PROJECT DESCRIPTION_TX NP MULTI PMS(1).pdf
PDF 186 KB Posted
- Attached to
- TX NP MULTI PMS(1) Pavement Preservation Texas Federal contract opportunity
- Solicitation number
- 69056725R000006
About this file
This document is a detailed project description for the TX NP MULTI PMS(1) Pavement Preservation Texas project, a federal highway infrastructure maintenance contract. The project involves pavement preservation work across nine national parks and recreation areas in Texas, spanning 37.72 miles, with an estimated price range of $5 million to $10 million and a tentative completion date of Summer 2026. Work includes crack sealing, patching, chip seal and micro surface treatments, and pavement marking.
The project scope encompasses comprehensive roadway maintenance activities across multiple divisions, including project requirements, aggregate and base courses, asphalt pavements and surface treatments, rigid pavements, and incidental construction. Specific tasks include roadway aggregate placement, full depth reclamation, asphalt concrete pavement work, emulsified asphalt application, micro surfacing, crack cleaning and sealing, pavement patching, pavement markings, temporary traffic control, and installation of rumble strips. The contract will be a negotiated firm-fixed-price task order issued through the Western Region Pavement Preservation MATOC (Multiple Award Task Order Contract).
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TX NP MULTI PMS(1) Pavement Preservation Texas
This work consists of crack sealing, patching, application of chip seal and micro surface treatments and pavement marking.
Project length: 37.72 Miles
Tentative Fixed Completion Date: Summer 2026 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $10 million
Location: Amistad National Recreation Area (5 miles North of Del Rio, TX), Big Thicket National Preserve (20 miles North of Lumberton, TX), Chamizal National Memorial (2 miles South of El Paso, TX), Fort Davis National Historic Site (20 miles North of Alpine, TX), Guadalupe Mountains National Park (113 East of El Paso, TX), Lyndon B. Johnson National Historic Park (60 miles West of Austin, TX), Palo Alto Battlefield National Historical Park (5 miles North of Brownsville, TX), Padre Island National Seashore (25 miles East of Corpus, Christi, TX), and San Antonio Missions National Historical Park (San Antonio, TX).
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Ba se
DIVISION 150 – Project Requirements 151 Mobilization (yes/no) Yes 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 11 TON 304 Full Depth Reclamation, Method 2 (4-Inch Depth) 11 SQYD DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt concrete pavement, Type 1 3,600 TON 406 Fog Seal 270 TON 407 Chip Seal, Type 1C 370,000 SQYD
Ba se
407 Emulsified Asphalt 670 TON 407 Blotter 40 TON 409 Micro surfacing,Type 2 220,000 SQYD 414 Cracks, Cleaning and Sealing 21 MILE 418 Asphalt Concrete Pavement Patching, Type 1 170 SQYD 418 Asphalt Concrete Pavement Patching, Type 2 7,200 SQYD 421 Polymer Modified Rejuvenating Asphalt Emulsion 88 TON
DIVISION 500 – Rigid Pavements 502 Sealing Joints and Cracks 120 LNFT
DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Rumble Strip (Centerline, Shoulder) 82 SQYD 634 Pavement Markings (Type B) 1,250,000 LNFT 634 Pavement Markings, Symbols (Type B) 430 EACH 634 Recessed Pavement Marker, Bi-Directional Reflective 9 EACH 635 Temporary Traffic Control, Cone 220 EACH 635 Temporary Traffic Control, Portable Changeable Message Sign 2 EACH 635 Temporary Traffic Control, Pavement Markings 134,000 LNFT 635 Temporary Traffic Control, Construction Sign 270 SQFT 635 Temporary Traffic Control , Flagger 5,300 HOUR 635 Temporary Traffic Control, Pilot Car 410 DAY 635 Temporary Traffic Control, Traffic Control Supervisor 165 DAY
| DIVISION 300 – Aggregate and Base Courses |
| 302 Roadway Aggregate, Method 2 |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .