This is a Project Manual and bidding document for street improvements contracted by the City of Madisonville, Texas, with funding from the Texas General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant - Mitigation (CDBG-MIT) Program. The project involves reclamation and stabilization of existing subgrade along city streets, installation of new Hot Mix Asphalt Concrete overlay on stabilized subgrade/base, removal and installation of storm water culverts, and cleaning and construction of storm water ditches. The base bid includes 14 line items encompassing mobilization, stormwater pollution prevention, concrete work, cement stabilization (3,955 square yards), hot mix asphalt overlay (3,655 square yards), HDPE storm sewer installation (12-inch, 15-inch, and 18-inch diameters totaling 765 linear feet), culvert removal (518 linear feet), and ditch excavation and grading. Three alternative bids are offered for Memorial Street, Bailey Street, and Thompson Street, with each adding 30 calendar days to the contract timeline. Bids are due by 2 P.M. on June 25, 2026, at City Hall in Madisonville, Texas, with public opening and reading at the same time and location. The contractor must complete substantially all work within 30 calendar days of contract commencement (45 calendar days for final completion), plus 30 additional days per awarded alternative bid up to a maximum of 90 days for substantial completion and 105 days for final completion.

The contract will be awarded to the lowest responsible bidder based on the computed total base bid plus any accepted alternatives. A bid bond equal to 5 percent of the bid amount is required, or alternatively a certified check, bank draft, or U.S. Government Bonds may be submitted. The successful bidder must execute performance and payment bonds within 15 days of the Notice of Award; a performance bond is required for contracts exceeding $100,000, and a payment bond is required for municipal contracts exceeding $50,000. The project is funded through CDBG-MIT grant assistance and is subject to prevailing wage requirements under the Davis-Bacon and Related Acts, with federal wage rates specified in the contract documents. All contractors and subcontractors must have active System for Award Management (SAM.gov) registration and cannot be debarred, suspended, or otherwise excluded from federal assistance programs. Contractors must comply with Section 3 provisions regarding economic opportunities for low- and very low-income persons, maintain Section 3 preference in hiring, and submit monthly compliance reports. The contract documents include standard federal equal opportunity requirements, nondiscrimination certifications, labor standards provisions, and certifications regarding lobbying, Iran/Sudan sanctions, critical infrastructure ownership, energy company boycotts, and firearm entity discrimination per Texas Government Code requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R:\BRE\Documents\Specifications\Active\Madisonville, City of (TX)\4410.023.2-2024.WJH\Specifications\!Mosaic Cover (For Editing) (Green=Municipal).docx

2024 GLO

CDBG-MIT MOD

Street Improvements

GLO CDBG-MIT

MOD Contract No.

24-065-077-E688

Contract 2-2024

Section 00 01 10-1 4410.023/2-2024

SECTION 00 01 10

TABLE OF CONTENTS

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

Pages

Through

DIVISION 00–BIDDING AND CONTRACTING REQUIREMENTS

CONSTRUCTION ADVERTISEMENT AND INVITATION FOR BIDS

INSTRUCTION TO BIDDERS FOR CONSTRUCTION

EQUAL OPPORTUNITY GUIDELINES FOR CONSTRUCTION CONTRACTORS

SECTION 3 POLICY

BID ................................................................................................................................. 00 41 00-16

BID BOND

STATEMENT OF BIDDER’S QUALIFICATIONS

CONFLICT OF INTEREST QUESTIONNAIRE

ADDITIONAL CONDITION OF AWARD

CERTIFICATE OF INTERESTED PARTIES

NONCOLLUSION AFFIDAVIT OF PRIME BIDDER

CERTIFICATION OF BIDDER REGARDING CIVIL RIGHTS LAWS AND REGULATIONS 1

CONTRACTOR’S LOCAL OPPORTUNITY PLAN

PROPOSED CONTRACTS BREAKDOWN

CERTIFICATION REGARDING LOBBYING

CONCERNING LABOR STANDARDS AND PREVAILING WAGE REQUIREMENTS

CONSTRUCTION CONTRACT

NOTICE TO PROCEED.................................................................................................. 00 55 00- 1 EROSION CONTROL CERTIFICATION......................................................................... 00 55 10- 1

TITLE 29: LABOR

SECTION 504 CERTIFICATION–POLICY OF NONDISCRIMINATION ON THE BASIS

OF DISABILITY

CODE OF FEDERAL REGULATIONS–TITLE 24-HOUSING AND URBAN DEVELOPMENT 2

TITLE 24–HOUSING AND URBAN DEVELOPMENT, EQUAL AND ECONOMIC

OPPORTUNITIES FOR LOW- AND VERY LOW-INCOME PERSONS

NEW HIRES SECTION 3–MONTHLY COMPLIANCE REPORT

SECTION 3–ECONOMIC OPPORTUNITY BROCHURE

MITIGATION MEASURES AND CONDITIONS

MINORITY/FEMALE GOALS AND TIMETABLES

ASSURANCES–CONSTRUCTION PROGRAMS (ATTACHMENT B)

GENERAL AFFIRMATIONS (ATTACHMENT C)

CHILD SUPPORT STATEMENT FOR NEGOTIATED CONTRACTS AND GRANTS

CONTRACTOR’S CERTIFICATION OF RECOVERED MATERIAL ACKNOWLEDGEMENT 1

CERTIFICATION FOR BUSINESS CONCERNS–SECTION 3 PREFERENCE IN

CONTRACTING AND DEMONSTRATION OF CAPABILITY

CONTRACTOR CERTIFICATION OF EFFORTS WITH EMPLOYMENT AND TRAINING

PROVISIONS OF SECTION 3

TABLE OF CONTENTS Continued Pages

Through

Section 00 01 10-2 4410.023/2-2024

REQUIREMENTS FOR PERFORMANCE AND PAYMENT BONDS.............................. 00 61 00- 2

PERFORMANCE BOND

PAYMENT BOND

CONTRACTOR PAYROLL CERTIFICATION

ATTORNEY’S REVIEW CERTIFICATION

GENERAL CONDITIONS

SPECIAL CONDITIONS

HUD 4010–FEDERAL LABOR STANDARDS PROVISIONS

ACORD CERTIFICATE OF LIABILITY INSURANCE

SPECIFICATIONS

DIVISION 01–GENERAL REQUIREMENTS

SUMMARY OF WORK ................................................................................................... 01 11 00- 4 CONTRACT CONSIDERATIONS................................................................................... 01 29 00- 1 COORDINATION, FIELD ENGINEERING, AND MEETINGS ......................................... 01 31 00- 2 SUBMITTALS ................................................................................................................. 01 33 00- 5 REGULATORY REQUIREMENTS.................................................................................. 01 41 00- 2 REFERENCE STANDARDS AND DEFINITIONS........................................................... 01 42 00- 6 QUALITY CONTROL...................................................................................................... 01 45 00- 2 TEMPORARY FACILITIES ............................................................................................. 01 50 00- 2

SIGNAGE REQUIREMENTS

TEMPORARY CONTROLS ............................................................................................ 01 57 00- 2 MATERIALS AND EQUIPMENT..................................................................................... 01 60 00- 4 CONTRACT CLOSEOUT ............................................................................................... 01 77 00- 3

FEDERAL WAGE RATES

DIVISION 02–EXISTING CONDITIONS

DEMOLITION ................................................................................................................. 02 41 00- 2

DIVISION 03–CONCRETE

CONCRETE FORMWORK ............................................................................................. 03 11 00- 3 CONCRETE REINFORCEMENT.................................................................................... 03 20 00- 4 CAST-IN-PLACE CONCRETE........................................................................................ 03 30 00-15

DIVISION 31–EARTHWORK

CLEARING AND GRUBBING......................................................................................... 31 11 00- 2 SITE GRADING.............................................................................................................. 31 22 00- 4 EXCAVATION, FILL, BACKFILL, AND GRADING.......................................................... 31 23 00- 6 CEMENT STABILIZED SAND ........................................................................................ 31 23 23.46- 3 STORM WATER POLLUTION PREVENTION................................................................ 31 25 13- 7 CEMENT STABILIZATION OF MATERIALS IN PLACE ................................................. 31 32 13.16- 4

TABLE OF CONTENTS Continued Pages

Through

Section 00 01 10-3 4410.023/2-2024

DIVISION 32–EXTERIOR IMPROVEMENTS

FLEXIBLE BASE ............................................................................................................ 32 11 00- 4 HOT MIX ASPHALTIC CONCRETE PAVEMENT........................................................... 32 12 16.13- 8 SEEDING ....................................................................................................................... 32 92 19- 3

DIVISION 33–UTILITIES

BURIED PIPING AND APPURTENANCES .................................................................... 33 00 10- 6

END OF SECTION

BIDDING AND CONTRACTING REQUIREMENTS

Construction Advertisement and Invitation for Bids

The City of Madisonville will receive Bids for the 2024 GLO CDBG-MIT MOD Street Improvements Project, GLO CDBG-MIT MOD Contract No. 24-065-077-E688, Contract 2-2024, until 2 P.M., on June 25, 2026, at City of Madisonville, 210 West Cottonwood Street, Madisonville, TX 77864. The Bids will be publicly opened and read aloud at 2 P.M. on June 25, 2026, at City of Madisonville, 210 West Cottonwood Street, Madisonville, TX 77864.

Bids are invited for several items and quantities of work as follows:

1. Reclamation of existing subgrade and stabilization of existing subgrade along city streets.

2. Installation of new Hot Mix Asphalt Concrete overlay on new stabilized subgrade/base.

3. Removal and instillation of storm water culverts.

4. Clean and construct storm water ditches along city streets.

Complete digital Project Bidding Documents are available at www.strand.com or at www.civcastusa.com at no cost. Please contact CivcastUSA.com for assistance with free membership generation, downloading, and working with this digital project information.

A Bid Bond in the amount of 5 percent of the Bid issued by an acceptable surety shall be submitted with each Bid. A certified check or bank draft payable to the City of Madisonville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

Attention is called to the fact that not less than the federally determined prevailing Davis-Bacon and Related Acts wage rate, as issued by the Texas General Land Office – Community Development and Revitalization and contained in the Contract Documents, must be paid on this project. In addition, the successful Bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin.

Pursuant Chapter 2269 Subchapter C of the Texas Government Code, a contract will be awarded to the lowest responsible Bidder that has the experience and reputation, quality of goods and services, safety record, proposed personnel, and financial capability to complete this project. The Bidder selected will be notified at the earliest possible date. The City reserves the right to reject any or all Bids and to waive any informality in Bids received where such action is in its interest. The City pays for goods and services according to the provisions of Chapter 2251 of the Government Code.

Bids may be held by the City of Madisonville for a period not to exceed 85 days from the date of the Bid Opening for the purpose of reviewing the Bids and investigating the Bidder’s qualifications prior to the Contract Award.

The City of Madisonville is an Affirmative Action/Equal Opportunity Employer. Section 3 Residents, Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and labor surplus area firms are encouraged to submit bids. Bidders shall comply with regulations governing the CDBG Disaster Recovery Program (Regulation 24 CFR 570).

All contractors/subcontractors whose System for Award Management (SAM.gov) registration is not active or that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.

City of Madisonville, Texas Kelcey Young, City Manager June 10, 2026 and June 17, 2026

INSTRUCTION TO BIDDERS FOR CONSTRUCTION

The project to be constructed will be financed with assistance from the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Block Grant - Mitigation (CDBG-MIT) program and is subject to all applicable Federal and State laws and regulations. The City of Madisonville is the subrecipient of the grant funding and is hereby referred to as “City”.

1. Use of Separate Bid Forms

These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.

2. Interpretations or Addenda

No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than five (5) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than three (3) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.

If an addendum to the bid package is necessary, it must be distributed to each potential bidder.

The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.

3. Inspection of Site

Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.

4. Alternate bid items

No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.

5. Bids

a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.

b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.

c. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, local opportunity plan, and the statement of the bidder’s qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project number, name of bidder and the date and time of bid opening.

d. The City may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.

e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.

6. Bid Modifications Prior to Bid Opening

a. Any bidder may modify its bid by submitting a modification or supplemental bid at any time prior to the scheduled closing time for receipt of bids, provided such modification or supplemental bid is received by the locality prior to the closing time.

The modification or supplemental bid should not reveal the original bid price but should provide only the addition, subtractions or other modifications to the original bid so that the final prices or terms will not be known by the locality until the sealed bid is open.

7. Bid Bond

a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

b. The bid bond or its comparable will be returned to the bidder as soon as practical after the opening of the bids.

8. Statement of Bidders Qualifications

Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request.

The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.

9. Unit Price

The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.

10. Corrections

Erasures or other corrections in the bid must be noted over the signature of the bidder.

11. Time for Receiving Bids

Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.

12. Opening of Bids

The City shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.

13. Withdrawal of Bids

Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.

14. Award of Contract/Rejection of Bids

a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date.

The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.

b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.

15. Execution of Agreement/Performance and Payment Bonds

a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work

b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract.

The payment bond must be filed within 15 (fifteen) days from the date of the Notice of Award:

o Municipalities: If the contract is in excess of $50,000, a payment bond is required.

o Counties: If the contract is in excess of $25,000, a payment bond is required.

c. The failure of the successful bidder to execute the agreement and supply the required bonds within 15 (fifteen) days from the date of the notice of award-or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option, either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.

16. Wages and Salaries

Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.

17. Equal Employment Opportunity

Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin, and other civil rights requirements.

18. Certification Regarding Lobbying

Contractors who apply or bid for an award of $100,000 or more shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by

31 USC § 1352.

Equal Opportunity Guidelines for Construction Contractors Note: To be included in bid packet and distributed at the preconstruction conference (optional)

1. What are the responsibilities of the offeror or bidder to ensure equal employment opportunity?

For contracts over $ 10,000, the offeror or bidder must comply with the "Equal Opportunity Clause" and the "Standard Federal Equal Opportunity Construction Contract Specifications."

2. Are construction contractors required to ensure a legal working environment for all employees?

Yes, it is the construction contractor's responsibility to provide an environment free of harassment, intimidation, and coercion to all employees and to notify all foremen and supervisors to carry out this obligation, with specific attention to minority or female individuals.

3. To alleviate developing separate facilities for men and women on all sites, can a construction contractor place all women employees on one site?

No, two or more women should be assigned to each site when possible.

4. Are construction contractors required to make special outreach efforts to Section 3 or minority and female recruitment sources?

Yes, construction contractors must establish a current list of Section 3, minority and female recruitment sources. Notification of employment opportunities, including the availability of on-the-job training and apprenticeship programs, should be given to these sources. The efforts of the construction contractors should be kept in file.

5. Should records be maintained on the number of Section 3 residents, minority and females applying for positions with construction contractors?

Yes, records must be maintained to include a current list of names, addresses and telephone numbers of all Section 3, minority and female applicants. The documentation should also include the results of the applications submitted.

6. What happens if a woman or minority is sent to the union by the Contractor and is not referred back to the Contractor for employment?

If the unions impede the construction contractor's responsibility to provide equal employment opportunity, a written notice should be submitted to GLO.

7. What efforts are made by construction contractors to create entry-level positions for Section 3 residents, women and minorities?

Construction contractors are required to develop on-the-job training programs, or participate in training programs, especially those funded by the Department of Labor, to create positions for Section 3 residents, women and minorities and to meet employment needs.

8. Are any efforts made by the Contractor to publicize their Equal Employment Opportunity (EEO) policy?

Yes, the construction contractor is responsible for notifying unions and sources of training programs of their equal employment opportunity policy. Unions should be requested to cooperate in the effort of equal opportunity. The policy should be included in any appropriate manuals, or collective bargaining agreements. The construction contractor is encouraged to publicize the equal employment opportunity policy in the company newspaper and annual report. The Contractor is also responsible to include the EEO policy in all media advertisement.

9. Are any in-service training programs provided for staff to update the EEO policy?

At least annually a review of the EEO policy and the affirmative action obligations are required of all personnel employees of a decision-making status. A record of the meeting including date, time, location, persons present, subject matter discussed, and disposition of the subject matter should be maintained.

10. What recruitment efforts are made for Section 3 residents, minorities and women?

The construction contractor must notify both orally and in writing, Section 3, minority and female recruitment sources one month prior to the date of acceptance for apprenticeship or other training programs.

11. Are any measures taken to encourage promotions for minorities and women?

Yes, an annual evaluation should be conducted for all minority and female personnel to encourage these employees to seek higher positions.

12. What efforts are taken to insure that personnel policies are in accordance with the EEO policy?

Personnel policies in regard to job practices, work assignments, etc. should be continually monitored to insure that the EEO policy is carried out.

13. Can women be excluded from utilizing any facilities available to men?

No, all facilities and company activities are non-segregated except for bathrooms or changing facilities to ensure privacy.

14. What efforts should be utilized to include minority and female contractors and suppliers?

Take affirmative steps to ensure that small, minority, and women owned businesses are included on all lists for contractors/service providers. Solicit these businesses when issuing RFPs and RFQs and soliciting construction bids. Divide project activities into small tasks to allow participation. Keep records of all offers to minority and female construction contractors.

15. If a construction contractor participates in a business related association that does not comply with equal opportunity affirmative action standards, does that show his/her failure to comply?

No, the construction contractor is responsible for its own compliance.

16. Can a construction contractor hire a subcontractor who has been debarred from government contracts pursuant to EEO?

No. The construction contractor must suspend, terminate or cancel its contract with any Subcontractor who is in violation of the EEO policy.

17. What effort has been taken by the construction contractor to monitor all employment to insure the company EEO policy is being carried out?

The construction contractor must designate a responsible individual to keep accurate records of all employees that includes specific information required by the government.

Section 00 41 00-1

SECTION 00 41 00

BID

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

A. Table of Contents

ARTICLE 1. BID RECIPIENT

ARTICLE 2. BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD,

INSTRUCTIONS, AND RECEIPT OF ADDENDA

ARTICLE 3. BIDDER’S REPRESENTATIONS

ARTICLE 4. BIDDER’S CERTIFICATIONS

ARTICLE 5. BASIS OF BID

ARTICLE 6. TIME OF COMPLETION

ARTICLE 7. ATTACHMENTS TO THIS BID

ARTICLE 8. DEFINED TERMS

ARTICLE 9. COMMUNICATIONS

ARTICLE 10. BID SUBMITTAL

ARTICLE 1–BID RECIPIENT

1.01 Bids to be received until 2 P.M. local time, June 25, 2026.

1.02 This Bid is submitted to: City of Madisonville, City Hall Attn: Kelcy Young, City Manager 210 West Cottonwood Street Madisonville, TX 77864

1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2–BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND

RECEIPT OF ADDENDA

2.01 Bid Acceptance Period

A. This Bid will remain subject to acceptance for 85 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

2.02 Instructions to Bidders

A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.

B. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of

Section 00 41 00-2 figures and the correct sum thereof will be resolved in favor of the correct sum. For Bids submitted on a Lump Sum basis, discrepancies between words and figures will be resolved in favor of the words.

2.03 In submitting this Bid, Bidder represents the following:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following addenda:

Date: Addendum Number:

2.04 Bidder will sign and deliver the required number of counterparts of the Agreement with the bonds, insurance certificates, and other documents required by the Bidding Requirements within 15 days after the date of OWNER’s Notice of Award.

ARTICLE 3–BIDDER’S REPRESENTATIONS

3.01 Bidder’s Representations

A. In submitting this Bid, Bidder represents the following:

1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.

2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.

4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Special Conditions, with respect to the Technical Data in such reports and drawings.

5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Special Conditions, with respect to Technical Data in such reports and drawings.

6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Special Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as CONTRACTOR; and (c) Bidder's (CONTRACTOR's) safety precautions and programs.

7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, Section 00 41 00-3 studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.

8. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.

9. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.

10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 4–BIDDER’S CERTIFICATIONS

4.01 Bidder certifies the following:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

C. Bidder has not solicited or induced any individual or entity to refrain from Bidding.

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the Bidding process.

2. Fraudulent practice means an intentional misrepresentation of facts made

(a) to influence the Bidding process to the detriment of OWNER, (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive OWNER of the benefits of free and open competition.

3. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of OWNER, a purpose of which is to establish Bid prices at artificial, non-competitive levels.

4. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the Bidding process or affect the execution of the Contract.

4.02 Prohibition on Boycotting Israel

In accordance with HB 89 and Texas Government Code Chapter 2270, OWNER may not enter into a Contract with a "company" for goods or services unless the Contract contains the following written verification:

Section 00 41 00-4

A. For the purposes for this section only, the terms "company" and "boycott Israel" shall have the meaning assigned by Texas Government Code Chapter 2270.

B. If a Bidder qualifies as a "company" outside of the exclusions of HB 793, then Bidder hereby verifies that it:

1. Does not "boycott Israel," and

2. Will not "boycott Israel" during the term of the Contract.

4.03 Iran, Sudan, and Foreign Terrorist Organization Verification

A. In accordance with SB 252 and Texas Government Code 2252, Bidder hereby certifies that it is not listed on the website of the Comptroller of the State of Texas concerning the list of companies that are identified under Section 806.051, Section 807.051, or Section 2252.153 of the Texas Government Code.

B. Bidder also further certifies that should it enter into a contract that is on said listing of companies on the website of the Comptroller of the State of Texas which do business with Iran, Sudan, or any foreign terrorist organization, it will immediately notify OWNER's purchasing department.

4.04 Critical Infrastructure Verification

In accordance with SB 2116 and Texas Government Code Chapter 2274, Bidder hereby certifies that if it has or will have remote or direct access to communication infrastructure systems, cybersecurity systems, the electric grid, hazardous waste treatment systems, or water treatment facilities as a result of entering into a Contract with OWNER, that Bidder is not:

A. Owned by or the majority of stock or other ownership interest is not held or controlled by:

1. Individuals who are citizens of China, Iran, North Korea, Russia, or a country designated by the Governor; or

2. A company or other entity, including a governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a country designated by the Governor; or

B. Headquartered in China, Iran, North Korea, Russia, or a country designated by the Governor.

4.05 Prohibition on Boycotting Energy Companies

In accordance with SB 13 and Texas Government Code 2274, Bidder hereby certifies that if it is not a sole proprietorship, if it has 10 or more full-time employees, or if the Contract Price will be greater than $100,000, that Bidder:

A. Will not boycott energy companies; and

B. Will not boycott energy companies during the term of the Contract.

Section 00 41 00-5

4.06 Firearm Entity or Trade Association Discrimination

In accordance with SB 19 and Texas Government Code 2274, Bidder hereby certifies that if it is not a sole proprietorship, if it has 10 or more full-time employees, or if the Contract Price will be greater than $100,000, that Bidder:

A. Does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade associations; and

B. Will not discriminate during the term Contract against a firearm entity or firearm trade association.

These requirements do not apply to an exempt contract under Section 2274.003 of the Texas Government Code.

4.07 Contracting Information Preservation Requirements

If Bidder is not a governmental body and if Bid or resulting Contract may exceed or result in the expenditure of at leaslt $1,000,000 in public funds, Bidder hereby agrees to the following:

A. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and any resulting Contract and Bidder agrees that the Contract can be terminated if Bidder knowingly or intentionally fails to comply with a requirement of that subchapter.

B. Pursuant to Subchapter J, Chapter 552, Texas Government Code, Bidder hereby certifies and agrees to:

1. Preserve all contracting information related to this Contract as provided by the records retention requirements applicable to OWNER for the duration of the Contract,

2. Promptly provide to OWNER any contracting information related to the Contract that is in the custody or possession of Bidder/CONTRACTOR on request of OWNER, and

3. On completion of the Contract, either:

a. Provide at no cost to OWNER all contracting information related to the Contract that is in the custody or possession of Bidder/CONTRACTOR, or

b. Preserve the contracting information related to the Contract as provided by the records retention requirements applicable to OWNER.

C. If Bidder/CONTRACTOR fails to provide to OWNER the requested information, Texas Government Code Chapter 552.373 requires OWNER to notify Bidder/CONTRACTOR in writing of the failure and allow 10 business days to cure the violation. OWNER may terminate the Contract if Bidder/CONTRACTOR fails to remedy the failure, OWNER determines the failure was knowing and intentional, and OWNER determines that steps have not been taken to conform to the requirements of Subchapter J, Chapter 552, Government Code.

4.08 Bidder also hereby acknowledges and agrees that all verifications and certifications located in Articles 4.02 through 4.07 will become material terms of the Contract and OWNER is expressly relying on these verification and certifications in agreeing to enter into a Contract.

Section 00 41 00-6

ARTICLE 5–BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

The following abbreviations may be used in this Bid:

CIP - Complete in Place LS - Lump Sum CY - Cubic Yard LT - Left DI - Ductile Iron MBF - Thousand Board Feet DIA - Diameter MFOB - Thousand Freight-On-Board EA - Each MH - Manhole EST - Estimate(d) RCP - Reinforced Concrete Pipe EXCL - Excluding RT - Right FT - Feet SF - Square Foot GAL - Gallon STA - Station HERCP - Horizontal Elliptical RCP SWPPP - Stormwater Pollution

Prevention Plan HRS - Hours SY - Square Yard IN - Inch T - Ton INCL - Including VLF - Vertical Linear Foot LBS - Pounds W/ - With LF - Linear Foot W/O - Without

BIDDERS SHOULD NOT ADD ANY CONDITIONS OR QUALIFYING STATEMENTS TO THIS BID

OR THE BID MAY BE DECLARED IRREGULAR AS NOT BEING RESPONSIVE TO THE

INSTRUCTIONS TO BIDDERS.

Section 00 41 00-7

BID

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

Contract award will be made based on the Computed Total Base Bid plus any Alternatives selected.

The price for all Base Bid items shall be included in the Computed Total Base Bid. Alternative Bids will be added to or deducted from the Computed Total Base Bid, if they are accepted, prior to Contract award being made.

OWNER reserves the right to accept or reject any alternatives to the Computed Total Base Bid.

Should OWNER wish to consider alternatives listed, Bidder may be required to provide additional information, prior to Notice of Award.

The following prices per item shall be for furnishing and installing the various items of material and work as specified and shown on the Drawings. Bidder agrees to perform the Work as shown on the Drawings and described in the Specifications for the following listed prices. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.

NOTE: A price must be bid for each item in the Bid, even though the estimated quantity is zero.

Unbalanced or unreasonable unit prices may cause rejection of the Bid.

Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price

1. Mobilization 1 LS $ $

2. SWPPP 1 LS $ $

3. Remove and Dispose of Existing Concrete. Replace W/ 6-IN Reinforced Concrete.

(Laydown Curb, Driveways, Valley Gutter)

35 SY $ $

4. 8-IN Cement Stabilization of Roadway Material in Place (4% by Dry Unit Weight)

3,955 SY $ $

5. 2-IN Hot Mix Asphalt (HMA), Type D 3,655 SY $ $

6. Furnish and Install 12-IN HDPE Storm Sewer

230 LF $ $

7. Furnish and Install 15-IN HDPE Storm Sewer

461 LF $ $

8. Furnish and Install 18-IN HDPE Storm Sewer

74 LF $ $

9. Remove and Dispose of Existing 6- to 24-IN Culvert (All Materials)

518 LF $ $

10. Clean Existing RCP Culverts to Remain

83 LF $ $

Section 00 41 00-8

Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price

11. Excavation, Grading, and Shaping Ditches (Both Sides)

1 LS $ $

12. Traffic Control According to Texas Manual on Uniform Traffic Control Devices (TMUTCD)

1 LS $ $

13. Construction Materials Testing 1 LS $ $

14. Site Restoration and Cleanup 1 LS $ $

COMPUTED TOTAL BASE BID CONTRACT 2-2024 (ITEMS 1 THROUGH 14)

Dollars $ (Words) (Numbers)

Section 00 41 00-9

BID ALTERNATIVE NO. 1

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price

MEMORIAL (FIRST) STREET

1. SWPPP 1 LS $ $

2. 8-IN Cement Stabilization Roadway Material in Place (4% by Dry Unit Weight)

2,355 SY $ $

3. 2-IN Hot Mix Asphalt (HMA), Type D 2,115 SY $ $

4. Remove and Replace Existing Gravel Area

50 SY $ $

5. Furnish and Install 12-IN HDPE Storm Sewer

234 LF $ $

6. Furnish and Install 18-IN HDPE Storm Sewer

28 LF $ $

7. Remove and Dispose of Existing 6- to 24-IN Culvert

170 LF $ $

8. Excavation, Grading, and Shaping Ditches (Both Sides)

1 LS $ $

9. Traffic Control According to Texas Manual on Uniform Traffic Control Devices (TMUTCD)

1 LS $ $

10. Construction Materials Testing 1 LS $ $

11. Site Restoration and Cleanup 1 LS $ $

COMPUTED TOTAL BID ALTERNATIVE NO. 1

Section 00 41 00-10

BID ALTERNATIVE NO. 2

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price

BAILEY STREET

1. SWPPP 1 LS $ $

2. 8-IN Cement Stabilization Roadway Material in Place (4% by Dry Unit Weight)

1,410 SY $ $

3. 2-IN Hot Mix Asphalt (HMA), Type D 1,335 SY $ $

4. Remove and Replace Trench Width Asphalt Pavement

32 LF $ $

5. Remove and Replace 5-IN Concrete Sidewalk

4 SY $ $

6. Furnish and Install 12-IN HDPE Storm Sewer

320 LF $ $

7. Furnish and Install 15-IN HDPE Storm Sewer

68 LF $ $

8. Furnish and Install 18-IN HDPE Storm Sewer

100 LF $ $

9. Remove and Dispose of Existing 6- to 24-IN Culvert (All Materials)

301 LF $ $

10. Reset Existing Brick Mailbox 3 EA $ $

11. Excavation, Grading, and Shaping Ditches (Both Sides)

1 LS $ $

12. Traffic Control According to Texas Manual on Uniform Traffic Control Devices (TMUTCD)

1 LS $ $

13. Construction Materials Testing 1 LS $ $

14. Site Restoration and Cleanup 1 LS $ $

COMPUTED TOTAL BID ALTERNATIVE NO. 2

Section 00 41 00-11

BID ALTERNATIVE NO. 3

CITY OF MADISONVILLE

MADISONVILLE, TEXAS

2024 GLO CDBG-MIT MOD STREET IMPROVEMENTS

GLO CDBG-MIT MOD CONTRACT NO. 24-065-077-E688

CONTRACT 2-2024

Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price

THOMPSON STREET

1. SWPPP 1 LS $ $

2. Remove and Dispose of Existing Concrete. Replace W/ 6-IN Reinforced Concrete (Laydown Curb, Driveways, Valley Gutter)

25 LF $ $

3. 8-IN Cement Stabilization Roadway Material in Place (4% by Dry Unit Weight)

1,410 SY $ $

4. 8-IN Limestone Flexible Base 690 SY

5. 2-IN Hot Mix Asphalt (HMA), Type D 1,300 SY $ $

6. Excavation, Grading, and Shaping Ditches (Both Sides)

1 LS $ $

7. Traffic Control According to Texas Manual on Uniform Traffic Control Devices (TMUTCD)

1 LS $ $

8. Construction Materials Testing 1 LS $ $

9. Site Restoration and Cleanup 1 LS $ $

COMPUTED TOTAL BID ALTERNATIVE NO. 3

Section 00 41 00-12

ARTICLE 6–TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete within 30 calendar days after the date when the Contract Time commences to run, and will be completed and ready for final payment in accordance with Paragraph 47 of the General Conditions within 45 calendar days after the date when the Contract Time commences to run. In addition, 30 calendar days will be added to the Contract Time for each awarded Alternate Bid, up to a maximum of 90 calendar days to reach Substantial Completion and 105 calendar days to reach final completion.

6.02 Bidder accepts the provisions of the General Conditions as to liquidated damages in the event of failure to complete the Work within the Contract Times.

ARTICLE 7–ATTACHMENTS TO THIS BID

7.01 The following documents are attached to and made a condition of this Bid:

A. Required Bid security in the form of (Certified Check, Bank Money Order, or Bond)

B. Statement of Bidder Qualifications.

C. Form CIQ Conflict of Interest Questionnaire (if required).

D. Additional Conditions of Award.

E. Certificate of Interested Parties.

F. Noncollusion Affidavit of Prime Bidder.

G. Certification of Bidder Regarding Civil Rights Laws and Regulations.

H. CONTRACTOR’s Local Opportunity Plan.

I. Proposed Contract Breakdown.

J. Certification Regarding Lobbying.

K. CONTRACTOR’s Certification Concerning Labor Standards and Prevailing Wage Requirements.

L. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license, if applicable, within the time for acceptance of Bids..

M. Where applicable, Bidder shall provide CONTRACTOR’s License Number for the state of the Project, where noted at end of Bid or Bidder shall provide evidence of Bidder’s ability to obtain a State Contractor’s License and a covenant by Bidder to obtain said license within the time for acceptance of Bids.

ARTICLE 8–DEFINED TERMS

8.01 The terms used in this Bid with initial or all capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Special Conditions.

Section 00 41 00-13

ARTICLE 9–COMMUNICATIONS

9.01 Communications concerning this Bid shall be addressed to the address of Bidder indicated below:

Name:

Street:

City, State, Zip Code:

Phone No.: Fax No.:

E-mail address:

ARTICLE 10–BID SUBMITTAL

Submitted on

State Contractor License Number (if applicable).

Section 00 41 00-14

If Bidder is:

An Individual

By:

(Individual’s signature)

Name (typed or printed):

Doing business as:

Business address:

Phone No.: Fax No.:

E-mail address:

A Partnership

Partnership Name:

By:

(Signature of general partner -- attach evidence of authority to sign)

Name (typed or printed):

Business address:

Phone No.: Fax No.:

E-mail address:

A Corporation

Corporation Name:

State of Incorporation:

Type (General Business, Professional, Service, Limited Liability):

By:

(Signature -- attach evidence of authority to sign)

Name (typed or printed):

Title:

Attest (Signature of Corporate Secretary)

Business address:

Phone No.: Fax No.:

E-mail address:

Date of Qualification to do business in (State where the Project is located) is

Sworn and subscribed to before me this Notary Public or Other Officer day of , Authorized to Administer Oaths.

My Commission expires:

Section 00 41 00-15

A Limited Liability Company (Note: If member-managed, an authorized member must sign; if manager-managed, the authorized manager must sign. Attach evidence of authority to sign on behalf of LLC).

(Fill in complete name of LLC)

State of Formation:

By:

(Signature)

, [Member] [Manager] (Print Name)

Business Address:

Telephone:

Email:

Fax:

Section 00 41 00-16

A Joint Venture

Name of Joint Venture:

First Joint Venturer Name:

By:

(Signature of first joint venture partner -- attach evidence of authority to sign)

Name (typed or printed):

Title:

Business address:

Phone No.: Fax No.:

E-mail address:

Second Joint Venturer Name:

By:

(Signature of second joint venture partner -- attach evidence of authority to sign)

Name (typed or printed):

Title:

Business address:

Phone No.: Fax No.:

E-mail address:

Phone No., Fax No., and postal and E-mail address for receipt of official communications:

(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)

Sworn and subscribed to before me this Notary Public or Other Officer day of , Authorized to Administer Oaths.

My Commission expires:

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, as PRINCIPAL, and , as

SURETY are held and firmly bound unto (City) hereinafter called the “Local Public Agency”, in the penal sum of Dollars, ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the Accompanying Bid, dated , for

NOW, THEREFORE, the Principal shall not withdraw said Bid within the period specified…