Project Manual 2027-08.pdf
PDF 5 MB Posted
- Attached to
- PCB Remediation Project
- Solicitation number
- 2027-08
- Issued by
- Fairfield County, Connecticut
About this file
This is a Project Manual and Invitation to Bid for PCB remediation work at the Town of Southington Water Pollution Control Plant (WPCP) located at 999 Meriden-Waterbury Turnpike in Southington, Connecticut (Project #2027-08). The work consists of clearing and removal of above-ground vegetation within the remediation area, removal and off-site disposal of PCB remediation waste, consolidation of PCB-impacted soils, and installation of engineered controls. Sealed bids are due electronically through the PlanetBids website on Friday, December 11, 2026, at 12:00 p.m., with electronic opening and posting to the Town's website immediately thereafter. A mandatory pre-bid conference will be held at the site on Wednesday, November 18, 2026, at 10:00 a.m.; failure to attend will result in bid rejection. Questions must be submitted through PlanetBids and received by Monday, November 23, 2026, at 12:00 p.m. Bids shall be submitted on a lump sum and unit price basis with alternate bid items as indicated in the Bid Form. The contract will include a schedule of values and performance/payment bond requirements. Remediation activities have been approved by the Environmental Protection Agency (EPA) and Connecticut Department of Energy and Environmental Protection (DEEP), and contractors must comply with all conditions of these approvals.
Bidders must be pre-qualified by the State of Connecticut Department of Administrative Services and must hold a Permitted Spill Cleanup Contractor permit in accordance with Connecticut General Statutes Section 22a-454. A bid deposit equal to five percent of the maximum bid price in the form of a bid bond is required. The contract includes Connecticut prevailing wage rate requirements unless the total bid is less than $1,000,000 for new construction or $100,000 for renovation projects. A minimum of twenty-five percent (25%) of the state-funded portion must be awarded to subcontractors holding current certification from the Connecticut Department of Administrative Services as small and minority-owned businesses or minority, women, and/or disabled-owned businesses. Contractors must complete and submit the CHRO Contract Compliance Regulations Notification to Bidders Form with their bid; incomplete submissions will be rejected. An additional two percent (2%) monthly retainage is required by CHRO. The Town reserves the right to award all or some bid items depending on available funding and to reject any and all bids. Connecticut prevailing wage rates apply to all work, and the Town is exempt from state sales and use taxes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Emergency_Sewer_Services_Including_Sewer_Pump_Stations.pdf | ||
| Design_Build_Skateboard_Park.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Bidding Specifications Volume 1 of 1
213 Court Street Suite 1100 Middletown, CT 06457
Invitation to Bid PCB Remediation
Southington WPCP 999 Meriden-Waterbury Turnpike
Southington, Connecticut
Project # 2027-08
Town of Southington 196 North Main Street
Southington, CT 06489
November 2026
Southington WPCP_11/12/26 TOC-1 Table of Contents
Section Title
DIVISION 0 – BIDDING AND CONTRACT REQUIREMENTS
00100 Advertisement for Bids
00200 Instructions to Bidders
00410 Bid Form
00430 Bid Bond
00520 Agreement
00610 Performance Bond
00615 Payment Bond
00700 General Conditions
00800 Supplementary Conditions
Division 1 – General Requirements
01110 Summary of Work
01140 Work Restrictions
01270 Measurement and Payment
01295 Schedule of Values
01330 Submittal Procedures
01350 Health and Safety Plan
01570 Temporary Controls
01725 Preservation and Restoration of Project Features
01770 Closeout Procedures
Division 2 – Site Construction
02110 Contaminated Soil Excavation
02120 Transportation and Disposal of Contaminated Materials
02200 Site Preparation
02315 Excavation, Backfill, and Compaction
02320 Borrow Materials
02920 Lawns and Grasses
DRAWINGS
Sheet 1 G-001 Cover Sheet
Sheet 2 G-002 General Notes and Standard Abbreviations
Sheet 3 C-101 Site Excavation and Soil Erosion Control Plan
Sheet 4 C-201 Site Grading Planes
Sheet 5 C-202 Site Sections – 1
Sheet 6 C-203 Site Sections – 2
Sheet 7 C-301 Site Restoration and Planting Plan
Sheet 8 C-401 Soil Erosion and Sedimentation Control Details - 1
Southington WPCP_11/12/26 TOC-2 Table of Contents
ATTACHMENTS
Attachment No. 1 – Application for Engineered Control Variance – Part 1
Attachment No. 2 – PCB Cleanup and Disposal Plan and Engineered Control Variance
Request Application – Part 2
Attachment No. 3 – EPA Approval
Attachment No. 4 – DEEP Approval
Attachment No. 5 – Waste Characterization Laboratory Data Reports
END OF SECTION
Division 0
A
Southington WPCP_11/12/26 00100-1 Advertisement For Bids
SECTION 00100
ADVERTISEMENT FOR BIDS
The Town of Southington is seeking qualified contractors to complete PCB remediation activities at the Town’s Water Pollution Control Plant. Sealed Bids for the “Town of Southington, PCB
Remediation Southington WPCP Project 2027-08” will be electronically received by the Southington
Town Hall through their PlanetBids Website, until Friday December 11, 2026 at 12:00pm at which time the Bids received will be electronically opened and posted on to the Town's website. No paper bids will be accepted.
In general, the work consists of clearing and removal of above-ground vegetation, including plants, bushes, and trees, within the remediation area, removal and off-site disposal of PCB remediation waste, consolidation of other PCB impacted soils and capped with an engineered control (EC).
Remediation activities have been approved by the Environmental Protection Agency (EPA) and
Connecticut Department of Energy and Environmental Protection (DEEP). Contractors are required to comply with all conditions of EPA and DEEP approvals. Bids shall be on a lump sum and unit price basis with alternate bid items as indicated in the Bid Form.
Bidding Documents may be obtained and bids received electronically from the PlanetBids website at https://vendors.planetbids.com/portal/61724/bo/bo-detail/147961
Prospective bidders must complete a one-time registration process on the website in order to receive log-in credentials. Bidders must log in to the web site to download bidding documents for the project. Bidders will be added to the “planholders” or prospective bidders list upon downloading the bidding documents for the project. Bidding documents will not otherwise be available for examination at other locations.
Bidders must be pre-qualified by the State of Connecticut Department of Administrative Services in accordance with C.G.S. Sec. 4b-91. Bidders must also be a Permitted Spill Cleanup Contractor with an individual permit to act as a contractor to contain or remove or otherwise mitigate the effects of any release in accordance with C.G.S. Sec. 22a-454.
A mandatory pre-Bid conference will be held at the site on Wednesday November 18, 2026 at 10am.
Questions must be received by Monday November 23, 2026 at 12pm and should be submitted through the PlanetBids website.
The Town of Southington is an Affirmative Action/Equal Opportunity Employer.
Minority/Women’s Business Enterprises are encouraged to apply.
The Town reserves the right to waive any technical defects in the bids, to reject bids which do not conform to the terms and conditions describe in the specifications; to reject any, any part of, or all bids; to waive informalities or irregularities in the bidding process, and to accept that bid which the
Town deems to be in the best interest, whether or not it is the lowest dollar proposal. The Town reserves the right to amend, cancel, postpone, withdraw, or resubmit this Invitation for Bid at any time if it is in the best interest of the Town to do so.
https://url.usb.m.mimecastprotect.com/s/JhzmC3YqNVTm7Vn4HgfZKtQgifI?domain=vendors.planetbids.com
Southington WPCP_11/11/26 00200-1 Instructions To Bidder
SECTION 00200
INSTRUCTIONS TO BIDDER
TABLE OF ARTICLES
1. Defined Terms
2. Copies of Bidding Documents
3. Qualifications of Bidders
4. Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety
Program; Other Work at the Site
5. Bidder’s Representations
6. Pre-Bid Conference
7. Interpretations and Addenda
8. Bid Deposit
9. Contract Times
10. Liquidated Damages
11. Substitute and “Or Equal” Items
12. Subcontractors, Suppliers, and Others
13. Preparation of Bid
14. Basis of Bid
15. Submittal of Bid
16. Modification or Withdrawal of Bid
17. Opening of Bids
18. Disqualification of Bidders
19. Bids to Remain Subject to Acceptance
20. Evaluation of Bids and Award of Contract
21. Contract Securities
22. Contract Insurance
23. Signing of Agreement
24. Sales Taxes
25. Connecticut Prevailing Wage Rates
PART 1 DEFINED TERMS
Southington WPCP_11/11/26 00200-2 Instructions To Bidder
1.1 TERMS USED IN THESE INSTRUCTIONS TO BIDDERS WILL HAVE THE MEANINGS
INDICATED IN THE GENERAL CONDITIONS AND SUPPLEMENTARY CONDITIONS.
PART 2 COPIES OF BIDDING DOCUMENTS
2.1 REFER TO ADVERTISEMENT FOR BIDS FOR INFORMATION ON EXAMINATION
AND PROCUREMENT OF DOCUMENTS.
2.2 COMPLETE SETS OF BIDDING DOCUMENTS SHALL BE USED IN PREPARING BIDS;
NEITHER OWNER NOR ENGINEER ASSUMES ANY RESPONSIBILITY FOR ERRORS
OR MISINTERPRETATIONS RESULTING FROM THE USE OF INCOMPLETE SETS OF
BIDDING DOCUMENTS.
2.3 OWNER AND ENGINEER IN MAKING COPIES OF BIDDING DOCUMENTS
AVAILABLE ON THE ABOVE TERMS DO SO ONLY FOR THE PURPOSE OF
OBTAINING BIDS FOR THE WORK AND DO NOT CONFER A LICENSE OR GRANT
FOR ANY OTHER USE.
PART 3 QUALIFICATIONS OF BIDDERS
3.1 BIDDERS MUST BE PRE-QUALIFIED BY THE STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES.
3.2 BIDDERS SHALL BE EXPERIENCED IN THE KIND OF WORK TO BE PERFORMED,
SHALL HAVE THE NECESSARY EQUIPMENT, AND SHALL POSSESS SUFFICIENT
CAPITAL TO PROPERLY EXECUTE THE WORK WITHIN THE TIME ALLOWED. BIDS
RECEIVED FROM BIDDERS WHO HAVE PREVIOUSLY FAILED TO COMPLETE
WORK WITHIN THE TIME REQUIRED, OR WHO HAVE PREVIOUSLY PERFORMED
SIMILAR WORK IN AN UNSATISFACTORY MANNER, MAY BE REJECTED. A BID
MAY BE REJECTED IF BIDDER CANNOT SHOW THAT HE HAS THE NECESSARY
ABILITY, PLANT AND EQUIPMENT TO COMMENCE THE WORK AT THE TIME
PRESCRIBED AND THEREAFTER TO PROSECUTE AND COMPLETE THE WORK AT
THE RATE OR WITHIN THE TIME SPECIFIED. A BID MAY BE REJECTED IF BIDDER
IS ALREADY OBLIGATED FOR THE PERFORMANCE OF OTHER WORK WHICH
WOULD DELAY THE COMMENCEMENT, PROSECUTION OR COMPLETION OF THE
WORK.
3.3 BIDDERS MAY BE INVESTIGATED BY OWNER TO DETERMINE IF THEY ARE
QUALIFIED TO PERFORM THE WORK. ALL BIDDERS SHALL BE PREPARED TO
SUBMIT WITHIN FIVE DAYS OF OWNER’S OR ENGINEER’S REQUEST, WRITTEN
EVIDENCE OF SUCH INFORMATION AND DATA NECESSARY TO MAKE THIS
DETERMINATION. THE INVESTIGATION OF A BIDDER WILL SEEK TO DETERMINE
WHETHER THE ORGANIZATION IS ADEQUATE IN SIZE, IS AUTHORIZED TO DO
BUSINESS IN THE JURISDICTION WHERE THE PROJECT IS LOCATED, HAS HAD
PREVIOUS EXPERIENCE AND WHETHER AVAILABLE EQUIPMENT AND
FINANCIAL RESOURCES ARE ADEQUATE TO ASSURE OWNER THAT THE WORK
WILL BE COMPLETED IN ACCORDANCE WITH THE TERMS OF THE AGREEMENT.
OWNER RESERVES THE RIGHT TO REJECT ANY BID IF THE EVIDENCE
SUBMITTED BY, OR INVESTIGATION OF SUCH BIDDER FAILS TO SATISFY OWNER
THAT SUCH BIDDER IS PROPERLY QUALIFIED TO CARRY OUT THE OBLIGATIONS
OF THE CONTRACT AND TO COMPLETE THE WORK CONTEMPLATED THEREIN.
Southington WPCP_11/11/26 00200-3 Instructions To Bidder
A. Bidders are required to provide a letter stating that the Bidder is in good financial standing. The letter must:
1. Be provided by a financial institution or certified public accountant having a relationship with the Bidder;
2. Be on the bank or accountant’s letterhead;
3. Include name and contact information for the bank or accountant including address, email and telephone number;
4. Identify the account holder(s), whose names must match the name of the Bidder, the type and length of business relationship, and the historical status of the accounts
(i.e. good standing, timely payments, no overdrafts, etc.); and
5. NOT include account numbers, account amounts, or lines of credit.
3.4 BIDDERS SHALL POSSESS ALL THE NECESSARY LICENSES AND CERTIFICATIONS
TO PERFORM THE WORK. ALL REQUIRED LICENSES AND CERTIFICATIONS MUST
BE CURRENT AND KEPT CURRENT DURING THE PROJECT.
3.5 CONTRACTOR MUST COMPLY WITH 4A-60 AND 4A-60A OF THE CONNECTICUT
GENERAL STATUTES (CGS) AND SECTIONS 46A-68B THROUGH F OF THE
REGULATIONS OF CONNECTICUT STATE AGENCIES, INCLUSIVE, AS AMENDED
BY JUNE 2015 SPECIAL SESSION PUBLIC ACT 15-5.
3.6 STATE LAW REQUIRES A MINIMUM OF TWENTY-FIVE (25%) PERCENT OF THE
STATE-FUNDED PORTION OF THE CONTRACT FOR AWARD TO
SUBCONTRACTORS HOLDING CURRENT CERTIFICATION FROM THE
CONNECTICUT DEPARTMENT OF ADMINISTRATIVE SERVICES (DAS) UNDER THE
PROVISIONS OF CGS SECTIONS 4A-60G (25% OF THE WORK WITH DAS CERTIFIED
SMALL AND MINORITY OWNED BUSINESSES AND 25% OF THE WORK WITH DAS
CERTIFIED MINORITY, WOMEN AND/OR DISABLED OWNED BUSINESSES). THE
CONTRACTOR MUST DEMONSTRATE GOOD FAITH EFFORT TO MEET THE 25%
SET ASIDE GOALS.
3.7 CONTRACTOR MUST COMPLETE, SIGN, AND RETURN THE “CHRO CONTRACT
COMPLIANCE REGULATIONS NOTIFICATION TO BIDDERS” FORM WITH THEIR
BID SUBMITTAL. BIDS NOT INCLUDING THIS FORM WILL BE CONSIDERED
INCOMPLETE AND REJECTED. THIS FORM IS ATTACHED, AND CAN ALSO BE
FOUND AT: https://portal.ct.gov/-/media/dds/conversion/notificationtobidders1.pdf
A. CHRO requires an extra 2% retainage each month on the project.
3.8 BIDDERS MUST COMPLY WITH THE REQUIREMENTS SET FORTH IN THE STATE
OF CONNECTICUT DEPARTMENT OF ECONOMIC AND COMMUNITY
DEVELOPMENT BIDDING, CONTRACTING & CONSTRUCTION GUIDELINES FOR
STATE PROGRAMS, REVISED MAY 2019.
3.9 ANY BID, FROM A BIDDER WHO IS ON A U.S. GOVERNMENT AND/OR STATE OF
CONNECTICUT DEBARRED CONTRACTOR LIST, WILL BE REJECTED BY THE
OWNER IN ACCORDANCE WITH STATE AND FEDERAL LAWS AND
REGULATIONS.
https://portal.ct.gov/-/media/dds/conversion/notificationtobidders1.pdf
Southington WPCP_11/11/26 00200-4 Instructions To Bidder
PART 4 SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF
SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.1 THE SITE IS IDENTIFIED IN THE BIDDING DOCUMENTS. BY DEFINITION, THE SITE
INCLUDES RIGHTS-OF-WAY, EASEMENTS, AND OTHER LANDS FURNISHED BY
OWNER FOR THE USE OF THE CONTRACTOR. ANY ADDITIONAL LANDS
REQUIRED FOR TEMPORARY CONSTRUCTION FACILITIES, CONSTRUCTION
EQUIPMENT, OR STORAGE OF MATERIALS AND EQUIPMENT ARE TO BE
OBTAINED AND PAID FOR BY CONTRACTOR.
4.2 EXISTING SITE CONDITIONS
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify those project documents known to the
Owner that describe subsurface conditions, physical conditions, and Hazardous
Environmental Conditions at or adjacent to the Site, including associated technical data and regulatory approvals.
2. Copies of project documents referenced above are included within the bidding documents and will also be made available on the Town of Southington website.
The Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
B. Underground Facilities: Information and data shown or indicated in the Bidding
Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including
Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 5.06 of the General Conditions.
4.3 SITE VISIT AND TESTING BY BIDDERS
A. Bidder shall not conduct any subsurface testing, sampling, or investigations for the Site.
B. the Owner has control over the Site and is requiring a mandatory pre-bid meeting for
Bidders to observe the Site. Failure to attend the mandatory pre-bid meeting will result in rejection of bid.
Southington WPCP_11/11/26 00200-5 Instructions To Bidder
C. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
4.4 OWNER’S SAFETY PROGRAM
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
PART 5 BIDDER’S REPRESENTATIONS
5.1 IT IS THE RESPONSIBILITY OF EACH BIDDER BEFORE SUBMITTING A BID TO:
A. examine and carefully study the Bidding Documents, including any Addenda, data, and referenced items identified in the Bidding Documents;
B. attend the mandatory pre-bid meeting to conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, or performance of the Work;
D. carefully study all reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or adjacent to the Site which have been identified in the
Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and carefully study all reports and drawings relating to a Hazardous
Environmental Condition, if any, at or adjacent to the Site which have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on 1) the cost, progress, and performance of the Work; 2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, and 3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
Southington WPCP_11/11/26 00200-6 Instructions To Bidder
H. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and finishing of the Work;
and
I. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
PART 6 MANDATORY PRE-BID MEETING
6.1 A MANDATORY PRE-BID MEETING WILL BE HELD AT THE TIME AND LOCATION
STATED IN THE INVITATION OR ADVERTISEMENT TO BID. REPRESENTATIVES
OF OWNER AND ENGINEER WILL BE PRESENT TO DISCUSS THE PROJECT.
FAILURE TO ATTEND THIS PRE-BID MEETING WILL RESULT IN REJECTION OF
BID. ENGINEER WILL TRANSMIT TO ALL PROSPECTIVE BIDDERS OF RECORD
SUCH ADDENDA AS ENGINEER CONSIDERS NECESSARY IN RESPONSE TO
QUESTIONS ARISING AT THE CONFERENCE. ORAL STATEMENTS MAY NOT BE
RELIED UPON AND WILL NOT BE BINDING OR LEGALLY EFFECTIVE.
PART 7 INTERPRETATIONS AND ADDENDA
7.1 ALL QUESTIONS ABOUT THE MEANING OR INTENT OF THE BIDDING
DOCUMENTS SHALL BE SUBMITTED IN WRITING TO [FIRST] [LAST], [TITLE],
TOWN OF SOUTHINGTON, 75 MAIN STREET, SOUTHINGTON, CT 06489, OR EMAIL
AT [EMAIL].
7.2 IN ORDER TO RECEIVE CONSIDERATION, QUESTIONS MUST BE RECEIVED BY
[DAY] [DATE]. INTERPRETATIONS OR CLARIFICATIONS CONSIDERED
NECESSARY BY OWNER AND ENGINEER IN RESPONSE TO SUCH QUESTIONS WILL
BE ISSUED BY ADDENDA TO ALL PARTIES IN ATTENDANCE AT THE
MANDATORY PRE-BID MEETING NOT LATER THAN THREE DAYS PRIOR TO THE
DATE FIXED FOR THE OPENING OF BIDS. ONLY QUESTIONS ANSWERED BY
ADDENDA WILL BE BINDING. ORAL AND OTHER INTERPRETATIONS OR
CLARIFICATIONS WILL BE WITHOUT LEGAL EFFECT.
7.3 ADDENDA MAY BE ISSUED TO CLARIFY, CORRECT, SUPPLEMENT OR CHANGE
THE BIDDING DOCUMENTS. SUCH ADDENDA, IF ANY, WILL BE ISSUED IN THE
MANNER AND WITHIN THE TIME PERIOD STATED IN PARAGRAPH 7.2.
7.4 THE BIDDER MUST ACKNOWLEDGE RECEIPT OF EACH ADDENDUM, IF ANY, IN
THE SPACE PROVIDED ON THE BID FORM.
PART 8 BID DEPOSIT
8.1 IN THE BIDDING DOCUMENTS, THE TERMS “BID SECURITY”, “BID DEPOSIT”,
AND “BID BOND” SHALL HAVE THE SAME MEANING.
8.2 A BID MUST BE ACCOMPANIED BY BID SECURITY MADE PAYABLE TO OWNER
IN AN AMOUNT OF FIVE PERCENT OF BIDDER’S MAXIMUM BID PRICE
(INCLUDING ANY ALTERNATES) AND IN THE FORM OF A BID BOND (ON THE
FORM INCLUDED IN THE BIDDING DOCUMENTS) ISSUED BY A SURETY MEETING
Southington WPCP_11/11/26 00200-7 Instructions To Bidder
THE REQUIREMENTS OF PARAGRAPHS 6.01 AND 6.02 OF THE GENERAL
CONDITIONS.
8.3 ALL BID DEPOSITS OF GENERAL BIDDERS, EXCEPT THOSE UNDER
CONSIDERATION BY OWNER, WILL BE RETURNED WITHIN FIVE DAYS,
EXCLUDING SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS, AFTER THE
OPENING OF GENERAL BIDS. OTHER BID DEPOSITS WILL BE RETURNED UPON
THE EXECUTION AND DELIVERY OF THE AGREEMENT. THE BID DEPOSIT OF THE
SUCCESSFUL BIDDER WILL BE RETAINED UNTIL SUCH BIDDER HAS FURNISHED
THE REQUIRED CONTRACT SECURITY AND EXECUTED THE AGREEMENT,
WHEREUPON THE BID DEPOSIT SHALL BE RETURNED. IF THE SUCCESSFUL
BIDDER FAILS TO FURNISH THE REQUIRED CONTRACT SECURITY WITHIN
FIFTEEN DAYS AFTER THE NOTICE OF AWARD AND EXECUTE THE AGREEMENT
WITHIN FIVE DAYS AFTER RECEIPT FROM OWNER, OWNER MAY ANNUL THE
NOTICE OF AWARD AND THE BID DEPOSIT OF THAT BIDDER WILL BE FORFEITED
TO OWNER AS LIQUIDATED DAMAGES FOR SUCH FAILURE.
PART 9 CONTRACT TIMES
9.1 THE NUMBER OF DAYS WITHIN WHICH, OR THE DATES BY WHICH, THE WORK
IS TO BE SUBSTANTIALLY COMPLETED, AND/OR COMPLETED AND READY FOR
FINAL PAYMENT ARE SET FORTH IN THE AGREEMENT.
PART 10 LIQUIDATED DAMAGES
10.1 PROVISIONS FOR LIQUIDATED DAMAGES, IF ANY, FOR FAILURE TO TIMELY
ATTAIN SUBSTANTIAL COMPLETION, OR COMPLETION OF THE WORK IN
READINESS FOR FINAL PAYMENT, ARE SET FORTH IN THE AGREEMENT.
PART 11 SUBSTITUTE AND “OR EQUAL” ITEMS
11.1 THE CONTRACT FOR THE WORK, AS AWARDED, WILL BE ON THE BASIS OF
MATERIALS AND EQUIPMENT SPECIFIED OR DESCRIBED IN THE BIDDING
DOCUMENTS WITHOUT CONSIDERATION DURING THE BIDDING AND CONTRACT
AWARD PROCESS OF POSSIBLE SUBSTITUTE OR “OR EQUAL” ITEMS. IN CASES IN
WHICH THE CONTRACT ALLOWS THE CONTRACTOR TO REQUEST THAT
ENGINEER AUTHORIZE THE USE OF A SUBSTITUTE OR “OR EQUAL” ITEM OF
MATERIAL OR EQUIPMENT, APPLICATION FOR SUCH ACCEPTANCE MAY NOT BE
MADE TO AND WILL NOT BE CONSIDERED BY ENGINEER UNTIL AFTER THE
EFFECTIVE DATE OF THE CONTRACT.
PART 12 SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.1 IF REQUIRED BY THE BID DOCUMENTS, THE APPARENT SUCCESSFUL BIDDER,
AND ANY OTHER BIDDER SO REQUESTED, SHALL WITHIN FIVE DAYS AFTER BID
OPENING, SUBMIT TO OWNER A LIST OF THE SUBCONTRACTORS OR SUPPLIERS
PROPOSED FOR THE WORK, WHICH FOR THIS PROJECT MAY INCLUDE A TREE
REMOVAL CONTRACTOR, SOIL HAULER, ETC. IF REQUESTED BY OWNER, SUCH
LIST SHALL BE ACCOMPANIED BY AN EXPERIENCE STATEMENT WITH
PERTINENT INFORMATION REGARDING SIMILAR PROJECTS AND OTHER
EVIDENCE OF QUALIFICATION FOR EACH SUCH SUBCONTRACTOR, SUPPLIER,
OR OTHER INDIVIDUAL OR ENTITY. IF OWNER OR ENGINEER, AFTER DUE
Southington WPCP_11/11/26 00200-8 Instructions To Bidder
INVESTIGATION, HAS REASONABLE OBJECTION TO ANY PROPOSED
SUBCONTRACTOR, SUPPLIER, INDIVIDUAL, OR ENTITY, OWNER MAY, BEFORE
THE NOTICE OF AWARD IS GIVEN, REQUEST APPARENT SUCCESSFUL BIDDER
TO SUBMIT AN ACCEPTABLE SUBSTITUTE, IN WHICH CASE APPARENT
SUCCESSFUL BIDDER SHALL SUBMIT A SUBSTITUTE, BIDDER’S BID PRICE WILL
BE INCREASED (OR DECREASED) BY THE DIFFERENCE IN COST OCCASIONED BY
SUCH SUBSTITUTION, AND OWNER MAY CONSIDER SUCH PRICE ADJUSTMENT
IN EVALUATING BIDS AND MAKING THE CONTRACT AWARD.
12.2 IF APPARENT SUCCESSFUL BIDDER DECLINES TO MAKE ANY SUCH
SUBSTITUTION, OWNER MAY AWARD THE CONTRACT TO THE NEXT LOWEST
BIDDER THAT PROPOSES TO USE ACCEPTABLE SUBCONTRACTORS, SUPPLIERS,
OR OTHER INDIVIDUALS OR ENTITIES. DECLINING TO MAKE REQUESTED
SUBSTITUTIONS WILL CONSTITUTE GROUNDS FOR FORFEITURE OF THE BID
SECURITY OF ANY BIDDER. ANY SUBCONTRACTOR, SUPPLIER, INDIVIDUAL, OR
ENTITY SO LISTED AND AGAINST WHICH OWNER OR ENGINEER MAKES NO
WRITTEN OBJECTION PRIOR TO THE GIVING OF THE NOTICE OF AWARD WILL
BE DEEMED ACCEPTABLE TO OWNER AND ENGINEER SUBJECT TO SUBSEQUENT
REVOCATION OF SUCH ACCEPTANCE AS PROVIDED IN PARAGRAPH 7.06 OF THE
GENERAL CONDITIONS.
12.3 CONTRACTOR SHALL NOT BE REQUIRED TO EMPLOY ANY SUBCONTRACTOR,
SUPPLIER, INDIVIDUAL, OR ENTITY AGAINST WHOM CONTRACTOR HAS
REASONABLE OBJECTION.
12.4 THE CONTRACTOR SHALL NOT AWARD WORK TO SUBCONTRACTOR(S) IN
EXCESS OF THE LIMITS STATED IN SC 7.06.
PART 13 PREPARATION OF BID
13.1 A BID MUST BE MADE ON THE BID FORM INCLUDED WITH THE PROJECT
MANUAL. THE BID FORM SHALL NOT BE ALTERED IN ANY WAY.
13.2 THE BID FORM MUST BE COMPLETED IN INK. BLANK SPACES IN THE BID FORM
MUST BE FILLED IN CORRECTLY WHERE INDICATED, AND THE BIDDER MUST
STATE, BOTH IN WORDS AND NUMERALS, THE PRICES FOR WHICH THEY
PROPOSE TO COMPLETE EACH AND EVERY ITEM OF WORK. DITTO MARKS
SHALL NOT BE USED.
13.3 A BIDDER SHALL EXECUTE HIS BID AS STATED BELOW.
A. A Bid by an individual shall show the Bidder’s name and official address.
B. A Bid by a partnership must be executed in the partnership name and signed by a partner
(whose title must appear under the signature) accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
C. A Bid by a corporation must be executed in the corporate name by a corporate officer
(whose title must appear under the signature) and must be accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the corporate secretary. The state of incorporation and the official corporate address shall be shown.
Southington WPCP_11/11/26 00200-9 Instructions To Bidder
D. A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign.
The state of formation of the firm and the official address of the firm shall be shown.
E. A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
F. All names must be printed in ink below the signature.
13.4 THE BID SHALL CONTAIN AN ACKNOWLEDGMENT OF THE RECEIPT OF ALL
ADDENDA IN THE SPACE PROVIDED ON THE BID FORM.
13.5 POSTAL AND EMAIL ADDRESSES AND TELEPHONE NUMBER TO WHICH
COMMUNICATIONS REGARDING THE BID ARE TO BE DIRECTED SHALL BE
SHOWN.
13.6 THE FOLLOWING LISTED DOCUMENTS SHALL BE SUBMITTED IN ADDITION TO
THE BID FORM:
A. Bid Bond
B. CHRO Contract Compliance Regulations Notification to Bidders Form
13.7 IN ORDER TO BE CONSIDERED FOR SELECTION, THE BIDDER MUST SUBMIT A
COMPLETE BID PACKAGE IN ACCORDANCE WITH THESE BIDDING DOCUMENTS.
PARTIAL BIDS WILL NOT BE ACCEPTED. REFER TO THE BID FORM FOR A LIST
OF DOCUMENTS THAT SHALL BE SUBMITTED IN ADDITION TO THE BID FORM.
13.8 ANY DEVIATIONS IN COMPLETION OF THE BID FORM AND ACCOMPANYING
DOCUMENTS FROM THE INSTRUCTIONS PROVIDED IN THIS ARTICLE MAY BE
CAUSE FOR REJECTION OF THE BID.
PART 14 BASIS OF BID
14.1 LUMP SUM
A. Bidders shall submit a Bid on a lump sum basis for select items as set forth in the Bid form.
B. The award will be based on the lowest eligible Bid for Bid items selected by the Owner to be implemented for the project based on available funding.
14.2 UNIT PRICE
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The unit price is requested for select Bid items. Estimated quantities are provided to the bidder for purposes of establishing unit pricing. However, quantities are not guaranteed and subject to change based on actual project conditions and available funding. The unit prices will be used by Owner for Bid comparison purposes. The final quantities and
Contract Price will be determined in accordance with paragraph 13.03 of the General
Conditions (00700) and Supplemental Conditions (00800) of the Bid Specifications.
Southington WPCP_11/11/26 00200-10 Instructions To Bidder
C. Discrepancies between words and figures will be resolved in favor of the words.
D. Unit prices for identical item numbers that are in more than one bid schedule shall be equal. Discrepancies will be resolved in favor of the lowest unit price.
E. The award will be based on the lowest eligible Bid for Bid items selected by the Owner to be implemented for the project based on available funding.
14.3 ALLOWANCES
A. For cash allowances the Contract Price shall include such amounts as the Bidder deems proper for Contractor’s overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents in accordance with paragraph 13.02 of the General Conditions.
PART 15 SUBMITTAL OF BID
15.1 A BID SHALL BE RECEIVED NO LATER THAN THE DATE AND TIME PRESCRIBED
AND AT THE PLACE INDICATED IN THE ADVERTISEMENT FOR BIDS AND SHALL
BE ENCLOSED IN AN OPAQUE SEALED ENVELOPE PLAINLY MARKED WITH THE
PROJECT TITLE, THE NAME AND ADDRESS OF BIDDER, AND SHALL BE
ACCOMPANIED BY THE BID DEPOSIT AND OTHER REQUIRED DOCUMENTS. IF A
BID IS SENT BY MAIL OR OTHER DELIVERY SYSTEM, THE SEALED ENVELOPE
CONTAINING THE BID SHALL BE ENCLOSED IN A SEPARATE ENVELOPE PLAINLY
MARKED ON THE OUTSIDE WITH THE NOTATION “SOUTHINGTON WPCP – PCB
REMEDIATION”. WHEN USING THE MAIL OR OTHER DELIVERY SYSTEM, THE
BIDDER IS TOTALLY RESPONSIBLE FOR THE MAIL OR OTHER DELIVERY SYSTEM
DELIVERING THE BID AT THE PLACE AND PRIOR TO THE TIME INDICATED IN
THE ADVERTISEMENT FOR BIDS. A MAILED BID SHALL BE ADDRESSED TO
OWNER AT THE ADDRESS IN THE ADVERTISEMENT FOR BIDS.
15.2 BIDS RECEIVED AFTER THE DATE AND TIME PRESCRIBED FOR THE OPENING OF
BIDS, OR NOT SUBMITTED AT THE CORRECT LOCATION OR IN THE DESIGNATED
MANNER, WILL NOT BE ACCEPTED AND WILL BE RETURNED TO THE BIDDER
UNOPENED.
PART 16 MODIFICATION OR WITHDRAWAL OF BID
16.1 WITHDRAWAL PRIOR TO BID OPENING
A. A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.2 MODIFICATION PRIOR TO BID OPENING
A. If a Bidder wishes to modify its Bid prior to the Bid opening, Bidder must withdraw its initial Bid in the manner specified in paragraph 16.1.A and submit a new Bid prior to the date and time for the opening of Bids.
PART 17 OPENING OF BIDS
Southington WPCP_11/11/26 00200-11 Instructions To Bidder
17.1 BIDS WILL BE OPENED AND REVIEWED BY TOWN STAFF AND THE PROJECT
ENGINEER.
17.2 IN ORDER TO BE CONSIDERED FOR SELECTION, BIDS MUST ARRIVE AT THE
DESIGNATED LOCATION ON OR BEFORE THE DATE AND TIME SPECIFIED IN THE
ADVERTISEMENT FOR BIDS. BIDDERS MAILING THEIR BIDS SHOULD ALLOW FOR
NORMAL MAIL DELIVERY TIME TO ENSURE TIMELY RECEIPT OF THEIR BIDS BY
OWNER.
17.3 BIDS RECEIVED BY MAIL OR OTHERWISE AFTER THE TIME SPECIFIED FOR THE
OPENING OF BIDS WILL NOT BE ACCEPTED AND WILL BE RETURNED TO THE
BIDDER UNOPENED.
17.4 NO RESPONSIBILITY WILL ATTACH TO OWNER, ITS EMPLOYEES OR THE
ENGINEER FOR PREMATURE OPENING OF A BID NOT PROPERLY ADDRESSED
AND IDENTIFIED IN ACCORDANCE WITH THE BIDDING DOCUMENTS.
PART 18 DISQUALIFICATION OF BIDDERS
18.1 MORE THAN ONE BID FOR THE SAME WORK FROM AN INDIVIDUAL, OR A FIRM,
PARTNERSHIP, CORPORATION OR AN ASSOCIATION UNDER THE SAME OR
DIFFERENT NAMES WILL NOT BE CONSIDERED. REASONABLE GROUNDS FOR
BELIEVING THAT ANY BIDDER IS INTERESTED IN MORE THAN ONE BID FOR THE
WORK MAY BE CAUSE FOR DISQUALIFICATION OF THAT BIDDER AND THE
REJECTION OF ALL BIDS IN WHICH THAT BIDDER IS INTERESTED.
PART 19 BIDS TO REMAIN SUBJECT TO ACCEPTANCE
19.1 ALL BIDS WILL REMAIN SUBJECT TO ACCEPTANCE FOR THE PERIOD OF TIME
STATED IN THE BID FORM, BUT OWNER MAY, IN ITS SOLE DISCRETION,
RELEASE ANY BID AND RETURN THE BID DEPOSIT PRIOR TO THE END OF THIS
PERIOD.
PART 20 EVALUATION OF BIDS AND AWARD OF CONTRACT
20.1 OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, TO WAIVE ANY
AND ALL INFORMALITIES, AND THE RIGHT TO DISREGARD ALL
NONCONFORMING, NONRESPONSIVE OR CONDITIONAL BIDS.
20.2 OWNER RESERVES THE RIGHT TO REJECT ANY BID NOT ACCOMPANIED BY
SPECIFIED DOCUMENTATION AND BID DEPOSIT.
20.3 OWNER RESERVES THE RIGHT TO REJECT ANY BID IF IT SHOWS ANY OMISSIONS,
ALTERATIONS OF FORM, ADDITIONS NOT CALLED FOR, CONDITIONS OR
QUALIFICATIONS, OR IRREGULARITIES OF ANY KIND.
20.4 OWNER RESERVES THE RIGHT TO REJECT ANY BID THAT, IN HIS SOLE
DISCRETION, IS CONSIDERED TO BE UNBALANCED OR UNREASONABLE AS TO
THE AMOUNT BID FOR ANY LUMP SUM OR UNIT PRICE ITEM.
20.5 IN EVALUATING BIDS, OWNER WILL CONSIDER WHETHER OR NOT THE BIDS
COMPLY WITH THE PRESCRIBED REQUIREMENTS, AND SUCH ALTERNATES,
UNIT PRICES AND OTHER DATA, AS MAY BE REQUESTED IN THE BID FORM OR
PRIOR TO THE NOTICE OF AWARD.
Southington WPCP_11/11/26 00200-12 Instructions To Bidder
20.6 IN EVALUATING WHETHER A BIDDER IS RESPONSIBLE, OWNER WILL CONSIDER
THE QUALIFICATIONS THE BIDDER AND MAY CONSIDER THE QUALIFICATIONS
AND EXPERIENCE OF SUBCONTRACTORS AND SUPPLIERS PROPOSED FOR THOSE
PORTIONS OF THE WORK FOR WHICH THE IDENTITY OF SUBCONTRACTORS AND
SUPPLIERS MUST BE SUBMITTED AS PROVIDED IN THE BIDDING DOCUMENTS.
20.7 OWNER MAY CONDUCT SUCH INVESTIGATIONS AS OWNER DEEMS NECESSARY
TO ESTABLISH THE RESPONSIBILITY, QUALIFICATIONS, AND FINANCIAL
ABILITY OF BIDDERS AND ANY PROPOSED SUBCONTRACTORS OR SUPPLIERS.
20.8 IF THE OWNER AWARDS THE CONTRACT FOR THE WORK, SUCH AWARD SHALL
BE TO THE RESPONSIBLE BIDDER (WHO HAS NEITHER BEEN DISQUALIFIED NOR
REJECTED PURSUANT TO ARTICLE 18 OR THIS ARTICLE 20) SUBMITTING THE
LOWEST RESPONSIVE BID.
20.9 CONTENTS OF THE BID OF THE SUCCESSFUL BIDDER WILL BECOME PART OF
ANY CONTRACT AWARDED.
PART 21 CONTRACT SECURITIES
21.1 PERFORMANCE AND PAYMENT BONDS ARE REQUIRED.
PART 22 CONTRACT INSURANCE
22.1 THE REQUIREMENTS FOR INSURANCE TO BE PROVIDED BY THE SUCCESSFUL
BIDDER ARE STATED IN ARTICLE 6 OF THE GENERAL CONDITIONS AND IN THE
SUPPLEMENTARY CONDITIONS.
22.2 WITHIN 15 DAYS FROM THE DATE OF THE NOTICE OF AWARD, THE SUCCESSFUL
BIDDER SHALL DELIVER EVIDENCE OF REQUIRED INSURANCE TO OWNER AND
ENGINEER. THE REQUIRED INSURANCE CERTIFICATES WILL BECOME PART OF
THE CONTRACT DOCUMENTS.
PART 23 SIGNING OF AGREEMENT
23.1 THE OWNER WILL TRANSMIT THE REQUIRED NUMBER OF UNSIGNED
AGREEMENTS TO THE SUCCESSFUL BIDDER WITH THE NOTICE OF AWARD.
WITHIN 15 DAYS OF THE DATE OF THE NOTICE OF AWARD, THE SUCCESSFUL
BIDDER SHALL SIGN THE AGREEMENTS AND RETURN THEM TO THE OWNER.
THE OWNER WILL RETURN ONE EXECUTED CONTRACT TO THE SUCCESSFUL
BIDDER.
PART 24 SALES TAXES
24.1 OWNER IS EXEMPT FROM CONNECTICUT STATE SALES AND USE TAXES ON
MATERIALS AND EQUIPMENT TO BE INCORPORATED IN THE WORK. SAID TAXES
SHALL NOT BE INCLUDED IN THE BID. THE EXEMPTION NUMBER WILL BE
PROVIDED TO THE SUCCESSFUL BIDDER.
PART 25 CONNECTICUT PREVAILING WAGE RATES
25.1 MINIMUM WAGE RATES AS DETERMINED BY THE CONNECTICUT STATE LABOR
COMMISSIONER AS REQUIRED UNDER [SECTION 22A-482-4(P)(3) OF THE CWF
REGULATIONS][SECTION 31-53 OF THE CONNECTICUT GENERAL STATUTES] AS
Southington WPCP_11/11/26 00200-13 Instructions To Bidder
AMENDED, APPLY TO THIS PROJECT UNLESS THE TOTAL BID IS LESS THAN
$1,000,000 FOR NEW CONSTRUCTION OR $100,000 FOR REMODELING,
REFINISHING, REFURBISHING, REHABILITATION, ALTERATION OR REPAIR
PROJECTS. THE WAGE RATE DETERMINATION IS INCLUDED IN PART II OF THE
SUPPLEMENTARY CONDITIONS.
25.2 IT IS THE RESPONSIBILITY OF THE BIDDER BEFORE BID OPENING TO REQUEST
ANY ADDITIONAL INFORMATION ON MINIMUM WAGE RATES FOR THOSE
TRADESPEOPLE WHO MAY BE EMPLOYED FOR THE PROPOSED WORK UNDER
THIS CONTRACT.
Southington WPCP_11/12/26 00410 -1 Bid Form
SECTION 00410
BID FORM
PROJECT IDENTIFICATION:
Southington WPCP – PCB Remediation
TABLE OF ARTICLES
1. Bid Recipient
2. Bidder’s Acknowledgements
3. Bidder’s Representations
4. Bidder’s Certifications
5. Basis of Bid
6. Time of Completion
7. Attachments to This Bid
8. Bid Submittal
PART 1 BID RECIPIENT
1.1 THIS BID IS SUBMITTED TO:
PLANETBIDS WEBSITE: https://vendors.planetbids.com/portal/61724/bo/bo-detail/147961
1.2 THE UNDERSIGNED BIDDER PROPOSES AND AGREES, IF THIS BID IS ACCEPTED,
TO ENTER INTO AN AGREEMENT WITH OWNER IN THE FORM INCLUDED IN THE
BIDDING DOCUMENTS TO PERFORM ALL WORK AS SPECIFIED OR INDICATED IN
THE BIDDING DOCUMENTS FOR THE PRICES AND WITHIN THE TIMES INDICATED
IN THIS BID AND IN ACCORDANCE WITH THE OTHER TERMS AND CONDITIONS
OF THE BIDDING DOCUMENTS.
PART 2 BIDDER’S ACKNOWLEDGEMENTS
2.1 BIDDER ACCEPTS ALL OF THE TERMS AND CONDITIONS OF THE
ADVERTISEMENT FOR BIDS AND INSTRUCTIONS TO BIDDERS, INCLUDING
WITHOUT LIMITATION, THOSE DEALING WITH THE DISPOSITION OF BID
DEPOSIT. THE BID WILL REMAIN SUBJECT TO ACCEPTANCE FOR 45 DAYS AFTER
THE BID OPENING, OR FOR SUCH LONGER PERIOD OF TIME THAT BIDDER MAY
AGREE TO IN WRITING UPON REQUEST OF OWNER.
PART 3 BIDDER’S REPRESENTATIONS
3.1 IN SUBMITTING THIS BID, BIDDER REPRESENTS, AS SET FORTH IN THE
AGREEMENT, THAT:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents and hereby acknowledges the receipt of all Addenda.
https://url.usb.m.mimecastprotect.com/s/JhzmC3YqNVTm7Vn4HgfZKtQgifI?domain=vendors.planetbids.com
Southington WPCP_11/12/26 00410 -2 Bid Form
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local and
Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all federal, state and local Laws and
Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all project documents, including (1) Drawings, (2)
Application for Engineered Control Variance – Part 1, (3) PCB Cleanup and Disposal
Plan and Engineered Control Variance Request – Part 2, (4) Regulatory Approvals, and
(5) Waste Characterization Laboratory Data Reports, especially with respect to Technical
Data in such project documents.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
K. Bidder is aware that the estimated quantities on the Bid Form are subject to Article 13.03 of the General Conditions (Section 00700).
PART 4 BIDDER’S CERTIFICATION
4.1 BIDDER CERTIFIES THAT, UNDER PENALTY OF PERJURY, BIDDER IS NOT
PRESENTLY DEBARRED FROM DOING PUBLIC CONSTRUCTION WORK IN THE
STATE OF CONNECTICUT UNDER THE PROVISIONS OF SECTION 31-53A OF THE
CONNECTICUT GENERAL STATUTES OR ANY OTHER APPLICABLE DEBARMENT
PROVISIONS OF ANY OTHER CHAPTER OF THE GENERAL STATUTES OR ANY
Southington WPCP_11/12/26 00410 -3 Bid Form
RULE OR REGULATION PROMULGATED THEREUNDER; AND IS NOT PRESENTLY
DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, DECLARED INELIGIBLE,
OR VOLUNTARILY EXCLUDED FROM COVERED TRANSACTIONS BY ANY
FEDERAL DEPARTMENT OR AGENCY.
4.2 BIDDER HEREBY CERTIFIES UNDER THE PENALTIES OF PERJURY, TO THE BEST
OF BIDDER’S KNOWLEDGE AND BELIEF, THAT BIDDER HAS FILED ALL STATE
TAX RETURNS AND PAID ALL STATE TAXES REQUIRED BY LAW.
4.3 BIDDER CERTIFIES THAT THIS BID IS GENUINE AND NOT MADE IN THE INTEREST
OF OR ON BEHALF OF ANY UNDISCLOSED INDIVIDUAL OR ENTITY AND IS NOT
SUBMITTED IN CONFORMITY WITH ANY COLLUSIVE AGREEMENT OR RULES OF
ANY GROUP, ASSOCIATION, ORGANIZATION, OR CORPORATION.
4.4 BIDDER CERTIFIES THAT BIDDER HAS NOT DIRECTLY OR INDIRECTLY INDUCED
OR SOLICITED ANY OTHER BIDDER TO SUBMIT A FALSE OR SHAM BID.
4.5 BIDDER CERTIFIES THAT BIDDER HAS NOT SOLICITED OR INDUCED ANY
INDIVIDUAL OR ENTITY TO REFRAIN FROM BIDDING.
4.6 BIDDER CERTIFIES THAT BIDDER HAS NOT ENGAGED IN CORRUPT,
FRAUDULENT, COLLUSIVE, OR COERCIVE PRACTICES IN COMPETING FOR THE
CONTRACT. FOR THE PURPOSES OF THIS PARAGRAPH:
A. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
B. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of the Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
C. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
D. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
Part 5 BASIS OF BID
5.1 BIDDER PROPOSES TO FURNISH ALL LABOR, MATERIALS, EQUIPMENT,
TRANSPORTATION, AND DISPOSAL COSTS TO COMPLETE SCREENING,
PROCESSING, EXCAVATION, AND RESTORATION ACTIVITIES REQUIRED FOR PCB
REMEDIATION ACTIVITIES AT THE SOUTHINGTON WATER POLLUTION
CONTROL PLANTIN ACCORDANCE WITH THE ACCOMPANYING BIDDING
DOCUMENTS PREPARED BY TIGHE & BOND, INC., FOR THE CONTRACT PRICE
SPECIFIED BELOW, SUBJECT TO ADDITIONS AND DEDUCTIONS ACCORDING TO
THE TERMS OF THE BIDDING DOCUMENTS.
5.2 THIS BID INCLUDES ADDENDA NUMBERED __________________________.
Southington WPCP_11/12/26 00410 -4 Bid Form
5.3 THE PROPOSED CONTRACT PRICE (ITEMS 1 THROUGH 20, EXCLUDING
ALTERNATES) IS:
dollars
(words)
(figures)
5.4 THE SUBDIVISION OF THE PROPOSED CONTRACT PRICE IS REQUESTED ON THE
FOLLOWING PAGE. THE AMOUNT PROVIDED FOR EACH ITEM NUMBER MUST BE
INCLUSIVE OF ALL LABOR, EQUIPMENT, MATERIALS, AND
APPROVALS/PERMITS TO COMPLETE THE WORK IN ACCORDANCE WITH
SPECIFICATIONS.
5.5 THE TOWN RESERVES THE RIGHT TO AWARD ALL OR SOME OF THE BID ITEMS
AS PART OF THE CONTRACT, DEPENDING UPON AVAILABLE FUNDING.
Southington WPCP_11/12/26 00410 -5 Bid Form
Item
Number
Item Name and Unit Bid Prices
Written in Words and Figures
Estimated Quantity Total Amount of Item
(in figures)
1 Mobilization/Demobilization/Decontamination
, per lump sum, the price of:
Lump Sum = $_________________
2 Sedimentation and Erosion Controls for the project duration includes temporary stockpile areas, per linear foot, the price of:
1,100 linear feet
Linear Foot =
Tree cutting and removal, per lump sum, the price of
4 Test Pits, per lump sum, the price of:
one day
Lump Sum =
5 Excavation and Loading of Soil PCB
Remediation Waste (>100 ppm), per cubic yard, the price of:
350 cubic yards
Per Cubic Yard =
Southington WPCP_11/12/26 00410 -6 Bid Form
6 Transport and Disposal of Soil PCB
Remediation Waste (>100 ppm), per ton, the price of:
525 tons
Per Ton =
7 Processing and Loading of tree stumps/wood debris PCB Remediation Waste, per cubic
400 cubic yards
8 Transport and Disposal of tree stumps/wood debris PCB Remediation Waste, per ton, the
450 tons
9 Processing and Loading of concrete PCB
Remediation Waste, per cubic yard, the price of:
250 cubic yards
Transport and Disposal of concrete PCB
Remediation Waste, per ton, the price of:
500 tons
Southington WPCP_11/12/26 00410 -7 Bid Form
11 Transport and Disposal of Decontamination
Wastes, per lump sum, the price of:
12 Soil Excavation from Floodplain and Other
Designated Areas (PCBs <100 ppm), relocation, placement, and compaction in EC
Area, per cubic yard, the price of:
2,600 cubic yards
Per Cubic Yard =
13 Soil excavation from on-site stockpiles, placement, and compaction in EC Area, per cubic yard, the price of:
1,000 cubic yards
Per Cubic Yard =
14 Disassemble and reinstall chain-link fencing around EC Area, per linear foot, the price of:
675 linear feet
Per Linear Foot =
15 Procure and install geotextile demarcation layer and erosion control in EC Area, per square foot, the price of:
12,250 square feet
Per Square Foot =
Southington WPCP_11/12/26 00410 -8 Bid Form
16a Procure and install Riprap, per cubic yard, the
450 cubic yards
Per Cubic Yard =
16b Procure and install No. 6 Crushed Stone, per cubic yard, the price of:
Per Cubic Yard =
17 Procure and plant trees and shrubs in accordance with the Site Restoration and Planting (C-301),, per lump sum, the price of:
Per Lump Sum = $_________________
18 Seed mix establishment in accordance with the
Site Restoration and Planting (C-301), per square yard, the price of:
7,800 square yards
Per Square Yard =
19 Install excavation shoring, cut two feet below ground surface as shown on contract Drawings, per linear foot, the price of:
Estimate 230 linear feet for comparison purposes
Per Linear Foot =
20 Monthly price adjustment for Diesel Fuel, the
Allowance =
5.6
Southington WPCP_11/12/26 00410 -9 Bid Form
Add /
Alternate
Number
Item Name and Unit Bid Prices
Written in Words and Figures
Estimated Quantity Total Amount of Item
(in figures)
1 Transport and Disposal of concrete as non-hazardous CT regulated waste, per ton, the
500 tons
Per Ton =
Processing and Reuse of concrete, per cubic
Per Cubic Yard =
3a Sand Borrow backfill, placement, and compaction in EC Area, per cubic yard, the
Per Cubic Yard =
3b Stone Borrow backfill, placement, and
Per Cubic Yard =
3c Processed Gravel Borrow backfill, placement, and compaction in EC Area, per cubic yard, the price of:
Southington WPCP_11/12/26 00410 -10 Bid Form
Clean organic backfill (topsoil), placement, and
Per Cubic Yard =
5 Complete removal of excavation shoring, per lump sum, the price of:
Per Lump Sum = $_________________
5.7 THE PROPOSED ALTERNATIVES (ITEMS 1 THROUGH 5) IS:
dollars
(words)
(figures)
5.8 UNIT PRICING SHOWN ABOVE WILL BE USED FOR CALCULATING ADDITIONS OR
DEDUCTIONS TO CERTAIN ITEMS IN THE CONTRACT PRICE BASED ON ACTUAL
QUANTITIES MEASURED.
PART 6 TIME OF COMPLETION
6.1 BIDDER AGREES THAT THE WORK WILL BE SUBSTANTIALLY COMPLETED AND
READY FOR FINAL PAYMENT IN ACCORDANCE WITH PARAGRAPH 15.06 OF THE
GENERAL CONDITIONS ON OR BEFORE THE DATES OR WITHIN THE NUMBER OF
CALENDAR DAYS INDICATED IN THE AGREEMENT.
6.2 BIDDER ACCEPTS THE PROVISIONS OF THE AGREEMENT AS TO LIQUIDATED
DAMAGES IN THE EVENT OF FAILURE TO COMPLETE THE WORK WITHIN THE
TIMES AS STATED IN THE AGREEMENT.
Part 7 ATTACHMENTS TO THIS BID
7.1 THE FOLLOWING DOCUMENTS ARE ATTACHED TO AND MADE A CONDITION OF
THIS BID:
A. Bid deposit in the amount of dollars ($ ), consisting of a bid bond in the amount of ten percent of the total amount of Bid
B. Evidence of authority to sign
C. List of Project References
D. Evidence of authority to do business in the state of Connecticut; or a written covenant to obtain such license within the time for acceptance of Bids
Southington WPCP_11/12/26 00410 -11 Bid Form
E. Evidence of Bidder's qualifications in accordance with Article 3 of Section 00200
F. List of Project References
G. Financial Statement
H. DAS Pre-Qualification Certificate
I. A list of adversarial proceedings in which the bidder is or was a party within the past five years that relate to the procurement or performance of any public or private construction contract together with a brief statement as to outcome if concluded or status if pending.
J. A list of any projects on which the firm was terminated or failed to complete the work within the past five years, including a brief explanation for each instance listed.
K. List of Subcontractors
Southington WPCP_11/12/26 00410 -12 Bid Form
PART 8 BID SUBMITTAL
BIDDER: [Indicate correct name of bidding entity]
By:
[Signature]
[Printed name]
(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest:
[Signature]
[Printed name]
Title:
Submittal Date:
Address for giving notices:
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Bidder’s License No.:
(where applicable)
Tighe&Bond
S-1928-009D-12.13.2022 00410-LS-7 Form for General Bid
ATTACHMENTS TO BID FORM
S-1928-009D-12.13.2022 00410-LS-8 Form for General Bid
ATTACHMENT A
BIDDER QUALIFICATIONS
Bid Form
ATTACHMENT A
TOWN OF SOUTHINGTON
BIDDER QUALIFICATIONS
The Bidder is requested to state below what work of a similar nature he has completed (a minimum of five in the last five years) and to give references (names and telephone numbers) that will enable the Owner to judge his experience, skill, and business standing.
The Bidder is requested to include below the names of subcontractors for the trades listed, and for other trades as may be applicable:
1. Electrical:______________________________________________________________________
2. ______________________________________________________________________________
3. ______________________________________________________________________________
4. ______________________________________________________________________________
(Add supplementary page if necessary)
ATTACHMENT B
NEW VENDOR DISCLOSURE STATEMENT
ATTACHMENT B
TOWN OF SOUTHINGTON
NEW VENDOR DISCLOSURE STATEMENT
Required within Bid
(Please provide additional sheets as necessary to answer any of the following questions.)
APPLICANT:____________________________________________________
ADDRESS: ___________________________________________________
PRINCIPAL OFFICE: _____________ PHONE: ___________ FAX:__________
1. Please check appropriate organizational structure:
________ Corporation _______ Other
________ Partnership _______ Sole Proprietorship
2. If a corporation, answer the following:
a. Date of incorporation ____________________________
b. State of incorporation ____________________________
c. List Board of Directors and Titles: _______________________
3. If a sole proprietorship or partnership, answer the following:
a. Date of organization: _______________________________
b. Name and address of all…