PROJECT DESCRIPTION.pdf
PDF 180 KB Posted
- Attached to
- MT DAR 2020(1), Defense Access Roads FY 2020
- Solicitation number
- 69056720B000005
About this file
This document provides a project description and related federal contract opportunity for roadway reconditioning and improvements. The project involves 59 miles of roadwork 25 miles west of Great Falls, Montana, including reconditioning, aggregate surfacing, stabilization, drainage upgrades, and cattle guard replacement. Estimated costs range from $5-7 million. The completion date is fall 2020. The solicitation is a small business set-aside offered by the Department of Transportation Federal Highway Administration under number 69056720B000005. Interested vendors must register through beta.SAM.gov to view the vendor list. The project description outlines earthwork, slope reinforcement, aggregate, and incidental construction details such as culverts, drainage structures, equipment rental, labor, topsoil, turf establishment and traffic control.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2020(1), Defense Access Roads FY 2020
This project consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, and cattle guard replacement. and other small items of work.
Project length: 59 Miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $7 million
Location: 16 Miles SW of Sisters, Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Ad di tio na l S ch
Ad di tio na
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices)
Fiber Roll
3,030 LNFT
Fiber Roll
3,260 LNFT
Fiber Roll
4,010 LNFT
158 Watering for Dust Control 3,013 MGAL 3,524 MGAL 4,195 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.2 ACRE 0.2 ACRE 0.3 ACRE 204 Excavation & Embankment Select Borrow
1,244 TON
Select Borrow
1,244 TON
Select Borrow
1,244 TON
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2
38 CUYD
Class 2
38 CUYD
Class 2
38 CUYD
On e S ch ed ul e
Ad di tio na
Ad di tio na
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1,410 TON 1,845 TON 2,415 TON 303 Road Reconditioning 226,618 LNFT 262,258 LNFT 310,411 LNFT 311 Stabilized Aggregate Surface Course Aggregate
100,577 TON
Calcium Chloride
1,794 TON
Aggregate
118,920 TON
Calcium Chloride
2,121 TON
Aggregate
142,326 TON
Calcium Chloride
2,538 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24 Inch Culvert
132 LNFT
24 Inch Culvert
132 LNFT
24 Inch Culvert
132 LNFT
607 Cleaning, Relaying, & Repairing Existing Drainage Structures
Cleaning Culvert
17 EACH
Repairing Drainage Structure
11 EACH
Cleaning Culvert
17 EACH
Repairing Drainage Structure
11 EACH
Cleaning Culvert
17 EACH
Repairing Drainage Structure
12 EACH
622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) 1,620 SQYD 1,620 SQYD 1,665 SQYD 625 Turf Establishment (indicate seeding or mulching separately) 1,620 SQYD 1,620 SQYD 1,665 SQYD 635 Temporary Traffic Control – Flagger 2,660 HR 3,000 HR 3,460 HR
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
File details come from the government source that posted it. Updated .