PROJECT DESCRIPTION_WA FLAP JEFFER 15009(1).pdf

PDF 63 KB Posted

Attached to
WA FLAP JEFFER 150009(1), Undi Road Bypass Improvements
Solicitation number
69056723B000005
Issued by

About this file

This document package includes a project description and related federal contract opportunity for the WA FLAP JEFFER 150009(1) Undi Road Bypass Improvements project. The project consists of relocating approximately 3,500 feet of Undi Road due to landslide threats, requiring new road construction to join existing DNR roads. Work includes grading, drainage, base, chip seal, and other minor items. The estimated price range is between $1 million to $2 million. The tentative completion date is late fall 2023. The contract will be a sealed bid firm-fixed price contract offered as a small business set-aside through the Department of Transportation Federal Highway Administration, anticipated for solicitation in spring 2023.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

WA FLAP JEFFER 150009(1), Undi Road Bypass Improvements, Jefferson and Clallam Counties, Washington

This project consists of relocating Undi Road (currently unstable) to an area that is free of landslide threat. This will require approximately 3,500 feet of new road construction to join to existing DNR roads. Work includes grading, drainage, base, chip seal, and other small items of work.

Project length: 0.7 miles

Tentative Fixed Completion Date: Late Fall 2023

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: 5 miles south of Forks, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S c h e d u le

A

DIVISON 150-Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no)

Yes

157 Soil Erosion & Sediment Control (Fiber Roll) 1,966 LNFT

157 Soil Erosion & Sediment Control (Check Dam) 14 EACH

157 Soil Erosion & Sediment Control (Inlet Protection) 1 EACH

DIVISION 200 – Earthwork

201 Clearing & Grubbing 5,600 SQYD

204 Excavation & Embankment 7,000 CUYD

207 Earthwork Geosynthetics 4,320 SQYD

211 Roadway Obliteration 38 SQYD

S c h e d u le

A

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap 21 CUYD

251 Riprap Ditch 576 LNFT

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate 2,300 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments

407 Chip Seal 9,300 SQYD

DIVISION 600 – Incidental Construction

602 Culverts 195 LNFT

604 Catch Basins 1 EACH

605 Underdrain System 140 LNFT

621 Monuments & Markers (construction survey & staking) No

622 Rental Equipment No

623 General Labor No

625 Turf Establishment 5,922 SQYD

625 Mulching, Hydraulic Method 5,922 SQYD

629 Rolled Erosion Control Products 3,665 SQYD

633 Signs 39 SQFT

634 Permanent Pavement Markings (traffic pavement markings) 5,850 LNFT

634 Permanent Pavement Markings (White Stop Bar) 28 LNFT

635 Temporary Traffic Control, Drum 195 EACH

635 Temporary Traffic Control, Construction Signs 697 SQFT

635 Temporary Traffic Control, Flagger 1,432 HOUR

File details come from the government source that posted it. Updated .