PROJECT DESCRIPTION_WA FLAP PACIFI 12800(2).pdf

PDF 136 KB Posted

Attached to
WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR
Solicitation number
69056724B000018
Issued by

About this file

This document is a project description for the WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR federal contract opportunity. The project involves roadway embankment, paving, and striping to enhance the safety and public access to the Willapa National Wildlife Refuge. The project length is 0.15 miles with a tentative completion date in Fall 2025. The estimated price range is between $700,000 and $2,000,000. This opportunity is set aside for small businesses. The contracting agency is the Department of Transportation Federal Highway Administration. The key deliverables include earthwork, paving, signage, and pavement markings. Interested vendors must register on SAM.gov to view the Interested Vendors List and receive notifications when the solicitation documents are posted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FLAP PACIFI 12800(2),

67th Place Public Enhancement to Willapa NWR

This project will enhance the safety and public access to the Willapa National

Wildlife Refuge through the repair and widening of the deteriorated roadway. The primary objective of the proposed project is roadway embankment, paving, and striping.

Project length: 0.15 miles

Tentative Fixed Completion Date: Fall 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $700,000 and $2,000,000

Location: 2 miles East of Long Beach, Washington in Pacific County

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

B as e S ch ed u le

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (erosion control devices) LPSM

158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 160 SQYD

203 Removal of Pipe Culvert 1 EACH

204 Roadway Excavation 1,500 CUYD

207 Separation-Stabilization Geotextile, Class 1, Type A (woven) 1,310 SQYD

207 Separation-Stabilization Geotextile, Class 1, Type D (non-woven) 800 SQYD

208 Foundation Fill 300 CUYD

208 Shoring and Bracing 4,400 SQFT

208 Dewatering LPSM

B as e S ch ed u le

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 500 CUYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Pavement, Type 1 360 TON

412 Asphalt Tack Coat (asphalt surface treatment) 1.0 TON

DIVISION 600 – Incidental Construction

602 18-Inch Pipe Culvert 40 LNFT

621 Monuments & Markers (construction survey & staking) (yes/no) No

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

625 Turf Establishment 160 SQYD

629 Cellular Confinement System (8-Inch) 1,300 SQYD

629 Cellular Confinement System (6-Inch) 800 SQYD

633 Sign System 18 SQFT

634 Permanent Pavement Markings, Type B, Solid (White) 3,260 LNFT

635 Temporary Traffic Control LPSM

File details come from the government source that posted it. Updated .