PROJECT DESCRIPTION_West Milner.pdf
PDF 200 KB Posted
- Attached to
- ID Cassia 972(1) West Milner Road Federal contract opportunity
- Solicitation number
- 69056720B000010
About this file
This document includes a project description and related federal contract opportunity for road construction work. The project description provides details on the scope of work to construct and widen a four mile stretch of West Milner Road in Idaho to accommodate increased traffic. Work includes straightening curves, replacing and extending culverts, clearing and grubbing areas, excavating and adding aggregate and asphalt. The estimated price range for the project is between $3-5 million and must be completed by Fall 2020. The related federal contract opportunity is a pre-solicitation notice for solicitation number 69056720B000010 issued through the Department of Transportation Federal Highway Administration to repair the described section of West Milner Road in Idaho. The opportunity is designated as a small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| id-a3109721_Plans.pdf | ||
| West Milner_Cross Sections.pdf | ||
| IFB 69056720B000010.pdf | ||
| West Milner_FinalGeotechnicalReport.pdf | ||
| id-a3109721_Plans_PreAd.pdf | ||
| West Milner Prelim Letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID Cassia 972(1) West Milner Road
The work consists of the following:
• Construct a paved surface designed to meet vertical and horizontal standards that accommodate the recreational and commercial users of West Milner Road.
• Increase the roadway width from the existing 24' to 28' to accommodate two 12 foot wide lanes with 2' shoulders.
• Realign the intersection of West Milner Road and 700W to intersect perpendicularly.
• Straighten the alignment of the section of West Milner Road located approximately 0.8 miles west of 700W. This will require relocation of utility poles (estimated 3-4 poles).
• Relocate the cattle guards entrances of the Milner Recreation Area to accommodate widening and trucks with trailers turning into the Milner Recreation Area.
• Hydraulic sizing of culverts, replacing existing culverts and extending existing culverts in good condition.
Project length: 4 Miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $5 million
Location: 10 Miles W of Burley, ID.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion Control LPSM 158 Watering for Dust Control 1000 MGAL
On e S ch ed ul e
Sc h
Na m e
DIVISION 200 – Earthwork 201 Clearing & Grubbing 9.3 ACRES 204 Roadway Excavation 6500 CUYD 204 Unclassified Borrow 7000 CUYD DIVISION 300 – Aggregate and Base Courses 301 Aggregate Base Grading D 26,000 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 15,000 TON 412 Asphalt Tack Coat 30 TON
DIVISION 600 – Incidental Construction 602 24-inch pipe Culvert 600 LN FT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Placing Conserved Topsoil, 4-inch 5.8 ACRE 625 Turf Establishment 24 SLRY 634 Permanent Pavement Markings – Type A Solid Yellow
86,000 LN
FT
634 Permanent Pavement Markings – Type A Solid White
86,000 LN
FT
635 Temporary Traffic Control LPSM
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |