PROJECT DESCRIPTION_MT FWS CMR 61520(1).pdf

PDF 129 KB Posted

Attached to
MT FWS CMR 61520(1), Charles M Russell Refuge Repairs
Solicitation number
69056722B000021
Issued by

About this file

This document contains a project description and related federal contract opportunity for repairs at the Charles M Russell Wildlife Refuge in Montana. The project consists of culvert replacement, roadway improvements, concrete ford construction, and bridge construction at various locations within the refuge. It will be solicited as a small business set-aside in winter 2022, with an estimated price range of $2-3 million for Schedule A work and $2-3 million for Schedule B work. Only one schedule will be awarded. The tentative completion date is fall 2023. The solicitation will be a sealed bid firm-fixed price contract issued through SAM.gov by the Department of Transportation Federal Highway Administration. Preliminary plans and additional information are available electronically.

View the file

Other files

File Type Posted
CMR_PLANS_Prelim Plans.pdf PDF
Prelim Letter_MT FWS CMR 61520(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FWS CMR 61520(1), Charles M Russell Refuge Repairs, Charles M Russell Wildlife Refuge, Fergus & Phillips Counties, Montana

The purpose of this project is to improve the drainage and roadways at the various locations within the Charles M Russell Wildlife Refuge: Route 101, Syparyann

Creek, Rock Creek, Seven Mile, Nichols Creek, and Sand Creek Crossing. This scope of work will include culvert replacement, roadway improvements, concrete ford construction, and construction of a single span, 25-foot long pre-fabricated steel bridge with abutments founded on cast-in-place concrete.

Schedule A consists of work at Sand Creek (90+10 to 97+80); Rock Creek (31+10 to 37+65); Seven Mile (72+40 to 74+00); and Nichols (50+90 to 54+10). Schedule

B consists of all Schedule A work and work at Route 101 (184+50 to 277+50) and

Siparyann Creek (14+60 to 17+00). See preliminary plans.

Project length: NA

Tentative Fixed Completion Date: Fall 2023

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million Schedule A

$2 million to $3 million Schedule B

Location: 70 miles NE of Lewiston, MT, Charles M Russell Wildlife Refuge, Fergus & Phillips counties, Montana

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S ch ed u le

A ed

B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no)

Yes Yes

157 Soil Erosion, Silt Fence 1,000 LNFT 1,000 LNFT

157 Soil Erosion, Fiber Roll 410 LNFT 930 LNFT

157 Soil Erosion, Check Dam 4 EACH 4 EACH

DIVISION 200 – Earthwork

201 Clearing & Grubbing 1.2 ACRE 1.2 ACRE

203 Removal of Pipe Culvert 2 EACH 3 EACH

204 Roadway Excavation 105 CUYD 110 CUYD ed

A ed

B

204 Select Borrow 2,500 CUYD 2,500 CUYD

207 Separation-stabilization Geotextile, Class 2, Type B - 1,700 SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap, Method A, Class 1 420 SQYD 30 CUYD

251 Riprap, Method A, Class 3 20 CUYD 1,300 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 1 340 CUYD 400 CUYD

DIVISION 500 – Rigid Pavement

501 Minor Concrete Pavement, Reinforced, 6-Inch Depth 660 SQYD 660 SQYD

DIVISION 550 – Bridge Construction

552 Structural Concrete, Class A (AE),(Abutments) 45 CUYD 45 CUYD

552 Precast Structural Concrete, Class A(AE), Abutments (Pile Cap) 20 CUYD 20 CUYD

552 Precast Structural Concrete, Class A(AE), Abutments (Backwall & Wings) 6 CUYD 6 CUYD

554 Reinforcing Steel 4,100 LB 4,100 LB

555 Pre-Fabricated Steel Bridge (Rock Creek) Yes Yes

555 Pre-Fabricated Steel Bridge (Sand Creek) Yes Yes

567 Micropiles 490 LNFT 490 LNFT

567 Micropiles Proof Load Test 2 EACH 2 EACH

DIVISION 600 – Incidental Construction

602 36-Inch Pipe Culvert 490 LNFT 630 LNFT

604 48-Inch Pipe Culvert - 290 LNFT

602 52-Inch equivalent Diameter Arch or Elliptical Pipe Culvert 50 LNFT 50 LNFT

602 84-Inch equivalent Diameter Arch or Elliptical Pipe Culvert 55 LNFT 55 LNFT

619 Remove & Reset Fence 115 LNFT 125 LNFT

622 Dump Truck, 10 Cubic Yard Minimum Capacity - 20 HOUR

622 Backhoe Loader, 4 Cubic Foot Minimum Rated Capacity Bucket, 18-Inch Wide

- 20 HOUR

623 General Labor - 20 HOUR

633 Sign System 60 SQFT 60 SQFT

633 Remove & Reset Sign 3 EACH 3 EACH

635 Temporary Traffic Control, Barricade Type 3 7 EACH 7 EACH

635 Temporary Traffic Control – Construction Sign 172 SQFT 172 SQFT

635 Temporary Traffic Control, Traffic Control Supervisor 74 DAY 84 DAY

647 Mitigation, Streambed Material 161 CUYD 161 CUYD