Project_Manual_12224_Book_II_of_II.pdf
PDF 3 MB Posted
- Attached to
- Project#12224. ReplaceWaterTank#1. CR25-311129
- Solicitation number
- 0000039126
- Issued by
- Amador County, Huntington Beach City, California
About this file
This is a Project Manual specification document from the State of California Department of General Services for the Department of State Hospitals, detailing comprehensive requirements for replacing Water Tank #1 at DSH-Metropolitan in Norwalk, Los Angeles County. The project, identified as JCCA #22792-4, encompasses the complete replacement of the existing water tank and associated systems, including demolition of the current tank, construction of a new welded steel ground-mounted potable water storage tank with a minimum capacity of 1,000,000 gallons, and installation of related mechanical, electrical, plumbing, and control systems. The 100% revised submittal dated December 24, 2025, prepared by J.C. Chang & Associates, Inc., specifies detailed requirements across multiple divisions including concrete work, high-performance coatings, plumbing systems with domestic water piping and booster pumps, HVAC level instruments, electrical power systems, communications pathways, earthwork, and process integration equipment such as amperometric chlorine analyzers and chemical metering systems. The specifications reference numerous industry standards including AWWA, ASME, IEEE, IES, NFPA, and UL standards, with requirements for field testing, quality control, commissioning, and comprehensive operation and maintenance documentation.
The specifications establish rigorous performance requirements for all materials and components, mandating compliance with NSF 61 and NSF 372 standards for drinking water system components and requiring third-party certification by ANSI-accredited testing bodies to ensure lead content at wetted surfaces does not exceed 0.25 percent. Multiple sections address seismic design requirements according to ASCE/SEI 7, thermal movements, and environmental protection standards appropriate for the Southern California location. The project includes detailed requirements for temporary construction controls, erosion and sediment management, utility coordination, inspection and testing protocols, and manufacturer field service support. Submittal requirements specify that product data, shop drawings, field quality control reports, and operation and maintenance data be provided for all major systems, with identified manufacturers and approved equals for competitive bidding. The specifications mandate that contractors provide various spare parts, tools, software licenses, and training services upon project completion, with warranty periods ranging from one to five years depending on the component, and require the preparation of as-built documentation reflecting final field conditions for owner records and future operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Manual_12224__Book_I_of_II.pdf | ||
| Bid_Package_12224.pdf | ||
| Plans__12224_-_Replace_Water_Tank__1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book II of II
SPECIFICATIONS
FOR:
REPLACE WATER TANK #1
DEPARTMENT OF STATE HOSPITALS
DSH-METROPOLITAN
NORWALK, LOS ANGELES COUNTY, CALIFORNIA
Thomas Brunet, Project Director West Sacramento, California
December 24, 2025
000000000012224
24 December 2025 100% Revised Submittal
JCCA #22792-4
REPLACE WATER TANK #1
DSH-METROPOLITAN
SPECIFICATIONS
Prepared for:
DEPARTMENT OF STATE HOSPITALS
1215 O Street, 2nd Floor Sacramento, California 95814
Prepared by:
Architects • Engineers
J.C. CHANG & ASSOCIATES, INC.
385 Van Ness Avenue, Suite 208 Torrance, California 90501 Phone: (310) 212-7644 www.jccainc.com
J.C. Chang & Associates, Inc. Replace Water Tank #1 JCCA No. 22792-4 DSH-Metropolitan
TABLE OF CONTENTS 1
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
Division 00 to be provided by Owner.
000105 Certifications Page 000115 List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
Division 01 to be provided by Owner.
DIVISION 02 - EXISTING CONDITIONS
024116 Structure Demolition
DIVISION 03 - CONCRETE
031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete
DIVISION 09 - FINISHES
099600 High-Performance Coatings
DIVISION 22 - PLUMBING
220519 Meters and Gauges for Plumbing Piping
220523.14 Check Valves for Plumbing Piping
220523.15 Gate Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220800 Commissioning of Plumbing 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties
221123.13 Domestic-Water Packaged Booster Pumps
221123.22 Diesel-Drive, Emergency Centrifugal Pumps
221219 Facility Ground-Mounted, Potable-Water Storage Tanks
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230923.17 Level Instruments
TABLE OF CONTENTS 2
DIVISION 26 - ELECTRICAL
260519 Low-Voltage Electrical Power Conductors and Cables 260523 Control-Voltage Electrical Power Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceway and Boxes for Electrical Systems 260543 Underground Ducts and Raceways for Electrical Systems 260553 Identification for Electrical Systems 260915 Programmable Logic Controllers 262213 Low-Voltage Distribution Transformers 262416 Panelboards 262726 Wiring Devices 262816 Enclosed Switches and Circuit Breakers 265619 LED Exterior Lighting
DIVISION 27 - COMMUNICATIONS
270528 Pathways for Communications Systems
DIVISION 31 - EARTHWORK
312000 Earth Moving
DIVISION 33 - UTILITIES
331415 Site Water Distribution Piping
DIVISION 40 – PROCESS INTEGRATION
409113.16 Amperometric Chlorine Analyzer
409113.16A Analyzer Controller
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
411436 Chemical Containment Scale
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE
EQUIPMENT
434246 Tank Mixing System
DIVISION 44 – POLLUTION AND WASTE CONROL EQUIPMENT
444413 Chemical Metering Pumps
END OF TABLE OF CONTENTS
CERTIFICATIONS PAGE 000105 - 1
DOCUMENT 000105
CERTIFICATIONS PAGE
PROJECT TITLE: Replace Water Tank #1
CLIENT AGENCY: Department of State Hospitals
LOCATION: DSH-Metropolitan 11401 S. Bloomfield Avenue Norwalk, CA 90650
PROJECT NUMBER: JCCA #22792-4
OWNER: State of California
PROJECT DIRECTOR: Natalie Garcia Department of State Hospitals - Metropolitan 11401 S. Bloomfield Avenue Norwalk, CA 90650 Telephone Number: (562) 802-4537
CONSULTANT: J.C. Chang & Associates, Inc.
James Redmond, PE, LEED AP
CIVIL ENGINEER
Sevag Avanessian, PE
ELECTRICAL ENGINEER
Robert Onishi, SE
STRUCTURAL ENGINEER
Robert Nolan, PE
LEED AP, CEM, CMVP, PF
MECHANICAL ENGINEER
AUTHORITY HAVING
JURISDICTION
Date Signed: 12/24/2025 Date Signed: 12/24/2025 Date Signed: 12/24/2025
Date Signed: 12/24/2025
LIST OF DRAWING SHEETS 000115 - 1
DOCUMENT 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
A. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:
GENERAL
T1.1 TITLE SHEET
T1.2 OVERALL SITE PLAN
T1.3 SITE PLAN
STRUCTURAL
S0.1 STRUCTURAL NOTES, STRUCTURAL DETAILS, & FOUNDATION PLAN
MECHANICAL
EROSION CONTROL
EC1.1 EROSION AND SEDIMENT CONTROL PLAN
EC2.1 EROSION AND SEDIMENT CONTROL DETAILS
CIVIL
C0.1 NOTES, LEGEND & ABBREVIATIONS
C1.1 DEMOLITION SITE PLAN
C2.1 NEW WORK SITE PLAN
C3.1 DETAILS – SHEET 1
DETAILS – SHEET 2C3.2
M0.1 MECHANICAL GENERAL NOTES
M0.2 MECHANICAL SCHEDULES
M0.3 MECHANICAL SITE PLAN
M1.1 MECHANICAL DEMO PLAN
M2.1 MECHANICAL NEW WORK PLAN
M2.2 MECHANICAL CHLORINATION NEW WORK PLAN
M3.1 MECHANICAL PHOTOGRAPHS
M3.2 MECHANICAL DETAILS
M5.1 CHLORINATION ELEVATION & SCHEMATIC
ELCECTRICAL
E0.1 ELECTRICAL GENERAL NOTES
E0.2 ELECTRICAL DEMOLITION & NEW WORK SINGLE LINE DIAGRAM
E0.3 ELECTRICAL PANEL AND FEEDER SCHEDULE
LIST OF DRAWING SHEETS 000115 - 2
E1.1 ELECTRICAL DEMOLITION – ENLARGED SITE PLAN
E1.2 ELECTRICAL DEMOLITION – DOMESTIC PUMP HOUSE PLAN
E2.1 ELECTRICAL NEW WORK – ENLARGED SITE PLAN
E2.2 ELECTRICAL NEW WORK – DOMESTIC & IRRIGATION PUMP HOUSE
PLAN
E3.1 ELECTRICAL WATER TANK DETAILS
E3.2 ELECTRICAL DETAILS
END OF DOCUMENT 000115
STRUCTURE DEMOLITION 024116 - 1
SECTION 024116
STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of water tank and site improvements.
2. Removing below-grade construction.
3. Disconnecting, capping or sealing, and removing site utilities.
4. Removal of pumps and appurtenances in pump house.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be demolished.
2. Review and finalize protection requirements.
3. Review procedures for noise control and dust control.
4. Review procedures for protection of adjacent buildings and site improvements.
1.5 INFORMATIONAL SUBMITTALS
1. Adjacent Buildings: Detail special measures proposed to protect adjacent buildings to remain including means of egress from those buildings.
STRUCTURE DEMOLITION 024116 - 2
B. Predemolition Photographs or Video: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by demolition operations.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed.
1.7 FIELD CONDITIONS
A. Buildings immediately adjacent to demolition area will be occupied. Conduct demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
D. On-site storage or sale of removed items or materials is not permitted.
1.8 COORDINATION
A. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent occupied buildings. See drawings for phasing requirements.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with all relevant hauling and disposal regulations.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
2.2 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."
STRUCTURE DEMOLITION 024116 - 3
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving structures to be demolished.
1. Contractor to coordinate shutoff with owner.
2. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.
3. Cut off pipe or conduit a minimum of 24 inches or as shown on the drawings, below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.3 PROTECTION
A. Existing Facilities: Protect adjacent walkways, fences, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations.
1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner.
2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner.
a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service is required during changeover.
C. Temporary Protection: Erect temporary protection as required.
1. Protect adjacent buildings and facilities from damage due to demolition activities.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.
4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
5. Provide protection to ensure safe passage of people around demolition area and to and from occupied portions of adjacent buildings and structures.
STRUCTURE DEMOLITION 024116 - 4
6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to demolition operations.
D. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.
3.4 DEMOLITION, GENERAL
A. General: Demolish indicated site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain fire watch during and for at least four (4) hours after flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
B. Site Access and Temporary Controls: Conduct demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner. Provide alternate routes around closed or obstructed trafficways if required.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
C. Explosives: Use of explosives is not permitted.
3.5 DEMOLITION BY MECHANICAL MEANS
A. Below-Grade Construction: Demolish foundations and other below-grade construction that are within footprint of new construction.
B. Existing Utilities: Demolish existing utilities and below-grade utility structures as shown on the drawings.
1. Fill removed utility structures with satisfactory soil materials according to backfill requirements in Section 312000 "Earth Moving."
3.6 SITE RESTORATION
A. Below-Grade Areas: Completely fill below-grade areas and voids resulting from demolition operations with satisfactory soil materials according to backfill requirements in Section 312000 "Earth Moving."
STRUCTURE DEMOLITION 024116 - 5
B. Site Grading: Uniformly grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
3.7 REPAIRS
A. Promptly repair damage to adjacent buildings or other improvements to remain, caused by demolition operations.
3.8 DISPOSAL OF DEMOLISHED MATERIALS
A. Legally remove demolition waste materials from Project site.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Do not burn demolished materials.
3.9 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by demolition operations. Return adjacent areas to condition existing before demolition operations began.
1. Clean roadways of debris caused by debris transport.
END OF SECTION 024116
STRUCTURE DEMOLITION 024116 - 6
THIS PAGE IS INTENTIONALLY LEFT BLANK
CONCRETE FORMING AND ACCESSORIES 031000 - 1
SECTION 031000
CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Form-facing material for cast-in-place concrete.
2. Shoring, bracing, and anchoring.
1.3 DEFINITIONS
A. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.
B. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review the following:
a. Special inspection and testing and inspecting agency procedures for field quality control.
b. Construction, movement, contraction, and isolation joints
c. Forms and form-removal limitations.
d. Shoring and reshoring procedures.
e. Anchor rod and anchorage device installation tolerances.
1.5 ACTION SUBMITTALS
A. Product Data: For each of the following:
CONCRETE FORMING AND ACCESSORIES 031000 - 2
1. Exposed surface form-facing material.
2. Concealed surface form-facing material.
3. Form ties.
4. Form-release agent.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing and inspection agency.
B. Minutes of preinstallation conference.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301 (ACI 301M), to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."
2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
2.2 FORM-FACING MATERIALS
A. As-Cast Surface Form-Facing Material:
1. Provide continuous, true, and smooth concrete surfaces.
2. Furnish in largest practicable sizes to minimize number of joints.
3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete, and as follows:
a. Plywood, metal, or other approved panel materials.
b. Exterior-grade plywood panels, suitable for concrete forms, complying with
DOC PS 1, and as follows:
1) APA MDO (medium-density overlay); mill-release agent treated and edge sealed.
B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.
1. Provide lumber dressed on at least two edges and one side for tight fit.
CONCRETE FORMING AND ACCESSORIES 031000 - 3
2.3 RELATED MATERIALS
A. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch (19 by 19 mm), minimum.
B. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners shall be acceptable to form liner manufacturer.
C. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301 (ACI 301M).
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 (ACI 117M) and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finisheS.
C. Limit concrete surface irregularities as follows:
1. Surface Finish-2.0: ACI 117 Class B, 1/4 inch (6 mm).
D. Construct forms tight enough to prevent loss of concrete mortar.
1. Minimize joints.
2. Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
3. Install keyways, reglets, recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1. Provide and secure units to support screed strips
2. Use strike-off templates or compacting-type screeds.
CONCRETE FORMING AND ACCESSORIES 031000 - 4
H. Chamfer exterior corners and edges of permanently exposed concrete.
I. At construction joints, overlap forms onto previously placed concrete not less than 12 inches (305 mm).
J. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.
1. Determine sizes and locations from trades providing such items.
2. Obtain written approval of Owner prior to forming openings not indicated on Drawings.
K. Construction Joints:
1. Construct joints true to line with faces perpendicular to surface plane of concrete.
2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Owner.
3. Place joints perpendicular to main reinforcement.
4. Locate joints for beams, slabs, joists, and girders in the middle third of spans.
L. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
M. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
N. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
3. Clean embedded items immediately prior to concrete placement.
3.3 REMOVING AND REUSING FORMS
A. Formwork for sides of RING beams, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F (10 deg C) for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.
B. Clean and repair surfaces of forms to be reused in the Work.
CONCRETE FORMING AND ACCESSORIES 031000 - 5
1. Split, frayed, delaminated, or otherwise damaged form-facing material are unacceptable for exposed surfaces.
2. Apply new form-release agent.
C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.
1. Align and secure joints to avoid offsets.
2. Do not use patched forms for exposed concrete surfaces.
3.4 SHORING AND RESHORING INSTALLATION
A. Comply with ACI 318 (ACI 318M) and ACI 301 (ACI 301M) for design, installation, and removal of shoring and reshoring.
3.5 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Inspections:
1. Inspect formwork for shape, location, and dimensions of the concrete member being formed.
END OF SECTION 031000
CONCRETE FORMING AND ACCESSORIES 031000 - 6
CONCRETE REINFORCING 032000 - 1
SECTION 032000
CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Steel reinforcement bars.
2. Welded-wire reinforcement.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review the following:
a. Special inspection and testing and inspecting agency procedures for field quality control.
b. Construction contraction and isolation joints.
c. Steel-reinforcement installation.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Each type of steel reinforcement.
2. Bar supports.
B. Shop Drawings: Comply with ACI SP-066:
1. Include placing drawings that detail fabrication, bending, and placement.
2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
C. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1. Location of construction joints is subject to approval of Owner.
D. Delegated Design Submittal: For water tank foundation, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
CONCRETE REINFORCING 032000 - 2
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Statements: For delegated design engineer.
B. Delegated Design Engineer Qualifications: Include the following:
1. Documentation that delegated design engineer is licensed in the state in which Project is located.
C. Material Test Reports: For the following, from a qualified testing agency:
1. Steel Reinforcement:
D. Minutes of preinstallation conference.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
1. Store reinforcement to avoid contact with earth.
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A615/A615M, Grade 60 (Grade 420), deformed.
B. Low-Alloy Steel Reinforcing Bars: ASTM A706/A706M, deformed.
2.2 REINFORCEMENT ACCESSORIES
A. Joint Dowel Bars: ASTM A615/A615M, Grade 60 (Grade 420), plain-steel bars, cut true to length with ends square and free of burrs.
B. Epoxy-Coated Joint Dowel Bars: ASTM A615/A615M, Grade 60 (Grade 420), plain-steel bars, ASTM A775/A775M epoxy coated.
C. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.
1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
CONCRETE REINFORCING 032000 - 3
a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.
D. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch (1.2908 mm) in diameter.
1. Finish: Plain
2.3 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2. Do not tack weld crossing reinforcing bars.
C. Preserve clearance between bars of not less than 1 inch (25 mm), not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318 (ACI 318M).
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1. Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches (610 mm), whichever is greater.
2. Stagger splices in accordance with ACI 318 (ACI 318M).
G. Install welded-wire reinforcement in longest practicable lengths.
1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."
CONCRETE REINFORCING 032000 - 4
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches (305 mm).
2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches (50 mm) for plain wire and 8 inches (200 mm) for deformed wire.
3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4. Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Owner.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3. Do not continue reinforcement through sides of strip placements of floors and slabs.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117 (ACI 117M).
3.5 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Inspections:
1. Steel-reinforcement placement.
END OF SECTION 032000
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 031000 "Concrete Forming and Accessories" for form-facing materials.
2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume;
materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:
a. Contractor's superintendent.
b. Concrete Subcontractor.
2. Review the following:
a. Special inspection and testing and inspecting agency procedures for field quality control.
b. Construction joints, control joints, isolation joints, and joint-filler strips.
c. Anchor rod and anchorage device installation tolerances.
d. Cold and hot weather concreting procedures.
e. Concrete finishes and finishing.
f. Curing procedures.
CAST-IN-PLACE CONCRETE 033000 - 2
g. Forms and form-removal limitations.
h. Shoring and reshoring procedures.
i. Concrete repair procedures.
j. Concrete protection.
k. Initial curing and field curing of field test cylinders (ASTM C31/C31M.)
l. Protection of field cured field test cylinders.
1.4 ACTION SUBMITTALS
A. Product Data: For each of the following.
1. Portland cement.
2. Fly ash.
3. Blended hydraulic cement.
4. Aggregates.
5. Admixtures:
a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.
6. Curing materials.
a. Include documentation from color pigment manufacturer, indicating that proposed methods of curing are recommended by color pigment manufacturer.
7. Repair materials.
B. Design Mixtures: For each concrete mixture, include the following:
1. Mixture identification.
2. Minimum 28-day compressive strength.
3. Durability exposure class.
4. Maximum w/cm.
5. Slump limit.
6. Air content.
7. Nominal maximum aggregate size.
8. Intended placement method.
9. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For the following:
1. Installer: Include copies of applicable ACI certificates.
2. Ready-mixed concrete manufacturer.
CAST-IN-PLACE CONCRETE 033000 - 3
B. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Curing compounds.
4. Bonding agents.
5. Adhesives.
6. Repair materials.
C. Research Reports:
1. For concrete admixtures in accordance with ICC's Acceptance Criteria AC198.
2. For sheet vapor retarder/termite barrier, showing compliance with ICC AC380.
D. Preconstruction Test Reports: For each mix design.
E. Minutes of preinstallation conference.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301 (ACI 301M).
1.7 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 306.1 and as follows.
1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2. When average high and low temperature is expected to fall below 40 deg F (4.4 deg C) for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301 (ACI 301M).
3. Do not use frozen materials or materials containing ice or snow.
4. Do not place concrete in contact with surfaces less than 35 deg F (1.7 deg C), other than reinforcing steel.
5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M), and as follows:
1. Maintain concrete temperature at time of discharge to not exceed 95 deg F (35 deg C).
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
CAST-IN-PLACE CONCRETE 033000 - 4
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 (ACI 301M) unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS
A. Source Limitations:
1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.
2. Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.
3. Obtain aggregate from single source.
4. Obtain each type of admixture from single source from single manufacturer.
B. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type II gray.
2. Fly Ash: ASTM C618, Class C or F.
C. Normal-Weight Aggregates: ASTM C33/C33M, Class 3M coarse aggregate or better, graded.
Provide aggregates from a single source.
1. Alkali-Silica Reaction: Comply with one of the following:
a. Expansion Result of Aggregate: Not more than 0.04 percent at one-year when tested in accordance with ASTM C1293.
b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with
ASTM C1567.
c. Alkali Content in Concrete: Not more than 4 lb./cu. yd. (2.37 kg/cu. m) for moderately reactive aggregate or 3 lb./cu. yd. (1.78 kg/cu. m) for highly reactive aggregate, when tested in accordance with ASTM C1293 and categorized in accordance with ASTM C1778, based on alkali content being calculated in accordance with ACI 301 (ACI 301M).
2. Maximum Coarse-Aggregate Size: 1 inch (25 mm) nominal.
3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
D. Air-Entraining Admixture: ASTM C260/C260M.
E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete.
Do not use calcium chloride or admixtures containing calcium chloride.
CAST-IN-PLACE CONCRETE 033000 - 5
1. Water-Reducing Admixture: ASTM C494/C494M, Type A.
F. Water: ASTM C94/C94M, potable.
2.3 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) when dry.
B. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.
1. Color:
a. Ambient Temperature Below 50 deg F (10 deg C): Black.
b. Ambient Temperature between 50 deg F (10 deg C) and 85 deg F (29 deg C): Any color.
c. Ambient Temperature Above 85 deg F (29 deg C): White.
C. Water: Potable or complying with ASTM C1602/C1602M.
D. Clear, Waterborne, Membrane-Forming, Dissipating Curing Compound: ASTM C309, Type 1, Class B.
E. Clear, Waterborne, Membrane-Forming, Nondissipating Curing Compound: ASTM C309, Type 1, Class B.
2.4 RELATED MATERIALS
A. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.
B. Epoxy Bonding Adhesive: ASTM C881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade and class to suit requirements, and as follows:
2.5 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch (3 mm) and that can be feathered at edges to match adjacent floor elevations.
1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.
2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch (3 to 6 mm) or coarse sand, as recommended by underlayment manufacturer.
CAST-IN-PLACE CONCRETE 033000 - 6
4. Compressive Strength: Not less than 4100 psi (29 MPa) at 28 days when tested in accordance with ASTM C109/C109M.
B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch (6 mm) and that can be filled in over a scarified surface to match adjacent floor elevations.
1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.
2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch (3.2 to 6 mm) or coarse sand as recommended by topping manufacturer.
4. Compressive Strength: Not less than [5000 psi (34.5 MPa)] <Insert strength> at 28 days when tested in accordance with ASTM C109/C109M.
2.6 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301 (ACI 301M).
1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash or Other Pozzolans: 25 percent by mass.
C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.
1. Use water-reducing admixture in concrete, as required, for placement and workability.
2.7 CONCRETE MIXTURES
A. Class A Normal-weight concrete used for footings, grade beams, and tie beams.
1. Minimum Compressive Strength: 3000 psi (20.7 MPa) at 28 days.
2. Maximum w/cm: 0.50
3. Slump Limit: 4 inches (100 mm), plus or minus 1 inch (25 mm) before adding high-range water-reducing admixture or plasticizing admixture at Project site.
2.8 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and furnish batch ticket information.
CAST-IN-PLACE CONCRETE 033000 - 7
B. Project-Site Mixing: Is not allowed.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions:
1. Before placing concrete, verify that installation of concrete forms, accessories, and reinforcement, and embedded items is complete and that required inspections have been performed.
2. Do not proceed until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:
1. Daily access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.
4. Security and protection for test samples and for testing and inspection equipment at Project site.
3.3 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.
3.4 JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.
3.5 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.
CAST-IN-PLACE CONCRETE 033000 - 8
1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.
2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.
B. Notify Owner and testing and inspection agencies 24 hours prior to commencement of concrete placement.
C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Owner in writing, but not to exceed the amount indicated on the concrete delivery ticket.
D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.
1. If a section cannot be placed continuously, provide construction joints as indicated.
2. Deposit concrete to avoid segregation.
3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
4. Consolidate placed concrete with mechanical vibrating equipment in accordance with
ACI 301 (ACI 301M).
a. Do not use vibrators to transport concrete inside forms.
b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches (150 mm) into preceding layer.
c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
3.6 FINISHING FORMED SURFACES
A. As-Cast Surface Finishes:
1. ACI 301 (ACI 301M) Surface Finish SF-3.0:
a. Patch voids larger than 1/4 inch (19 mm) wide or 1/8 inch (13 mm) deep.
b. Remove projections larger than 1/8 inch (3 mm).
c. Patch tie holes.
d. Surface Tolerance: ACI 117 (ACI 117M) Class A.
e. Locations: Apply to all concrete surfaces.
B. Related Unformed Surfaces:
1. At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.
CAST-IN-PLACE CONCRETE 033000 - 9
2. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.7 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS
A. Filling In:
1. Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.
2. Mix, place, and cure concrete, as specified, to blend with in-place construction.
3. Provide other miscellaneous concrete filling indicated or required to complete the Work.
B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.
C. Equipment Bases and Foundations:
1. Coordinate sizes and locations of concrete bases with actual equipment provided.
2. Construct concrete bases 4 inches (100 mm) high unless otherwise indicated on
Drawings, and extend base not less than 6 inches (150 mm) in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated on Drawings, or unless required for seismic anchor support.
3. Minimum Compressive Strength: 3000 psi (20.7 MPa) at 28 days.
4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of concrete base.
5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete substrate.
6. Prior to pouring concrete, place and secure anchorage devices.
a. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
b. Cast anchor-bolt insert into bases.
c. Install anchor bolts to elevations required for proper attachment to supported equipment.
3.8 CONCRETE CURING
A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
1. Comply with ACI 301 (ACI 301M) and ACI 306.1 for cold weather protection during curing.
2. Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M) for hot-weather protection during curing.
3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h (1 kg/sq. m x h), calculated in accordance with ACI 305.1, before and during finishing operations.
CAST-IN-PLACE CONCRETE 033000 - 10
B. Curing Formed Surfaces: Comply with ACI 308.1 (ACI 308.1M) as follows:
1. Cure formed concrete surfaces.
2. Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.
3. If forms remain during curing period, moist cure after loosening forms.
4. If removing forms before end of curing period, continue curing for remainder of curing period, as follows:
a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.
b. Continuous Sprinkling: Maintain concrete surface continuously wet.
c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.
d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.
e. Membrane-Forming Curing Compound: Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.
1) Recoat areas subject to heavy rainfall within three hours after initial application.
2) Maintain continuity of coating and repair damage during curing period.
C. Curing Unformed Surfaces: Comply with ACI 308.1 (ACI 308.1M) as follows:
1. Begin curing immediately after finishing concrete.
3.9 TOLERANCES
A. Conform to ACI 117 (ACI 117M).
3.10 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.
B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
1. Testing agency to be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with
ASTM C31/C31M.
2. Testing agency to immediately report to Owner, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.
3. Testing agency to report results of tests and inspections, in writing, to Owner, Owner, Contractor, and concrete manufacturer within 48 hours of inspections and tests.
CAST-IN-PLACE CONCRETE 033000 - 11
a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:
1) Project name.
2) Name of testing agency.
3) Names and certification numbers of field and laboratory technicians performing inspections and testing.
4) Name of concrete manufacturer.
5) Date and time of inspection, sampling, and field testing.
6) Date and time of concrete placement.
7) Location in Work of concrete represented by samples.
8) Date and time sample was obtained.
9) Truck and batch ticket numbers.
10) Design compressive strength at 28 days.
11) Concrete mixture designation, proportions, and materials.
12) Field test results.
13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.
14) Type of fracture and compressive break strengths at seven days and 28 days.
C. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.
D. Inspections:
1. Headed bolts and studs.
2. Verification of use of required design mixture.
3. Concrete placement, including conveying and depositing.
4. Curing procedures and maintenance of curing temperature.
5. Verification of concrete strength before removal of shores and forms from beams and slabs.
6. Batch Plant Inspections: On a random basis, as determined by Owner.
E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M to be performed in accordance with the following requirements:
1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd. (4 cu. m), but less than 25 cu. yd. (19 cu. m), plus one set for each additional 50 cu. yd. (38 cu. m) or fraction thereof.
a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing to be conducted from at least five randomly selected batches or from each batch if fewer than five are used.
2. Slump: ASTM C143/C143M:
CAST-IN-PLACE CONCRETE 033000 - 12
a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.
b. Perform additional tests when concrete consistency appears to change.
3. Concrete Temperature: ASTM C1064/C1064M:
a. One test hourly when air temperature is 40 deg F (4.4 deg C) and below or 80 deg F (27 deg C) and above, and one test for each composite sample.
4. Compression Test Specimens: ASTM C31/C31M:
a. Cast and laboratory cure two sets of three 6-inch (150 mm) by 12-inch (300 mm) or 4-inch (100 mm) by 8-inch (200 mm) cylinder specimens for each composite sample.
5. Compressive-Strength Tests: ASTM C39/C39M.
a. Test one set of four field-cured specimens at seven days and one set of two specimens at 28 days.
b. A compressive-strength test to be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.
6. Additional Tests:
a. Testing and inspecting agency to make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Owner.
b. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C42/C42M or by other methods as directed by Owner.
1) Acceptance criteria for concrete strength to be in accordance with ACI 301 (ACI 301M), Section 1.6.6.3.
7. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
8. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.
3.11 PROTECTION
A. Protect all concrete surfaces.
END OF SECTION 033000