This document is a Project Description for the MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation project. The project consists of pavement rehabilitation, new pavement sections in three parking lots, replacement of 8 culverts, new signage and striping, pulverizing and paving of the campground loop road system, and placement of barrier rock. The project is located 12 miles west of Babb, Glacier County, Montana and is approximately 2 miles in length. The estimated price range for the project is between $5 and $10 million. The tentative solicitation date is Spring/Summer 2024 with a tentative fixed completion date in Fall 2025. The document provides a detailed construction specification, including items such as surveying, quality control, earthwork, aggregates, asphalt paving, culverts, sidewalks, pavement markings, and temporary traffic control.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation

This work consists of: Pavement rehabilitation, new pavement section is three parking lots, 8 culvert replacements, signage, stripping, campground loop road system pulverizing and paving, and barrier rock placement. .

Project Location: 12 miles W of Babb, Glacier County, Montana

Project Length: 2 Miles

Estimated Price Range: Between $5 and $10 Million

Tentative Solicitation Date: Spring/Summer 2024

Tentative Fixed Completion Date: Fall 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

O n e S ch ed u le

S ch

N am e

_A

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion Control Devices (erosion control devices) 10 EACH

158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 5 ACRES

203 Removal of Structures & Obstructions (Boulders) 258 EACH

203 Removal of Structures & Obstructions

(DELINEATOR) 11 EACH

203 Removal of Structures & Obstructions (pipe culvert) 1 EACH e S ch ed

N

203 Removal of Structures & Obstructions (building) LPSM

204 Excavation & Embankment 3700 CUYD

205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap 53 CUYD

251 Barrier Rock 1688 EACH

251 Remove and Reset Boulder 10 EACH

DIVISION 300 – Aggregate Courses

301 AGGREGATE BASE GRADING D 5500 TONS

304 FULL DEPTH RECLAMATION, METHOD

16,900

SQYD

313 AGGREGATE-TOPSOIL COURSE 300 CUYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 ASPHALT CONCRETE PAVEMENT,

TYPE 1 (wedge and leveling course) 340 TONS

403 ASPHALT CONCRETE PAVEMENT,

TYPE 1 5700 TONS

412 Asphalt Tack Coat (asphalt surface treatment) 25 TONS

DIVISION 600 – Incidental Construction

602 24-INCH PIPE CULVERT 350 LNFT

602- 24 INCH END SECTION FOR 24-INCH

PIPE CULVERT 5 EACH

602 12-INCH PIPE CULVERT 50 LNFT

602- 12 INCH END SECTION FOR 24-INCH

EQUIVALENT DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT 1 EACH

602 18-INCH EQUIVALENT DIAMETER ARCH

OR ELLIPTICAL PIPE CULVERT 105 LNFT

e S ch ed

N

602-18 INCH END SECTION FOR 18-INCH

EQUIVALENT DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT 2 EACH

609 CURB, CONCRETE (precast simulated log pattern) 1950 LNFT

609 WHEELSTOP, CONCRETE 130 EACH

615 SIDEWALK, ASPHALT 600 SQYD

615 SIDEWALK, Exposed Aggregate Colored Concrete 600 SQYD

615 ACCESSIBILITY RAMP, ASPHALT 13 SQYD

615 ACCESSIBILITY RAMP, Exposed Aggregate Colored Concrete 13 SQYD

621 Monuments & Markers (construction survey & staking) (yes/no) Select

622 Rental Equipment (yes/no) Select

624 Topsoil (landscaping & related items) 500 SQYD

625 Turf Establishment (indicate seeding or mulching separately) 18-SLRY

633 Permanent Traffic Control Devises (Sign System) 46 SQFT

633 Remove and Reset Signs 29 EACH

634 Permanent Pavement Markings (Type D Solid, White) 16000 LNFT

634 Permanent Pavement Markings (Type D, Solid Double Yellow) 9000 LNFT

634 Permanent Pavement Markings (stop bar, white) 122 SQFT

634 Permanent Pavement Markings TYPE D, STRAIGHT ARROW (white) 14 EACH

634 PAVEMENT MARKINGS, TYPE D,

ACCESSIBILITY SYMBOL 9 EACH

635 TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN 120 SQFT

637 Facilities & Services (field offices, laboratories, & housing) 2 EACH