Product Specs_Altitude Simulator.docx
DOCX document 18 KB Posted
- Attached to
- Altitude Simulation System Federal contract opportunity
- Solicitation number
- 12405B24Q0380
About this file
This document is a Request for Quote (RFQ) for an Altitude Simulation System. The key details are:
The Government is seeking an Altitude Simulation System that meets the following specifications: interior dimensions of at least 15" x 15" x 15", exterior dimensions not to exceed 60" (W) x 30" (D) x 30" (H), pressure range of 1,000' to 8,000', and a controller unit to monitor and re-pressurize the chamber as needed. The system must include the pump, controller unit, and chamber.
The RFQ is being issued by the U.S. Department of Agriculture, Agricultural Research Service, Southeast Area, under Solicitation Number 12405B24Q0380. Responses are due by Monday, July 29, 2024 at 4:00pm Central Time. The Government anticipates award of a Firm Fixed Price contract to the lowest priced, technically acceptable offer that also has satisfactory past performance. Electronic submissions are preferred, to be emailed to Cecilia.McNamee@usda.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clauses and Provisions.docx | DOCX document | |
| Beta Sam Solicitation 12405B24Q0380.docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document | |
| Beta Sam Solicitation 12405B24Q0380.docx | DOCX document | |
| 12405B24Q0380.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product specifications for altitude simulation unit:
· Interior dimensions (minimum dimensions): 15” x 15” 15”
· Exterior dimension (maximum dimensions): 60” (W) x 30” (D) x 30” (H)
· Pressure range (minimum): 1,000’ – 8,000’
· Features a controller unit that will monitor pressure within the chamber, recognize when pressures have diverged from a given setting, and then re-pressurize as needed.
· Chamber fitted with glove access for use while pressurized.
· Whole system needs to include the pump, controller unit, and chamber.
File details come from the government source that posted it. Updated .