PLAN – FIRE & LIFE SAFETY

G031 CODE ANALYSIS, BUILDING DATA & ACCESSIBILITY ANALYSIS

G032 BUILDING A OCCUPANCY ANALYSIS & EXIT PLAN 12

CIVIL

C001 CIVIL PROJECT INFORMATION

C011 EXISTING SITE SURVEY

C021 FACILITY SITE DEMOLISTION PLAN

C101 SITE IMPROVEMENT PLAN

C102 FACILITY SITE IMPROVEMENT PLAN

C103 FRONTAGE IMPROVEMENT PLAN

C201 FACILITY SITE LAYOUT PLAN

C301 SITE GRADING PLAN

C302 PARTIAL SITE GRADING PLAN VIEWS

C303 PARTIAL SITE GRADING PLAN VIEWS

C304 PARTIAL SITE GRADING PLAN VIEWS

C305 PARTIAL SITE GRADING PLAN VIEWS

C321 SITE GRADING SECTIONS

C401 SITE UTILITIES PLAN

C501 EROSION AND SEDIMENT CONTROL PLAN

C502 CIVIL SITE DETAILS

C511 CIVIL SITE DETAILS

C512 CIVIL FLATWORK DETAILS

C513 CIVIL FENCING AND WALL DETAILS

C541 CIVIL UTILITY DETAILS

C542 CIVIL UTILITY DETAILS

C543 CIVIL UTILITY DETAILS

RESDMSTR: 02/03/2014 00 01 15 - 2 DGS000000013817

C544 CIVIL UTILITY DETAILS

C546 CIVIL UTILITY DETAILS

C547 LPG TANK

C548 ABOVEGROUND FUEL STORAGE TANK AND DETAILS

C549 AST INFORMATION, NOTES, AND DETAILS

C551 SITE ACCESSIBILITY DETAILS

C552 SITE ACCESSIBILITY DETAILS

LANDSCAPE

LI-01 IRRIGATION PLAN

LI-02 IRRIGATION DETAILS

LI-03 IRRIGATION CALCS & GENERAL NOTES

LP-01 PLANTING PLAN

LP-02 PLANTING DETAILS

ARCHITECTURE

A001 ARCHITECTURAL ABBREVIATIONS, MATERIALS, AND SYMBOLS

AA110 BUILDING A- CONCRETE SLAB PLAN

AA111 BUILDING A FLOOR PLAN – DIMENSION

AA112 BUILDING A FLOOR PLAN – ANNOTATION PLAN

AA113 BUILDING A FLOOR PLAN – SIGNAGE PLAN

AA121 BUILDING A – REFLECTED CEILING PLAN

AA122 BUILDING A – ATTIC PLAN & VENTILATION CALCULATION

AA131 BUILDING A – ROOF PLAN

AA211 BUILDING A – EXTERIOR ELEVATIONS

AA212 BUILDING A – EXTERIOR ELEVATIONS

AA311 BUILDING A – BUILDING SECTIONS

AA312 BUILDING A – BUILDING SECTIONS

AA321 BUILDING A – WALL SECTIONS

AA322 BUILDING A – WALL SECTIONS

AA411 BUILDING A – ENLARGED FLOOR PLAN @ APPARATUS BAY &

WORK ROOM

AA412 BUILDING A – ENLARGED FLOOR PLAN @ OFFICE & MESS HALL

AA413 BUILDING A – ENLARGES FLOOR PLAN @ BEDROOMS,

BATHROOMS & LAUNDRY

AA420 BUILDING A – INTERIOR ELEVATIONS

AA421 BUILDING A – INTERIOR ELEVATIONS

AA422 BUILDING A – INTERIOR ELEVATIONS

AA423 BUILDING A – INTERIOR ELEVATIONS

AA424 BUILDING A – INTERIOR ELEVATIONS

AA425 BUILDING A – INTERIOR ELEVATIONS

AA501 FIRE RATED ASSEMBLY DETAILS

AA502 FIRE RATED ASSEMBLY – PENETRATION FIRESTOP SYSTEMS

AA503 WALL TYPES & SCHEDULE

AA511 ACCESSIBILITY DETAILS – DOOR AND FLOOR CLEARANCE

AA512 ACCESSIBILITY DETAILS – PLUMBING FIXTURES

AA513 ACCESSIBILITY DETAILS – SIGNAGE

AA514 ACCESSIBILITY DETAILS – MISCELLANEOUS

AA520 EXTERIOR DETAILS – SILL @ CONCRETE SLAB & CURB

AA521 EXTERIOR DETAILS – CEMENT PLASTER DETAILS (WOOD

FRAMING) & RAIN GUTTER

RESDMSTR: 02/03/2014 00 01 15 - 3 DGS000000013817

AA522 EXTERIOR DETAILS – DOOR & STOREFRONT, TYP. FLASHING

DETAILS

AA523 EXTERIOR DETAILS – WINDPWS & OVERHEAD GARAGE DOOR

AA524 EXTERIOR DETAILS – METAL ROOFING W/ STANDING SEAM

AA525 EXTERIOR DETAILS – METAL ROOFING, DECO. COLUMNS, &

CEILING DETAILS

AA531 INTERIOR DETAILS – TYPICAL DOOR, SHOWER, GRAB BAR, &

CEILING DETAILS

AA532 INTERIOR DETAILS – CASEWORKS, LOCKRE & WARDROBE

AA533 INTERIOR DETAILS – CASEWORKS, WAINSCOTING, LOCKER &

OTHERS

AA621 DOOR AND FRAME SCHEDULE & HARDWARE GROUPS

AA622 WINDOW/LOUVER & ROOM FINISH SCHEDULE & NOTES

AA623 SIGNAGE SCHEDULE & STATION MONUMENT SIGN

AB111 BUILDING B – PUMP AND STORAGE FLOOR PLANS

AB112 BUILDING B – PUMP & STORAGE ROOF PLAN & EXTERIOR

ELEVATION

AB113 BUILDING B – PUMP & STORAGE EXTERIOR ELEVATIONS AND

SECTION

AC111 BUILDING C – GENERATOR AND STORAGE FLOOR PLAN

AC112 BUILDING C – GENERATOR AND STORAGE EXTERIOR

AC113 BUILDING C – GENERATOR AND STORAGE BUILDING SECTIONS

AD111 BUILDING D – TRASH ENCLOSURE FLOOR & ROOF PLAN,

ELEVATIONS

STRUCTURAL

S001 STRUCTURAL GENERAL NOTES

S531 CONCRETE TYPICAL DETAILS

S532 CONCRETE TYPICAL DETAILS

S541 CMU TYPICAL DETAILS

S561 WOOD FRAMING SCHEDULE

S562 WOOD WALL FRAMING TYPICAL DETAILS

S563 WOOD SHEARWALL AND DIAPHRAGM DETAILS

S564 TYPICAL WOOD DETAILS

S565 TYPICAL WOOD DETAILS ROOF JOIST FRAMING

SA111 BUILDING A FOUNDATION PLAN

SA113 BUILDING A ROOF FRAMING PLAN

SA261 BUILDING A WOOD FRAMING ELEVATIONS

SA262 BUILDING A WOOD FRAMING ELEVATIONS

SA311 BUILDING A STRUCTURAL BUILDING SECTIONS

SA312 BUILDING A STRUCTURAL BUILDING SECTIONS

SA313 BUILDING A STRUCTURAL BUILDING SECTIONS

SA314 BUILDING A STRUCTURAL BUILDING SECTIONS

SA401 ENLARGES PLANS

SA531 BUILDING A CONCRETE DETAILS

SA561 BUILDING A WOOD DETAILS

SA562 BUILDING A WOOD DETAILS

SA563 BUILDING A WOOD DETAILS

SA564 BUILDING A WOOD DETAILS

SA661 BLDG A TRUSS PROFILES

SA662 BLDG A TRUSS PROFILES

RESDMSTR: 02/03/2014 00 01 15 - 4 DGS000000013817

SB101 BUILDING B FOUNDATION AND ROOF FRAMING PLANS

SB201 BUILDING B STRUCTURAL BUILDING SECTIONS

SB301 BUILDING B CMU FRAMING ELEVATIONS

SC101 BUILDING C FOUNDATION AND ROOF FRAMING PLANS

SC201 BUILDING C STRUCTURAL BUILDING SECTIONS

SC301 BUILDING C CMU FRAMING ELEVATIONS

SBC561 BUILDINGS B AND C DETAILS

SD111 BUILDING D TRASH ENCLOSURE

SE111 PHOTOVOLTAIC CANOPY FOUNDATION PLAN

SE311 SITE IMPROVEMENT SECTION AND DETAILS

MECHANICAL & PLUMBING

M001 MECHANICAL SYMBOLS AND NOTES

MA021 MECHANICAL EQUIPMENT SCHEDULES

MA121 BUILDING A – MECHANICAL PLAN

MA122 BUILDING A – MECHANICAL PLAN

MB121 BUILDING B – MECHANICAL PLAN AND SCHEDULE

MC121 BUILDING C – MECHANICAL PLAN AND SCHEDULE

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M505 MECHANICAL DETAILS

M506 MECHANICAL DETAILS

M601 MECHANICAL TITLE 24 COMPLIANCE

M602 MECHANICAL TITLE 24 COMPLIANCE

M603 MECHANICAL TITLE 24 COMPLIANCE

M604 MECHANICAL TITLE 24 COMPLIANCE

M605 MECHANICAL TITLE 24 COMPLIANCE

PLUMBING

P001 PLUMBING SYMBOLS AND NOTES

PA021 PLUMBING CALCULATION

PA022 PLUMBING CALCULATION

PA023 PLUMBING EQUIPMENT SCHEDULE

PA024 PLUMBING EQUIPMENT SCHEDULE

PA121 BUILDING A – PLUMBING FLOOR PLAN – HW, CW, AIR

PA122 BUILDING A – PLUMBING FLOOR PLAN – HW, CW, AIR

PA123 BUILDING A – PLUMBING FLOOR PLAN – SS, V, LPG, CD

PA124 BUILDING A – PLUMBING FLOOR PLAN – SS, V, LPG, CD

PB121 BUILDING B – PLUMBING PLAN AND SCHEDULE

PC021 PLUMBNG CALCULATION AND SCHEDULE

PC121 BUILDING C – PLUMBING PLAN

P501 PLUMBING DETAILS

P502 PLUMBING DETAILS

P503 PLUMBING DETAILS

P504 PLUMBING DETAILS

RESDMSTR: 02/03/2014 00 01 15 - 5 DGS000000013817

ELECTRICAL

E001 ELECTRICAL LEGEND

E002 GENERAL NOTES, MEP. SEISMIC CERT., ABBREVIATIONS

E011 TITLE 24 COMPLIANCE FORMS

E012 TITLE 24 COMPLIANCE FORMS

E101 ELECTRICAL SITE PLAN

E102 SITE LIGHTING PHOTOMETRIC ANALYSIS PLAN

E103 ELECTRICAL PHOTOVOLTAIC PLAN

EA121 BUILDING A – POWER PLAN

EA122 BUILDING A – POWER PLAN

EA131 BUILDING A – LIGHTING PLAN

EA132 BUILDING A – LIGHTING PLAN

EA133 BUILDING A – ATTIC CATWALK ENTRY LIGHTING PLAN

EA134 BUILDING A – PHOTOMETRIC ANALYSIS PLAN

EA141 BUILDING A – COMMUNICATION AND SIGNAL PLAN

EA142 BUILDING A – COMMUNICATION AND SIGNAL PLAN

EB121 BUILDING B – POWER PLAN

EB131 BUILDING B – LIGHTING PLAN

EB141 BUILDING B – COMMUNICATION PLAN

EC121 BUILDING C – POWER PLAN

EC131 BUILDING C – LIGHTING PLAN

EC141 BUILDING C – COMMUNICATION PLAN

E421 ENLARGED FUEL DISPENSING AREA PLAN

E521 ELECTRICAL DETAILS 1

E522 ELECTRICAL DETAILS 2

E523 ELECTRICAL DETAILS 3

E524 ELECTRICAL DETAILS 4

E525 ELECTRICAL DETAILS 5

E526 ELECTRICAL DETAILS 6

E527 ELECTRICAL DETAILS 7

E528 ELECTRICAL DETAILS 7

E601 SINGLE LINE DIAGRAM

E602 PHOTOVOLTAIC SINGLE LINE DIAGRAM

E621 PANEL SCHEDULES

E622 PULL BOX AND CABLE SCHEDULES

E631 LIGHTING FIXTURE SCHEDULES

E632 LIGHTING DIAGRAMS AND SCHEMATICS

FIRE ALARM

FA001 FIRE ALARM LEGEND AND ABBREVIATIONS

FA002 FIRE ALARM RISER DIAGRAM

FA101 FIRE ALARM SITE PLAN

FAA121 BUILDING A – FIRE ALARM PLAN

FAB121 BUILDING B – FIRE ALARM PLAN

FAC121 BUILDING C – FIRE ALARM PLAN

RESDMSTR: 02/03/2014 00 01 15 - 6 DGS000000013817

FIRE SUPPRESSION

FSA121 BUILDING A – FIRE SPRINKLER PLAN

FSB121 BUILDING B – FIRE SPRINKLER PLAN

FSC121 BUILDING C – FIRE SPRINKLER PLAN

PC DRAWINGS

PC1.1 GENERAL NOTES

PC1.2 GENERAL NOTES & PC OPTIONS

PC2.2 OFFSET STRUCTURE PLAN AND SECTION

PC2.3 PURLIN ELEVATION & SCHEDULE

PC3.1 FOUNDATION DETAILS

PC4.1 FRAMING DETAILS

PC4.2 FRAMING DETAILS

PC4.3 FRAMING DETAILS

INVITATION FOR BIDS

RESDMSTR: 10/01/2025 00 11 00 - 1 DGS000000139817

STATE OF CALIFORNIA

DEPARTMENT OF GENERAL SERVICES

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

DOCUMENT 00 11 00

SEALED BIDS: DGS will receive sealed bids at 707 Third Street, West Sacramento, California 95605, before 2:00 P.M., December 15, 2026. Bids received after this date/time will not be considered received on time.

A public bid opening will be held on December 16, 2026 at 10:00 A.M. at 707 Third Street, West Sacramento, CA 95605. Bidders may attend virtually or in person. Bidders attending the bid opening in-person will need to meet and sign in at the security guard station in the lobby at the mailing address below. At the public bid opening, all bids received before 2:00 P.M., December 15, 2026 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders.

The bid opening may be attended virtually via the following link:

Join: https://teams.microsoft.com/meet/294387264568661?p=3iHHS0mZsbrmQuh7Cm Meeting ID: 294 387 264 568 661 Passcode: EP6y5sP6

HAND DELIVERED BIDS: Shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby at 707 3rd Street in West Sacramento. The Drop Box will be opened at 2:00 p.m. Tuesday through Thursday and bids/proposals in the box will be certified as being received before 2:00 p.m.

that day.

If mailing bids, ensure the outside of the mailing reads:

ATTENTION: PAVAN RANDHAWA

POTRERO FIRE STATION-FACILITY REPLACEMENT

DEPARTMENT OF FORESTRY & FIRE

ROUDN POTRERO ROAD

POTRERO, CALIFORNIA 91963

0000000000000000000139817

DO NOT OPEN

DEPARTMENT OF GENERAL SERVICES

OFFICE OF BUSINESS AND ACQUISITION SERVICES

707 3RD STREET, MS 508, WEST SACRAMENTO, CA 95605

The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date.

Scope of Work: Major components of Project Work consist of constructing a standard 2-engine fire station on newly acquired 7 acre+/- site consisting of a 12-bed barracks/mess-hall, 3-bay apparatus building, and a generator/pump storage building with generator. Project site also includes a fuel dispensing system and fuel vault, vehicle wash rack, hose wash rack, 60,000-gallon water storage tank with pumphouse, and flammable storage building. Site work includes clearing, grading, drainage, paving, walkways, curbs, roads, well drilling and domestic water system with tank storage, septic https://teams.microsoft.com/meet/294387264568661?p=3iHHS0mZsbrmQuh7Cm

RESDMSTR: 10/01/2025 00 11 00 - 2 DGS000000139817

system, electrical, telephone, irrigation, lighting, fencing, landscaping, all utilities and all appurtenances.

This will be an essential services building.

License: Contractors' State License Classification required to bid Project is A or B. Refer to Document 00 22 00, Supplementary Instructions to Bidders, Subparagraph 2.1.3 and 2.1.4, regarding performance of work of a Fire Protection specialty contractor license classification C-16 and Well Drilling specialty contractor license classification C-57.

Certificate of Reported Compliance (CRC) – Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.

More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation

Generative Artificial Intelligence (GenAI): The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

Bidder must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

Upon notification by a Bidder of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

Government Code § 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

Availability of Funds: Award of this contract is subject to the availability of funds through the State’s normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund.

Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended the MANDATORY pre-bid site inspection tour on December 1, 2026, at 10:00 A.M., at which time representatives of the State and prospective bidders shall meet at 1230 Round Potrero Road, Potrero, CA 91960 The State’s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid.

Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation

RESDMSTR: 10/01/2025 00 11 00 - 3 DGS000000139817

it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Bidder’s bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

Drawings and Project Manual: Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov. Click on “Start Search”. In the Event Name field, enter the project number and click “Search”. While viewing the Event Details, click on “View Event Package” to view bid forms.

It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.

Bid: Submit on Lump Sum basis as set forth in Bid Forms.

DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual.

DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5.

Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5

Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6

Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.

Non-Discrimination Program (Government Code § 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.

Labor Code: Pursuant to Labor Code § 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code § 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed. Copies of the general prevailing rate of per diem wages are available from the Department of Industrial Relations, Labor Statistics & Research Division, P.O. Box 420603, San Francisco, CA 94142, (415) 703-4780; or general prevailing rate of per diem may be accessed on the internet at Department of Industrial Relations website (https://www.dir.ca.gov) for the August 2026 published general prevailing rate of per diem wages for this contract. Copies of the general prevailing rate of per diem wages are on file at DGS’ principal office, which shall be made available to any interested party on request. Note that when the general prevailing rate of per diem determination shows an expiration date (noted by a double asterisk**), to expire during the term of the contract, the Contractor must call or write the DIR to obtain the new rates and incorporate them in this contract for submittal of bid. The Contractor is responsible to comply with the Labor Code Sections and general prevailing rate of per diem determinations, including all the guidelines and the fine print in the general prevailing rate of per diem determinations. Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.

Labor Compliance Monitoring and Enforcement: This project is subject to monitoring and http://www.caleprocure.ca.gov/ https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx https://www.dir.ca.gov/

RESDMSTR: 10/01/2025 00 11 00 - 4 DGS000000139817

enforcement by the Department of Industrial Relations (DIR), Compliance Monitoring Unit. All Contractors and subcontractors, regardless of tier, shall be required to comply with the Monitoring and Enforcement Program, including, but not limited to, contractor registration, submittal of electronic certified payroll reports directly to the DIR as applicable and cooperation with on-site monitoring by DIR personnel. Refer to Labor Code § 1771.4 et seq. and the General Conditions of the Contract for Construction, Document 00 72 00, Article 3.3.3 for more information.

Minimum wage rates in accordance with latest Secretary of Labor decision and modifications thereto that are in effect in the area where this Project is located, as of the date the Contract is awarded, shall be part of the Contract. In the event that the current Secretary of Labor Decision should expire prior to Contract award, the new decision which is promulgated by the Secretary of Labor to replace it shall become effective in lieu thereof.

Where there is a difference between wage rates, including Health and Welfare Funds and similar contributions, as determined by the Secretary of Labor and those determined by the Department of Industrial Relations for similar classifications of labor, Contractor and subcontractors shall pay not less than the wage rate which is highest of the two.

INSTRUCTIONS TO BIDDERS

RESDMSTR: 10/16/2026 00 21 00 DGS000000139817

STATE OF CALIFORNIA

DEPARTMENT OF GENERAL SERVICES

DOCUMENT 00 21 00

Index

Article Page

1. General

2. Competence of Bidders

3. Examination of Bid Documents and Site

4. Discrepancies or Errors and Addenda

5. Bidding Documents

6. Submission of Bids

7. Withdrawal of Bids

8. Public Opening of Bids

9. Rejection of Irregular Bids

10. Competitive Bidding

11. Award of Contract

12. Substitution of Alternative Materials,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .