PROJECT DESCRIPTION_AK FLAP ANCHORAGE 2021(1).pdf
PDF 200 KB Posted
- Solicitation number
- 69056726B000012
About this file
This is a presolicitation notice for construction of pedestrian infrastructure improvements at Far North Bicentennial Park in Anchorage, Alaska. The Municipality of Anchorage is the contracting entity. The work consists of construction of one pedestrian bridge and two boardwalks, with additional requirements for trail aggregate and turf establishment across a 0.2-mile project length. The estimated price range is $700,000 to $2,000,000, with a tentative solicitation date of Winter 2026/2027 and a tentative fixed completion date of Fall 2027. The project is located 5 miles east of Anchorage.
The description of work outlines deliverables across six divisions using US customary units. Division 150 (Project Requirements) mandates construction survey and staking, contractor quality control and assurance, contractor sampling and testing, construction schedules, and soil erosion and sediment control. Division 200 (Earthwork) includes clearing and grubbing, removal of an existing bridge, roadway excavation, select borrow, excavation and embankment, and structural backfill. Division 250 addresses slope reinforcement and retaining walls using gabions. Division 300 specifies roadway aggregate placement. Division 550 (Bridge Construction) requires structural concrete, reinforcing steel, steel structures, timber bridge railing, structural timber and lumber (both treated standard and decking), and helical piles. Division 600 (Incidental Construction) includes culverts, turf establishment, and temporary traffic control measures. The solicitation presents both a base schedule and an optional schedule with varying quantities for most line items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim Letter_AK FLAP ANCHORAGE 2021(1).pdf | ||
| aka-anchorage2021-1_Plans - PRE-AD_reduced.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park
Enhancements
Municipality of Anchorage, AK
The work consists of construction of a pedestrian bridge and two boardwalks.
Work also includes trail aggregate and turf establishment.
Project length: 0.2 miles
Tentative Fixed Completion Date: Fall 2027
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)
Tentative Solicitation Date: Winter 2026/2027
Estimated Price Range: $700,000 to $2,000,000
Location: 5 miles E of Anchorage, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-24
B as e S ch ed u le
O p ti o n X
S ch ed
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes
157 Soil Erosion & Sediment Control (erosion control devices) LPSM LPSM
DIVISION 200 – Earthwork
201 Clearing & Grubbing 0.38 Acre 0.11 Acre
203 Removal of Bridge 1 Each
204 Roadway Excavation 527 CUYD 192 CUYD
204 Select Borrow 1098 CUYD 262 CUYD
207 Excavation & Embankment 1204 SQYD 485 SQYD
B as e S ch ed
O p ti o n X
S ch ed
208 Structural Backfill 16 CUYD 10 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
253 Gabions 90 SQFT 63 SQFT
DIVISION 300 – Aggregate and Base Courses
302 Roadway Agg
156 Ton 16 Ton
DIVISION 550 – Bridge Construction
552 Structural Concrete (concrete – major structures) 10 CUYD
554 Reinforcing Steel 2250 LB
555 Steel Structures (structures, steel) LPSM
556 Bridge Railing, Timber, Boardwalk 122 LNFT 102 LNFT
556 Bridge Railing, Timber, Bridge 100 LNFT
557 Structural Timber and Lumber, Treated 2.5 MFBM 1.8 MFBM
557 Structural Timber and Lumber, Treated, Decking 56 SQYD 25 SQYD
573 Helical Pile 14 Each 12 Each
DIVISION 600 – Incidental Construction
602 Culverts 32 LNFT
625 Turf Establishment 1343 SQYD 484 SQYD
635 Temporary Traffic Control – Barricade Type 3 6 Each 3 Each
635 Temporary Traffic Control – Construction Sign 90 SQFT 30 SQFT
File details come from the government source that posted it. Updated .