Project Brief and Plan.pdf

PDF 1 MB Posted

Attached to
Y1DA--756-21-100 Install Booster Pump Station
Solicitation number
36C25721Q1213
Issued by

View the file

Other files

File Type Posted
36C25721Q1213 0001.docx DOCX document
Site Plan Booster Pump Station.pdf PDF
Codes and Standards.pdf PDF
756-21-100 Booster Pump Station - Electrical Floor Plan.pdf PDF
36C25721Q1213_1.docx DOCX document
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EPVAHCS

756-21-100

Booster Pump Station

New Booster Pump Station Brief and Plan

El Paso Veteran Affairs Main Facility 5001 N. Piedras St.

El Paso, TX 79930

Project Description and Brief

• The purpose of the booster pump station is to take Ft. Bliss water, supplied between

30psig to 50psig, to an acceptable pressure for the water softener system between 65psig to 100psig. The required water flow rate out of the pump station shall be

250GPM.

• The pump station will require the following but is not limited to the following tasks:

Shut down and draining of the main water lines to the VA Main Facility.

Demolition of the current piping coming from the backflow preventers to the water softener tanks.

Obtaining an approved dig permit from Ft. Bliss authority.

Trenching for underground electrical.

Installing underground and above ground power.

Accessing VA Main Facility electrical room and other areas to run approximately 350 linear feet of wiring and conduit .

Providing and installing a concrete pad to anchor the new pumps and piping.

Providing and installing an accessible enclosure to protect new pumps from the weather.

Perform Leak Check and Testing new booster pump station.

Training VA Personnel on use, service, operating and maintaining booster pump station.

Location of work is on the North side of the VA Annex.

Water Softener Building

Location of new pump station and support Pad

Back Flow Preventors/Main Water Shutoff

Piping Legend

Isolation Valve Globe or Gate Valve

Backflow Preventer

Booster Pump

New Piping

Existing Piping

Signifies Flow Direction

Existing Site

Fort Bliss Main Water Supply

VA Water Softener Building

DEMO Plan

Main Water Supply

VA Water Softener Building

Demo approximately 20 linear feet of 4” steel potable water piping.

New Piping Plan

Main Water Supply

VA Water Softener Building