PROJECT DESCRIPTION_ID BOR SRAO 0017(1).pdf

PDF 172 KB Posted

Attached to
ID BOR SRAO 0017(1), Sportsman’s Park Transportation Improvements
Solicitation number
69056724B000017
Issued by

About this file

This document is a Project Description for the ID BOR SRAO 0017(1) Sportsman's Park Transportation Improvements project in Bingham County, Idaho. The primary objective is full depth reclamation and asphalt surfacing for the parking area and trail. Other work includes striping and minor drainage. The project length is 1.5 miles with a tentative completion date of Summer 2025. The estimated price range is between $700,000 and $2,000,000. This is a small business set-aside solicitation anticipated to be issued early 2025. The project will include two bid schedules, with only one schedule to be awarded. Preliminary plans and additional project information have been posted with the pre-solicitation notice.

View the file

Other files

File Type Posted
PRELIM LETTER_ID BOR SRAO 0017(1).pdf PDF
idr-srao0017-1_Plan_Set_Pre-ad.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID BOR SRAO 0017(1), Sportsman’s Park Transportation Improvements

Bingham County, Idaho

The primary objective of the proposed construction project is full depth reclamation and asphalt surfacing for the parking area and trail at Sportsman's

Park. Other items of work include striping and minor drainage.

Project length: 1.5 miles

Tentative Fixed Completion Date: Summer 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $700,000 and $2,000,000

Location: 3 miles E of Aberdeen, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S C

H A

Q u an ti ty

B an

DIVISION 150 – Project Requirements

151 Mobilization LPSM LPSM

152 Construction Survey & Staking Yes Yes

153 Contractor Quality Control and Assurance Yes Yes

154 Contractor Testing Yes Yes

155 Construction Schedules Yes Yes

157 Soil Erosion Control 2,650 LNFT 8,120 LNFT

158 Watering for Dust Control LPSM LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 0.9 ACRE 0.9 ACRE

204 Roadway Excavation 1,950 CUYD 1,950 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 40 TON 40 TON

304 Full Depth Reclamation, Method 2, 4-Inch Depth 16,000 SQYD 16,000 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Pavement, Type 1 2,621 TON 3,130 TON

412 Tack Coat 2.3 TON

DIVISION 600 – Incidental Construction

609 Curb, Asphalt, 6-inch Depth 155 LNFT 155 LNFT

A an

B an

622 Dump Truck, 10 CUYD 40 HR 40 HR

622 Backhoe Loader, 4 CUYD 40 HR 40 HR

622 Chain Saw 20 HR 20 HR

623 General Labor 40 HR 40 HR

624 Placing Conserved Topsoil, 4-Inch Depth 0.9 ACRE 0.9 ACRE

625 Turf Establishment 0.9 ACRE 0.9 ACRE

633 Sign System 22.25 SQFT 22.25 SQFT

633 Remove and Reset Sign 4 EACH 4 EACH

633 Remove and Reset Delineator 2 EACH

634 Pavement Markings, Type B, Solid (White) 9,920 LNFT 9,920 LNFT

634 Pavement Markings, Type B, Broken (Yellow) 3,720 LNFT 3,720 LNFT

634 Pavement Markings, Type B, (White, Hatched Area) 11,080 SQFT 11,080 SQFT

634 Pavement Markings, Type B, Accessibility Symbol 6 EACH 6 EACH

635 Temporary Traffic Control, Barricade Type

3 10 EACH 16 EACH

635 Temporary Traffic Control, Construction Sign 40 SQFT 60 SQFT

646 Fixture, Pedestrian Railing (Wood) 90 LNFT

646 Remove and Reset Bench 2 EACH