This document outlines the scope of work for a federal contract opportunity to upgrade domestic hot and cold water systems at multiple buildings of a Department of Veterans Affairs medical center. Key details include replacement of plumbing fixtures and shower valves with associated finish repairs, removal of unused piping sections with wall/floor repairs, replacement of domestic water heaters, water softeners, backflow preventers and associated pumps and valves, and replacement of isolation valves at two buildings. The domestic water supply for one building will be replaced with a new connection to another building, including all related components. The solicitation number and opportunity type are provided, along with the involved agency and description of products and services required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Award.pdf | ||
| Project 506-19-104 Statement of Work (SOW).pdf | ||
| Project 506-19-104 BID SCHEDULE.docx | DOCX document | |
| Contractor EMR Certification Form .docx | DOCX document | |
| Project 506-19-104 RFI Form.doc | DOC document | |
| Wage Determination MI20220100 7.15.2022.pdf | ||
| 36C25022B0067.pdf | ||
| Project 506-19-104 Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EW
S
1W
1E
2 3
T9
CAMPUS MAP
NOT TO SCALE
N
EW
S
LAKE ERIE
GRAND
RAPIDS
TRAVERSE
CITY
LAKE SUPERIOR
UPPER PENINSULA
MACKINAW
CITY LAKE HURO
N
ALPENA
PETOSKEY
GAYLORD
GRAYLING
LA
K
E M
IC
H
IG
A
N
SAGINAW
FLINT
LANSING
DETROIT
KALAMAZOO
ANN
ARBOR
BATTLE
CREEK
LOCATION MAP
NOT TO SCALE
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
SIGNATURE DATE
Director
Associated Director
Chief of Staff
Associate Director for Patient Care Services
Chief, FMS
Chief, Engineering Section
Chief, Police Service
Chief, Fire Service
Union Safety Representative
Chief, Environmental Management Section
Infection Control Officer
Patient Safety Manager
GEMS Coordinator
Safety Specialist
Contracting Officer
COR
SIGNATURE BLOCK
POSITION DATESIGNATUREPOSITION
DEPARTMENT OF VETERANS AFFAIRS - VA ANN ARBOR HEALTHCARE SYSTEM
ANN ARBOR, MICHIGAN
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:3
7:
A M
G-001
COVER SHEET UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
506-19-104
01JUL2022 EJR MRB
100% BID DOCUMENTS200151
UPGRADE HOT & COLD WATER
506-19-104
01JUL2022
100% BID DOCUMENTS
506-19-104
SHEET LIST
BUILDING
NO.
SHEET
NO. SHEET NAME
1W 1W P-160 A2 SIXTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-160 B SIXTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-170 A1 SEVENTH LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-170 A2 SEVENTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-170 B SEVENTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-180 A1 EIGHTH LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-180 A2 EIGHTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-180 B EIGHTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-190 A1 NINTH LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-190 A2 NINTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-190 B NINTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-401 PLUMBING ENLARGED PLANS
PLUMBING
28 28 PD401 PLUMBING DEMOLITION ENLARGED PLANS
28 28 P-100 F1 LOWER LEVEL AREA F1 - DOMESTIC WATER PIPING
28 28 P-100 F2 LOWER LEVEL AREA F2 - DOMESTIC WATER PIPING
28 28 P-110 F1 FIRST LEVEL AREA F1 - DOMESTIC WATER PIPING
28 28 P-110 F2 FIRST LEVEL AREA F2 - DOMESTIC WATER PIPING
28 28 P-120 F1 SECOND LEVEL AREA F1 - DOMESTIC WATER PIPING
28 28 P-120 F2 SECOND LEVEL AREA F2 - DOMESTIC WATER PIPING
28 28 P-401 PLUMBING ENLARGED PLANS
PLUMBING
31 31 PD401 PLUMBING DEMOLITION ENLARGED PLANS
31 31 P-130 G1 PENTHOUSE LEVEL AREA G1 - DOMESTIC WATER PLAN
PLUMBING
36 36 P-110 FIRST & SECOND LEVEL - DOMESTIC WATER PIPING
PLUMBING
ALL P-501 PLUMBING SINK / LAVATORY DETAILS
ALL P-502 PLUMBING SHOWER DETAILS
ALL P-601 NOTES, LEGENDS, AND SCHEDULES
ALL P-701 PLUMBING SCHEMATICS
ELECTRICAL
-- E-001 GENERAL NOTES AND LEGENDS
ELECTRICAL
28 28 E-101 F POWER PLAN - FIRST LEVEL
Grand total: 74
SHEET LIST
BUILDING
NO.
SHEET
NO. SHEET NAME
GENERAL
-- G-001 COVER SHEET
PLUMBING
1E 1E PD401 PLUMBING DEMOLITION ENLARGED PLANS
1E 1E P-100 C LOWER LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-100 D LOWER LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-110 C FIRST LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-110 D FIRST LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-120 C SECOND LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-120 D SECOND LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-130 C THIRD LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-130 D THIRD LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-140 C FOURTH LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-140 D FOURTH LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-150 C FIFTH LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-150 D FIFTH LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-160 C SIXTH LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-160 D SIXTH LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-170 C SEVENTH LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-170 D SEVENTH LEVEL AREA D & E - DOMESTIC WATER PIPING
1E 1E P-180 C EIGHTH LEVEL AREA C - DOMESTIC WATER PIPING
1E 1E P-180 D EIGHTH FLOOR AREA D & E - DOMESTIC WATER PIPING
1E 1E P-401 PLUMBING ENLARGED PLANS
PLUMBING
1W 1W PD401 PLUMBING DEMOLITION ENLARGED PLANS
1W 1W P-000 A1 SUB LOWER LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-000 A2 SUB LOWER LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-000 B SUB LOWER LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-100 A1 LOWER LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-100 A2 LOWER LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-100 A3 LOWER LEVEL AREA A3 - DOMESTIC WATER PIPING
1W 1W P-100 B LOWER LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-110 A1 FIRST LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-110 A2 FIRST LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-110 B FIRST LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-120 A1 SECOND LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-120 A2 SECOND LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-120 B SECOND LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-130 A1 THIRD LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-130 A2 THIRD LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-130 B THIRD LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-140 A1 FOURTH LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-140 A2 FOURTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-140 B FOURTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-150 A1 FIFTH LEVEL AREA A1 - DOMESTIC WATER PIPING
1W 1W P-150 A2 FIFTH LEVEL AREA A2 - DOMESTIC WATER PIPING
1W 1W P-150 B FIFTH LEVEL AREA B - DOMESTIC WATER PIPING
1W 1W P-160 A1 SIXTH LEVEL AREA A1 - DOMESTIC WATER PIPING
DEDUCTIVE ALTERNATE LEGEND:
• DEDUCTIVE ALTERNATE 1 - REMOVE PLC FAUCETS FROM BUILDING 28 AND
BUILDING 1W.
ICRA NOTES:
• ALL SPACES TO HAVE AN ICRA CLASSIFICATION OF CLASS II UNLESS NOTED
OTHERWISE ON THE DRAWINGS. REFER TO PROJECT SPECIFICATION 01 35 26,
SECTION 1.12 INFECTION CONTROL, FOR CONTROL PRECAUTION
REQUIREMENTS.
• CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS
PRIOR TO THE START OF CONSTRUCTION. THIS INCLUDES ALL TOP OF WALL
CONDITIONS FOUND WITHIN THE CEILING PLENUM WHERE ICRA CLASSIFICATION
OF CLASS III / IV ARE PRESENT AND PRECAUTION REQUIREMENTS ARE MORE
STRINGENT AS REQUIRED TO COMPLETE NEW WORK.
• CONTRACTOR WILL BE RESPONSIBLE TO MODIFY ALL EXISTING CONDITIONS TO
COMPLY WITH INFECTION CONTROL REQUIREMENTS. AS HOW TO COMPLY IS
CONSIDERED MEANS AND METHODS, CONTRACTOR WILL SEEK APPROVAL FROM
VA BEFORE START OF CONSTRUCTION.
• CONTRACTOR TO REVIEW VA FIRE RATED WALL DRAWING SET PRIOR TO
STARTING WORK IN THAT AREA. NOTIFY THE VA OF ANY DISCREPANCIES
IDENTIFIED BETWEEN THE VA FIRE RATED WALL DRAWING SET AND EXISTING
FIRE RATED CONSTRUCTION BARRIERS THAT DO NOT MEET THE REQUIREMENTS
OF VERIFIED FIRE RATINGS.
• ANY RATED WALL OR FLOOR PENETRATION WHICH CANNOT BE PERMANENTLY
SEALED BY THE END OF THE WORK SHIFT CAN BE TEMPORARILY SEALED WITH
MINERAL WOOL.
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
95% CONSTRUCTION DOCUMENTS RESUBMISSION 18FEB2022
95% CONSTRUCTION DOCUMENTS RESUBMISSION 13MAY2022
E X
-6
H W
EX-DWH-4
EX-DWH
EX-DWH
EX-4"
EX-4"
E X
-4
H W
E X
-8
C W
E X
-6
C W
EX-1 1/4" CW
EX-4" HW
E X
-6
C W
E X
-8
C W
EX-8" CW
EX-6" CW
EX-6" HW
E X
-1
/4
H W
R
E X
-2
C W
E X
-2
H W
R
E X
-1
/4
H W
R
EX-1 1/4"
E X
-1 0"
C
W
E X
-1 0"
W
EX-6" CW
E X
-6
C W
EX-2" CW
E X
-2
C W
EX-1 1/4"
EX-1 1/4"
EX-10" CW
EX-BRINE
TANK
DN TO DCW
BOOSTER
PUMP SKID
EX-4"
EX-4"
EX-8" CW
E X
-3
C W
E X
-3
C W
EX-4"
EX-4"
EX-4" CW
E X
-6
C W
RPZ (BFP)
GLOBE
VALVE (TYP.)
OSY VALVE (TYP.) RPZ (BFP)
GATE VALVE
(TYP.)
PRESSURE
REGULATING VALVE
(TYP.)
BV 5'-0" AFF DN TO
VACUUM BREAKERED
HOSE BIBB 2'-0" AFF.
HOSE
1" DEAD PIPES
OPEN END
6" DROP TO BV (OPEN
ENDED) 1/2" CW DROP
E X
-1
C W
EX-1" CW
EX-1 1/4" CW
E X
-1 /2
C
W
TO DRAIN (TYP. 2)
RPZ (BFP)(TYP. 2)
6" DROP TO CLOSED BV DN TO CAPPED END
1" CW DROP
CLOSED
EX-1/2" CW
EX-1/2" CW
EX-PUMP
DD
CC
CC
EX-WS
BB
BB
AA
AA
AA
AA
MECH
DB61
EX-RCP
EX-1 1/4" HWR
CCEX-WSBB
DD
AA
48" W X 80" H DOOR. REMOVE
DOOR AND FRAME AS NEEDED
FOR EQUIPMENT DEMOLITION
AND INSTALLATION REINSTALL
AT COMPLETION.
AA
PLUMBING DEMOLITION NOTES:
1. THE CONTRACTOR SHALL REVIEW THE ENTIRETY OF THE DRAWINGS AND SPECIFICATIONS BEFORE ANY
WORK IS STARTED.
2. ALL WORK TO BE DEMOLISHED IS NOTED WITH DASHED LINES, OR A DEMOLITION KEYNOTE, OR BOTH.
REVIEW THE DEMOLITINO KEYNOTES PRIOR TO BEGINNING THE WORK.
3. EXCEPT FOR WHEN NOTED ON DRAWINGS, PLUMBING FIXTURES, EQUIPMENT, AND SYSTEMS NOTED TO
BE REMOVED SHALL BE ENTIRELY DEMOLISHED, AND SHALL BECOME PROPERTY OF THE CONTRACTOR
TO REMOVE FROM THE SITE, WHILE FOLLOWING ALL CODES ARE REQUIREMENTS.
4. ITEMS NOTED FOR SALVAGE SHALL BE REMOVED WITH DUE CARE TAKEN AND RETUNED TO THE OWNER
IN A LIKE CONDITION TO IT'S PREVIOUS STATE.
5. DEMOLITION SHALL BE COORDINATED WITH OTHER TRADES. THE CONTRACTOR IS RESPOINSIBLE FOR
ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED IN THE DEMOLITION PROCESS.
6. THESE DRAWINGS ARE COMPILED BY THE ARCHITECT AND ENGINEER FROM THE OWNER'S RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF EXISTING CONDITIONS. THE CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS. AREAS OF WORK THAT DIFFER GREATLY FROM THE DEMOLITION
PLAN SHALL GENERATE AND RFI TO THE ENGINEER.
7. PLUMBING FIXTURES, EQUIPMENT, AND SYSTEMS LOCATED IN THE AREA OF DEMOLITION BUT USED TO SERVE ARES THAT ARE NOT TO BE DEMOLISHED SHALL BE LEFT EXISTING TO REMAIN OR RELOCATED IN
SUCH A WAY AS TO MAINTAIN THE ORIGINAL DESIGN INTENT OF THE SYSTEM.
8. CONTRACTOR TO VERIFY EXTENT AND TYPE OF CEILING DEMOLITION REQUIRED IN EACH AREA PRIOR TO
CONSTRUCTION.
PLUMBING DEMOLITION KEYNOTES:
REMOVE PIPING, FITTINGS VALVES, INSULATION AND ALL ANCILLARIES AS INDICATED.
REMOVE THE EXISTING DOMESTIC WATER HEATER. REMOVE ALL ASSOCIATED STEAM, CONDENSATE, CW, HW, HWR PIPING, FITTINGS, VALVES AND INSULATION AS INDICATED. DISCONNECT POWER. WHERE EQUIPMENT IS TO BE REPLACED, LEAVE ALL ELECTRICAL COMPONENTS FOR CONNECTION TO NEW
EQUIPMENT.
REMOVE THE WATER SOFTENER, BRINE TANK, ALL ASSOCIATED PIPING, FITTINGS, VALVES AND INSULATION AS INDICATED. DISCONNECT POWER. WHERE EQUIPMENT IS TO BE REPLACED, LEAVE ALL
ELECTRICAL COMPONENTS FOR CONNECTION TO NEW EQUIPMENT.
REMOVE THE DOMESTIC HOT WATER RECIRCULATION PUMP. DISCONNECT POWER. WHERE EQUIPMENT IS
TO BE REPLACED, LEAVE ALL ELECTRICAL COMPONENTS FOR CONNECTION TO NEW EQUIPMENT.
PROVIDE A BLIND FLANGE AT THE "TEE" IN THE STEAM MAIN.
REMOVE THE CONDENSATE RECEIVER, PUMPS AND ALL ASSOCIATED PIPING.
EXISTING DRIPLEG WITH CONDENSATE TO EXISTING CONDENSATE RECEIVER. REMOVE CONDENSATE
LINE AS INDICATED.
RETURN ALL VALVES AND EQUIPMENT, SERVING THE EXISTING DWH TO THE OWNER.
REMOVE THE WATER SOFTENER AND BRINE TANK. RETURN TO THE OWNER. THE UNIT IS CURRENTLY
BEING STORED IN THIS LOCATION. IT HAS NOT BEEN CONNECTED TO THE WATER SYSTEM.
REMOVE ALL ELECTRICAL COMPONENTS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED. CONDUIT
AND WIRING SHALL BE REMOVED BACK TO THE PANEL.
PIPING IN THIS AREA IS ABOVE AN EXISTING CEILING. REMOVE AND REINSTALL EXISTING CEILING AS
REQUIRED FOR DEMOLITION.
REMOVE AND REUSE THE EXISTING BACKFLOW PREVENTOR.
REMOVE CONDENSATE RECEIVER AND PUMPS.
REMOVE THE 1 1/2" MPR PUMPED CONDENSATE LINES FROM THE CONDENSATE RECEIVER TO THE FLASH
TANK IN THE BUILDING 1W SUB-BASEMENT MECHANICAL ROOM.
AA
BB
CC
DD
EE
FF
GG
HH
JJ
KK
LL
MM
NN
OO
N
KEY PLAN
NOT TO SCALE
D E
C C B
A1 A2
F1
F2
G B1
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:3
0:
A M
1E PD401
PLUMBING DEMOLITION
ENLARGED PLANS
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 AS JDL
100% BID DOCUMENTS200151 506-19-104
1/4" = 1'-0"
ENLARGED MECHANICAL ROOM DB61 PLUMBING DEMOLITION PLAN
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
SERVICE
ELEVATOR
SE-03
SERVICE
ELEVATOR
SE-04
SERVICE
ELEVATOR
LOBBY
CB-4
ELEVATOR
P-6
ELEVATOR
P-5
PASSENGER
ELEVATOR
LOBBY
CB-5
ELEVATOR
P-3
ELEVATOR
P-4
STORAGE
CB02
STORAGE
CB03
CORRIDOR
CB-6
CORRIDOR
CB-3
STORAGE
CB01A
CORRIDOR
CB-2
STAIR 09
S-09
CORRIDOR
CB-2
RECEIVING/
UNPACKING
DB12A
CART LIFT
CL-1
EXIST. VAULT
DB23
VEST
CB07A
EXTEMP.
COMP.
DB12
H.A.C.
DB35
DECONTAM
ANTE RM
DB36
STORAGE
DB49
MAILROOM
DISTRIBUTION
CB05
PAPER/RIBBON
DISTRIBUTION
CB04
REPRODUCTION
CB06A
LOST/FOUND
CB06
TELEPHONE
SWITCH ROOM
CB07
OFFICE
CB08A
LAV
CB08B
SECURITY
CB08
SECURITY
CB08C
STORAGE
CB10
EXIST. VAULT
DB23
VEST
CB07A
EXTEMP.
COMP.
DB12
H.A.C.
DB35
STORAGE
DB49
BATH
DB48B
MENS STAFF
LOCKER
DB48A
LOCKER ANTE
RM
DB48
WOMENS
STAFF LOCKER
DB48C
BATH
DB48D
H.A.C.
DB50
STORAGE
CB10A
OFFICE
CB11
OFFICE
CB12B
LAV
CB12D
OFFICE
DB39
STORAGE
DB50
CORRIDOR
CB-7
OFFICE
DB42
H.A.C.
CB22B
AR
EA
C
A R
E A
D
A R
E A
C
AR
EA
B
AREA B
AREA C1 A
R E
A C
A R
E A
C
A R
E A
C
A R
E A
C
OFFICE
CB11
CORRIDOR
CB-7A
LAV
CB12D
STAIR 12
S-12
OFFICE
EB03
STORAGE
DB50
BREAK ROOM
CB12
STORAGE
EB15
DISPATCH
EB03 STORAGE
EB02
BREAK OUT
CLEAN
RECEIVING
EB01
STAIR 08
S-08
ELEC
CB16
SERVICE
ELEVATOR
LOBBY
CB-8
SERVICE
ELEVATOR
SE-1
SERVICE
ELEVATOR
SE-2
ELEVATOR
P-2
ELEVATOR
P-1
ELEVATOR
LOBBY
CB-9
OFFICE
CB17C
STORAGE
CB17B
FIRE
SUPPRESSION
CONTROL
CB17A
WAREHOUSE
CB17E
CORRIDOR
CB-10
TRASH DOCK
CB18
LAV
CB19
H.A.C.
CB20
STORAGE
CB17C
COMPACTOR
CB21
STORAGE
CB21A
STORAGE
CB22
STORAGE
CB23
STORAGE
CB25
STORAGE
CB24
OFFICE
EB05
A R
E A
C
A R
E A
C
A R
E A
E
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
C
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AS REQUIRED TO INSTALL PIPING. STORE, PROTECT AND
REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL DAMAGED CEILING
COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
6. SEE COR FOR VA FIRE RATED WALL DRAWINGS PRIOR TO STARTING WORK AND
ENSURE REPAIRS/PENETRATIONS ARE PROPERLY SEALED AT THE COMPLETION OF
THE WORK. CONTRACTOR CAN TEMPORARILY SEAL WITH MINERAL WOOL FOR WALL
OR FLOOR PENETRATIONS AT THE END OF THE WORK SHIFT.
ARCHITECTURAL GENERAL NOTES
N
KEY PLAN
NOT TO SCALE
D E
C C B
A1 A2
A3
F1
F2
G
C3
B1
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:2
9:
A M
1E P-100 C
LOWER LEVEL AREA C -
DOMESTIC WATER PIPING
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 EJR REF
100% BID DOCUMENTS200151 506-19-104
1/8" = 1'-0"
LOWER LEVEL - AREA C1 - DOMESTIC WATER PIPING
1/8" = 1'-0"
LOWER LEVEL AREA C2 - DOMESTIC WATER PIPING
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AND GRID AS REQUIRED TO INSTALL PIPING. STORE,
PROTECT AND REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL
DAMAGED CEILING COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
ARCHITECTURAL GENERAL NOTES
22 11
STAIR 09
S-09
CORRIDOR
CB-2
RECEIVING/
UNPACKING
DB12A
CART LIFT
CL-1
EXIST. VAULT
DB23
VEST
CB07A
EXTEMP.
COMP.
DB12
H.A.C.
DB35
DECONTAM
ANTE RM
DB36
STORAGE
DB49
EXIST. VAULT
DB23
VEST
CB07A
EXTEMP.
COMP.
DB12
H.A.C.
DB35
STORAGE
DB49
BATH
DB48B
MENS STAFF
LOCKER
DB48A
LOCKER ANTE
RM
DB48
WOMENS
STAFF LOCKER
DB48C
BATH
DB48D
H.A.C.
DB50
OFFICE
EB03
VENDOR
CHECK IN
EB04
OFFICE
DB39
STORAGE
DB50
DISPATCH
EB03
STORAGE
EB02
BREAK OUT
CLEAN
RECEIVING
EB01
STAIR 08
S-08
OFFICE
DB00
OFFICE
DB02
OFFICE
DB03
OFFICE
DB04
OFFICE
DB05
OFFICE
DB06
OFFICE
DB07
H.A.C.
DB08
CORRIDOR
CB-11
CONF/CLASSROOM
DB09
DRUG INFO
SERV
DB10
INVEST
DRUGS/ADMIN
WORK
DB15
LLTS LOUNGE
DB16
MENS
LOCKERS
DB16A
WOMENS
LOCKERS
DB16C
OFFICE
DB17
OFFICE
DB18
OPEN OFFICES
DB12
CIRCULATION
SPACE
DB12
HAZ DRUG
PROCESSING
DB21F
H.A.C.
DB21D
SUPPLIES
DB12
IV ADMIXTURE
DB21B
VEST
DB21A
VEST
DB21E
ONCOLOGY
MIXING
DB21C
PHARMACY
DB12
CART LIFT
(DIRTY)
CL-2
DECONTAMINATION
DB32A
CLEAN PREP &
STERILIZATION
DB34
STERILIZERS
DB34A
STORAGE
DB37
CONFERENCE
DB11
WATER
FILTRATION
DB13
BREAK ROOM
DB14
LAV
DB19
LAV
DB20
STORAGE
DB21
BREAK OUT &
CLEAN
RECEIVING
DB22
DISPATCH
DB23
DISPATCH
ANTE RM
DB24
BATH
DB25B
MENS STAFF
LOCKER
DB25A
LOCKER ANTE
RM
DB25
WOMENS
STAFF LOCKER
DB25C
BATH
DB25D
OFFICE
DB40
OFFICE
DB41
OFFICE
DB42
CLEAN CASE
CART STAGING
DB43
ETO
STERILIZER
DB45
H.A.C.
CB22B
ANTE ROOM
DB35
STAIR 06
S-06
MECH
DB60 DATA
DB60A
ELEC
DB60B
MECH
DB61
CORRIDOR
CB-14
CORRIDOR
CB-13
CORRIDOR
CB-15
OFFICE
EB05
COPY ROOM
EB06
OFFICE
EB07
OFFICE
EB08
OFFICE
EB09
OFFICE
EB10
STORAGE
EB11
CART LIFT
(CLEAN)
CL-3
H.A.C.
DB47
HELP DESK
EB04H
OFFICE
EB04J
OFFICE
EB04K
OFFICE
EB04L
OFFICE
EB04M
OFFICE
EB04D
OFFICE
EB02E
OFFICE
EB02G
OFFICE
EB04G
STORAGE
EB02K
OFFICE
EB02C
OFFICE
EB02D
OFFICE
EB02F
OFFICE
EB02H
STAIR 07
S-07
MECH
EB60
DATA
EB60A
ELEC
EB60B
1E P-401
A R
E A
D
A R
E A
C
A R
E A
E
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
D
A R
E A
E
N
KEY PLAN
NOT TO SCALE
D E
C C B
A1 A2
A3
F1
F2
G
C3
B1
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:2
9:
A M
1E P-100 D
LOWER LEVEL AREA D & E -
DOMESTIC WATER PIPING
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 EJR REF
100% BID DOCUMENTS200151 506-19-104
1/8" = 1'-0"
LOWER LEVEL AREA D & E - DOMESTIC WATER PIPING
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
LAV
B185A
EXAM
B137 TRIAGE
B155
TRIAGE
EXAM
B158
MENTORS
B161
PROCEDURE
B172
PROCEDURE
B173
EXAM
B182
PROCEDURE
B180WAITING
STORAGE
B181
OFFICE
SERVICE
ELEVATOR
LOBBY
C1-1
DATA
B114
EMERGENCY/URGENT
CARE WAITING
ROOM
C100
SERVICE
ELEVATOR
SE-03
SERVICE
ELEVATOR
SE-04
HALL OF
HEROES
C1-4
ELEVATOR
P-5
ELEVATOR
P-6
PASSENGER
ELEVATOR
LOBBY
C1-5
ELEVATOR
P-3
ELEVATOR
P-4
STORAGE
C102
OFFICE
C103
CORRIDOR
C1-6
CORRIDOR
C1-2
WAITING
C104
CHECK-IN
C106
OFFICE
C111A
CORRIDOR
C1-7
CORRIDOR
C1-7A
MED PREP
C105A
EXAM
C105
LAV
C107
OFFICE
C108
LAV
C110
OFFICE
C111B
ABULATORY
CARE
C111
CPAC
C116
OFFICE
C116-A
ELIGIBILITY
C116A
BENEFICIARY
TRAVEL
C121
STATION 2
AGENT
CASHIER
C118
CORRIDOR
C1-8C
EXAM
D193
CLOSET
D195A
EXAM
D194
ORTHOPEDICS
CAST ROOM
D195
CART LIFT
CL-1
OUTPATIENT
PHARMACY
D196
CONTROLLED
SUBSTANCE
VAULT
D196E
OFFICE
D100A
STATION 4
PHARMACY
CONSULTATION
& MAIL-OUT
PRESCRIPTIONS
D100
CART LIFT
(DIRTY)
CL-2
EXAM
B186
EXAM
B157
STAIR 3
S-03
EXAM
D192
AR
EA
C
A R
E A
D
A R
E A
C
AR
EA
B
AREA B
AREA C1
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
D
A R
E A
E
A
A
A
A
A A
A
A
A
OFFICE
C116-A
ELIGIBILITY
C116A
BENEFICIARY
TRAVEL
C121
STATION 2
AGENT
CASHIER
C118
CORRIDOR
C1-8C
CART LIFT
(DIRTY)
CL-2
STORAGE
C122B
OFFICE
C122C
LAV
C120 STORAGE
C122D
OFFICE
C122E
PATIENT
EDUCATION
LIBRARY
C122F
VEST
C122
OFFICE
C122A
LAV
C125
LAV
C126
EAST SERVICE
ELEVATOR
LOBBY
C1-9
SERVICE
ELEVATOR
SE-1
SERVICE
ELEVATOR
SE-2
ELEVATOR
P-2 ELEVATOR
P-1
ELEVATOR
LOBBY
C1-10
CART PICK UP
L138
OPEN AREA
L136
WAITING
L103
LAV
L102
LAV
L101
CORRIDOR
L139
WAITING
L111
CORRIDOR
L104
OFFICE
E191
ELEC
E192
STAIR 08
S-08
CORRIDOR
C1-35
SAFE PATIENT
HANDLING
(SPH) EQ. RM
E114
DIRTY UTILITY
E112
CLEAN UTILITY
E110
PROCEDURE
E108
LAV
E108A
PROCEDURE
E106
LAV
E106A
LAV
E104A
PROCEDURE
E104
HEMATOLOGY/
ONCOLOGY
RESEARCH
E102
UROLOGY
E100
A R
E A
C
A R
E A
C
AREA E
AREA C
A R
E A
C
A R
E A
C
A R
E A
D
A R
E A
E
A R
E A
C
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AND GRID AS REQUIRED TO INSTALL PIPING. STORE,
PROTECT AND REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL
DAMAGED CEILING COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
ARCHITECTURAL GENERAL NOTES
N
KEY PLAN
NOT TO SCALE
D E
C C B
A1 A2
F1
F2
G B1
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:2
9:
A M
1E P-110 C
FIRST LEVEL AREA C - DOMESTIC
WATER PIPING
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 EJR REF
100% BID DOCUMENTS200151 506-19-104
1/8" = 1'-0"
FIRST LEVEL AREA C1 - DOMESTIC WATER PIPING
1/8" = 1'-0"
FIRST LEVEL AREA C2 - DOMESTIC WATER PIPING
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
B
A
D
B
A
D
C
B
A
A A
A
A
B
11 11 11
EXAM
D193
CLOSET
D195A
EXAM
D194
ORTHOPEDICS
CAST ROOM
D195
CART LIFT
CL-1
OUTPATIENT
PHARMACY
D196
CONTROLLED
SUBSTANCE
VAULT
D196E
OFFICE
D100A
STATION 4
PHARMACY
CONSULTATION
& MAIL-OUT
PRESCRIPTIONS
D100
CART LIFT
(DIRTY)
CL-2
OFFICE
E191
ELEC
E192
STAIR 08
S-08
CORRIDOR
C1-35
SAFE PATIENT
HANDLING
(SPH) EQ. RM
E114
DIRTY UTILITY
E112
CLEAN UTILITY
E110
PROCEDURE
E108
LAV
E108A
PROCEDURE
E106
LAV
E106A
LAV
E104A
PROCEDURE
E104
HEMATOLOGY/
ONCOLOGY
RESEARCH
E102
UROLOGY
E100
STAFF LOUNGE
D180
EXAM
D181
EXAM
D183
EXAM
D184
OFFICE
D185
OFFICE
D186
WAITING
D188
EXAM
D190
EXAM
D191
EXAM
D192
EXAM
D192A
OFFICE
D106A
CHECK IN
CHECK OUT
D127
CORRIDOR
C1-18
EXAM
D125D
LAV
D196B
STORAGE
D125E
BREAK ROOM
D196C
EXAM
D125C
EXAM
D125B
EXAM
D125A
CLOSET
D101A
OFFICE
D101
IV/CHEM
D196D
CORRIDOR
C1-17D
EXAM
D120
EXAM
D141
EXAM
D143
EXAM
D121
EXAM
D122
EXAM
D145
SUPPLIES
D123
CORRIDOR
C1-24
SOILED UTILITY
D123
CONSULTATION
D124
EXAM
D126
EXAM
D151
EXAM
D152
EXAM
D128
LAV
D187
LAV
D154
LAV
D182
H.A.C.
D174
EXAM
D170
EXAM
D148
EXAM
D150
EXAM
D172
MENTOR ROOM
D146
EXAM
D162
EXAM
D144
EXAM
D142
EXAM
D160
EXAM
D159
STATION 6
D140
LAV
D177
EXAM
D175
EXAM
D173
EXAM
D171
EXAM
D169
CORRIDOR
C1-21
EXAM
D165
EXAM
D163
EXAM
D161
LAV
E157
BLOOD DRAW
E156
STAIR 06
S-06
MECH
D178
DATA
D178A
ELEC
D178B
ELEC
E179
CORRIDOR
C1-22
CORRIDOR
C1-19
CORRIDOR
C1-17B
CORRIDOR
C1-20
CORRIDOR
C1-17C
CORRIDOR
C1-30
EXAM
E101
STATION 8
E120
NURSING EXIT
RM
E122
UROLOGY
NURSES
E103
OFFICE
E105
EXAM
E124
OFFICE
E126
MENTOR ROOM
E107
EXAM
E126A
EXAM
E126B
EXAM
E128
EXAM
E109 EXAM
E111
EXAM
E130
LAV
E188
LAV
E113 OFFICE
E190
UROLOGY
SUPPLIES
E189
OFFICE
E187
OFFICE
E186
OFFICE
E185
LAV
E131A
EXAM
E131
EXAM
E129CLEAN UTILITY
E127
EXAM
E125
EXAM
E123
CART LIFT
(CLEAN)
CL-3
OFFICE
E121
ANTI
COAGULATION
E142
EXAM
E144
EXAM
E144A
SOILED UTILITY
E146 EXAM
E148 LAV
E150A
EXAM
E150
CORRIDOR
C1-31
CORRIDOR
C1-17F CORRIDOR
C1-35
CORRIDOR
C1-17A
CORRIDOR
C1-32
CORRIDOR
C1-33
LAV
E155
EXAM
E161
EXAM
E163
EXAM
E165
CORRIDOR
C1-34
EXAM
E169
EXAM
E171
EXAM
E173
EXAM
E175
LAV
E177
EXAM
E159
STATION 7
E141
ANTI
COAGULATION
E160
EKG
E143
EXAM
E162
EXAM
E145
MENTOR ROOM
E147
EXAM
E170
EXAM
E149
EXAM
E172
EXAM
E151
H.A.C.
E174
LAV
E182
STAFF LOUNGE
E180
EXAM
E181
EXAM
E183
EXAM
E184
ELEC
E178B
DATA
E178A
MECH
E178E
STAIR 07
S-07
AAAA
33 33
EE
EE EE
AA AA
A
A R
E A
D
A R
E A
C
AREA E
AREA C
A R
E A
C
A R
E A
C
EX-4" CW
EX-2 1/2" HW
EX-6" CW
EX-3" HW
EX-1 1/4" HWR
EX-1" HWR
EX-4" CW
EX-2 1/2" HW
EX-1" HWR
EX-4" CW
EX-2 1/2" HW
EX-6" CW
EX-3" HW
EX-1 1/4" HWR
EX-1" HWR
EX-4" CW
EX-2 1/2" HW
EX-1" HWR
EX-4" CW
A R
E A
D
A R
E A
E
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AND GRID AS REQUIRED TO INSTALL PIPING. STORE,
PROTECT AND REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL
DAMAGED CEILING COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
ARCHITECTURAL GENERAL NOTES
N
KEY PLAN
NOT TO SCALE
D E
C C B
A1 A2
F1
F2
G B1
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:2
9:
A M
1E P-110 D
FIRST LEVEL AREA D & E -
DOMESTIC WATER PIPING
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 EJR REF
100% BID DOCUMENTS200151 506-19-104
1/8" = 1'-0"
FIRST LEVEL AREA D & E- DOMESTIC WATER PIPING
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
UP
UP
B
B
B
C
B
C
CART LIFT
(DIRTY)
CL-2
STAIR 08
S-08
SERVICE
ELEVATOR
SE-1
SERVICE
ELEVATOR
SE-2
ELEVATOR
P-2
ELEVATOR
P-1
A R
E A
C
A R
E A
C
AR
EA
E
AR
EA
C
A R
E A
C
A R
E A
C
A R
E A
D
A R
E A
E
B
CART LIFT
(DIRTY)
CL-2
STAIR 09
S-09
CART LIFT
CL-1
CORRIDOR
C2-5
CONFERENCE
B267AOFFICE
B251
OFFICE
B253 OFFICE
B254
CONFERENCE
B257A
CONFERENCE
B257B
EXAM
B258
CORRIDOR
C2-3
CORRIDOR
C2-2
CHECK-IN
B250A
CLINICAL
DIETICIAN
C204
OFFICE
C203
H.A.C.
C202
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
LOBBY
C2-4
ELEVATOR
P-6
ELEVATOR
P-5
CORRIDOR
C2-2A
LAV
C201
LAV
C200
SERVICE
ELEVATOR
SE-03
SERVICE
ELEVATOR
SE-04
SERVICE
ELEVATOR
LOBBY
C2-1
DATA
C21A
OFFICES
B275
OFFICE
B271
STAIR 3
AR
EA
C
A R
E A
D
A R
E A
C
AR
EA B
AREA B
AREA C1
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
C
A R
E A
D
A R
E A
E
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AND GRID AS REQUIRED TO INSTALL PIPING. STORE,
PROTECT AND REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL
DAMAGED CEILING COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
ARCHITECTURAL GENERAL NOTES
N
KEY PLAN
NOT TO SCALE
D E
C C
B
A1 A2
F1
F2
G
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
211 E. Water Street, Suite 213L Kalamazoo, MI 49007
269.216.0222
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C :\R ev it\
\2
1_
P _m ic he lle .b ur ri.
rv t
7/ 1/
:2
9:
A M
1E P-120 C
SECOND LEVEL AREA C -
DOMESTIC WATER PIPING
UPGRADE HOT & COLD
WATER
ANN ARBOR, MI
1E
01JUL2022 EJR REF
100% BID DOCUMENTS200151 506-19-104
1/8" = 1'-0"
SECOND LEVEL AREA C2 -DOMESTIC WATER PIPING
1/8" = 1'-0"
SECOND LEVEL AREA C1 - DOMESTIC WATER PIPING
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 15DEC2021
- 2"
-- 1"
C
B
C
B
B
C
B
B
D
C
B
B C
B
CB
B
STAIR 06
S-06
STAIR 07
S-07
CART LIFT
(CLEAN)
CL-3
MECH
D803
CART LIFT
(DIRTY)
CL-2
STAIR 09
S-09
CART LIFT
CL-1
STAIR 08
S-08
A R
E A
D
A R
E A
C
AR
EA
E
AR
EA
C
A R
E A
D
A R
E A
E
PLUMBING / ELECTRICAL KEYNOTES:
REMOVE EXISTING FAUCET AND POINT OF USE MIXING VALVE. INSTALL NEW DECK
MOUNT/WALL MOUNT PLC FAUCET (FA-1,FA2, FA-3) AND MODIFY PIPING BELOW
LAVATORY AS REQUIRED FOR NEW FAUCET INSTALLATION. REFER TO FAUCET
DEMOLITION, INSTALLATION AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502.
REMOVE EXISTING POINT OF USE SHOWER MIXING VALVE. INSTALL NEW PLC MIXING
VALVE (SMV-1) AND MODIFY IN WALL PIPING AS REQUIRED FOR NEW MIXING VALVE
INSTALLATION. REFER TO SHOWER MIXING VALVE (SMV-1) DEMOLITION, INSTALLATION
AND ELECTRICAL DETAILS ON SHEET P-501 AND P-502. CONTRACTOR TO MAINTAIN ALL
ADA MOUNTING HEIGHTS.
REMOVE AND REPLACE EXISTING ISOLATION VALVE. ALL NEW VALVES SHALL BE TYPE
316 STAINLESS STEEL (BUTTERFLY VALVES FOR ALL HW/CW AND BALL VALVES FOR FOR
ALL HWR) REFER TO DRAWINGS FOR SIZES.
CUT EX. 2" CW. ADD 2"x2"x2" TEE, 2" 90° ELBOW, AND 2" (3) PIECE BALL VALVE.
REMOVE THE WALL CABINET AND RETURN TO THE OWNER. INSTALL WATER HEATERS
ON A 4" CONCRETE HOUSEKEEPING PAD. SEE TANK TYPE WATER HEATER PIPING
DIAGRAM ON SHEET P-702.
NEW DOMESTIC WATER HEATER. CONNECT TO EXISTING STEAM, CONDENSATE, CW, HW,
AND HWR PIPING. CONNECT TO EXISTING ELECTRICAL CIRCUIT.
NEW DOMESTIC HOT WATER RECIRCULATION PUMP. CONNECT TO EXISTING ELECTRICAL
CIRCUIT.
REMOVE EXISTING PIPING AS INDICATED .
PROVIDE A NEW BALANCING VALVE AT THE CONNECTION TO THE NEW HWR .
DROP NEW 4" HW AND 2" HWR INTO A NEW PIPE CHASE AND EXTEND INTO THE SUB-
BASEMENT
PROVIDE A 2 X4 METAL STUD CHASE WALL FROM FLOOR TO CEILING TO HIDE THE NEW
PIPING. COVER WITH 5/8" GYPSUM BOARD. PRIME AND PAINT TO MATCH EXISTING
WALLS. PROVIDE BASEBOARD TO MATCH EXISTING.
2" FROM WATER SOFTENER BACKWASH TO EXISTING FLOOR DRAIN.
REPLACE FLOOR DRAIN GRATE WITH A NEW DRAIN GRATE AND FUNNEL.
INSTALL NEW WATER SOFTENER. CONNECT TO EXISTING PIPING AND ELECTRICAL.
THIS AREA OF THE SUB-BASEMENT IS A CRAWL SPACE WITH LIMITED HEAD ROOM AND
LIMITED ACCESS.
CAP THE EXISTING 1 1/4" HW LINE AT THE TEE.
NEW PIPING. CONNECT TO EXISTING AS INDICATED.
REMOVE LAY-IN CEILING TILE AND GRID AS REQUIRED TO INSTALL PIPING. STORE,
PROTECT AND REINSTALL CEILING AT COMPLETION OF PROJECT. REMOVE ALL
DAMAGED CEILING COMPONENTS TO MATCH EXISTING.
STEAM DRIP LEG AND TRAP. INSTALL AT 5' 0" AFF ON THE FACE OF THE COLUMN. SEE
"THE DRIP LEG PIPING DETAIL" ON SHEET P-701.
EXTEND THE 3" FLASH TANK RETURN HEADER AND CONNECT NEW 1" MPR.
REPLACE THE EXISTING 1 1/2" MPR FROM BUILDING 28 WITH A NEW 2" MPR.
NEW PRESSURE REDUCING VALVE. SEE DETAIL 4 ON SHEET P-701.
INSTALL NEW CONDENSATE RECEIVER CONNECT TO EXISTING VENT AND CONDENSATE
PIPING. INSTALL A NEW 2" PUMPED CONDENSATE LINE.
INSTALL NEW PRESSURE REDUCING STATION A 4' 0" AFF ON THE EXISTING CONCRETE
PAD. SUPPORT WITH UNISTRUT.
REMOVE EXISTING DOMESTIC WATER DEAD END IN WALL BACK TO MAIN AND CAP.
PATCH AND PAINT WALL TO MATCH EXISTING. PATCH INTERSTITIAL FLOOR HOLES
CREATED BY PIPING DEMO TO MATCH FINISHED FLOOR.
REMOVE CW DEAD END BACK TO MAIN AND CAP WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HW DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE HWR DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE DIAMETERS.
REMOVE UNIDENTIFIABLE DEAD END BACK TO MAIN AND WITHIN 1 1/2 PIPE
DIAMETERS.
PLUMBING DEAD END KEYNOTES
A
B
C
D
E
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY DEMOLITION
WORK. COORDINATE WITH VA COR ON ALL EXISTING FINISHES FOR ANY POTENTIAL
PATCH AND REPAIR WORK.
2. PATCH AND REPAIR ALL EXPOSED INTERIOR WALLS WHERE ATTACHED OR EMBEDDED
ITEMS WERE REMOVED.
3. CONTRACTOR TO REMOVE AND REINSTALL ANY EXISTING SUSPENDED CEILINGS AS
REQUIRED FOR EXTENTS OF WORK. REPLACE ANY DAMAGED ITEMS WITH NEW TO
MATCH EXISTING. CONTACT THE ENGINEER FOR DEMOLITION OF HARD CEILINGS TO
COORDINATE EXTENTS OF DEMOLITION AND NEW WORK. PATCH AND REPAIR ALL
ADJACENT SURFACES AND FINISH/PAINT SURFACES TO MATCH EXISTING FINISHES.
4. ALL DISTURBED SURFACES DUE TO DEMOLITION / NEW WORK SHALL BE PATCHED /
REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW CONDITION TO MATCH
ADJACENT FINISH.
5. WHERE TILE / SOLID SURFACE MATERIALS ARE TO BE REMOVED, REMOVE ADHESIVE /
MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
ARCHITECTURAL GENERAL NOTES
N
KEY PLAN
NOT TO SCALE
D E
C C
B
A1 A2
F1
F2
G
G1
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
BUILDING
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .