This document provides details for a federal construction project solicitation to improve roadways and pedestrian infrastructure in Caldwell, Idaho. The project includes constructing 4-foot paved shoulders on two roads totaling nearly 7 miles, pedestrian upgrades, and replacing a bridge. The solicitation will be a sealed bid with a firm fixed price between $2 million and $5 million. The work is separated into two schedules and only one will be awarded. Interested vendors must register in SAM to view details. The tentative completion date is fall 2025. This opportunity is designated as a small business set aside. The soliciting agency is the US Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID FLAP CANYON MULTI(1), Indiana and Orchard Shared Roadway, Canyon County; Caldwell, Idaho

The project will construct 4 foot paved shoulders on Indiana Avenue and Orchard

Avenue. Pedestrian improvements at Murphy’s Neck are also included, and the project will replace the Forest Canal bridge (bridge removal and box culvert installation).

Project length: Schedule A- 2.55 miles

Schedule B- 4.06 miles

Tentative Fixed Completion Date: Fall 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $5 million

Location: Caldwell, Idaho

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S ch ed u le A ed u

B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes

157 Soil Erosion & Sediment Control (erosion control devices)

Silt Fence Fiber Roll Check Dam Inlet Protection Stabilized Construction Exit

900 LNFT

13,000 LNFT

20 EA

9 EA

1 EA

900 LNFT

24,000 LNFT

60 EA

10 EA

2 EA

DIVISION 200 – Earthwork

201 Clearing & Grubbing 6.9 ACRE 10.7 ACRE

203 Removal of Structures & Obstructions (structures, demolition) Bridge Removal Gate Removal Fence Removal

6 EA

7,000 LNFT

7 EA

8,500 LNFT

204 Excavation & Embankment Roadway Excavation 14,000 CUYD 14,000 CUYD

208 Dewatering LPSM LPSM ed u ed u

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 11,500 TON 28,000 TON

303 Ditch Reconditioning 600 LNFT 700 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete 3,000 TON 4,500 TON

412 Asphalt Tack Coat (asphalt surface treatment)

5.5 TON 9 TON

418 Asphalt Concrete Pavement Patching Type 1 Type 2

17 SQYD

171 SQYD

DIVISION 550 – Bridge Construction

552 Structural Concrete (concrete – major structures)

17 CUYD 17 CUYD

DIVISION 600 – Incidental Construction

602 Culverts & Drains End section 12-inch pipe culvert

End Section 18-inch pipe culvert Precast Box Culvert

10 EA

50 LF

12 EA

2 EA

50 LF

604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) Inlet Adjustment

607 Cleaning, Relaying, & Repairing Existing Drainage Structures

8 EA 12 EA

611 Water Systems Adjust Water Valve

5 EA 8 EA

619 Fences, Gates, Cattle Guards & Bollard Posts Fence, Barb-less wire

1,100 LF

1,100 LF

622 Rental Equipment (yes/no) Yes Yes

623 General Labor (yes/no) Yes Yes

624 Topsoil (landscaping & related items) Furnishing and placing topsoil 400 SQYD 400 SQYD

625 Turf Establishment (indicate seeding or mulching separately) 400 SQYD 400 SQYD

633 Permanent Traffic Control (traffic control devices)

Sign System Object Marker Remove and Re-set sign Remove and re-set delineator

20 SQFT

4 EA

45 EA

2 EA

20 SQFT

4 EA

55 EA

2 EA

ed u ed u

634 Permanent Pavement Markings (traffic pavement markings)

Pavement Markings, Type B, Solid Pavement Markings, Type B, Broken Type 1

71,000 LNFT

4,500 LNFT

80 SQFT

108,000 LNFT

10,000 LNFT

200 SQFT

635 Temporary Traffic Control – Barricade Type 3 Drum Portable Changeable Message Sign Temporary Pavement Markings Plastic Fence Construction Sign

28 EA

130 EA

2 EA

1,100 LNFT

25 LNFT

450 SQFT

28 EA

130 EA

2 EA

1,100 LNFT

25 LNFT

450 SQFT

635 Temporary Traffic Control – Pilot Car 140 DY 180 DY

635 Temporary Traffic Control – Flagger 5,600 HR 7,200 HR

635 Temporary Traffic Control – Traffic Control Supervisor

160 DAY 180 DAY

645 Locating Utilities 25 EA 25 EA

646 Roadside Development (use pay item description)

Remove and Reset Mailbox 35 EA 35 EA