Project Brief and Plan.pdf
PDF 1 MB Posted
- Attached to
- Y1DA--756-21-100 Install Booster Pump Station
- Solicitation number
- 36C25721Q1213
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25721Q1213 0001.docx | DOCX document | |
| Site Plan Booster Pump Station.pdf | ||
| Codes and Standards.pdf | ||
| 756-21-100 Booster Pump Station - Electrical Floor Plan.pdf | ||
| 36C25721Q1213_1.docx | DOCX document | |
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPVAHCS
756-21-100
Booster Pump Station
New Booster Pump Station Brief and Plan
El Paso Veteran Affairs Main Facility 5001 N. Piedras St.
El Paso, TX 79930
Project Description and Brief
• The purpose of the booster pump station is to take Ft. Bliss water, supplied between
30psig to 50psig, to an acceptable pressure for the water softener system between 65psig to 100psig. The required water flow rate out of the pump station shall be
250GPM.
• The pump station will require the following but is not limited to the following tasks:
Shut down and draining of the main water lines to the VA Main Facility.
Demolition of the current piping coming from the backflow preventers to the water softener tanks.
Obtaining an approved dig permit from Ft. Bliss authority.
Trenching for underground electrical.
Installing underground and above ground power.
Accessing VA Main Facility electrical room and other areas to run approximately 350 linear feet of wiring and conduit .
Providing and installing a concrete pad to anchor the new pumps and piping.
Providing and installing an accessible enclosure to protect new pumps from the weather.
Perform Leak Check and Testing new booster pump station.
Training VA Personnel on use, service, operating and maintaining booster pump station.
Location of work is on the North side of the VA Annex.
Water Softener Building
Location of new pump station and support Pad
Back Flow Preventors/Main Water Shutoff
Piping Legend
Isolation Valve Globe or Gate Valve
Backflow Preventer
Booster Pump
New Piping
Existing Piping
Signifies Flow Direction
Existing Site
Fort Bliss Main Water Supply
VA Water Softener Building
DEMO Plan
Main Water Supply
VA Water Softener Building
Demo approximately 20 linear feet of 4” steel potable water piping.
New Piping Plan
Main Water Supply
VA Water Softener Building
File details come from the government source that posted it. Updated .