Project_Manual_-_Book_3_.pdf
PDF 9 MB Posted
- Solicitation number
- 0000038012
- Issued by
- Alpine County, Amador County, Butte County, Calaveras County, Colusa County, El Dorado County, Glenn County, Lassen County, Modoc County, Nevada County, Placer County, Plumas County, Sacramento County, San Joaquin County, Shasta County, Sierra County, Siskiyou County, Stanislaus County, Sutter County, Tehama County, Trinity County, Tuolumne County, Yolo County, Yuba County, Alpine Village CDP, Amador City, Amador Pines CDP, Sutter Creek City, Butte Creek Canyon CDP, Butte Meadows CDP, Butte Valley CDP, Rancho Calaveras CDP, Colusa City, El Dorado Hills CDP, Placerville City, San Joaquin City, Alta Sierra CDP, Glennville CDP, Sierra Madre City, Nevada City, Plumas Eureka CDP, Sacramento City, Alpine CDP, Shasta CDP, Shasta Lake City, Sierra Brooks CDP, Sierra City CDP, Sierraville CDP, Mount Shasta City, Sutter CDP, Yuba City, Rancho Tehama Reserve CDP, Tehama City, Trinity Center CDP, Trinity Village CDP, Sierra Village CDP, Tuolumne City CDP, West Sacramento City, Yolo CDP, Plumas Lake CDP, California
About this file
This is a Project Manual Book 3 containing technical specifications prepared by the California Department of General Services (DGS) Real Estate Services Division Project Management and Development Branch for a Job Order Contract (JOC) in the Northern Region. The specifications document provides comprehensive technical requirements across multiple construction divisions including demolition, concrete work, masonry, metals, carpentry, and waterproofing. The associated state and local contract opportunity indicates that DGS will receive bids no later than 11:59 P.M. on Thursday, March 19, 2026, for a Job Order Contract under which work will be accomplished through individual job orders issued on an as-needed basis for repair, alteration, construction, maintenance, rehabilitation, demolition, and infrastructure work. The contract will be awarded to the lowest Combined Adjustment Factors bidder as a fixed unit price, indefinite quantity contract with a twenty-four (24) month initial contract term covering the Northern Region of California Area 1 and 2. A preinstallation conference will be conducted at the project site, and the specifications reference mockups to be built to verify selections and demonstrate quality standards for materials and execution.
Bidders must be registered with the California Department of Industrial Relations as public works contractors holding a B-General license. The pricing structure utilizes pre-established Unit Prices organized in a catalog format, with contractors submitting combined adjustment factors rather than fixed lump-sum bids. Contractors and all subcontractors must comply with all federal, state, and local health and safety mandates, with the most restrictive mandate taking precedence. The specifications are based on the American Institute of Architects (AIA) MasterSpec format and reference numerous industry standards including those from the American Society for Testing and Materials (ASTM), the American Welding Society (AWS), and the Architectural Woodwork Standards (AWS). All materials and workmanship must comply with specified quality standards, and the contract includes performance requirements, delivery and storage protocols, field conditions, and detailed execution procedures for each trade.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Manual_-_Book_2_.pdf | ||
| Project_Manual_-_Book_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book 3 of 3
BOOK 1
DIVISION 00 & 01 SPECIFICATIONS
BOOK 2
JOB ORDER PRICE PROPOSAL SAMPLE
JOB ORDER SAMPLE DOCUMENTS
UNIT PRICE CATALOG (UPC)
BOOK 3
TECHNICAL SPECIFICATIONS
FOR:
JOB ORDER CONTRACT – NORTHERN REGION
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA
Richard Standiford, Capital Outlay Program Manager West Sacramento, California
Consultants: Facility Optimization Solutions, LLC (FOS)
FEBRUARY 2026
#000000000014572
©2026 Facility Optimization Solutions, LLC All Rights Reserved
Simplebid® Specifications
Job Order Contracting Technical Specifications
Prepared for: CA DGS
Version: 1-15-2026
Printed: 1-9-2026
Mike Swarm Sticky Note Cancelled set by Mike Swarm
Mike Swarm Sticky Note Rejected set by Mike Swarm
Mike Swarm Sticky Note Unmarked set by Mike Swarm
Jacob Guy Sticky Note Completed set by Jacob Guy
Simplebid® Version: 1-15-2026 CADGS - Technical Specifications
CA-TS-01
- 1
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
00 01 10 Table of Contents
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
See CADGS Division 01 Requirements
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 - EXISTING CONDITIONS
02 41 16 02 41 19
STRUCTURE DEMOLITION
SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
03 10 00 03 20 00 03 30 00 03 41 00 03 45 00 03 53 00 03 54 13 03 54 16
CONCRETE FORMING AND ACCESSORIES
CONCRETE REINFORCING
CAST-IN-PLACE CONCRETE
PRECAST STRUCTURAL CONCRETE
PRECAST ARCHITECTURAL CONCRETE
CONCRETE TOPPING
GYPSUM CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT
DIVISION 04 - MASONRY
04 20 00 04 22 00 04 26 13 04 42 00
UNIT MASONRY
CONCRETE UNIT MASONRY
MASONRY VENEER
EXTERIOR STONE CLADDING
04 43 13.13 ANCHORED STONE MASONRY VENEER
04 43 13.16 ADHERED STONE MASONRY VENEER
04 72 00 CAST STONE MASONRY
CA-TS-01
- 2
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
DIVISION 05 - METALS
05 01 70.51 DECORATIVE METAL CLEANING
05 01 70.61 DECORATIVE METAL REPAIR
05 01 70.63 DECORATIVE METAL REFINISHING
05 12 00 STRUCTURAL STEEL FRAMING
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECKING
05 40 00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
05 70 00 DECORATIVE METAL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 13 EXTERIOR FINISH CARPENTRY
06 20 23 INTERIOR FINISH CARPENTRY
06 40 13 EXTERIOR ARCHITECTURAL WOODWORK
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 13 26 SELF-ADHERING SHEET WATERPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 13 54 THERMOPLASTIC SHEET WATERPROOFING
07 14 13 HOT FLUID-APPLIED RUBBERIZED ASPHALT
WATERPROOFING
07 14 16 COLD FLUID-APPLIED WATERPROOFING
07 16 13 POLYMER MODIFIED CEMENT
WATERPROOFING
07 16 16 CRYSTALLINE WATERPROOFING
07 16 19 METAL OXIDE WATERPROOFING
07 17 00 BENTONITE WATERPROOFING
07 21 00 THERMAL INSULATION
07 21 19 FOAMED-IN-PLACE INSULATION
07 31 13 ASPHALT SHINGLES
07 31 16 METAL SHINGLES
07 31 26 SLATE SHINGLES
07 31 29 WOOD SHINGLES AND SHAKES
07 32 13 CLAY ROOF TILES
07 32 16 CONCRETE ROOF TILES
07 41 13.13 FORMED METAL ROOF PANELS
07 41 13.16 STANDING-SEAM METAL ROOF PANELS
07 41 13.19 BATTEN-SEAM METAL ROOF PANELS
07 41 16 INSULATED METAL ROOF PANELS
07 42 13.13 FORMED METAL WALL PANELS
07 42 13.16 METAL PLATE WALL PANELS
07 42 13.19 INSULATED METAL WALL PANELS
07 42 13.23 METAL COMPOSITE MATERIAL WALL PANELS
07 46 16 ALUMINUM SIDING
CA-TS-01
- 3
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
07 46 19 STEEL SIDING
07 46 24 WOOD SHINGLE AND SHAKE SIDING
07 46 33 PLASTIC SIDING
07 46 46 FIBER-CEMENT SIDING
07 51 13 BUILT-UP ASPHALT ROOFING
07 51 16 BUILT-UP COAL TAR ROOFING
07 52 13 ATACTIC-POLYPROPYLENE (APP) MODIFIED
BITUMINOUS MEMBRANE ROOFING
07 52 16 STYRENE-BUTADIENE-STYRENE (SBS)
MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 16 CHLOROSULFONATE-POLYETHYLENE (CSPE)
ROOFING
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER
(EPDM) ROOFING
07 54 16 KETONE ETHYLENE ESTER (KEE) ROOFING
07 54 19 POLYVINYL-CHLORIDE (PVC) ROOFING
07 54 23 THERMOPLASTIC-POLYOLEFIN (TPO)
ROOFING
07 55 52.13 ATACTIC-POLYPROPYLENE (APP) MODIFIED
BITUMINOUS PROTECTED MEMBRANE
ROOFING
07 55 52.16 STYRENE-BUTADIENE-STYRENE (SBS)
MODIFIED BITUMINOUS PROTECTED
MEMBRANE ROOFING
07 55 56 FLUID-APPLIED PROTECTED MEMBRANE
ROOFING
07 57 00 COATED FOAMED ROOFING
07 61 00 SHEET METAL ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 71 29 MANUFACTURED ROOF EXPANSION JOINTS
07 72 00 ROOF ACCESSORIES
07 81 00 APPLIED FIRE PROTECTION
07 81 23 INTUMESCENT FIRE PROTECTION
07 82 00 BOARD FIRE PROTECTION
07 84 13 PENETRATION FIRESTOPPING
07 84 43 JOINT FIRESTOPPING
07 92 00 JOINT SEALANTS
07 92 19 ACOUSTICAL JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 11 16.13 INTERIOR ALUMINUM DOORS AND FRAMES
08 11 19 STAINLESS-STEEL DOORS AND FRAMES
08 11 73 SLIDING METAL FIRE DOORS
08 12 13 HOLLOW METAL FRAMES
08 13 16.13 ALUMINUM TERRACE DOORS
08 14 16 FLUSH WOOD DOORS
CA-TS-01
- 4
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
08 14 33 STILE AND RAIL WOOD DOORS
08 14 33.13 WOOD TERRACE DOORS
08 18 16.13 SLIDING ALUMINUM-FRAMED GLASS DOORS
08 18 16.19 SLIDING WOOD-FRAMED GLASS DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 41 26 ALL-GLASS ENTRANCES AND STOREFRONTS
08 41 26.23 INTERIOR ALL-GLASS ENTRANCES
08 42 13 ALUMINUM-FRAMED ENTRANCES
08 42 26 ALL-GLASS ENTRANCES
08 42 29.23 SLIDING AUTOMATIC ENTRANCES
08 42 29.33 SWINGING AUTOMATIC ENTRANCES
08 42 33 REVOLVING DOOR ENTRANCES
08 43 13 ALUMINUM-FRAMED STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 44 23 STRUCTURAL-SEALANT-GLAZED CURTAIN
WALLS
08 51 13 ALUMINUM WINDOWS
08 52 00 WOOD WINDOWS
08 53 13 VINYL WINDOWS
08 54 13 FIBERGLASS WINDOWS
08 61 00 ROOF WINDOWS
08 62 00 UNIT SKYLIGHTS
08 63 00 METAL-FRAMED SKYLIGHTS
08 71 00 DOOR HARDWARE
08 71 13 POWER DOOR OPERATORS
08 80 00 GLAZING
08 83 00 MIRRORS
08 84 00 PLASTIC GLAZING
08 91 19 FIXED LOUVERS
08 95 16 WALL VENTS
DIVISION 09 - FINISHES
09 01 90.52 MAINTENANCE REPAINTING
09 22 16 NON-STRUCTURAL METAL FRAMING
09 23 00 GYPSUM PLASTERING
09 24 00 CEMENT PLASTERING
09 26 13 GYPSUM VENEER PLASTERING
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 30 23 GLASS TILING
09 30 33 STONE TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 51 23 ACOUSTICAL TILE CEILINGS
09 64 00 WOOD FLOORING
09 64 66 WOOD ATHLETIC FLOORING
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 16 RESILIENT SHEET FLOORING
CA-TS-01
- 5
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
09 65 19 RESILIENT TILE AND PLANK FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 67 23 RESINOUS FLOORING
09 68 13 TILE CARPETING
09 68 16 SHEET CARPETING
09 72 00 WALL COVERINGS
09 84 33 SOUND-ABSORBING WALL UNITS
09 84 36 SOUND-ABSORBING CEILING UNITS
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
09 93 00 STAINING AND TRANSPARENT FINISHING
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 11 46 VISUAL DISPLAY FABRICS
10 12 00 DISPLAY CASES
10 13 00 DIRECTORIES
10 14 16 PLAQUES
10 14 19 DIMENSIONAL LETTER SIGNAGE
10 14 23 PANEL SIGNAGE
10 14 23.16 ROOM-IDENTIFICATION PANEL SIGNAGE
10 14 73 PAINTED SIGNAGE
10 21 13.13 METAL TOILET COMPARTMENTS
10 21 13.16 PLASTIC-LAMINATE-CLAD TOILET
COMPARTMENTS
10 21 13.17 PHENOLIC-CORE TOILET COMPARTMENTS
10 21 13.19 PLASTIC TOILET COMPARTMENTS
10 22 33 ACCORDION FOLDING PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 43 00 EMERGENCY AID SPECIALTIES
10 44 13 FIRE PROTECTION CABINETS
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 51 16 WOOD LOCKERS
10 51 23 PLASTIC-LAMINATE-CLAD LOCKERS
10 51 29 PHENOLIC LOCKERS
10 51 43 WIRE MESH STORAGE LOCKERS
10 73 13 AWNINGS
10 73 43 TRANSPORTATION STOP SHELTERS
10 75 16 GROUND-SET FLAGPOLES
10 75 23 WALL-MOUNTED FLAGPOLES
DIVISION 11 - EQUIPMENT
11 11 36 VEHICLE CHARGING EQUIPMENT
11 12 00 PARKING CONTROL EQUIPMENT
11 13 13 LOADING DOCK BUMPERS
11 13 16 LOADING DOCK SEALS AND SHELTERS
CA-TS-01
- 6
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
11 30 13 RESIDENTIAL APPLIANCES
11 40 00 FOODSERVICE EQUIPMENT
11 51 23 LIBRARY STACK SYSTEMS
11 52 13 PROJECTION SCREENS
11 52 13.19 REAR PROJECTION SCREENS
11 61 43 STAGE CURTAINS
11 66 23 GYMNASIUM EQUIPMENT
11 66 53 GYMNASIUM DIVIDERS
11 73 00 PATIENT CARE EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS
12 21 16 VERTICAL LOUVER BLINDS
12 22 00 CURTAINS AND DRAPES
12 24 13 ROLLER WINDOW SHADES
12 24 16 PLEATED WINDOW SHADES
12 32 13 MANUFACTURED WOOD-VENEER-FACED
CASEWORK
12 32 16 MANUFACTURED PLASTIC-LAMINATE-CLAD
CASEWORK
12 35 30 RESIDENTIAL CASEWORK
12 35 53.13 METAL LABORATORY CASEWORK
12 35 53.16 PLASTIC-LAMINATE-CLAD LABORATORY
CASEWORK
12 35 53.19 WOOD LABORATORY CASEWORK
12 35 70 HEALTHCARE CASEWORK
12 36 16 METAL COUNTERTOPS
12 36 19 WOOD COUNTERTOPS
12 36 23.13 PLASTIC-LAMINATE-CLAD COUNTERTOPS
12 36 61 SIMULATED STONE COUNTERTOPS
12 66 00 TELESCOPING STANDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 14 - CONVEYING EQUIPMENT
14 21 00 ELECTRIC TRACTION ELEVATORS
14 24 00 HYDRAULIC ELEVATORS
14 26 00 LIMITED-USE/LIMITED-APPLICATION
ELEVATORS
FACILITY SERVICES SUBGROUP
DIVISION 21 - FIRE SUPPRESSION
21 05 00 COMMON WORK RESULTS FOR FIRE
SUPPRESSION
21 05 23 GENERAL-DUTY VALVES FOR WATER-BASED
FIRE-SUPPRESSION PIPING
21 05 29 HANGERS AND SUPPORTS FOR FIRE-
CA-TS-01
- 7
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SUPPRESSION PIPING AND EQUIPMENT
21 05 53 IDENTIFICATION FOR FIRE-SUPPRESSION
PIPING AND EQUIPMENT
21 07 00 FIRE-SUPPRESSION SYSTEMS INSULATION
21 10 00 WATER-BASED FIRE-SUPPRESSION SYSTEMS
21 31 13 ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS
21 31 16 DIESEL-DRIVE, CENTRIFUGAL FIRE PUMPS
21 32 13 ELECTRIC-DRIVE, VERTICAL-TURBINE FIRE
PUMPS
21 32 16 DIESEL-DRIVE, VERTICAL-TURBINE FIRE
PUMPS
DIVISION 22 - PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING
PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING
PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION
22 11 16 DOMESTIC WATER PIPING
22 11 17 GRAY-WATER PIPING
22 13 16 SANITARY WASTE AND VENT PIPING
22 32 00 DOMESTIC WATER FILTRATION EQUIPMENT
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 41 00 RESIDENTIAL PLUMBING FIXTURES
22 42 00 COMMERCIAL PLUMBING FIXTURES
22 43 00 HEALTHCARE PLUMBING FIXTURES
22 47 00 DRINKING FOUNTAINS AND WATER COOLERS
22 61 13 COMPRESSED-AIR PIPING FOR LABORATORY
AND HEALTHCARE FACILITIES
22 61 19 COMPRESSED-AIR EQUIPMENT FOR
LABORATORY AND HEALTHCARE FACILITIES
22 62 13 VACUUM PIPING FOR LABORATORY AND
HEALTHCARE FACILITIES
22 62 19 VACUUM EQUIPMENT FOR LABORATORY AND
HEALTHCARE FACILITIES
22 63 13 GAS PIPING FOR LABORATORY AND
HEALTHCARE FACILITIES
22 66 00 CHEMICAL-WASTE SYSTEMS FOR
LABORATORY AND HEALTHCARE FACILITIES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.52 EXISTING HVAC AIR DISTRIBUTION SYSTEM
CLEANING
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING
CA-TS-01
- 8
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
AND EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC PIPING AND
EQUIPMENT
23 07 13 DUCT INSULATION
23 07 16 HVAC EQUIPMENT INSULATION
23 07 19 HVAC PIPING INSULATION
23 11 13 FACILITY FUEL-OIL PIPING
23 11 23 FACILITY NATURAL-GAS PIPING
23 11 26 FACILITY LIQUEFIED-PETROLEUM GAS PIPING
23 12 13 FACILITY FUEL-OIL PUMPS
23 13 13 FACILITY UNDERGROUND FUEL-OIL STORAGE
TANKS
23 13 23 FACILITY ABOVEGROUND FUEL-OIL STORAGE
TANKS
23 31 13 METAL DUCTS
23 31 16 NONMETAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 36 00 AIR TERMINAL UNITS
23 37 13.13 AIR DIFFUSERS
23 37 13.23 REGISTERS AND GRILLES
23 52 13 ELECTRIC BOILERS
23 52 23 CAST-IRON BOILERS
23 52 33 WATER-TUBE BOILERS
23 52 39 FIRE-TUBE BOILERS
23 54 16.13 GAS-FIRED FURNACES
23 54 16.16 OIL-FIRED FURNACES
23 62 00 PACKAGED COMPRESSOR AND CONDENSER
UNITS
23 63 13 AIR-COOLED REFRIGERANT CONDENSERS
23 64 13.13 DIRECT-FIRED ABSORPTION WATER
CHILLERS
23 64 13.16 INDIRECT-FIRED ABSORPTION WATER
CHILLERS
23 64 16 CENTRIFUGAL WATER CHILLERS
23 64 23.13 AIR-COOLED, SCROLL WATER CHILLERS
23 64 23.16 WATER-COOLED, SCROLL WATER CHILLERS
23 64 26.13 AIR-COOLED, ROTARY-SCREW WATER
CHILLERS
23 64 26.16 WATER-COOLED, ROTARY-SCREW WATER
CHILLERS
23 65 13.13 OPEN-CIRCUIT, FORCED-DRAFT COOLING
TOWERS
23 65 13.16 CLOSED-CIRCUIT, FORCED-DRAFT COOLING
TOWERS
23 65 14.13 OPEN-CIRCUIT, INDUCED-DRAFT,
COUNTERFLOW COOLING TOWERS
23 65 14.14 OPEN-CIRCUIT, INDUCED-DRAFT,
CROSSFLOW COOLING TOWERS
CA-TS-01
- 9
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
23 65 14.16 CLOSED-CIRCUIT, INDUCED-DRAFT,
COUNTERFLOW COOLING TOWERS
23 65 14.17 CLOSED-CIRCUIT, INDUCED-DRAFT,
COMBINED-FLOW COOLING TOWERS
23 73 13.13 INDOOR, BASIC AIR-HANDLING UNITS
23 73 13.16 INDOOR, SEMI-CUSTOM AIR-HANDLING UNITS
23 73 33.16 INDOOR, INDIRECT, GAS-FIRED HEATING AND
VENTILATING UNITS
23 73 39 INDOOR, DIRECT-FIRED HEATING AND
VENTILATING UNITS
23 73 43.16 OUTDOOR, SEMI-CUSTOM AIR-HANDLING
UNITS
23 81 13.11 PACKAGED TERMINAL AIR-CONDITIONERS,
THROUGH-WALL UNITS
23 81 13.12 PACKAGED TERMINAL AIR-CONDITIONERS,
FREESTANDING UNITS
23 81 13.13 PACKAGED TERMINAL AIR-CONDITIONERS,
OUTDOOR, WALL-MOUNTED UNITS
23 81 19 SELF-CONTAINED AIR-CONDITIONERS
23 82 23 UNIT VENTILATORS
23 82 29 RADIATORS
23 82 39.13 CABINET UNIT HEATERS
23 82 39.19 WALL AND CEILING UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 10 SUPPLEMENTAL REQUIREMENTS FOR
ELECTRICAL
26 05 13 MEDIUM-VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL
SYSTEMS
26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS
26 05 33.16 BOXES AND COVERS FOR ELECTRICAL
SYSTEMS
26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL
SYSTEMS
26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 05 44 SLEEVES AND SLEEVE SEALS FOR
ELECTRICAL RACEWAYS AND CABLING
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 13 26 MEDIUM-VOLTAGE METAL-CLAD SWITCHGEAR
26 13 29 MEDIUM-VOLTAGE COMPARTMENTALIZED
SWITCHGEAR
26 22 13 LOW-VOLTAGE DISTRIBUTION
TRANSFORMERS
CA-TS-01
- 10
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
26 22 16 LOW-VOLTAGE BUCK-BOOST
TRANSFORMERS
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 23 13 PARALLELING LOW-VOLTAGE SWITCHGEAR
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 25 00 LOW-VOLTAGE ENCLOSED BUS ASSEMBLIES
26 27 13 ELECTRICITY METERING
26 27 26 WIRING DEVICES
26 27 26.11 GENERAL-USE SWITCHES, DIMMER
SWITCHES, AND FAN-SPEED CONTROLLER
SWITCHES
26 27 26.31 GENERAL-GRADE SINGLE STRAIGHT-BLADE
RECEPTACLES
26 27 26.33 GENERAL-GRADE DUPLEX STRAIGHT-BLADE
RECEPTACLES
26 27 26.37 RECEPTACLES WITH ARC-FAULT AND
GROUND-FAULT PROTECTIVE DEVICES
26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS
26 32 13.16 GAS-ENGINE-DRIVEN GENERATOR SETS
26 32 13.19 BI-FUEL-ENGINE-DRIVEN GENERATOR SETS
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 SURGE PROTECTIVE DEVICES FOR LOW-
VOLTAGE ELECTRICAL POWER CIRCUITS
26 50 00 LIGHTING
26 55 61 THEATRICAL LIGHTING
26 55 68 ATHLETIC FIELD LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 11 00 COMMUNICATIONS EQUIPMENT ROOM
FITTINGS
27 13 13 COMMUNICATIONS COPPER BACKBONE
CABLING
27 13 23 COMMUNICATIONS OPTICAL FIBER
BACKBONE CABLING
27 13 33 COMMUNICATIONS COAXIAL BACKBONE
CABLING
27 15 13 COMMUNICATIONS COPPER HORIZONTAL
CABLING
27 15 23 COMMUNICATIONS OPTICAL FIBER
HORIZONTAL CABLING
27 15 33 COMMUNICATIONS COAXIAL HORIZONTAL
CABLING
27 16 11 COMMUNICATIONS HYBRID CABLING
27 41 33 MASTER ANTENNA TELEVISION SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
27 51 23.20 COMMERCIAL INTERCOMMUNICATIONS AND
PROGRAM SYSTEMS
CA-TS-01
- 11
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
27 51 23.50 EDUCATIONAL INTERCOMMUNICATIONS AND
PROGRAM SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 13 00 ACCESS CONTROL SOFTWARE AND
DATABASE MANAGEMENT
28 14 00 ACCESS CONTROL SYSTEM HARDWARE
28 15 15 ELECTRIFIED LOCKING DEVICES AND
ACCESSORIES
28 20 00 VIDEO SURVEILLANCE
28 31 00 INTRUSION DETECTION
28 46 00 FIRE DETECTION AND ALARM
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 50 00 EXCAVATION SUPPORT AND PROTECTION
31 62 13 CONCRETE PILES
31 62 16 STEEL PILES
31 62 19 TIMBER PILES
31 62 23 COMPOSITE PILES
31 63 16 AUGER CAST GROUT PILES
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 12 23 IMPRINTED ASPHALT
32 13 13 CONCRETE PAVING
32 14 00 UNIT PAVING
32 14 43 POROUS UNIT PAVING
32 17 23 PAVEMENT MARKINGS
32 17 26 TACTILE WARNING SURFACING
32 18 13 SYNTHETIC GRASS SURFACING
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
32 31 13 CHAIN LINK FENCES AND GATES
32 33 00 SITE FURNISHINGS
32 84 00 PLANTING IRRIGATION
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
DIVISION 33 - UTILITIES
33 05 00 COMMON WORK RESULTS FOR UTILITIES
33 11 13 POTABLE WATER SUPPLY WELLS
33 14 15 SITE WATER DISTRIBUTION PIPING
33 31 15 SITE SANITARY SEWERAGE PIPING
33 42 00 STORMWATER CONVEYANCE
33 46 00 SUBDRAINAGE
33 71 49.13 OVERHEAD MEDIUM-VOLTAGE WIRING
CA-TS-01
- 12
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
END OF TABLE OF CONTENTS
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 1
SECTION 02 41 16 - STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. The Work of this Section Includes:
1. Demolition and removal of buildings or structures.
2. Demolition and removal of site improvements.
3. Abandoning in-place below-grade construction.
4. Removing below-grade construction.
5. Disconnecting, capping or sealing, and abandoning in-place site utilities.
6. Disconnecting, capping or sealing, and removing site utilities.
7. Salvaging items for reuse by Owner.
1.2 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be demolished.
2. Review structural load limitations of existing structures.
3. Review and finalize building demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review and finalize protection requirements.
5. Review procedures for noise control and dust control.
6. Review procedures for protection of adjacent buildings.
7. Review storage, protection, and accounting for items to be salvaged and returned to Owner.
1.3 INFORMATIONAL SUBMITTALS
A. Engineering Survey: Submit engineering survey of condition of building.
B. Survey of Existing Conditions: Submit survey.
C. Schedule of Building Demolition Activities: Indicate the following:
1. Detailed sequence of demolition work, with starting and ending dates for each activity.
2. Temporary interruption of utility services. Indicate how long services will be interrupted.
3. Coordination for shutoff and capping of utility services.
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 2
1.4 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.5 QUALITY ASSURANCE
A. Specialty Demolition Contractor Qualifications: A competent person who has training, knowledge, or experience in the use of each type of blasting method used and in the field of transporting, storing, handling, and using explosives; and has a working knowledge of state and local laws and regulations pertaining to explosives.
1.6 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.
B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.
C. Hazardous Materials:
1. It is not expected that hazardous materials will be encountered in the Work.
a. Hazardous materials will be removed by Owner before start of the Work.
b. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
D. On-site sale of removed items or materials is not permitted.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 3
2.2 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during building demolition operations.
D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.
E. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
3.2 PREPARATION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of demolition.
C. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated. Comply with requirements in Section 015000 "Temporary Facilities and Controls."
1. Protect adjacent buildings and facilities from damage due to demolition activities.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.
4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
5. Provide protection to ensure safe passage of people around building demolition
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 4 area and to and from occupied portions of adjacent buildings and structures.
6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.
7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings.
D. Existing Utilities to Remain: Maintain utility services to remain and protect against damage during demolition operations.
1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.
2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and authorities having jurisdiction.
a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service is required during changeover.
E. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.
1. Owner will arrange to shut off utilities when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If disconnection of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.
4. Cut off pipe or conduit a minimum of 24 inches below grade at or outside the building or structure to be demolished and cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing in accordance with requirements of authorities having jurisdiction.
5. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing by authorities having jurisdiction.
F. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment in accordance with 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 DEMOLITION, GENERAL
A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials.
Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain adequate ventilation when using cutting torches.
3. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 5
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt.
Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
C. Explosives: Use of explosives is not permitted.
3.4 SITE RESTORATION
A. Below-Grade Areas:
1. Rough grade below-grade areas ready for further excavation or new construction.
2. Completely fill below-grade areas and voids resulting from building demolition operations with satisfactory soil materials in accordance with backfill requirements in Section 312000 "Earth Moving."
B. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
3.5 REPAIRS
A. Promptly repair damage to adjacent buildings caused by demolition operations.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Do not burn demolished materials.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.
1. Clean roadways of debris caused by debris transport.
CA-TS-01 STRUCTURE DEMOLITION
02 41 16 - 6
END OF SECTION 02 41 16
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 1
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. The Work of this Section Includes:
1. Demolition and removal of selected portions of exterior or interior of building or structure and site elements.
2. Removal and salvage of existing items for delivery to Owner and removal of existing items for reinstallation.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.3 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
4. Review areas where existing construction is to remain and requires protection.
5. Review and finalize protection requirements.
6. Review procedures for noise control and dust control.
7. Review storage, protection, and accounting for items to be removed for salvage or reinstallation.
1.5 INFORMATIONAL SUBMITTALS
A. Survey of Existing Conditions: Submit survey.
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property [, for environmental protection][, for dust control][and][, for noise control]. Indicate proposed locations and construction of barriers.
C. Schedule of Selective Demolition Activities: Indicate the following:
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 2
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Temporary interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.
D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed in accordance with EPA regulations.
Include name and address of technician and date refrigerant was recovered.
E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: [Type I][Type II][Type III][Universal] certified by an EPA-approved certification program.
1.8 FIELD CONDITIONS
A. Hazardous Materials:
1. It is not expected that hazardous materials will be encountered in the Work.
a. Hazardous materials will be removed by Owner before start of the Work.
b. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
B. On-site sale of removed items or materials is not permitted.
1.9 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:
B. Notify warrantor on completion of selective demolition, and obtain documentation
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 3 verifying that existing system has been inspected and warranty remains in effect.
Submit documentation at Project closeout.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. [Perform][Engage a professional engineer to perform] an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.
E. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
F. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video [, measured drawings][and][templates]. Comply with Section 013233 "Photographic Documentation."
1. Inventory and record the condition of items to be removed for salvage or reinstallation. Photograph or video conditions that might be misconstrued as damage caused by removal.
2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 4
3.2 PREPARATION
A. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
B. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.3 UTILITY SERVICES AND BUILDING SYSTEMS
A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated utilities when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to those parts of the building.
4. Demolish and remove existing building systems, equipment, and components indicated on Drawings to be removed.
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 5
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.
5. Abandon existing building systems, equipment, and components indicated on Drawings to be abandoned in place.
a. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
b. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
6. Remove and reinstall/salvage existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:
a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when appropriate, reinstall, reconnect, and make equipment operational.
b. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and components and deliver to Owner.
3.4 SALVAGE/REINSTALL
A. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.
3. Store items in a secure area until delivery to Owner.
4. Protect items from damage during transport and storage.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 6
1. Proceed with selective demolition systematically, from higher to lower level.
Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt.
Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
CA-TS-01 SELECTIVE DEMOLITION
02 41 19 - 7
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
CA-TS-01 CONCRETE FORMING AND
ACCESSORIES
03 10 00 - 1
SECTION 03 10 00 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Form-facing materials.
2. Form liners.
3. Waterstops.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 INFORMATIONAL SUBMITTALS
A. Minutes of preinstallation conference.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Form Liners: Store form liners under cover to protect from sunlight.
B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil, and other contaminants.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."
2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
a. For architectural concrete specified in Section 033300 "Architectural Concrete," limit deflection of form-facing material, studs, and walers to
CA-TS-01 CONCRETE FORMING AND
ACCESSORIES
03 10 00 - 2
0.0025 times their respective clear spans (L/400).
B. Design, engineer, erect, shore, brace, and maintain insulating concrete forms in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
2.2 FORM-FACING MATERIALS
A. As-Cast Surface Form-Facing Material:
1. Provide continuous, true, and smooth concrete surfaces.
2. Furnish in largest practicable sizes to minimize number of joints.
3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-in-Place Concrete, and as follows:
a. Plywood, metal, or other approved panel materials.
b. Exterior-grade plywood panels, suitable for concrete forms, complying with
DOC PS 1, and as follows:
1) APA HDO (high-density overlay).
2) APA MDO (medium-density overlay); mill-release agent treated and edge sealed.
3) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.
4) APA Plyform Class I, B-B or better; mill oiled and edge sealed.
B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.
1. Provide lumber dressed on at least two edges and one side for tight fit.
C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that produce surfaces without spiral or vertical seams not exceeding specified formwork surface class.
1. Provide forms with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.
D. Pan-Type Forms: Glass-fiber-reinforced plastic or formed steel, stiffened to resist plastic concrete loads without detrimental deformation, with straight end forms.
E. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads.
2.3 FORM LINERS
A. Form Liners: Architectural finish pattern on the concrete surface can be achieved by attaching form liners to the inside faces of form-facing materials.
CA-TS-01 CONCRETE FORMING AND
ACCESSORIES
03 10 00 - 3
1. Face Pattern: Smooth.
2.4 WATERSTOPS
A. Flexible Rubber Waterstops: U.S. Army Corps of Engineers' CE CRD-C 513, for embedding in concrete to prevent passage of fluids through joints, with factory-fabricated corners, intersections, and directional changes.
1. Profile: Flat dumbbell without center bulb.
2. Dimensions: 4 by 3/16 inch thick; nontapered.
B. Self-Expanding Butyl Strip Waterstops: Manufactured rectangular or trapezoidal strip, butyl rubber with sodium bentonite or other hydrophilic polymers, for adhesive bonding to concrete, 3/4 by 1 inch.
2.5 RELATED MATERIALS
A. Reglets: Fabricate reglets of not less than 0.022-inch- thick, galvanized-steel sheet.
Temporarily fill or cover face opening of reglet to prevent intrusion of concrete or debris.
B. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.
D. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal.
E. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners to be acceptable to form liner manufacturer.
F. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.
2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.
3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.
G. Sealant: One-part moisture cure silicone sealant used with form liners.
CA-TS-01 CONCRETE FORMING AND
ACCESSORIES
03 10 00 - 4
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301.
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .