Project Manual_AirlineGriggs_CSJx761.pdf
PDF 8 MB Posted
- Solicitation number
- CB-2026-0068
- Issued by
- Harris County, Texas
About this file
Project Manual Summary
This is a Project Manual for the City of Houston Public Works Capital Projects related to the Airline Drive Intersection and Griggs Road Crossing Improvements, a systemic safety project involving two separate construction initiatives identified by CSJ numbers 0912-72-761 and 0912-72-762. The project encompasses removal of existing spanwire traffic signals and installation of mastarm traffic signals with LED heads, countdown pedestrian signal heads, APS pushbuttons, and loop detection systems, along with intersection modifications including corner radii adjustments, median work, sidewalk and curb extensions, crosswalks, pavement markings, signage, and ADA improvements. The work is located at Airline Drive at Canino Road, Airline Drive from Aurora Street to Link Road, and Griggs Road from Culberson Street to Scott Street. The contract establishes a substantial completion date of 182 calendar days from the Date of Commencement of Work, with the letting date scheduled for November 2026. The project manual references The Goodman Corporation as the engineering firm (TBPE Firm No. 19990), and includes comprehensive specifications, drawings, and contract documents organized into divisions covering general requirements, site work, and detailed technical specifications incorporating references to Houston Public Works Standard Construction Specifications, Harris County Engineering Department Standard Specifications, and CenterPoint Energy specifications.
The contract price is to be determined by competitive bidding, with payments issued on a monthly basis covering periods ending on the 15th or last day of each month. Liquidated damages are specified for delays beyond the Contract Time as detailed in the Supplementary Conditions. The project imposes prevailing wage rate requirements with applicable federal wage rates for highway construction as identified in Division 00 documents. Women and Small Business Enterprise (WSBE) participation goals are established, with contractors required to make Good Faith Efforts to award subcontracts in the stated percentages; contractors certified as WBE may count up to 50 percent of their own workforce toward the goal. The contract includes mandatory performance and statutory payment bonds, with the surety responsible for completion and all correction periods. No specific set-asides for disadvantaged, minority, women-owned, small business, or other designated business enterprises are explicitly selected in the bid documents shown, though the WSBE compliance framework and various business enterprise program options are referenced as applicable. The project is federally funded under FHWA provisions, with any discrepancies between TxDOT/Federal requirements and City requirements resolved in favor of federal and state requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF HOUSTON
HOUSTON PUBLIC WORKS
CAPITAL PROJECTS
PROJECT MANUAL
AIRLINE DR INTERSECTION AND GRIGGS RD CROSSINGS IMPROVEMENTS
WBS No.: N-321040-0162-4
(CITY OF HOUSTON SYSTEMIC SAFETY PROJECT)
CSJ: 0912-72-761, etc.
TDLR Project Nos. TABS2026017456, TABS2026013494
SPECIFICATIONS
Division 00 – 16
Issue Date: October 14, 2026
Letting Date: November 2026
The Goodman Corporation TBPE Firm No. 19990 3200 Travis Street, Suite 200 Houston, TX 77006
(713) 951-7951
10/14/2026
10/14/2026
TABLE OF CONTENTS
00010-1
09-22-2026
Document 00010
NOTE: Capitalized Specification Sections are included in https://www.houstonpermittingcenter.org/media/6386/download, and are incorporated in Project Manuals by reference as if copied verbatim. Documents listed "for filing" are to be provided by Bidder and are not included in this Project Manual unless indicated for example only. The Document numbers and titles hold places for actual documents to be submitted by Contractor during Bid, post-bid, or construction phase of the Project. Specification Sections marked with an asterisk (*) are amended by a supplemental specification, printed on blue paper and placed in front of the Specification it amends. Documents in the 00200, 00300 and 00400 series of Division 00, except for Document 00410B, “Bid Form, Part B,” are not part of the Contract.
Pg. Doc. No. Document Title Doc. Date
INTRODUCTORY INFORMATION
2 00010 Table of Contents ...................................................................... 09-22-2026 6 00015 List of Drawings ......................................................................... 06-15-2026
CONTRACTING REQUIREMENTS
AGREEMENT
11 00520 Agreement ................................................................................. 06-15-2026
BONDS AND CERTIFICATES
16 00600-T List of Proposed Subcontractors and Suppliers ......................... 06-15-2026 18 00610 Performance Bond ..................................................................... 07-30-2020 21 00611 Statutory Payment Bond ............................................................ 07-30-2020
GENERAL CONDITIONS
23 00700 General Conditions .................................................................... 09-21-2026
SUPPLEMENTARY CONDITIONS
77 00800 Supplementary Conditions ......................................................... 09-22-2026 104 00810 Wage Scale for Highway Construction....................................... 06-15-2026
ADDENDA AND MODIFICATIONS
109 00943 Monthly Subcontractor Payment Reporting Form ...................... 04-07-2026 111 00946 Payment Notification – Explanation Of Withholding ................... 02-27-2026
FEDERAL AND TxDOT PROVISIONS FOR FEDERALLY FUNDED PROJECTS Note: In the event of discrepancies between TxDOT/Federal Requirements and City of Houston Requirements, the TxDOT and Federal Requirements will override.
113 FHWA-1273 Required Contract Provisions – Federal-Aid Construction Contracts ................................................................................. 10-23-2023
Airline Dr Intersection and Griggs Rd Crossing Improvement WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 2 / 399 https://www.houstonpermittingcenter.org/media/6386/download
00010-2
127 1L Abbreviations and Definitions 139 2L Instructions to Bidders 145 3L Award and Execution of Contract 148 4L Scope of Work 152 5L Control of Work 158 6L Control of Materials 164 7L Legal Relations and Responsibilities 177 8L Prosecution and Progress (Definition of Working Day voided, use City) 186 9L Measurement and Payment 192 SP 000-001L Nondiscrimination 194 SP 000-002L Certification of Nondiscrimination in Employment 195 SP 000-007L Cargo Preference Act Requirements 196 SP 002-003L Instructions to Bidders 197 SP 003-006L Award and Execution of Contract 198 SP 006-009L Control of Materials
FEDERAL, STATE & TxDOT STATEMENTS & CERTIFICATIONS 202 00950 Contractor’s Assurance 203 00951 Certification Regarding Lobbying 204 00952 Child Support Statement 208 00953 Acknowledgment of Stormwater Management Program 209 00954 House Bill 89 Verification 210 00955 Title VI Nondiscrimination 212 00956 Non-collusion Statement 213 00957 Statement of Loan Guarantees 214 00958 Prison Produced Materials 215 00959 Certification Regarding Disclosure of Public Information 218 00960 Prohibition on Certain Telecommunications Equipment or Services 219 Form 1818 Material Statement 220 Form 2806 Construction Materials and Manufactured Product Buy America Certification 222 Form 2177 Prompt Payment Certification
CITY OF HOUSTON GENERAL NOTES (Included in Plan Set)
223 General Notes 224 METRO Notes 225 CenterPoint Energy Notes 226 AT&T Texas/SWBT Facilities 227 Storm Water Pollution Prevention Notes 228 Tree Protection Notes 228 Street and Bridge Construction Notes 229 Storm Construction Notes 230 HCED Construction Notes 231 Other Notes
Airline Dr Intersection and Griggs Rd Crossing Improvement WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 3 / 399
00010-3
SPECIFICATIONS
Houston Public Works Standard Construction Specifications and Harris County Engineering Department Standard Specifications reference the latest editions of the Specifications that are in effect as of the date of receipt of bids, unless otherwise noted. Supplemental Specifications include Doc Date for reference.
Project Specific Notes:
Division 01 Specifications are included in this Project Manual. Division 02 Specifications are available at https://www.houstonpermittingcenter.org/media/6386/download and Harris County Engineering Department Specifications are available at https://oce.harriscountytx.gov/Services/Consultants-Resources-and- Specifications/Standards-Specification/Standard-Engineering-Design-Specifications. Both are incorporated in this Project Manual by reference as if copied verbatim.
CenterPoint Energy’s streetlighting specifications, provided as an attachment to Section 02581 – Street Lighting Conduits, are included in this Project Manual following Division 01.
The specification sections included in this Table of Contents correspond to the respective bid items or to related sections identified within the bid item specifications.
DIVISION 1 - GENERAL REQUIREMENTS
232 01110 Summary of Work ............................................................................... 06-15-2026 241 01145 Use of Premises 245 01255 Change Order Procedures 250 01270 Measurement and Payment 254 01292 Schedule of Values 256 01312 Coordination And Meetings 259 01321 Construction Photographs 263 01325 Construction Schedule 268 01330 Submittal Procedures 272 01340 Shop Drawings, Product Data, and Samples 275 01351 Environmental Safety and Worker Protection 289 01450 Contractor's Quality Control 291 01452 Inspection Services 292 01454 Testing Laboratory Services 295 01502 Mobilization 298 01554 Traffic Control and Street Signs 305 01555 Traffic Control and Regulation 314 01562 Tree and Plant Protection 324 01570 Storm Water Pollution Prevention Control 339 01576 Waste Material Disposal 341 01580 Project Identification Signs 348 01610 Basis Product Requirements 351 01630 Product Substitution procedures 355 01725 Field Surveying 358 01731 Cutting and Patching 362 01740 Site Restoration 369 01755 Starting Systems 371 01770 Closeout Procedures
Airline Dr Intersection and Griggs Rd Crossing Improvement WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 4 / 399 https://www.houstonpermittingcenter.org/media/6386/download https://oce.harriscountytx.gov/Services/Consultants-Resources-and-Specifications/Standards-Specification/Standard-Engineering-Design-Specifications https://oce.harriscountytx.gov/Services/Consultants-Resources-and-Specifications/Standards-Specification/Standard-Engineering-Design-Specifications
00010-4
374 01782 Operations and Maintenance Data 377 01785 Project Record Documents
DIVISION 2 - SITE WORK
02086 ADJUSTING MANHOLES, INLETS AND VALVE BOXES TO GRADE
02221 REMOVING EXISTING PAVEMENTS, STRUCTURES, WOOD, AND DEMOLITION
DEBRIS
02233 CLEARING AND GRUBBING
02318 EXTRA UNIT PRICE WORK FOR EXCAVATION AND BACKFILL
02555 MANHOLE REHABILITATION
02581 STREET LIGHTING CONDUIT
380 02581A Attachments to COH Specification Section 02581 – Specification for Ready-Mixed Concrete for CenterPoint Energy .............................. 07-01-2004
02754 CONCRETE DRIVEWAYS
02762 BLAST CLEANING OF PAVEMENT
02764 RAISED PAVEMENT MARKERS
02767 THERMOPLASTIC PAVEMENT MARKINGS
02771 CURB, CURB AND GUTTER, AND HEADERS
02772 CONCRETE MEDIANS AND DIRECTIONAL ISLANDS
02775 CONCRETE SIDEWALKS
02811 LANDSCAPE IRRIGATION
02890 PEDESTRIAN CROSSWALK SYSTEM RECTANGULAR RAPID FLASHING BEACON
(RRFB)
02922 SODDING
02951 PAVEMENT REPAIR AND RESTORATION
03315 CONCRETE FOR UTILITY CONSTRUCTION
HARRIS COUNTY ENGINEERING DEPARTMENT SPECIFICATIONS
416 DRILLED SHAFT FOUNDATIONS
618 CONDUIT
627 TREATED TIMBER POLES
636 SIGNS
682 TRAFFIC SIGNAL HEADS
684 TRAFFIC SIGNAL CABLES
686 TRAFFIC SIGNAL POLE ASSEMBLIES
687 PEDESTAL POLE ASSEMBLIES
688 ACCESSIBLE PEDESTRIAN SIGNALS
690 TRAFFIC SIGNAL INSTALLATION AND MODIFICATION
692 INTELLIGENT TRANSPORTATION SYSTEM (ITS) CONTROLLER CABINET
ASSEMBLY
864 PEDESTRIAN LED TRAFFIC SIGNAL LAMP UNIT
END OF DOCUMENT
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 5 / 399
LIST OF DRAWINGS
00015-1 06-15-2026
Document 00015
LIST OF DRAWINGS
Airline Dr Intersections Improvement (CSJ: 0912-72-761)
I. GENERAL
1 TXDOT COVER SHEET
1A COVER SHEET
1B HARRIS COUNTY REVIEW SHEET
2 INDEX OF SHEETS
3 GENERAL NOTES
4 CONSTRUCTION NOTES, LEGENDS AND ABBREVIATIONS
5 SUMMARY OF QUANTITIES
6 SURVEY CONTROL MAP – INTERSECTION OF AIRLINE DR & CANINO RD
7 SURVEY CONTROL MAP – INTERSECTION OF AIRLINE DR & LINK RD
8 EXISTING RIGHT-OF-WAY (R.O.W.) MAP – AIRLINE DR AND CANINO RD
9 EXISTING RIGHT-OF-WAY (R.O.W.) MAP – AIRLINE DR AND LINK RD
10 PROJECT CONSTRUCTION SIGN
11 EPIC 1 OF 2
11A EPIC 2 OF 2
II. REMOVAL, SWPPP AND TRAFFIC CONTROL PLANS
12 REMOVAL & SWPPP PLAN 1 – AIRLINE DR & CANINO RD
13 REMOVAL & SWPPP PLAN 2 – AIRLIND DR & LINK RD
14 01571-01 STORM WATER POLLUTION PREVENTION PLAN DETAILS
15 TCP AT AIRLINE DR & CANINO RD
III. SIDEWALK AND PAVEMENT MARKING PLANS
16 SIDEWALK & PAVEMENT MARKING PLAN 1 – AIRLINE DR & CANINO RD
17 SIDEWALK & PAVEMENT MARKING PLAN 2 – AIRLINE DR & LINK RD
18 CURB RAMP AND DRIVEWAY DETAILS – AIRLINE DR & CANINO RD
19 CURB RAMP DETAILS – AIRLINE DR & LINK RD
20 BOLLARD, CURB WALL, AND RRFB DETAILS
IV. TRAFFIC SIGNAL PLANS
21 BASIS OF ESTIMATE AT AIRLINE DR & CANINO RD
22 EXISTING SIGNAL LAYOUT AT AIRLINE DR & CANINO RD
23 SIGNAL LAYOUT AT AIRLINE DR & E CANINO RD
24 TRAFFIC SIGNAL DETAILS WITH WIRING CHART
25 TRAFFIC SIGNAL ELEVATIONS AT AIRLINE DR & CANINO RD
V. DETAILS
Va. HARRIS COUNTY TRAFFIC SIGNAL STANDARD DETAILS
26 CONTROLLER CABINET FOUNDATION DETAILS
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 6 / 399
00015-2 06-15-2026
27 CONDUIT / PULL BOX / GROUND BOX TRAFFIC SIGNAL SYSTEM DETAILS
28 ELECTRICAL DETAILS: SERVICE ENCLOSURE AND NOTES
29 ELECTRICAL DETAILS: SERVICE SUPPORTS TYPE SF AND SP
ELECTRICAL DETAILS: SERVICE SCHEMATICS AND SUPPORT TYPE P
(OVERHEAD)
31 ELECTRICAL DETAILS: TYPICAL TRAFFIC SIGNAL SYSTEM DETAILS
32 LUMINAIRE ARM DETAILS (100 MPH WIND ZONE)
33 PEDESTRIAN SIGNAL AND POLE INSTALLATION DETAILS
34 SINGLE AND DUAL MAST ARM ASSEMBLY DETAILS (100 MPH WIND ZONE)
35 STRAIN POLE FOUNDATION DETAILS
36 TRAFFIC SIGNAL SIGN DETAILS
37 SIGNAL MODEM ASSEMBLY
Vb. TxDOT TRAFFIC SIGNAL STANDARD DETAILS
LMA(1)-12 – TRAFFIC SIGNAL SUPPORT STRUCUTRES – LONG MAST ARM
ASSEMBLY (50 TO 65 FT) (80 AND 100 MPH WIND ZONE) – SHEET 1 OF 5
LMA(1)-12 – TRAFFIC SIGNAL SUPPORT STRUCUTRES – LONG MAST ARM
ASSEMBLY (50 TO 65 FT) (80 AND 100 MPH WIND ZONE) – SHEET 2 OF 5
40 LMA(1)-12 – TRAFFIC SIGNAL SUPPORT STRUCUTRES – LONG MAST ARM
ASSEMBLY (50 TO 65 FT) (80 AND 100 MPH WIND ZONE) – SHEET 3 OF 5
41 LMA(1)-12 – TRAFFIC SIGNAL SUPPORT STRUCUTRES – LONG MAST ARM
ASSEMBLY (50 TO 65 FT) (80 AND 100 MPH WIND ZONE) – SHEET 4 OF 5
42 LMA(5)-12 – LONG MAST ARM ASSEMBLY PARTS LIST – SHEET 5 OF 5
Vc. COH STANDARD DETAILS FOR STREET PAVING AND SIDEWALK
43 02951-04 – PAVEMENT REPAIR DETAIL FOR STREET CUTS
02752-02 – SIDEWALK EXPANSION AND CONSTRUCTION JOINT DETAILS
44 02754-01B – DRIVEWAY DETAIL WITH 6” CURBED STREETS
45 02771-01 – CURB, CURB AND GUTTER, AND HEADER DETAILS
46 02775-01 – TYPICAL SIDEWALK LAYOUT AND DETAILS FOR STREETS WITH
CURBS
47 02775-02 – TYPICAL CURB RAMP DETAILS
48 02775-03 – PARALLEL CURB RAMP
02775-04 – CURB MODIFICATION FOR CURB RAMPS & CROSSWALKS
49 02775-05 – COMMERCIAL & HIGH DENSITY CONDITIONS CURB RAMP DETAILS
02775-06 – DETECTABLE WARNING CURB RAMP DETAILS
50 02775-07 – DETECTABLE WARNING SURFACE (OPTIONS)
02775-08 – SIDEWALK AND CLEAR ZONE TRANSIT CORRIDOR STREET
02775-09 – PERPENDICULAR CURB RAMP
Vd. COH STANDARD DETAILS FOR TRAFFIC
51 01554-01 – GENERAL NOTES AND GROUND MOUNTING SIGN
01554-02 – SIGN BASE HARD SURFACE MOUNTING DETAILS
01554-07 – TYPICAL SIGN PLACEMENT
52 01554-06 – GROUND MOUNTED SIGN SIZES
53 01555-01 – TCP NOTES CHANNELIZING DEVICES AND BARRICADES
54 01555-02 – TCP OVERALL TRAFFIC CONTROL LAYOUT
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 7 / 399
00015-3 06-15-2026
55 01555-03 – TRAFFIC CONTROL LAYOUT
56 01555-04 – TCP ONE LANE CLOSURE PHASE 1 & 2
57 01555-06 – TCP TYPICAL CONSTRUCTION ZONE AT T-INTERSECTION PHASE
58 01555-07 – TCP TYPICAL CONSTRUCTION ZONE AT T-INTERSECTION PHASE
59 01555-08 – TCP TYPICAL CONSTRUCTION ZONE AT T-INTERSECTION PHASE
60 01555-13 – TRAFFIC CONTROL PLAN FOR SIGNAL CONSTRUCTION
61 01555-14 – BARRICADE AND CHANNELIZING DEVICES
62 01555-16 – CROSSWALK CLOSURES AND PEDESTRIAN DETOURS
63 02760-01 – PAVEMENT MARKINGS GENERAL NOTES AND DETAILS
64 02760-02 – LEFT/RIGHT-TURN “ONLY” AND ARROW SPACING
65 02760-03 – STANDARD PAVEMENT MARKING (WORDS)
66 02760-04 – STANDARD PAVEMENT MARKING – SYMBOLS
67 02760-05 – STANDARD PAVEMENT MARKINGS WITH REFLECTIVE RAISED
PAVEMENT MARKERS FOR POSITION GUIDANCE
68 02760-12 – TYPICAL CROSSWALK DETAILS
69 02760-13 – LEFT-TURN LANE & RIGHT-TURN LANE DESIGN (SHEET 1 OF 2)
70 02760-14 – LEFT-TURN LANE & RIGHT-TURN LANE DESIGN (SHEET 2 OF 2)
71 02760-15 – TWO WAY LEFT-TURN LANE DETAIL 1 (SHEET 1 OF 2)
72 02760-16 – TWO WAY LEFT-TURN LANE DETAIL 2 (SHEET 2 OF 2)
73 01562-01 – TREE PROTECTION GENERAL REQUIREMENTS
01562-02 – TREE PROTECTION TREE AND ROOT PRUNING
Ve. HARRIS COUNTY CIVIL, PAVEMENT MARKING & FIBER OPTIC CABLE STANDARD
DETAILS
74 HCED CURB RAMP AND DRIVEWAY DETAILS
75 HCED DRIVEWAY DETAILS AND TABLE
76 HCED PAVEMENT MARKING DETAILS
77 HCED FIBER OPTIC CABLE PLAN NOTES (1 OF 11) & (2 OF 11)
78 HCED FIBER OPTIC CABLE PLAN NOTES (3 OF 11) & (4 OF 11)
79 HCED FIBER OPTIC CABLE PLAN NOTES (5 OF 11) & (6 OF 11)
80 HCED FIBER OPTIC CABLE PLAN NOTES (7 OF 11) & (8 OF 11)
81 HCED FIBER OPTIC CABLE PLAN NOTES (9 OF 11) & (10 OF 11)
82 HCED FIBER OPTIC CABLE PLAN NOTES (11 OF 11)
83 HCED FIBER OPTIC CABLE AERIAL DROP INSTALLATION DETAILS
84 HCED FIBER OPTIC CABLE CONDUIT INSTALLATION DETAILS
85 HCED FIBER OPTIC CABLE SECTION & CONFIGURATION DETAILS
86 HCED FIBER OPTIC CABLE CENTER-PULL OPERATION DETAILS
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 8 / 399
00015-4 06-15-2026
Griggs Rd Safe Crossings (CSJ: 0912-72-762)
I. GENERAL
1 COVER SHEET
2 INDEX OF SHEETS
3 GENERAL NOTES
4 CONSTRUCTION NOTES, LEGENDS AND ABBREVIATIONS
5 SUMMARY OF QUANTITIES
6 TYPICAL SECTIONS AND DETAILS
7 DRAINAGE CALCULATIONS 1
8 DRAINAGE CALCULATIONS 2
9 FEMA FLOODPLAIN MAP
10 SURVEY CONTROL MAP
11 EXISTING R.O.W. MAP (SHEET 1 OF 2)
12 EXISTING R.O.W. MAP (SHEET 2 OF 2)
13 OVERALL LAYOUT
14 EPIC 1 OF 2
14A EPIC 2 OF 2
II. SIDEWALK PLANS, REMOVAL PLANS AND DETAILS
15 REMOVAL & SWPPP PLAN 1
16 REMOVAL & SWPPP PLAN 2
17 SIDEWALK PLAN 1
18 SIDEWALK PLAN 2
19 CURB RAMP POINT ELEVATIONS
III. DETAILS
IIIa. COH GENERAL DETAILS
20 01555-14 – BARRICADE AND CHANNELIZING DEVICES
21 01571-01 – STORM WATER POLLUTION PREVENTION PLAN DETAILS
22 PROJECT IDENTIFICATION SIGN
IIIb. COH STANDARD DETAILS FOR STREET PAVING AND SIDEWALK
02751-02 – SIDEWALK EXPANSION AND CONSTRUCTION JOINT DETAILS
02754-01A – DRIVEWAY DETAIL WITH 4”X12” CURB FOR LOCAL RESIDENTIAL
STREETS
25 02754-01B – DRIVEWAY DETAIL WITH 6” CURBED STREETS
26 02754-03 – PROPOSED SIDEWALK THROUGH DRIVEWAY WITH EXCESSIVE
ELEVATION DIFFERENCE
27 02754-04 – PROPOSED SIDEWALK THROUGH DRIVEWAY WITH MINIMAL
ELEVATION DIFFERENCE
28 02771-01 – CURB, CURB AND GUTTER, AND HEADER DETAILS
29 02772-01 – ESPLANADE NOSE AND LEFT TURN DETAILS
02775-01 – TYPICAL SIDEWALK LAYOUT AND DETAILS FOR STREETS WITH
CURBS
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 9 / 399
00015-5 06-15-2026
30 02775-02 – TYPICAL CURB RAMP DETAILS
31 02775-04 – CURB MODIFICATION FOR CURB RAMPS & CROSSWALKS
02775-06 – DETECTABLE WARNING CURB RAMP DETAILS
32 02775-07 – DETECTABLE WARNING SURFACE (OPTIONS)
02775-08 – SIDEWALKS AND CLEAR ZONE TRANSIT CORRIDOR STREET
IIIc. COH STANDARD DETAILS FOR TRAFFIC
33 01554-01 – GENERAL NOTES AND GROUND MOUNTING SIGN
01554-02 – SIGN BASE HARD SURFACE MOUNTING DETAILS
34 01554-03 – STREET NAME SIGN AND SIGN MOUNTING
01554-07 – TYPICAL SIGN PLACEMENT
35 01554-06 – GROUND MOUNTED SIGN SIZES
36 01555-01 – TCP NOTES CHANNELIZING DEVICES AND BARRICADES
37 01555-02 – TCP OVERALL TRAFFIC CONTROL LAYOUT
38 01555-03 – TRAFFIC CONTROL LAYOUT
39 01555-04 – TCP ONE LANE CLOSURE PHASE 1 & 2
40 01555-05 – TCP TYPICAL DETOUR ROUTING WITH ONE LANE CLOSURE (ONE
BLOCK)
41 01555-06 – TCP TYPICAL CONSTRUCTION ZONE AT A T-INTERSECTION – PHASE 1
OF 3
42 01555-07 – TCP TYPICAL CONSTRUCTION ZONE AT A T-INTERSECTION – PHASE 2
OF 3
43 01555-08 – TCP TYPICAL CONSTRUCTION ZONE AT A T-INTERSECTION – PHASE 3
OF 3
44 01555-16 – CROSSWALK CLOSURES AND PEDESTRIAN DETOURS
45 02760-01 – PAVEMENT MARKINGS GENERAL NOTES AND LEGENDS
46 02760-12 – TYPICAL CROSSWALK DETAILS
IIId. COH STANDARD DETAILS FOR TREE AND HARDSCAPE PROTECTION
47 01562-01 – TREE PROTECTION GENERAL REQUIREMENTS
01562-02 – TREE PROTECTION TREE AND ROOT PRUNING
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 10 / 399
00520-1 06-15-2026
Document 00520
Project: Airline Dr Intersection and Griggs Rd Crossings Improvements
Project Location: Airline Dr at Canino Rd, Airline Dr from Aurora St to Link Rd, Griggs Rd from Culberson St to Scott St
Project No: WBS No. N-321040-0162-4
The City:
THE CITY OF HOUSTON, 900 Bagby Street, Houston, Texas 77002 (the “City”).
and
Contractor:
(Address for Written Notice)
Contact name and email address:
The City Engineer, with respect to the General Conditions, is:
Oluwole McFoy, P.E. (or his successor)
P. O. Box 1562
Houston, Texas 77251-1562
(Address for Written Notice)
THE CITY AND CONTRACTOR AGREE AS FOLLOWS:
ARTICLE 1
THE WORK OF THE CONTRACT
1.1 Contractor shall perform the Work in accordance with the Contract.
ARTICLE 2
CONTRACT TIME
2.1 Contractor shall achieve Date of Substantial Completion within 182 calendar days after Date of
Commencement of the Work, subject to adjustments of Contract Time as provided in the Contract.
The Chief Procurement Officer, or designee, may authorize additional extensions to the Date of Substantial Completion beyond the Contract Time when deemed necessary or in the best interest of the City.
2.2 The Parties recognize that time is of the essence for this Contract and that the City will suffer financial loss if the Work is not completed within the Contract Time. Parties also recognize delays, expense, and difficulties involved in proving in a legal or arbitration proceeding actual loss suffered by the City if the Work is not completed on time. Accordingly, and if applicable, instead of requiring any such proof, the Parties agree that as liquidated damages for delay (but not as a penalty), WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 11 / 399
00520-2 06-15-2026
Contractor shall pay the City the amount stipulated in Document 00800, Supplementary Conditions, for each day beyond Contract Time.
ARTICLE 3
CONTRACT PRICE
3.1 Subject to terms of the Contract, the City will pay Contractor in current funds for Contractor's performance of the Contract, the Contract Price of $ , which includes Alternates, if any, accepted below.
3.2 The City accepts Alternates as follows: Not Used.
ARTICLE 4
PAYMENTS
4.1 The City will make progress payments to Contractor as provided below and in the General
Conditions of the Contract.
4.2 The Period covered by each progress payment is one calendar month ending on the 15th or last day of the month.
4.3 The City will issue Certificates for Payment and will make progress payments on the basis of such
Certificates as provided in the General Conditions of the Contract.
4.4 Final payment, constituting entire unpaid balance of Contract Price, will be made by the City to
Contractor as provided in the General Conditions of the Contract.
ARTICLE 5
CONTRACTOR REPRESENTATIONS
5.1 Contractor represents:
5.1.1 Contractor has examined and carefully studied Contract documents and other related data identified in Bid Documents.
5.1.2 Contractor has visited the site and become familiar with and is satisfied as to general, local, and site conditions that may affect cost, progress, and performance of the Work.
5.1.3 Contractor is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work.
5.1.4 Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in Contract documents and (2) reports and drawings of a hazardous environmental condition, if any, at the site which has been identified in Contract documents.
5.1.5 Contractor has obtained and carefully studied (or assumes responsibility for having done
so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including applying specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 12 / 399
00520-3 06-15-2026
Contract to be employed by Contractor, and safety precautions and programs incident thereto.
5.1.6 Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for performance of the Work at Contract Price, within Contract Time, and in accordance with the Contract.
5.1.7 Contractor is aware of general nature of work to be performed by the City and others at the site that relates to the Work as indicated in Contract documents.
5.1.8 Contractor has correlated information known to Contractor, information and observations obtained from visits to the site, reports and drawings identified in the Contract, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract.
5.1.9 Contractor has given City Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract, and written resolution thereof by City Engineer is acceptable to Contractor.
5.1.10 Contract documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
ARTICLE 6
MISCELLANEOUS PROVISIONS
6.1 The Contract may be terminated by either Party as provided in the General Conditions of the
Contract.
6.2 The Work may be suspended by the City as provided in the General Conditions of the Contract.
ARTICLE 7
ENUMERATION OF CONTRACT DOCUMENTS
7.1 The following documents are incorporated into this Agreement:
[ X ] Bid Form/Proposal Form
Document No. Title [ X ] 00610 Performance Bond [ X ] 00611 Statutory Payment Bond [ ] 00612 One-year Maintenance Bond [ ] 00613 One-year Surface Correction Bond [ ] 00623 Contractor’s Act of Assurance (SRF Form ED-103) [ ] 00628 Affidavit of Compliance with Disadvantaged Business Enterprise
(DBE) Program for Project Funded By AIP Grant
[Mandatory] Document 00700 - General Conditions.
[Mandatory] .
[ X ] 00800 Supplementary Conditions [ ] 00801 Supplementary Conditions for Project AIP Funded [ ] 00802 SRF Supplementary Conditions [ ] 00803 Work Order Supplementary Conditions [ ] 00806 EPA DBE and Wage Rate Requirements (SRF only) [ ] 00807 Bidder/Contractor Requirements for DBE Program [ ] 00808 Minority and Women-owned Business Enterprise (MWBE) &
Persons with Disabilities Business Enterprise (PDBE) Program
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 13 / 399
00520-4 06-15-2026
[ X ] 00810 Federal Wage Rate - Highway [ ] 00811 Federal Wage Rate - Building [ ] 00812 Federal Wage Rate - Heavy [ ] 00820 Wage Rate for Engineering Construction [ ] 00821 Wage Rate for Building Construction [ ] 00830 Trench Safety Geotechnical Information [ ] 00943 Monthly Subcontractor Payment Reporting Form [ ] 00946 Payment Notification – Explanation of Withholding
[Mandatory] Addenda and Riders which apply to the Contract, are as follows:
Addendum No. 1, dated
Addendum No. 2, dated
Addendum No. 3, dated
Rider No. [ ], dated
[Mandatory] 00010 Table of Contents (sealed) [Mandatory] Drawings listed in Document 00015, List of Drawings, and
Drawing No. , bound separately.
[Mandatory] Division 01 - General Requirements.
[Mandatory] Divisions 02 through 50 of Specifications.
[Mandatory] Harris County Engineering Department Specifications.
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 14 / 399
00520-5 06-15-2026
ARTICLE 8
SIGNATURES
8.1 The Parties have executed this Agreement in multiple copies, each of which is an original. Each person signing this Agreement represents and warrants that he or she is duly authorized and has legal capacity to execute and deliver this Agreement. Each Party represents and warrants to the other that the execution and delivery of this Agreement and the performance of such Party’s obligations hereunder have been duly authorized and that the Agreement is a valid and legal agreement binding on such Party and enforceable in accordance with its terms. The Parties hereby agree that each Party may sign and deliver this Agreement electronically or by electronic means and that an electronic transmittal of a signature, including but not limited to, a scanned signature page, will be as good, binding, and effective as an original signature.
CONTRACTOR: _________________________ (If Joint Venture)
By: By:
Name: Name:
Title: Title:
Title: Title:
Tax Identification Number: Tax Identification Number:
CITY OF HOUSTON, TEXAS
ATTEST/SEAL: SIGNED:
City Secretary Mayor
APPROVED: COUNTERSIGNED:
Director, City Controller
By: Date Countersigned:
Chief Procurement Officer
8.2 This Contract and Ordinance have been reviewed as to form by the undersigned Assistant City Attorney and have been found to meet established Legal Department criteria. Legal Department has not reviewed the content of these documents.
Assistant City Attorney Date
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 15 / 399
LIST OF PROPOSED
SUBCONTRACTORS AND SUPPLIERS
00600-T-1
Document 00600-T
LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS – PART A1
DBE PARTICIPATION PLAN
PROJECT NAME: Airline Dr and Griggs Rd Improvements TOTAL DBE AWARD: $
ORIG. CONTRACT PRICE: $ TOTAL MWSBE AWARD: $
PROJECT NO.: WBS N-321040-0162-4 TOTAL HUB AWARD: $
DATE OF REPORT: TOTAL PDBE AWARD: $
NAICS
(6 digits)
SUBCONTRACTOR OR
SUPPLIER (INCLUDE
“MWSBE”, “PDBE”, “DBE”, OR
“HUB” DESIGNATION)2
ADDRESS
SCOPE OF
WORK3
NOTES: 1. RETURN PART A FOR PROJECTS WITH A STATED MWBE, PDBE, DBE AND/OR SBE GOAL, AS REQUIRED IN
DOCUMENT 00800 – SUPPLEMENTARY CONDITIONS. RETURN PART A WITHIN THE SPECIFIED NUMBER OF DAYS AFTER RECEIPT OF NOTICE OF INTENT TO AWARD. DUPLICATE THIS FORM AS NEEDED FOR ALL DBE
SUBCONTRACTORS AND SUPPLIERS.
2. LISTED FIRMS SHALL BE CERTIFIED BY THE AFFIRMATIVE ACTION / CONTRACT COMPLIANCE DIVISION.
3. DESCRIBE THE WORK TO BE PERFORMED, FOR WHICH THE FIRM IS CERTIFIED, SUCH AS “PAVING”, “ELECTRICAL”, ETC.
CONTRACTOR SHALL EXECUTE CONTRACTS WITH APPROVED SUBCONTRACTORS AND SUPPLIERS WITHIN 30 DAYS AFTER THE DATE OF THE NOTICE TO PROCEED. COPIES OF CONTRACTS WITH DESIGNATED FIRMS MUST BE SENT TO
THE OFFICE OF BUSINESS OPPORTUNITY.
SIGNATURE: COMPANY NAME:
NAME: TITLE:
(Type or Print)
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 16 / 399
LIST OF PROPOSED
SUBCONTRACTORS AND SUPPLIERS
00600-T-2
Document 00600-T
LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS – PART B1
SCHEDULE OF NON-DBE FIRMS
PROJECT NAME: Airline Dr and Griggs Rd Improvements
DATE OF REPORT:
PROJECT NO.: WBS N-321040-0162-4
NAICS
(6 digits)
SUBCONTRACTOR OR
SUPPLIER
ADDRESS
SCOPE OF
WORK2
NOTES: 1. RETURN PART B FOR PROJECTS WITHIN THE SPECIFIED NUMBER OF DAYS AFTER RECEIPT OF NOTICE OF
INTENT TO AWARD. DUPLICATE THIS FORM AS NEEDED FOR ALL NON-DBE SUBCONTRACTORS AND
SUPPLIERS.
2. DESCRIBE THE WORK TO BE PERFORMED, FOR WHICH THE FIRM IS CERTIFIED, SUCH AS “PAVING”, “ELECTRICAL”, ETC.
SIGNATURE: COMPANY NAME:
NAME: TITLE:
(Type or Print)
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 17 / 399
PERFORMANCE BOND
00610-1 07-30-2020
Document 00610
THAT WE, , as Principal, (the “Contractor”), and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound to the City of Houston (the “City”), a municipal corporation, in the penal sum of $ for the payment of which sum, well and truly to be made to the City, its successors and assigns, Contractor and Surety do bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the Contractor has on or about this day executed a Contract in writing with the City for , all of such work to be done as set out in full in said Contract documents therein referred to and adopted by the City Council, all of which are made a part of this instrument as fully and completely as if set out in full herein.
NOW THEREFORE, if the said Contractor shall faithfully and strictly perform the Contract in all its terms, provisions, and stipulations in accordance with its true meaning and effect, and in accordance with the Contract documents referred to therein and shall comply strictly with each and every provision of the Contract and with this Bond, then this obligation shall become null and void and shall have no further force and effect; otherwise the same is to remain in full force and effect. Should the Contractor fail to faithfully and strictly perform the Contract in all its terms, including but not limited to the indemnifications thereunder, the Surety shall be liable for all damages, losses, expenses and liabilities that the City may suffer in consequence thereof, as more fully set forth herein.
It is further understood and agreed that the Surety does hereby relieve the City or its representatives from the exercise of any diligence whatever in securing compliance on the part of the Contractor with the terms of the Contract, and the Surety agrees that it shall be bound to take notice of and shall be held to have knowledge of all acts or omissions of the Contractor in all matters pertaining to the Contract. The Surety understands and agrees that the provision in the Contract that the City will retain certain amounts due the Contractor until the expiration of 30 days from the acceptance of the Work is intended for the City's benefit, and the City will have the right to pay or withhold such retained amounts or any other amount owing under the Contract without changing or affecting the liability of the Surety hereon in any degree.
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 18 / 399
00610-2
It is further expressly agreed by Surety that the City or its representatives are at liberty at any time, without notice to the Surety, to make any change in the Contract documents and in the Work to be done thereunder, as provided in the Contract, and in the terms and conditions thereof, or to make any change in, addition to, or deduction from the Work to be done thereunder; and that such changes, if made, shall not in any way vitiate the obligation in this Bond and undertaking or release the Surety therefrom.
It is further expressly agreed and understood that the Contractor and Surety will fully indemnify and save harmless the City from any liability, loss, cost, expense, or damage arising out of Contractor’s performance of the Contract.
If the City gives Surety notice of Contractor’s default, Surety shall, within 45 days, take one of the following actions:
1. Arrange for Contractor, with consent of the City, to perform and complete the Contract; or
2. Take over and assume completion of the Contract itself, through its agents or through independent contractors, and become entitled to the payment of the balance of the Contract Price.
If the Surety fails to take either of the actions set out above, it shall be deemed to have waived its right to perform and complete the Contract and receive payment of the balance of the Contract Price and the City shall be entitled to enforce any remedies available at law, including but not limited to completing the Contract itself and recovering any cost in excess of the Original Contract Price from the Surety.
This Bond and all obligations created hereunder shall be performable in Harris County, Texas. This Bond is given in compliance with the provisions of Chapter 2253, Texas Government Code, as amended, which is incorporated herein by this reference.
Notices required or permitted hereunder shall be in writing and shall be deemed delivered when actually received or, if earlier, on the third day following deposit in a United States Postal Service post office or receptacle, with proper postage affixed (certified mail, return receipt requested), addressed to the respective other Party at the address prescribed in the Contract documents, or at such other address as the receiving party may hereafter prescribe by written notice to the sending party.
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 19 / 399
00610-3
IN WITNESS THEREOF, the said Contractor and Surety have signed and sealed this instrument on the respective dates written below their signatures and have attached current Power of Attorney.
ATTEST, SEAL: (if a corporation) WITNESS: (if not a corporation) Name of Contractor
Name: Name:
Title: Title:
Date:
ATTEST/SURETY WITNESS:
Full Name of Surety
(SEAL)
Address of Surety for Notice
Telephone Number of Surety
Title: Title: Attorney-in-Fact Date: Date:
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department has not reviewed the content of these documents.
Legal Assistant Date
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 20 / 399
STATUTORY PAYMENT BOND
00611-1
Document 00611
THAT WE, , as Principal, hereinafter called Contractor and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound unto the City of Houston, a municipal corporation, in the sum of $ for the payment of which sum, well and truly to be made to the City of Houston, and its successors, the said Contractor and Surety do bind themselves, their heirs, executors, administrators, successors, jointly and severally.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the Contractor has on or about this day executed a contract in writing with the City of Houston for all of such work to be done as set out in full in said Contract documents therein referred to and adopted by the City Council, all of which are made a part of this instrument as fully and completely as if set out in full herein;
NOW, THEREFORE, if the said Contractor shall pay all claimants supplying labor and materials to him or a Subcontractor in the prosecution of the Work provided for in the Contract, then, this obligation shall be void; otherwise the same is to remain in full force and effect;
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this Bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein.
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 21 / 399
00611-2
IN WITNESS THEREOF, the said Contractor and Surety have signed and sealed this instrument on the respective dates written below their signatures and have attached current Power of Attorney.
ATTEST, SEAL: (if a corporation) WITNESS: (if not a corporation) Name of Contractor
Title: Title:
Date:
ATTEST/SURETY WITNESS
Full Name of Surety
(SEAL)
Address of Surety for Notice
Telephone Number of Surety
Title: Title: Attorney-in-Fact Date: Date:
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department has not reviewed the content of these documents.
Legal Assistant Date
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 22 / 399
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 1 of 54 DOCUMENT 00700 - GENERAL CONDITIONS 21 September 2026
Document 00700
GENERAL CONDITIONS
September 21, 2026 EDITION
TABLE OF ARTICLES
1. GENERAL PROVISIONS
2. THE CITY
3. CONTRACTOR
4. ADMINISTRATION OF THE CONTRACT
5. SUBCONTRACTORS AND SUPPLIERS
6. CONSTRUCTION BY THE CITY OR BY SEPARATE CONTRACTORS
7. CHANGES IN THE WORK
8. TIME
9. PAYMENTS AND COMPLETION
10. SAFETY PRECAUTIONS
11. INSURANCE AND BONDS
12. WARRANTIES AND CORRECTION OF THE WORK
13. MISCELLANEOUS PROVISIONS
14. TERMINATION OR SUSPENSION OF THE CONTRACT
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 23 / 399
Page 00700/2 of 54 CITY OF HOUSTON - CONDITIONS OF THE CONTRACT
DOCUMENT 00700 - GENERAL CONDITIONS
ARTICLE 1 – GENERAL PROVISIONS 5
1.1 DEFINITIONS
1.2 EXECUTION, CORRELATION AND INTENT
1.3 OWNERSHIP OF DOCUMENTS AND CONFIDENTIALITY
1.4 INTERPRETATION
ARTICLE 2 – THE CITY 11
2.1 LIMITATIONS OF THE CITY’S OFFICERS AND EMPLOYEES
2.2 DUTIES OF THE CITY
2.3 AVAILABILITY OF LAND AND USE OF SITE
2.4 THE CITY’S RIGHT TO STOP THE WORK
2.5 THE CITY’S RIGHT TO CARRY OUT WORK
ARTICLE 3 – CONTRACTOR 12
3.1 RESPONSIBILITIES
3.2 REVIEW OF CONTRACT AND FIELD CONDITIONS BY CONTRACTOR
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
3.4 SUPERINTENDENT
3.5 BUSINESS ENTERPRISE COMPLIANCE
3.6 PREVAILING WAGE RATES
3.7 LABOR CONDITIONS
3.8 DRUG-FREE WORKPLACE COMPLIANCE
3.9 MATERIALS & EQUIPMENT
3.10 PRODUCT OPTIONS AND SUBSTITUTIONS
3.11 CASH ALLOWANCES
3.12 TITLE AND RISK OF LOSS
3.13 TAXES
3.14 PERMITS, FEES, AND NOTICES
3.15 CONSTRUCTION SCHEDULES
3.16 DOCUMENTS AND SAMPLES AT THE SITE
3.17 MANUFACTURER’S SPECIFICATIONS
3.18 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
3.19 CULTURAL RESOURCES AND ENDANGERED SPECIES
3.20 CUTTING AND PATCHING
3.21 CLEANING
3.22 SANITATION
3.23 ACCESS TO WORK AND TO INFORMATION
3.24 TRADE SECRETS
3.25 INDEMNIFICATION
3.26 RELEASE AND INDEMNIFICATION – PATENT, COPYRIGHT, TRADEMARK, AND TRADE SECRET INFRINGEMENT
3.27 INDEMNIFICATION PROCEDURES
3.28 CONTRACTOR DEBT
3.29 PRESERVATION OF CONTRACTING INFORMATION
3.30 COMPLIANCE WITH EQUAL OPPORTUNITY ORDINANCE
ARTICLE 4 – ADMINISTRATION OF THE CONTRACT 24
4.1 CONTRACT ADMINISTRATION
4.2 COMMUNICATIONS IN ADMINISTRATION OF THE CONTRACT
4.3 CONDITION PRECEDENT TO SUIT; WAIVER OF ATTORNEY FEES AND INTEREST
ARTICLE 5 – SUBCONTRACTORS AND SUPPLIERS 25
5.1 AWARD OF SUBCONTRACTS OTHER CONTRACTS FOR PORTIONS OF THE WORK
5.2 CONTRACTOR RESPONSIBILITY FOR SUBCONTRACTORS
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 24 / 399
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 3 of 54
ARTICLE 6 – CONSTRUCTION BY THE CITY OR BY SEPARATE CONTRACTORS 26
6.1 THE CITY’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS .. 26
6.2 COORDINATION
6.3 MUTUAL RESPONSIBILITY
6.4 THE CITY’S RIGHT TO CLEAN UP
ARTICLE 7 – CHANGES IN THE WORK 27
7.1 CHANGES
7.2 WORK CHANGE DIRECTIVES
7.3 ADJUSTMENTS IN CONTRACT PRICE
7.4 MINOR CHANGES IN THE WORK
7.5 CONCEALED OR UNKNOWN CONDITIONS
7.6 CONTRACTOR REQUESTED CHANGES
7.7 REVIEW AND DETERMINATION BY CITY ENGINEER
ARTICLE 8 – TIME 31
8.1 PROGRESS AND COMPLETION
8.2 DELAYS AND EXTENSIONS OF TIME
ARTICLE 9 – PAYMENTS AND COMPLETION 32
9.1 UNIT PRICE WORK
9.2 ESTIMATES FOR PAYMENT, UNIT PRICE WORK
9.3 STIPULATED PRICE WORK
9.4 APPLICATIONS FOR PAYMENT, STIPULATED PRICE WORK
9.5 CERTIFICATES FOR PAYMENT
9.6 COMPUTATIONS OF CERTIFICATES FOR PAYMENT
9.7 DECISIONS TO WITHHOLD CERTIFICATION
9.8 PROGRESS PAYMENTS
9.9 DATE OF SUBSTANTIAL COMPLETION
9.10 PARTIAL OCCUPANCY OR USE
9.11 FINAL COMPLETION AND FINAL PAYMENT
9.12 LIQUIDATED DAMAGES
ARTICLE 10 – SAFETY PRECAUTIONS 38
10.1 SAFETY PROGRAMS
10.2 POLLUTANTS AND POLLUTANT FACILITIES
10.3 SAFETY OF THE ENVIRONMENT, PERSONS, AND PROPERTY
10.4 EMERGENCIES
ARTICLE 11 – INSURANCE AND BONDS 39
11.1 GENERAL INSURANCE REQUIREMENTS
11.2 INSURANCE TO BE PROVIDED BY CONTRACTOR
11.3 PROOF OF INSURANCE
11.4 PERFORMANCE AND PAYMENT BONDS
11.5 MAINTENANCE BONDS
11.6 SURETY
11.7 DELIVERY OF BONDS
ARTICLE 12 -- WARRANTIES AND CORRECTION OF THE WORK 47
12.1 WARRANTIES
12.2 ACCEPTANCE OF NONCONFORMING WORK
ARTICLE 13 – MISCELLANEOUS PROVISIONS 49
13.1 GOVERNING LAW AND VENUE
13.2 SUCCESSORS
13.3 BUSINESS STRUCTURE AND ASSIGNMENTS
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 25 / 399
Page 00700/4 of 54 CITY OF HOUSTON - CONDITIONS OF THE CONTRACT
13.4 WRITTEN NOTICE
13.5 RIGHTS AND REMEDIES
13.6 TESTS AND INSPECTIONS
13.7 INTEREST
13.8 PARTIES IN INTEREST
13.9 ENTIRE CONTRACT
13.10 WRITTEN AMENDMENT
13.11 COMPLIANCE WITH LAWS
13.12 SEVERABILITY
13.13 COMPLIANCE WITH CERTAIN STATE LAW REQUIREMENTS
13.14 ZERO TOLERANCE POLICY FOR HUMAN TRAFFICKING & RELATED ACTIVITIES
ARTICLE 14 - TERMINATION OR SUSPENSION OF THE CONTRACT 51
14.1 TERMINATION BY THE CITY FOR CAUSE
14.2 TERMINATION BY THE CITY FOR CONVENIENCE
14.3 SUSPENSION BY THE CITY FOR CONVENIENCE
14.4 TERMINATION BY CONTRACTOR
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 26 / 399
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 5 of 54
ARTICLE 1
GENERAL PROVISIONS
1.1 DEFINITIONS.
1.1.1 Agreement: Document signed by the Parties and binding the Parties, containing the name of Contractor, title and location of the Project, Original Contract Time, Original Contract Price, enumeration of documents included in the Contract, and other provisions.
1.1.2 Applicable Law: All laws, treaties, ordinances, judgments, decrees, injunctions, writs, orders, codes, rules, regulations, permits, and interpretations of any Governmental Authority having jurisdiction over the Parties, the Project, the Work, the Contract, and each other document delivered hereunder or in connection herewith.
1.1.3 Bonds: Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument.
1.1.4 Business Enterprise: Any business entity registered in a program authorized by 49 C.F.R.
§ 26 (where applicable) or City Code of Ordinances, Chapter 15, Article II. The term “Business Enterprise” may include any Disadvantaged Business Enterprise (“DBE”), Minority Business Enterprise (“MBE”), Woman Business Enterprise (“WBE”), Small Business Enterprise (“SBE”), and any Person with Disability Enterprise (“PDBE”).
1.1.5 Business Enterprise Policy: Contract documents and applicable policies relating to
Business Enterprises and authorized under 49 C.F.R. § 26 or City Code of Ordinances, Chapter 15, Article V.
1.1.6 Cash Allowance: An estimated sum of money to be used only for a limited class of expenditures such as utility relocation costs, fees for special licenses or permits, or other “pass-through” costs that would be the same for any contractor. Cash Allowances may not be used to purchase goods or services that are not specified in the Contract. The unspecified items must be purchased according to the terms of Article 7.
1.1.7 Change Order: Written instrument prepared by the City and signed by Director or his designee and Contractor, specifying the following:
1.1.7.1 a change in the Work;
1.1.7.2 a change in Contract Price, if any; and
1.1.7.3 a change in Contract Time, if any.
The value of a Change Order is the net amount after offsetting all deductions against all additions effected by the Change Order.
1.1.8 City: The City of Houston, a home rule municipality located principally within Harris County, Texas, including its successors and its authorized representatives.
1.1.9 City Engineer: The City Engineer, or the City employee representing the City Engineer, designated in the Agreement and authorized to represent the City, or successors.
1.1.10 City Indemnified Parties: The City and its officials, officers, directors, representatives, agents, employees, consultants and separate contractors.
1.1.11 Conditions of the Contract: General Conditions and Supplementary Conditions.
1.1.12 Construction Manager: Person or firm under contract with the City as its authorized representative to oversee and administer construction of the Work, and who may perform the role of Project Manager and Inspector, as designated by Director in writing.
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 27 / 399
Page 00700/6 of 54 CITY OF HOUSTON - CONDITIONS OF THE CONTRACT
1.1.13 Contract: The Agreement, documents enumerated in and incorporated into the
Agreement, Modifications, and amendments.
1.1.14 Contract Price: The monetary amount stated in the Agreement adjusted by Change
Order, and increases or decreases in Unit Price Quantities, if any.
1.1.15 Contract Time: The number of days stated in the Agreement to substantially complete the
Work, plus days authorized by Change Order.
1.1.16 Contractor: Person or firm identified as such in the Agreement including its successors and its authorized representatives.
1.1.17 Date of Commencement of the Work: Date established in Notice to Proceed on which
Contract Time will commence. This date will not be changed by failure of Contractor, or persons or entities for whom Contractor is responsible, to act.
1.1.18 Date of Substantial Completion: Date that construction, or portion thereof designated by Director, is certified by Director to be substantially complete.
1.1.19 Defect Correction Period: The period during which the Contractor shall be obligated to replace or correct deficiencies in Products and/or the Work, which period shall be one year following the Date of Substantial Completion and acceptance of the Project, or discrete phase thereof, subject to an Extended Defect Correction Period as provided in Paragraph 12.1.7, unless the applicable manufacturer or Subcontractor, if any, provides a longer correction period, in which event the longer correction period shall apply.
1.1.20 Design Consultant: Person or firm, under contract with the City, to provide professional services during construction and its authorized representatives. If a Design Consultant is not employed for services during construction, Project Manager will perform duties of Design Consultant designated in the Contract in addition to usual duties of Project Manager.
1.1.21 Director: The Director of the City Department for which this Work is being performed, or any person designated in writing by such a Director to perform one or more of the Director’s duties under this Contract.
1.1.22 Documents: notes, manuals, notebooks, plans, computations, computer databases and diskettes, software, tabulations, exhibits, reports, underlying data, charts, analyses, maps, letters, models, forms, photographs, the original tracings of all drawings and plans, and other work products (and any modifications or improvements to them) that Contractor prepares or provides under this Agreement.
1.1.23 Drawings: Graphic and pictorial portions of the Contract that define the character and scope of the Work.
1.1.24 Extra Unit Price: Unit Prices, which may be required for completion of the Work. These
Unit Prices and Unit Price Quantities are in the Contract and are included in Original Contract Price.
1.1.25 Force Majeure: catastrophic storms or floods, tornadoes, hurricanes, earthquakes, unusually severe weather, and other acts of God, wars, civil disturbances, acts of government in its sovereign capacity that were not requested, promoted, or caused by the affected Party, terrorist attacks, revolts, riots, insurrections, hostilities, strikes (excluding strikes of a Party’s employees), sabotage, commercial embargoes, epidemics or
WBS No. N-321040-0162-4 / CSJ 0912-72-762, etc. 28 / 399
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 7 of 54 pandemics, quarantine restrictions, fires, explosions, changes in Applicable Law, discovery of Pollutants or Pollutant Facilities at the site; provided that the act or event:
(i) delays or renders impossible the affected Party’s performance of its obligations under this Contract;
(ii) is beyond the reasonable control of the affected Party, not due to its fault or negligence, and was not reasonably foreseeable; and
(iii) could not have been prevented or avoided by the affected Party through the exercise of due diligence.
For avoidance of doubt, Force Majeure will not include any of the following:
(a) economic hardship;
(b) changes in market conditions;
(c) late delivery or failure of equipment, unless the delay or failure is caused by Force Majeure;
(d) labor availability, strikes of a Party’s employees, or other similar labor actions; or
(e) nonperformance or delay by Contractor or its Subcontractors, unless the nonperformance or delay is otherwise caused by Force Majeure.
1.1.26 Furnish: To supply, pay for, deliver to the site, and unload.
1.1.27 General Requirements: The sections of Division 01 Specifications that specify administrative and procedural requirements and temporary facilities required for the Work.
1.1.28 Good Faith Efforts: Steps taken to achieve an MBE, WBE, SBE, or PDBE goal or other requirements which, by their scope, intensity, and usefulness, demonstrate the bidder’s responsiveness to fulfill the business opportunity objective, as well as the Contractor’s responsibility to put forth measures to meet or exceed the MBE, WBE, SBE, or PDBE goal (Contract Goal).
This is the start of the file's text. The full file is on GovTribe.