This document package includes a project description and related federal contract opportunity for construction of two bridges and roadwork on the Upper Hoh River Road in Washington state. The project description provides specifications for various construction tasks and materials required to complete the work, including earthwork, drainage, paving, bridge construction with driven piles and structural concrete, erosion control, traffic control, environmental mitigation, and permanent infrastructure. The related federal contract opportunity notes this project is located 14.9 miles southeast of Forks, WA, includes construction of two 120-foot long bridges and demolition of an existing bridge, has a tentative completion date of Fall 2023, and estimates the contract value will be between $15-20 million. The solicitation will be full and open competition on an unrestricted basis through the Department of Transportation Federal Highway Administration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA JEFF 91420(1), Upper Hoh river Road Phase 2
The project includes construction of two single span, 120-foot long 5 girder bridges with cast-inplace concrete abutments, wing walls and deck. Abutments are founded on Concrete filled steel pipe piles. The work includes demolition and removal of an existing steel girder bridge upon completion of the new structure.
Project length: 0.59 Miles
Tentative Fixed Completion Date: Fall 2023.
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $15 Million to $20 Million
Location: 14.9 Miles SE of Forks, WA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc he du le
A Ad di tio na l S ch
Sc he du le
C
Ad di tio na du le D
Ad di tio na du le B
Ad di tio na h Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes Select 152 Construction Survey & Staking – Permanent Monument and Marker (Property Corner) 1 Each 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes Yes Select 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes No Select 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes Select 157 Soil Erosion & Sediment Control (erosion control devices) Temporary Diversion Channel All All All 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence 600 Lnft 1,840 Lnft 2165 Lnft ch ed ul e
Sc he du le
A Ad di tio na du le
C
Ad di tio na du le D
Ad di tio na du le B
Ad di tio na
Na m e
157 Soil Erosion & Sediment Control (erosion control devices) Check Dam (Filter Rock) 6 Each 6 Each 24 Each 157 Soil Erosion & Sediment Control (erosion control devices) Check Dam (Filter Rock) 15 Each 33 Each 158 Watering for Dust Control
DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.4 Acre 2.2 Acre 3.1 Acre 203 Removal of Structures & Obstructions - Pipe Culvert (60 – Inch Diameter) 1 Each
203 Removal of Structures & Obstructions - Saw Cutting Pavement 42 Lnft 44 Lnft 42 Lnft 203 Removal of Structures & Obstructions - Gate 1 Each 203 Removal of Structures & Obstructions - Pipe Culvert (18 – Inch Diameter) 1 Each 203 Removal of Structures & Obstructions - Sign 6 Each 2 203 Removal of Structures & Obstructions - Guardrail 229 Lnft 203 Removal of Structures & Obstructions - Bridge All 203 Removal of Structures & Obstructions - Box Culvert 1 204 Excavation & Embankment
527 Cuyd 4,574 Cuyd 10,042 Cuyd
207 Earthwork Geosynthetics - Geotextile, Class 1, Type C 100 Sqyd 1,199 Sqyd 649 Sqyd 207 Earthwork Geosynthetics - Geotextile, Class 1, Type C (Non woven) 231 Sqyd 208 Structure Excavation - Shoring and Bracing All 208 Structure Excavation Bridge 245 Cuyd 20 Cuyd 208 Structure Backfill Bridge 200 Cuyd 485 Cuyd 211 Roadway Obliteration 708 Sqyd 602 Sqyd ch ed ul e
Sc he du le
A Ad di tio na du le
C
Ad di tio na du le D
Ad di tio na du le B
Ad di tio na
Na m e
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap - Method A Class 3 100 Cuyd 251 Riprap - Method A Class 4 1,377 Cuyd 749 Cuyd 251 Riprap - Method A Class 6 1,740 Cuyd 252 Rockery, Special Rock Embankment, and Rock Buttress Special Rock Embankment Mechanically Placed 94 Cuyd 257 Contactor-Designed Retaining Walls (contractor completed designs) Soil Nail Retaining Wall All
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate Roadway Aggregate, Method 2 887 Ton 3,581 Ton 3,816 Ton
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Asphalt Concrete Pavement , Type1 196 Ton 830 Ton 834 Ton 411 Asphalt Prime Coat (asphalt surface treatment) 0.36 Ton 1.69 Ton 1.68 Ton
DIVISION 550 – Bridge Construction 551 Driven Piles 785 Lnft 845 Lnft 551 Driven Piles - Pile Load Test 2 Each 2 Each 552 Structural Concrete (concrete – major structures) Class A (AE) 40 Cuyd 40 Cuyd 552 Structural Concrete (concrete – major structures) Class D (AE) 37 Cuyd 37 Cuyd ch ed ul e
Sc he du le
A Ad di tio na du le
C
Ad di tio na du le D
Ad di tio na du le B
Ad di tio na
Na m e
552 Structural Concrete (concrete – major structures) Class D (AE) For approach slabs Type 2 59 Sqyd 59 Sqyd 552 Structural Concrete – Expansion Joints 58 Lnft 58 Lnft 553 Prestressed Concrete – Decked Bulb Tee Girder, 53-inch 595 Lnft 595 Lnft 554 Reinforcing Steel 5,100 Lb 4910 Lb 554 Reinforcing Steel – Epoxy Coated 5,150 Lb 5150 Lb 556 Bridge Railing – Steel Two Rail 356 Lnft 356 Lnft 559 Waterproofing (concrete – major structures) 350 Sqyd 350 Sqyd 564 Bearing Devices - Elastomeric 10 Each 10 Each
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) Precast Reinforced Concrete Box Culvert (20- FT Span x 18-FT Rise) 40 Lnft 617 Guardrail - MGS Type 2, Class B, Steel Posts 200 Lnft 75 Lnft 75 Lnft 617 Guardrail – Terminal Section, Type MGS Tangent 4 Each 4 Each 4 Each 617 Guardrail – Structure transition railing 84 Lnft 84 Lnft 621 Monuments & Markers (construction survey & staking) (yes/no) Select Select Select Select 622 Rental Equipment (yes/no) Yes No No No 623 General Labor (yes/no) Yes No No No 625 Turf Establishment (indicate seeding or mulching separately) 1,488 Sqyd 8,423 Sqyd 15,947 Sqyd 626 Plants, Trees, Shrubs, Vines & Groundcovers All All 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 1,488 Sqyd 8,423 Sqyd 15,947 Sqyd 633 Permanent Traffic Control - Sign System 37 Sqft 18 Sqft 633 Permanent Traffic Control - Delineator 25 Each 22 Each 634 Permanent Pavement Markings - Solid Yellow 1,194 Lnft 5,600 Lnft 5,610 Lnft 634 Permanent Pavement Markings – Solid White 1,194 Lnft 635 Temporary Traffic Control – Flagger 2,580 Hour 1,080 Hour 980 Hour 100 Hour ch ed ul e
Sc he du le
A Ad di tio na du le
C
Ad di tio na du le D
Ad di tio na du le B
Ad di tio na
Na m e
635 Temporary Traffic Control – Pilot Car 1,820 Hour 540 Hour 490 Hour 635 Temporary Traffic Control – Supervisor 224 Day 79 Day 73 Day 635 Temporary Traffic Control – Barricade, Type 3 4 Each 4 Each 4 Each 635 Temporary Traffic Control – Cone 45 Each 28 Each 34 Each 635 Temporary Traffic Control – Drum 26 Each 26 Each 25 Each 635 Temporary Traffic Control – Warning Light Type A 4 Each 4 Each 4 Each 635 Temporary Traffic Control – Warning Light Type B 4 Each 4 Each 4 Each 635 Temporary Traffic Control – Warning Light Type C 26 Each 33 Each 32 Each 635 Temporary Traffic Control – PCMS 2 Each 635 Temporary Traffic Control – Crash Cushion 2 Each 2 Each 2 Each 635 Temporary Traffic Control – Traffic Signal System 2 Each 2 Each 2 Each 635 Temporary Traffic Control – Concrete Barrier 990 Lnft 680 Lnft 780 Each 635 Temporary Traffic Control – Plastic Fence 620 Lnft 635 Temporary Traffic Control – Construction Sign 318 Sqft 247 Sqft 247 Sqft 635 Temporary Traffic Control – Stop Line 48 Sqft 48 Sqft 48 Sqft 647 Environmental Mitigation - (Wood buffer w/ Dolosse) 29 Each 647 Environmental Mitigation – Stream bed material 630 Cuyd 658 Cuyd 205 Cuyd 647 Environmental Mitigation – (Coarse Woody Debris)
11,600 Cuyd 1,680 Cuyd
647 Environmental Mitigation – Wetland Mitigation All 647 Environmental Mitigation – Channel Habitat Preservation – Channel Pliug All 650 Temporary Diversions (Flow Diversion) All All