PROJECT DESCRIPTION_Riverside Road Improvements B.pdf
PDF 146 KB Posted
- Solicitation number
- 69056725R000018
About this file
This document is a detailed solicitation for the ID Boundary 5806 (3)B Riverside Road Improvements B project in Boundary County, Idaho. The road improvement project spans 1.62 miles west of Bonners Ferry, with a tentative solicitation date in Winter 2025/2026 and a fixed completion date in Fall/Winter 2026. The estimated price range is $5 million to $10 million, covering comprehensive road construction activities including grading, drainage, base work, subexcavation, culverts, and paving.
The project scope includes multiple construction divisions with specific quantities: 11.5 acres of clearing and grubbing, removal of existing infrastructure (6 pipe culverts, 1 sign, 766 linear feet of fence, 18,911 square yards of asphalt pavement), extensive earthwork (5,921 cubic yards of roadway excavation, 24,979 cubic yards of subexcavation), aggregate base of 24,000 tons, 7,000 tons of asphalt concrete pavement, and installation of culverts and drains. Additional work encompasses soil erosion control, geotextile and geogrid stabilization, riprap, traffic control, permanent pavement markings, and landscape restoration across 6.4 acres.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| id-a2158063_Prelim plans.pdf | ||
| Prelim Letter Riverside Road Improvements B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID BOUNDARY 5806 (3)B, Riverside Road Improvements B
Boundary County, Idaho
The work consists of grading, drainage, base, subexcavation, culverts and paving.
Project length: 1.62 miles
Tentative Solicitation Date: Winter 2025/2026
Tentative Fixed Completion Date: Fall/Winter 2026
Estimated Price Range: $5 million to $10 million
Location: W of Bonners Ferry, Idaho
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O n e S ch ed u le
S ch
N am e
DIVISION 150 – Project
Requirements
152 Construction Survey & Staking (yes/no)
Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control (Silt fence) 8150 LNFT
157 Soil Erosion & Sediment Control (fiber roll) 10200 LNFT
157 Soil Erosion & Sediment Control (check dam) 31 each
DIVISION 200 – Earthwork
201 Clearing & Grubbing 11.5 acres e S ch ed
N am e
203 Removal of pipe culvert
6 each
203 removal of sign 1 each
203 removal of fence 766 lnft
203 removal of pavement, asphalt 18911
SQYD
204 Roadway Excavation 5921 CUYD
204 Subexcavation 24979
CUYD
204 Unclassified borrow 62290
CUYD
204 Select borrow 27090
CUYD
207 Separation-stabilization geotextile 49500
SQYD
207 Geogrid Stabilization 13860
SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 529 CUYD
DIVISION 300 – Aggregate and Base Courses
301 Aggregate Base 24000 Tons
302 Roadway aggregate 715 CUYD
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 Asphalt Concrete Pavement By Gyratory Mix Design Method 7000 Tons
DIVISION 600 – Incidental Construction
602 Culverts & Drains (12, 24 and 36” culverts) 500 LNFT
602 Reinforced concrete box culverts 102 LNFT e S ch ed
N am e
606 Spillways
1 each 619 Fences, Gates, Cattle Guards & Bollard Posts 2 each
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
624 Topsoil (landscaping & related items) 31210
SQYD
625 Turf Establishment (indicate seeding or mulching separately) 6.4 acres
633 Permanent Traffic Control (traffic control devices) 83 each
634 Permanent Pavement Markings (traffic pavement markings) 64430 LNFT
635 Temporary Traffic Control LPSM