PROJECT DESCRIPTION_WA ERFO FS GIFPN603 2020(1).pdf

PDF 146 KB Posted

Attached to
WA ERFO FS GIFPN603 2020-1(1), Gifford Pinchot Repairs 2020, Phase 1
Solicitation number
69056724B000011
Issued by

About this file

This document is a Project Description for the WA ERFO FS GIFPN603 2020-1(1) project, which is part of the Emergency Relief for Federally Owned Roads (ERFO) program. The project is located in the Gifford Pinchot National Forest in Skamania County, Washington and consists of activities such as earthwork, subgrade, road base reconstruction, embankment reconstruction, slope construction, and drainage infrastructure. The primary objective is to repair and restore roads back to their pre-event condition. The tentative fixed completion date is Summer 2025, and the estimated price range is between $2 million and $5 million. This is a small business set-aside procurement, and the related federal contract opportunity is solicitation number 69056724B000011.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA ERFO FS GIFPN603 2020-1(1),

Gifford Pinchot Repairs 2020, Phase 1

Gifford Pinchot National Forest

Skamania County, Washington

This work consists of activities prescribed under the Emergency Relief for

Federally Owned Roads (ERFO) program: earthwork, subgrade, road base reconstruction, embankment reconstruction, slope construction, and drainage infrastructure. The primary objective of the project is to repair and restore roads back to their pre-event condition, replacing culverts and roadway as necessary

Project length: NA

Tentative Fixed Completion Date: Summer 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $5 million

Location: This ERFO project has several sites near Randle, WA within the Gifford

Pinchot National Forest. The furthest site is located approximately 49.1 Miles N of

Randle, WA.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O n e S ch ed u le

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll

1,179 LNFT

DIVISION 200 – Earthwork

201 Clearing & Grubbing 0.7 ACRE

204 Excavation & Embankment Roadway Excavation Select Borrow Rock Excavation

4,169 CUYD

348 CUYD

333 CUYD

O n e S ch ed u le

207 Earthwork Geosynthetics Separation-Stabilization Geotextile, Class 1, Type A (Non-Woven) Geogrid, Stabilization 35 SQYD

209 SQYD

208 Structure Excavation Shoring and Grubbing 1 LPSM

DIVISION 250 – Slope Reinforcement and Retaining Walls

252 Rockery, Special Rock Embankment, and Rock Buttress

2,179 CUYD

255 Mechanically Stabilized Earth Walls (retaining walls)

2,623 SQFT

DIVISION 300 – Aggregate and Base Courses

301 Untreated Aggregate Courses (crushed aggregate) Roadway Aggregate, Method 2 848 CUYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

417 Emulsified Asphalt Pavement 22 TON

418 Asphalt Concrete Pavement Patching 72 SQFT

DIVISION 600 – Incidental Construction

602 Culverts & Drains (indicate one or both) 24-Inch Pipe Culvert 36-Inch Pipe Culvert

110 LNFT

150 LNFT

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

625 Turf Establishment (indicate seeding or mulching separately) Seeding 3,281 SQYD

635 Temporary Traffic Control – Flagger 370 HOUR

635 Temporary Traffic Control 1 LPSM

646 Roadside Development (use pay item description) Remove and Reset (Existing 95” x 67”) Remove and Reset (Existing 112” x 75”)

1 EACH

1 EACH