Project Manual (42).pdf
PDF 64 MB Posted
- Attached to
- Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor, Canvasback Cay & Circle Drive Project
- Solicitation number
- City Project No. RW 2204 / ARKK Project No. 23-034
- Issued by
- Harris County, Texas
About this file
This Project Manual is prepared by the City of Pearland, Texas for the neighborhood street reconstruction project spanning Lantern Park Subdivision, Dolphin Harbor, Canvasback Cay, and a portion of Circle Drive. The scope of work encompasses removal of existing concrete roadway and subgrade stabilization, followed by replacement with 6-inch concrete roadway, curbs, and 5-foot-wide sidewalks. Drainage improvements include replacement of the storm sewer system, existing inlets, and installation of outfalls. The project also includes water-line replacement in Lantern Park Subdivision, Dolphin Harbor, and Canvasback Cay, as well as pipe bursting of sanitary sewer lines on Dolphin Harbor and Canvasback Cay. Bids were due September 9, 2026, and Addendum No. 1, issued September 1, 2026, modified and clarified project specifications and requirements that bidders were required to incorporate into their proposals.
The Project Manual establishes the technical specifications, standards, and requirements for construction execution. Bidders were required to comply with all provisions outlined in the manual and incorporate Addendum No. 1 to ensure proposal compliance and avoid bid rejection or performance disputes. The manual serves as the binding reference document defining the project's scope, quality standards, and construction methodologies that the selected contractor must follow throughout project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 1 (3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .