Project Manual as Part of the Bidding Documents (2).pdf
PDF 4 MB Posted
- Attached to
- Connection to Bluebonnet Water Improvements
- Solicitation number
- 1-04339
- Issued by
- Loving County, Texas
About this file
This is a Project Manual containing bidding documents for the City of McGregor, Texas, for the Connection to Bluebonnet Water Improvements project (Project Number 1-04339.00). The project involves construction of approximately 950 linear feet of new 16-inch PVC (C900) waterline near the intersection of State Highway 317 and Bluebonnet Parkway in McGregor, including installation of new meter and backflow vaults and connection to an existing 16-inch waterline operated by Bluebonnet Water Supply Corporation. Sealed bids were due by 2:00 P.M. on September 29, 2026, with public opening and reading at the City of McGregor Council Chambers. A pre-bid conference was scheduled for 10:00 A.M. on Wednesday, September 23, 2026, at City Hall (302 S Madison Avenue, McGregor, Texas 76657). The contract time for completion is 60 consecutive calendar days for substantial completion and 75 calendar days for final completion. Bidders were required to submit a 5 percent bid security, and the successful bidder must execute the contract and provide performance and payment bonds within 15 days of the Notice of Award.
The contract utilizes a unit price basis for bidding on multiple line items, with estimated quantities provided for comparison purposes only; final payment is based on actual quantities determined by the Engineer. Liquidated damages are assessed at $500 per day for failure to achieve substantial completion within the specified contract time. A 5 percent retainage is held on each payment application until final payment. The Engineer, Walker Partners, LLC (TBPE Registration No. 8053, Nancy Nichols PM), is responsible for project administration and interpretation of contract documents. Texas sales and use taxes are exempt from the bid price as the Owner is tax-exempt. Copies of bidding documents were available electronically through CivCast (www.civcastusa.com), with questions submitted through the platform's Question and Answer feature. The project manual includes detailed general and supplementary conditions, technical specifications for site improvements and utility work, bid forms, bond requirements, and sample forms for change orders, payment applications, and substantial completion certificates.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/10/2026
CITY OF MCGREGOR
CONNECTION TO BLUEBONNET WATER
IMPROVEMENTS
SEPTEMBER 2026
PROJECT NUMBER 1-04339.00
PROJECT MANUAL
T.B.P.E. Registration No. 8053
Nancy Nichols PM as part of the Bidding Documents
Table of Contents
00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
Section Title No. of Pages
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 Table of Contents
PROCUREMENT REQUIREMENTS
00 11 16 Advertisement for Bids
00 21 15 Instructions to Bidders
00 41 43 Bid Form
00 42 43 Bid Bond
CONTRACTING REQUIREMENTS
00 45 00 Notice of Award
00 46 00 Notice to Proceed
00 52 15 Agreement Form
00 61 00 Performance Bond
00 61 50 Payment Bond
00 72 15 General Conditions
00 73 13 Supplementary Conditions
00 91 13 Addenda
Non-Collusion Affidavit
Wage Rates
Sample Forms
Work Change Directive
Field Order
Change Order
Contractor’s Application for Payment
Certificate of Substantial Completion
Technical Specifications No. of Pages
DIVISION 01 - GENERAL REQUIREMENTS
01 20 00 Price and Payment Procedures
01 21 00 Mobilization, Traffic Handling, and Incidentals
01 30 00 Administrative Requirements
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 60 00 Product Requirements
01 70 00 Execution and Closeout Requirements
DIVISION 31 - EARTHWORK
31 10 00 Clearing
31 23 15 Trench Safety Systems
31 23 17 Trenching
Table of Contents
00 01 10 - 2
DIVISION 32 – CIVIL SITE IMPROVEMENTS
32 05 16 Aggregates for Civil Site Improvements
32 11 23 Flexible Base
32 30 00 Cast-in-Place Concrete for Civil Site Improvements
32 41 00 Precast Concrete for Civil Site Improvements
32 92 19 Seeding
DIVISION 33 - UTILITIES
33 01 30 Frames, Grates, Rings and Covers and Manhole Grade Adjustements
33 05 16 Utility Structures
33 05 19 Pressure Piping Tied Joint Restraint System
33 05 22 Boring and Jacking Pipe
33 11 13 Public Water Distribution Piping and Appurtenances
33 12 00 Water Utility Distribution Equipment
END OF TABLE OF CONTENTS
Advertisement for Bids
00 11 16 - 1
ADVERTISEMENT FOR BIDS
City of McGregor
(Owner)
Separate sealed bids for the Connection to Bluebonnet Water Improvements for the City of
McGregor will be received by the Engineer at the City of McGregor, City Hall, 302 S Madison
Avenue, McGregor, Texas 76657 until 2:00 P.M. on September 29, 2026, and then publicly opened and read aloud immediately in the Council Chambers of the City of McGregor on the same day.
The information for Bidders, Form of Bid, Form of Contract, Plans Specifications, and
Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following:
Walker Partners, LLC
823 Washington Avenue, Suite 100, Waco, Texas 76701
Copies of the bidding documents can be obtained electronically online from CivCast
(www.civcastusa.com). All questions must be submitted electronically through CivCast’s
Question and Answer feature. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com.
The owner reserves the right to waive any informalities or to reject any or all bids.
Each bidder must deposit with his bid, security in the minimum amount of 5% of the greatest amount of bid. The bid bond and surety's power of attorney must both carry the date of the bid opening.
Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract.
No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.
September 10, 2026
Date Engineer
Instructions to Bidders
00 21 15 - 1
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
ARTICLE 1 - DEFINED TERMS
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND
SITE
ARTICLE 5 - PRE-BID CONFERENCE
ARTICLE 6 - SITE AND OTHER AREAS
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
ARTICLE 8 - BID SECURITY
ARTICLE 9 - CONTRACT TIMES
ARTICLE 10 - LIQUIDATED DAMAGES
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 13 - PREPARATION OF BID
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
ARTICLE 15 - SUBMITTAL OF BID
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
ARTICLE 17 - OPENING OF BIDS
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
ARTICLE 21 - SIGNING OF AGREEMENT
ARTICLE 22 - SALES AND USE TAXES
ARTICLE 23 - RETAINAGE
00 21 15 - 2
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the payment sum, if any, stated in the Advertisement or Invitation to Bid may be obtained from the Issuing Office. The payment is nonrefundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, within five days of Owner’s request, Owner may request the Bidder to submit written evidence such as financial data, previous experience, present commitments, and such other data as may be requested.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND
SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that
Engineer has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the
“technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the
General Conditions has been identified and established in Paragraph 4.02 of the Supplementary Conditions.
Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
00 21 15 - 3
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing
Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others. The Contractor shall call Texas 811 at 1-800-344-8377 at least 48 hours prior to digging.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous
Environmental Condition identified at the Site, if any, that Engineer has used in preparing the Bidding
Documents.
B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the
“technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the
General Conditions has been identified and established in Paragraph 4.06 of the Supplementary Conditions.
Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General
Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and
Regulations relative to excavation and utility locates.
4.06 Reference is made to Article 7 of the General Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents (if applicable). On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding
Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
00 21 15 - 4
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary
Conditions as provided in Paragraph 4.02 of the General Conditions, and (2) reports and drawings of
Hazardous Environmental Conditions at the Site which have been identified in the Supplementary
Conditions as provided in Paragraph 4.06 of the General Conditions;
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding
Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained from visits to the
Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that
Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A pre-Bid conference will be held at 10:00 am local time on Wednesday, September 23, 2026 at the City of McGregor, City Hall, 302 S Madison Ave, McGregor, Texas 76657. Representatives of
Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
00 21 15 - 5
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the
Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder’s maximum Bid price and in the form of a certified check or bank money order or a Bid
Bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the
General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Contract Documents, furnished the required contract security and met the other conditions of the Notice of
Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The Contractor shall have 60 consecutive calendar days to complete the proposed work in accordance with Article 4.02 of the Agreement.
00 21 15 - 6
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Liquidated damages in the amount of $500.00 shall be assessed each day after the number of days specified as the contract time as set forth in Article 9, above and in accordance with Article 4.03 of the
Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, or those substitute or “or-equal” materials and equipment approved by Engineer and identified by Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or-equal” item. No item of material or equipment will be considered by Engineer as a substitute or “or-equal” unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph 6.05 of the
General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner.
If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful
Bidder to submit a substitute, without an increase in the Bid.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which
Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the
Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from
Engineer.
00 21 15 - 7
13.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternative, and unit price item listed therein, or the words
“No Bid,” “No Change,” or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.
13.06 A Bid by an individual shall show the Bidder’s name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid
Form. The official address of the joint venture shall be shown below the signature.
13.08 All names shall be typed or printed in ink below the signatures.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the
General Conditions.
00 21 15 - 8
14.03 Bid prices will be compared after adjusting for differences in the time designated by Bidders for
Substantial Completion. The adjusting amount will be determined at the rate set forth in the Contract
Documents for liquidated damages for failing to achieve Substantial Completion for each day before or after the desired date appearing in Article 9.
ARTICLE 15 - SUBMITTAL OF BID
15.01 The Bid Form is to be completed and submitted with the Bid Security.
15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the
Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to City of McGregor, 302 S Madison Avenue, McGregor, Texas 76657.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
16.02 If within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the
Work.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any
Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an
00 21 15 - 9 award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful
Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner is exempt from Texas state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-6.10 of the
Supplementary Conditions for additional information.
00 21 15 - 10
ARTICLE 23 - RETAINAGE
23.01 The amount of retainage shall be 5% of the Work as approved on the “Contractor’s Application for Payment,” in which 5% shall be retained on each payment application until the Final Payment.
Bid Form
00 41 43 - 1
BID FORM
City of McGregor Connection to Bluebonnet Water Improvements
1-04339.00
TABLE OF ARTICLES
Article Article No.
Bid Recipient
Bidder’s Acknowledgements
Bidder's Acceptance of Instructions
Bidder's Representations
Further Representations
Basis of Bid
Time of Completion
Attachments to this Bid
Defined Terms
Bid Submittal
00 41 43 - 2
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of McGregor
302 S Madison Avenue
McGregor, Texas 76657
ARTICLE 2 – BIDDER'S ACKNOWLEDGEMENTS
2.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 3 – BIDDER'S ACCEPTANCE OF INSTRUCTIONS
3.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 4 – BIDDER'S REPRESENTATIONS
4.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in SC-4.02.
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to
00 41 43 - 3 the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the
Bidding Documents.
I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by
Engineer is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the state where the
Project is located not later than the date of its execution of the Agreement.
ARTICLE 5 – FURTHER REPRESENTATIONS
5.01 Bidder further represents that:
A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
ARTICLE 6 – BASIS OF BID
6.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT
1.00 GENERAL CONDITIONS
1.01 MOBILIZATION, TRAFFIC HANDLING, AND INCIDENTALS 1 LS
1.02 TRENCH SAFETY PLAN 1 LS
1.03 CLEARING 0.5 AC
1.04 CONTINGENCY ALLOWANCE 1 LS 100,000.00$ 100,000.00$
GENERAL CONDITIONS SUBTOTAL
2.00 WATERLINE IMPROVEMENTS
2.01
16" C900 PVC (DR-18) (ALL DEPTHS) INCLUDING ALL
EXCAVATION AND BACKFILL (OFF-STREET TRENCH)
902 LF
2.02
16" C900 PVC (DR-18) INSTALLED IN 24" C900 PVC
ENCASEMENT (ALL JOINTS RESTRAINED)
20 LF
2.03
30" CASING PIPE INSTALLED BY OPEN CUT
INCLUDING ALL EXCAVATION AND BACKFILL
20 LF
2.04 16" 45° BEND, D.I., M.J. 4 EA
2.05 16"X16" TEE, D.I., M.J. 2 EA
2.06 16" FIELD CONNECTION 3 EA
2.07 16" GATE VALVE 3 EA
2.08 16" CAP M.J. CAP 1 EA
2.09
10" METER AND VAULT, INCLUDING METER, VALVES,
CONCRETE VAULT AND HATCH, PIPING, FITTINGS,
EXCAVATION AND BACKFILL, COMPLETE AND IN
PLACE
1 LS
2.10
10" DCDA AND VAULT, INCLUDING DOUBLE-CHECK
DETECTOR ASSEMBLY, VALVES, CONCRETE VAULT
AND HATCH, PIPING, FITTINGS, EXCVATION AND
BACKFILL, COMPLETE AND IN PLACE.
1 LS
2.11 TRENCH SAFETY IMPLEMENTATION 960 LF
2.12 BERMUDA BROADCAST SEEDING (METHOD C) 960 LF
WATERLINE IMPROVEMENTS SUBTOTAL
TOTAL BASE BID
BID FORM
T.B.P.E. Registration No. 8053
G:\Projects\1-04339\2 Engineering\2.3 Engr OPC & Quantities\1-04339 EOPC - JRH 2026-09-02
00 41 43 - 4
00 41 43 - 5
Unit Prices have been computed in accordance with Paragraph 11.03.B of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 7 – TIME OF COMPLETION
7.01 Bidder agrees that the Work will be substantially complete within 60 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General
Conditions, and will be completed and ready for final payment in accordance with Paragraph
14.07.B of the General Conditions within 75 calendar days after the date when the Contract
Times commence to run.
7.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.
ARTICLE 8 – ATTACHMENTS TO THIS BID
8.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of Bid Bond, Certified Check, or Bank Money Order
B. Affidavit of Non-Collusion
C. List of Proposed Subcontractors
ARTICLE 9 – LEFT BLANK INTENTIONALLY
ARTICLE 10 – DEFINED TERMS
10.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 11 – BID SUBMITTAL
11.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By: (SEAL)
(Individual’s signature)
Doing business as:
00 41 43 - 6
A Partnership
Partnership Name: (SEAL)
By:
(Signature of general partner -- attach evidence of authority to sign)
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
(Signature -- attach evidence of authority to sign)
Title: (CORPORATE SEAL)
Attest
Date of Authorization to do business in [State Where Project is Located] is / / .
00 41 43 - 7
A Joint Venture
Name of Joint Venture:
First Joint Venturer Name: (SEAL)
(Signature of first joint venture partner -- attach evidence of authority to sign)
Title:
Second Joint Venturer Name: (SEAL)
(Signature of second joint venture partner -- attach evidence of authority to sign)
Title:
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
Bidder's Business Address
Phone No. Fax No.
SUBMITTED on , 20 .
State Contractor License No. . (If applicable)
Bid Bond
00 42 43 - 1
BID BOND
Any singular reference to Bidder, Surety, Owner, or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Project (Brief Description Including Location):
BOND
Bond Number:
Date (Not later than Bid due date):
Penal Sum:
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder�s Name and Corporate Seal Surety�s Name and Corporate Seal
By: By:
Signature and Title Signature and Title
(Attach Power of Attorney)
Attest: Attest:
Signature and Title Signature and Title
Note: Above addresses are to be used for giving required notice.
DAMAGES FORM
Bid Bond
00 42 43 - 2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of
Bidder any difference between the total amount of Bidder's
Bid and the total amount of the Bid of the next lowest, responsible Bidder who submitted a responsive Bid as determined by Owner for the work required by the Contract
Documents, provided that:
1.1. If there is no such next Bidder, and Owner does not
abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and
1.2.In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by
Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1.Owner accepts Bidder's Bid and Bidder delivers within the time required by the Bidding Documents
(or any extension thereof agreed to in writing by
Owner) the executed Agreement required by the
Bidding Documents and any performance and payment bonds required by the Bidding
Documents, or
3.2.All Bids are rejected by Owner, or
3.3.Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents
(or any extension thereof agreed to in writing by
Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from
Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to
Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term "Bid" as used herein includes a Bid, offer, or proposal as applicable.
Notice of Award 00 45 00 - 1
Notice of Award
Dated
Project: Owner: Owner's Contract No.:
Contract: Engineer's Project No.:
Bidder:
Bidder's Address: (send Certified Mail, Return Receipt Requested)
You are notified that your Bid dated for the above Contract has been considered. You are the Successful Bidder and are awarded a Contract for
(Indicate total Work, alternates or sections or Work awarded.)
The Contract Price of your Contract is Dollars ($ ).
copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this Notice of Award.
1. Deliver to the Owner [ ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the Instructions to Bidders (Article 20), [and] General Conditions (Paragraph 5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Contract Documents.
Owner
Authorized Signature
Title
Copy to Engineer
Notice to Proceed
00 46 00 - 1
Notice to Proceed
Dated
Project: Owner: Owner's Contract No.:
Contract: Engineer's Project No.:
Contractor:
Contractor's Address: [send Certified Mail, Return Receipt Requested]
You are notified that the Contract Times under the above contract will commence to run on . On or before that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 4 of the
Agreement, the date of Substantial Completion is , and the date of readiness for final payment is [(or) the number of days to achieve Substantial Completion is , and the number of days to achieve readiness for final payment is ].
Before you may start any Work at the Site, Paragraph 2.01.B of the General Conditions provides that you and Owner must each deliver to the other (with copies to Engineer and other identified additional insureds) certificates of insurance which each is required to purchase and maintain in accordance with the Contract Documents.
Also, before you may start any Work at the Site, you must:
1.0 Call the Texas One-Call System @ 1-800-344-8377 at least 48 hours prior to digging.
2.0 Prepare and submit Trench Safety Plan.
3.0 Prepare a Stormwater Pollution Prevention Plan. Prepare and submit a Notice of Intent (NOI) to TCEQ as prescribed in the Technical Specifications.
4.0 Preconstruction Conference Requirements:
Copy to Engineer
Contractor Owner
Received by: Given by:
Authorized Signature Authorized Signature
Title Title
Date Date
Agreement Form 00 52 15 - 1
EJCDC
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR FOR
CONSTRUCTION CONTRACT
THIS AGREEMENT is by and between City of McGregor
(Owner) and
(Contractor).
Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows:
ARTICLE 1 - WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: RFB No. 1-04339.00 – City of McGregor Connection to Bluebonnet Water Improvements in accordance with the Drawings, Specifications, and terms and conditions related thereto to which reference is hereby made.
ARTICLE 2 - THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Consists of approximately 950 linear feet of new, 16-inch PVC (C900) waterline near the intersection of SH 317 and Bluebonnet Parkway in the City of McGregor. Work includes new meter and backflow vaults as well as connection to an existing 16-inch waterline owned and operated by Bluebonnet Water Supply Corporation.
ARTICLE 3 - ENGINEER
3.01 The Project has been designed by Walker Partners, LLC (Engineer), who is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
00 52 15 - 2
ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the
Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion and Final Payment
A. The Work will be substantially completed within 60 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the
General Conditions within 75 calendar days after the date when the Contract Times commence to run.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the
General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 - CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A, below:
A. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price
Work times the estimated quantity of that item as indicated in this paragraph 5.01.A:
As provided in Paragraph 11.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .