This document provides details for a federal construction project solicitation to improve roadways and pedestrian infrastructure in Caldwell, Idaho. The project includes constructing 4-foot paved shoulders on two roads totaling nearly 7 miles, pedestrian upgrades, and replacing a bridge. The solicitation will be a sealed bid with a firm fixed price between $2 million and $5 million. The work is separated into two schedules and only one will be awarded. Interested vendors must register in SAM to view details. The tentative completion date is fall 2025. This opportunity is designated as a small business set aside. The soliciting agency is the US Department of Transportation Federal Highway Administration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway, Canyon County; Caldwell, Idaho
The project will construct 4 foot paved shoulders on Indiana Avenue and Orchard
Avenue. Pedestrian improvements at Murphy’s Neck are also included, and the project will replace the Forest Canal bridge (bridge removal and box culvert installation).
Project length: Schedule A- 2.55 miles
Schedule B- 4.06 miles
Tentative Fixed Completion Date: Fall 2025
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2 million to $5 million
Location: Caldwell, Idaho
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
S ch ed u le A ed u
B
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes
157 Soil Erosion & Sediment Control (erosion control devices)
Silt Fence Fiber Roll Check Dam Inlet Protection Stabilized Construction Exit
900 LNFT
13,000 LNFT
20 EA
9 EA
1 EA
900 LNFT
24,000 LNFT
60 EA
10 EA
2 EA
DIVISION 200 – Earthwork
201 Clearing & Grubbing 6.9 ACRE 10.7 ACRE
203 Removal of Structures & Obstructions (structures, demolition) Bridge Removal Gate Removal Fence Removal
6 EA
7,000 LNFT
7 EA
8,500 LNFT
204 Excavation & Embankment Roadway Excavation 14,000 CUYD 14,000 CUYD
208 Dewatering LPSM LPSM ed u ed u
DIVISION 300 – Aggregate and Base Courses
302 Roadway Aggregate, Method 2 11,500 TON 28,000 TON
303 Ditch Reconditioning 600 LNFT 700 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 3,000 TON 4,500 TON
412 Asphalt Tack Coat (asphalt surface treatment)
5.5 TON 9 TON
418 Asphalt Concrete Pavement Patching Type 1 Type 2
17 SQYD
171 SQYD
DIVISION 550 – Bridge Construction
552 Structural Concrete (concrete – major structures)
17 CUYD 17 CUYD
DIVISION 600 – Incidental Construction
602 Culverts & Drains End section 12-inch pipe culvert
End Section 18-inch pipe culvert Precast Box Culvert
10 EA
50 LF
12 EA
2 EA
50 LF
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) Inlet Adjustment
607 Cleaning, Relaying, & Repairing Existing Drainage Structures
8 EA 12 EA
611 Water Systems Adjust Water Valve
5 EA 8 EA
619 Fences, Gates, Cattle Guards & Bollard Posts Fence, Barb-less wire
1,100 LF
1,100 LF
622 Rental Equipment (yes/no) Yes Yes
623 General Labor (yes/no) Yes Yes
624 Topsoil (landscaping & related items) Furnishing and placing topsoil 400 SQYD 400 SQYD
625 Turf Establishment (indicate seeding or mulching separately) 400 SQYD 400 SQYD
633 Permanent Traffic Control (traffic control devices)
Sign System Object Marker Remove and Re-set sign Remove and re-set delineator
20 SQFT
4 EA
45 EA
2 EA
20 SQFT
4 EA
55 EA
2 EA
ed u ed u
634 Permanent Pavement Markings (traffic pavement markings)
Pavement Markings, Type B, Solid Pavement Markings, Type B, Broken Type 1
71,000 LNFT
4,500 LNFT
80 SQFT
108,000 LNFT
10,000 LNFT
200 SQFT
635 Temporary Traffic Control – Barricade Type 3 Drum Portable Changeable Message Sign Temporary Pavement Markings Plastic Fence Construction Sign
28 EA
130 EA
2 EA
1,100 LNFT
25 LNFT
450 SQFT
28 EA
130 EA
2 EA
1,100 LNFT
25 LNFT
450 SQFT
635 Temporary Traffic Control – Pilot Car 140 DY 180 DY
635 Temporary Traffic Control – Flagger 5,600 HR 7,200 HR
635 Temporary Traffic Control – Traffic Control Supervisor
160 DAY 180 DAY
645 Locating Utilities 25 EA 25 EA
646 Roadside Development (use pay item description)
Remove and Reset Mailbox 35 EA 35 EA