This document includes a project description and related federal contract opportunity for rehabilitation work at Glacier National Park headquarters in Montana. The project consists of pavement removal, clearing and grubbing, drainage, curb and gutter, sidewalk and signage installation along 0.85 miles of roadway near West Glacier. The estimated price range is $2-5 million and work must be completed in fall 2024. This will be a sealed bid small business set-aside awarded under two bid schedules, with only one schedule receiving the award. Interested vendors should monitor the opportunity on SAM.gov for issuance of the invitation for bids containing plans and specifications. The federal agency is the Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT NP GLAC P HQ(1), GLAC HQ Parking Area Rehabilitation

Glacier National Park, Flathead County, Montana

The work consists of pavement removal, removal of unsuitable material, clearing and grubbing, import of borrow material, drainage, curb and gutter, sidewalks, pavement, signage, and other small items of work.

Project length: 0.85 miles

Tentative Fixed Completion Date: Fall 2024

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $5 million

Location: 0.5 miles N of West Glacier

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S ch ed u le A

S ch ed u

B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes

157 Soil Erosion & Sediment Control (Fiber Roll) 3000 LNFT 900 LNFT

157 Soil Erosion & Sediment Control (Inlet Protection) 2 EACH 1 EACH

DIVISION 200 – Earthwork

201 Clearing & Grubbing 4000 SQYD 1000 SQYD

202 Removal, Individual Tree 7 EACH 2 EACH

203 Removal of Drainage Structures 3 EACH 1 EACH

203 Removal of Curb & Gutter 992 LNFT 248 LNFT

203 Removal of Sidewalk 520 SQYD 130 SQYD

204 Excavation & Embankment 9360 CUYD 2340 CUYD

204 Subexcavation 202 CUYD 51 CUYD

204 Select Borrow 6320 TON 1580 TON

204 Granular Backfill 80 CUYD 20 CUYD

207 Earthwork Geosynthetics 104 SQYD 26 SQYD ch ed u ed u

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap 2 CUYD 1 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate 6535 TON 1635 TON

313 Aggregate-Topsoil Course 752 SQYD 188 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete 2867 TON 717 TON

412 Asphalt Tack Coat (asphalt surface treatment) 11 TON 3 TON

DIVISION 600 – Incidental Construction

604 Manholes, Inlets, & Catch Basins (Catch Basin) 2 EACH

604 Manholes, Inlets, & Catch Basins (Manhole Adjustment) 6 EACH 1 EACH

604 Manholes, Inlets, & Catch Basins (Inlet) 2 EACH

607 Cleaning, Relaying, & Repairing Existing Drainage Structures 3 EACH 1 EACH

609 Curb & Gutter (concrete – minor structures) (Curb & Gutter, 12” Depth) 1008 LNFT 252 LNFT

609 Curb & Gutter (concrete – minor structures) (Wheelstop) 33 EACH 8 EACH

611 Water Systems (Valve Adjustment) 7 EACH 2 EACH

615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 520 SQYD 130 SQYD

621 Monuments & Markers (construction survey & staking) (yes/no) No No

622 Rental Equipment (yes/no) No No

623 General Labor (yes/no) No No

625 Turf Establishment (Seeding) 3632 SQYD 908 SQYD

633 Permanent Traffic Control (traffic control devices) Sign System 3 SQFT

633 Permanent Traffic Control (traffic control devices) Remove & Reset Sign 4 EACH 1 EACH

633 Permanent Traffic Control (traffic control devices) Snow Pole Holder 55 EACH 14 EACH

634 Permanent Pavement Markings (traffic pavement markings) Linear Markings 2144 LNFT 536 LNFT ch ed u ed u

634 Permanent Pavement Markings (traffic pavement markings) Symbols 4 EACH 1 EACH

635 Temporary Traffic Control – Barricade, Type 3 4 EACH 1 EACH

635 Temporary Traffic Control – Warning Light, Type B 4 EACH 1 EACH

635 Temporary Traffic Control – Plastic Fence 1120 LNFT 280 LNFT

635 Temporary Traffic Control – Construction Sign 95 SQFT 24 SQFT

646 Roadside Development (Remove & Reset Mailbox) 1 EACH