This document contains a project description and related federal contract opportunity for repair work on two historic viaduct structures located in the Columbia River Gorge National Scenic Area in Multnomah County, Oregon. The project includes concrete patching, crack injection, rebar repair, cathodic protection, polymer concrete deck overlay, beam shear strengthening, wall repair, and surface coating on the two viaducts, which are approximately 403 feet and 864 feet long. The estimated price range for the work is $5 million to $7 million. The tentative fixed completion date is Spring 2026. The solicitation number for the related federal contract opportunity is 69056723B000019 and was issued by the Department of Transportation Federal Highway Administration for the OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts Repair project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts Repairs
Columbia River Gorge National Scenic Area
Multnomah County, Oregon
The project includes repair of two historic concrete viaduct structures located on either side of Multnomah Falls Lodge. Repair work includes concrete patching, crack injection, rebar repair, cathodic protection, polymer concrete deck overlay, beam shear strengthening, wall repair, and surface coating. One viaduct is approximately 403-feet long and one is 864-feet long.
Project length: 2.6 miles
Tentative Fixed Completion Date: Spring 2026
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $7 million
Location: 17 miles E of Troutdale, OR
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O n e S ch ed u le
S ch ed u
A
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll Check Dam Inlet Protection Stabilized Construction Exit
2,350 LNFT
4 EACH
2 EACH
3 EACH
DIVISION 200 – Earthwork
201 Clearing & Grubbing 0.50 ACRE
203 Removal of Structures & Obstructions Removal Sign/Marker Remove of Curb, Concrete Removal of Structures and Obstructions
4 EACH
60 LNFT
ALL
204 Excavation & Embankment Roadway Excavation
160 CUYD
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No
207 Earthwork Geosynthetics 1,300 SQYD e S ch ed ed u
208 Structure Excavation 33 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap Keyed Riprap, Method A, Class 1 14 CUYD
DIVISION 300 – Aggregate and Base Courses
301 Untreated Aggregate Courses Aggregate Base Grading C 140 CUYD
302 Minor Crushed Aggregate Roadway Aggregate, Method 2 100 CUYD
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 300 TON
412 Asphalt Tack Coat (asphalt surface treatment) 3 TON
413 Asphalt Pavement Milling Asphalt Pavement Milling Asphalt Pavement Milling, 4-Inch Depth Asphalt Pavement Milling, 5-Inch Depth
1,600 SQYD
800 SQYD
1,800 SQYD
DIVISION 550 – Bridge Construction
552 Structural Concrete Repair Concrete (Patching and Cathodic Protection) Repair Concrete (Rail Patching) Repair Concrete (Epoxy Coating) Repair Concrete (Rail Epoxy Coating) Clean Concrete Surface Grout
415 SQYD
21 SQYD
44 LNFT
170 LNFT
ALL
650 CUFT
554 Reinforcing Steel 44,500 LB
561 Structural Concrete Injection & Crack Repair 780 LNFT
562 Temporary Works ALL
563 Painting (structures, painting) 13,810 SQFT
569 Concrete Overlays For Bridge Decks Concrete Overlay, Class HPC(O) 2,470 SQYD
575 Minor Bridge Work Minor Bridge Work (Beam Shear Strengthening) Minor Bridge Work (Deck Dowels)
ALL
ALL
DIVISION 600 – Incidental Construction
609 Curb & Gutter Curb, Concrete, 12-Inch Depth Recondition Curb
60 LNFT
165 LNFT
619 Fences, Gates, Cattle Guards & Bollard Posts Fence, Chain Link, 72-Inch Height Gate, Chain Link, 20 Feet Width Remove and Reset Fence
160 LNFT
1 EACH
20 LNFT
e S ch ed ed u
620 Stone Masonry Remove and Reset Dry Laid Wall Clean Stone Masonry Surfaces (Re-chinking)
210 LNFT
850 SQYD
621 Monuments & Markers (construction survey & staking) (yes/no) No
622 Rental Equipment (yes/no) No
623 General Labor (yes/no) No
625 Turf Establishment 2,000 SQYD
633 Permanent Traffic Control (traffic control devices) Remove and Reset Sign 15 EACH
634 Permanent Pavement Markings Pavement Markings, Type A, Solid Pavement Markings, Type H (Shuttle Loading) Pavement Markings, Type A, Straight Arrow Pavement Markings, Type B, Accessibility Symbol
13,000 LNFT
200 SQFT
4 EACH
6 EACH
635 Temporary Traffic Control Barricade Type 2 Barricade Type 3 Tubular Marker, Type 28-Inch Drum Portable Changeable Message Sign Crash Cushion (Inertial Barrel System) Crash Cushion (Narrow Site System Repair) Crash Cushion (Narrow Site System) Replacement Barrels for Crash Cushion (Interial Barrel System) Raised Pavement Marker (Reflective) Traffic Signal System (Flagger Station Light) Crowd Control Barricade Moving Concrete Barrier Pavement Markings Pavement Marking Removal Construction Sign Pavement Markings, Symbols and Letters Flagger Traffic Control Supervisor Railroad Flagger (24-Hour, 7-Days/Week) Railroad Flagger (Daytime)
6 EACH
8 EACH
30 EACH
70 EACH
3 EACH
1 EACH
3 EACH
3 EACH
5 EACH
200 EACH
4 EACH
450 LNFT
1,550 LNFT
3,000 LNFT
4,800 LNFT
1,550 SQFT
2,500 SQFT
2,300 HOUR
805 DAY
ALL
ALL