This document provides a project description and related federal contract opportunity for the OR DOT CRGNSA 100(4), Historic Columbia River Highway State Trail, Mitchell Point Crossing project. The work consists of tunneling, grading, asphalt paving, concrete paving, signing, striping, landscaping, structures, rockfall protection and other small items along a 1.45 mile section of trail located 3 miles west of Hood River, Oregon. The estimated price range for the work is between $15-20 million and has a tentative completion date of Fall 2022. The solicitation number for the federal contract opportunity is 69056720B000024 and is being offered through an unrestricted full and open competition on the BETA.SAM website by the Department of Transportation Federal Highway Administration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT CRGNSA 100(4), Historic Columbia River Highway State Trail, Mitchell Point Crossing
The work consists of tunneling, grading, asphalt paving, concrete paving, signing, striping, landscaping, structures, rockfall protection and other small items of work.
Project length: 1.45 Miles
Tentative Fixed Completion Date: Fall 2022 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $15 million to $20 million
Location: 3 Miles West of Hood River, Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Turbidity Monitoring Silt Fence Temporary Diversion Channel Fiber Roll Check Dam Stabilized Construction Exit Supervisor Stormwater Pollution Prevention Plan
ALL
300 LNFT
70 LNFT
4,400 LNFT
16 EACH
3 EACH
150 DAY
ALL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 3.2 ACRE 202 Additional Clearing & Grubbing (clearing & grubbing) Removal, Individual Tree 13 EACH ch ed ul e
203 Removal of Structures & Obstructions (structures, demolition) Removal of Bollard Removal of Pipe Culvert Removal of Sign Removal of Structures and Obstructions (Restroom Building) Removal of Structures and Obstructions (Bike Rack) Removal of Structures and Obstructions (OPRD Cluster Board) Removal of Wheelstop Removal of Curb, Concrete Removal of Fence Removal of Guardrail, Concrete Barrier Removal of Masonry Guardwall Removal of Structures and Obstructions (Dry Stack Masonry Wall) Removal of Structure and Obstructions (Asphalt Piles) Removal of Pavement, Asphalt Removal of Sidewalk, Concrete
3 EACH
1 EACH
2 EACH
1 EACH
3 EACH
1 EACH
13 EACH
494 LNFT
2,102 LNFT
24 LNFT
640 LNFT
150 SQYD
55 SQYD
1,637 SQYD
142 SQYD
204 Excavation & Embankment Roadway Excavation Rock Excavation (Surface) Rock Excavation (Tunnel) Ditch, Excavation Backfill, Select Granular Backfill, Granular Conserve and Place Boulder
4,325 CUYD
120 CUYD
7,493 CUYD
850 CUYD
829 CUYD
4 CUYD
74 EACH
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics Geotextile Filter, Class 1, Type A 255 SQYD 208 Structure Excavation Structure Excavation (Retaining Wall) Structure Excavation (MSE Wall) Structural Backfill
309 CUYD
596 CUYD
140 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed Riprap, Method A, Class 2 Placed Riprap, Method B, Class 1 Placed Riprap, Method B, Class 4 Boulder
19 CUYD
5 CUYD
88 CUYD
57 EACH
252 Rockery, Special Rock Embankment, and Rock Buttress 650 SQFT 253 Gabions & Revet Mattresses 897 SQFT 255 Mechanically Stabilized Earth Walls (retaining walls) 1,900 SQFT 256 Permanent Ground Anchors (ground anchors) Ground Anchor (#11 Solid Threadbar) Ground Anchor (#11 Hollow Threadbar Spile)
1,300 EACH
360 EACH
258 Reinforced Concrete Retaining Walls (retaining walls) 1,377 SQFT ch ed ul e
260 Rock Bolts & Dowels Rock Dowel (#9) Rock Dowel (#8) Rock Dowel (Slope)
504 LNFT
8,063 LNFT
200 LNFT
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate Roadway Aggregate, Method 2 Roadway Aggregate, Method 2, Surface Course
3,180 TON
4.5 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1,100 TON
DIVISION 500 – Rigid Pavement 501 Minor Concrete Pavement, Reinforced, 6-Inch Depth 1,410 SQYD
DIVISION 550 – Bridge Construction 554 Reinforcing Steel 25,600 LB 555 Steel Structures (structures, steel) Miscellaneous Steel (Steel Sets) Miscellaneous Steel (Mine Straps)
14 EACH
104 EACH
566 Shotcrete Shotcrete (2 inches) Reinforced Shotcrete, 6-Inch Depth)
487 SQYD
2,790 SQYD
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) Concrete (Precast Pilaster) Concrete (Sprayed or Cast-In-Place)
2.4 CUYD
157 CUYD
602 Culverts & Drains (indicate one or both) 12-Inch Pipe Culvert 18-Inch Pipe Culvert 36-Inch Pipe Culvert End Section for 12-Inch Pipe Culvert End Section for 18-Inch Pipe Culvert End Section for 36-Inch Pipe Culvert
356 LNFT
92 LNFT
61 LNFT
15 EACH
4 EACH
2 EACH
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) Trench Drain 24 LNFT 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) Standard Underdrain System Underdrain Cleanout, 8-Inch
506 LNFT
7 EACH
609 Curb & Gutter (concrete – minor structures) (indicate which) Curb, Concrete (Mountable) Curb, Stone, Type 2, 14-Inch Depth Curb, Stone, Type 2, 14-Inch Depth (Mountable)
27 LNFT
379 LNFT
53 LNFT
ch ed ul e
615 Sidewalks, Pads & Paved Medians Sidewalk, Exposed Aggregate Colored Concrete 360 SQYD 617 Guardrail 240 LNFT 619 Fences, Gates, Cattle Guards & Bollard Posts Fence, Chain Link, 72-Inch Height Fence, Rail Bollard Post
1,500 LNFT
32 LNFT
5 EACH
620 Stone Masonry Stone Masonry (Retaining Wall Veneer) Stone Masonry (Tunnel Portal Facing) Stone Masonry (Tunnel Portal Keystone Engraving) Stone Masonry (Flush Basalt Band 24-Inch Width) Stone Masonry (Flush Basalt Band 36-Inch Width) Stone Masonry (48” Basalt Railing on Railing Footing) Stone Masonry (42” Basalt Railing on Top of Retaining Wall) Stone Masonry (48” Basalt Railing on Top of Retaining Wall) Stone Masonry (42” Basalt Railing on Railing Footing) Stone Masonry (Flush Basalt Band 18-Inch Width)
205 SQYD
216 SQYD
ALL
614 LNFT
221 LNFT
208 LNFT
100 LNFT
321 LNFT
99 LNFT
135 LNFT
621 Monuments & Markers (construction survey & staking) (yes/no) Yes 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) Furnishing and Placing Topsoil (Topsoil and Soil Amendments) Furnishing and Placing Topsoil (Water Quality Mix)
510 CUYD
85 CUYD
625 Turf Establishment Mulching, Dry Method 8,100 SQYD 626 Plants, Trees, Shrubs, Vines & Groundcovers Landscaping Edging, Metal 41 LNFT 633 Permanent Traffic Control Sign System (Type C Trail Sign Support) Sign System (Sign Type A.1) Sign System (Sign Type A.2) Sign System Object Marker (Culvert ID Marker) Delineator (Stormwater Facility Marker)
1 EACH
1 EACH
2 EACH
136 SQFT
24 EACH
2 EACH
634 Permanent Pavement Markings Pavement Markings, Type B, Solid Pavement Markings, Type B, Straight Arrow Pavement Markings, Type B, Accessibility Symbol
1,130 LNFT
2 EACH
1 EACH
ch ed ul e
635 Temporary Traffic Control Arrow Board, Type A Barricade Type 3 Drum Portable Changeable Message Sign Plastic Fence Construction Sign Pilot Car Traffic Control Supervisor Flagger
1 EACH
2 EACH
210 EACH
4 EACH
1,100 LNFT
1,541 SQFT
32 HOUR
300 DAY
224 FXHR
646 Roadside Development Fixture (Columnar Basalt Seating, Horizontal) Fixture (Trail Sign Support) Fixture (Columnar Basalt Seating, Vertical) Fixture, Bicycle Storage Rack Fixture, Picnic Table Fixture, Vault Toilet (Prefabricated Restroom Building) Fixture, Pedestrian Railing Fixture (Existing Interpretive Panel, Relocated) Fixture (OPRD Cluster Board)
4 EACH
1 EACH
13 EACH
3 EACH
2 EACH
1 EACH
72 LNFT
ALL
ALL
647 Environmental Mitigation Streambed Channel Reconstruction 30 CUYD 651 Rockfall Protection Draped Rockfall Protection, Wire Mesh Draped Rockfall Protection, Wire Mesh (Tunnel) Rockfall Protection Fence (Flexible Barrier, 10 foot height) Rockfall Protection Fence (Flexible Barrier, 8 foot height) Rockfall Protection Fence (6’ Attenuator Fence) Rockfall Protection Fence (10’ Attenuator Fence) Temporary Rockfall Protection (Movable Rockfall Barrier) Temporary Rockfall Protection (Containment Net) Rockfall Protection, Pin (Contour Anchor)
600 SQYD
152 SQYD
135 LNFT
298 LNFT
500 SQYD
800 SQYD
ALL
ALL
20 EACH
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
| DIVISION 500 – Rigid Pavement |
| DIVISION 550 – Bridge Construction |