Combined Synopsis Solicitation Modular Stage USAG Humphreys

Post Date: 27 November 2018 Due Date: 12 December 2018 Solicitation Number:

Notice Type: Combined Synopsis/Solicitation This is a combined synopsis/solicitation for commercial items. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

North American Industry Classification System (NAICS) Code: 321214 Trusses, wood, glue laminated or metal connected, manufacturing with a size standard of 500 people

Product Service Code: 7195 Miscellaneous Furniture and Fixtures Set-Aside Status: N/A System for Award Management: It is advised that all firms be registered in the SAM database at www.sam.gov. "Registered in the SAM database" means that (1) the contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database; and (2) The Government has validated all mandatory data fields and has marked the record "Active." A valid DUNS number is required to be considered for award.

Contract Type: The Government is contemplating issuance of a Firm Fixed Priced award to one contractor.

USAG Humphreys Family & MWR has a requirement for an All-Terrain Modular Stage capable of having multiple configurations.

OFFERS ARE DUE AT 10PM EST/12PM KST 12 December 2018 Offers shall be submitted in English and USD to Carmen N Falls at carmen.n.falls.naf@mail.mil.

A rendering of the proposed offer shall be included to be considered for award.

Questions regarding this announcement shall end on 7 December 2018 at 12PM KST.

Description: Modular Stage

Minimum capacity of 4,000 lbs 4 ea – 12’ X 24’ stage kits

· Each kit includes 9 ea – 4’ X 8’ panels with adjustable legs from 31” to 51”

· Panels have an industrial indoor/outdoor finish 4 ea – adjustable stairs for stages 31” to 51” 4 ea – adjustable stairs for stages 19’ to 24” 4 ea – 2 pairs of stairway guardrails 10 ea – 2 pairs of 8’ guardrails 4 ea – 2 pairs of 4’ guardrails 1 ea – guardrails trolley 8 ea – 4 pack guardrails assembly clamps 4 ea – stage platform trolley 36 ea – 19” to 27.5” adjustable telescopic legs 1 ea – double assembly inserts 8 ea – 24’ x 52” stage skirting panels 20 ea – skirt clips Velcro 36 ea – 6 pack panel to panel assembly lips 100 ea - Leg Brace for Connecting Legs on Stages Over 36" High with Leg Clamp for Attachment of Leg Brace to Leg Optional Item: Stage Truss appropriate sized stage truss that can accommodate stage lights and sound

Pricing Schedule

CLINs
Item Description
PERIOD OF PERFORMANCE
QTY
COST
0001
All- Terrain multi configurable modular stage
30 days ARO to Tracy
1
0001A
Warranty

Optional Stage Truss appropriate sized stage truss that can accommodate stage lights and sound

CLAUSES INCORPORATED BY FULL TEXT

I - Contract Clauses

BI.002 NONAPPROPRIATED FUND INSTRUMENTALITY (NOV 2004)

The Nonappropriated Fund Instrumentality (NAFI), which is party to this contract, is a nonappropriated fund instrumentality of the Department of the Army. NO APPROPRIATED FUNDS OF THE UNITED STATES SHALL BECOME DUE OR BE PAID THE CONTRACTOR BY REASON OF THIS CONTRACT. This contract is NOT subject to The Contract Disputes Act of 1978.

(End of clause)

BI.005 MATERIAL REQUIREMENTS (NOV 2005)

(a) Definitions. As used in this clause-

"New" means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.

"Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.

"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

"Remanufactured" means factory rebuilt to original specifications. "Virgin material" means-

(1) Previously unused raw material, including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore; or

(2) Any undeveloped resource that is, or with new technology will become, a source of raw materials.

(b) Unless this contract otherwise requires virgin material or supplies composed of or manufactured from virgin material, the Contractor shall provide supplies that are new, reconditioned, or remanufactured, as defined in this clause.

(c) A proposal to provide unused former Government surplus property shall include a complete description of the material, the quantity, the name of the Government agency from which acquired, and the date of acquisition.

(d) A proposal to provide used, reconditioned, or remanufactured supplies shall include a detailed description of such supplies and shall be submitted to the Contracting Officer for approval.

(e) Used, reconditioned, or remanufactured supplies, or unused former Government surplus property, may be used in contract performance if the Contractor has proposed the use of such supplies, and the Contracting Officer has authorized their use.

(End of clause)

BI.008 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS (NOV 2005)

(a) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The NAFI reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The NAFI has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The NAFI may reject nonconforming supplies with or without disposition instructions. The NAFI may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The NAFI shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. NAFI failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the NAFI, for nonconforming supplies. Inspections and tests by the NAFI do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(b) Assignment. The Contractor or its assignee's rights to be paid amounts due as a result of performance of this contract, may be assigned to a bank, trust company, or other financing institution, including any Federal lending agency.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Excusable delays. The Contractor shall be liable for default in cases of delayed performance unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the NAFI in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(e) Invoice.

(1) An invoice is a written request for payment under the contract for supplies delivered or for services rendered. In order to be proper, an invoice must include as applicable the following:

a. Name and address of the contractor.

b. Invoice date.

c. Contract number or other authorization for supplies delivered, services performed (including order number and contract line item number).

d. Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed.

e. Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government/NAFI bills of lading.

f. Name and address of contractor official to whom payment is to be sent (must be the same as that on the contract or on a proper notice of assignment).

g. Name (where applicable), title, phone number, mailing address of person to be notified in event of defective invoice.

h. Any other information or documentation required by the contract (such as evidence of shipment). Invoices shall be prepared and submitted in duplicate (one copy shall be marked "original") unless otherwise specified.

(2) For purposes of determining if interest begins to accrue under the Prompt Payment Act (Public Law 97-177, as amended by P.L. 100-496):

a. A proper invoice will be deemed to have been received when it is received by the office designated in the contract for receipt of invoices and acceptance of the supplies delivered or services rendered has occurred;

b. Payment shall be considered made on the date on which check for such payment is dated;

c. Payment terms (e.g., "net 20") offered by the contractor will not be deemed a "required payment date"; and

d. The following periods of time will not be included:

(i) after receipt of an improper invoice and prior to notice of any defect or impropriety, but not to exceed 7 days (3 days on contracts for meat food products, and 5 days on contacts for perishable agricultural commodities, dairy products, edible fats or oils and food products prepared from edible fats or oils); and

(ii) between the date of a notice of any defect or impropriety and the date a proper invoice is received. When the notice is in writing, it shall be considered made on the date shown on the notice.

(3) If the NAFI makes payment by Electronic Funds Transfer (EFT) (see applicable contract clause). In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purposes of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(f) Patent indemnity. The Contractor shall indemnify the NAFI and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(g) Payment. Payment shall be made for items accepted by the NAFI that have been delivered to the delivery destinations set forth in this contract. The NAFI will make payment in accordance with the Prompt Payment clause.

(h) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the NAFI upon

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the NAFI at the destination specified in the contract, if transportation is f.o.b. destination.

(i) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(j) Termination for the NAFI's convenience. The NAFI reserves the right to terminate this contract, in whole or in part, when it is in the best interest of the NAFI in accordance with AR 215-4. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the NAFI, using its standard record keeping system, have resulted from the termination. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(k) Termination for cause. The NAFI may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the NAFI, upon request, with adequate assurances of future performance. In the event of termination for cause, the NAFI shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the NAFI for any and all rights and remedies in accordance with the terms of the contract and governing regulations. If it is determined that the NAFI improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(l) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the NAFI upon acceptance, regardless of when or where the NAFI takes physical possession.

(m) Warranty. The Contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such supplies or services and that the rights and remedies provided herein are in addition to and to not limit any rights afforded to the NAFI by any other clause of this contract.

(n) Limitation of liability. Except as otherwise provided by an express or implied warranty, the Contractor will not be liable to the NAFI for consequential damages resulting from any defect or deficiencies in accepted items.

(o) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(p) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, and Other Compliances.

(3) The clause entitled Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Form #[ ].

(8) Other documents, exhibits, and attachments.

(9) The specification or statement of work located in Section C of the order or contract.

(End of clause)

BI.010 INVOICES (APR 2011)

(a) An invoice is a written request for payment under the contract for supplies delivered or for services rendered. In order to be proper, an invoice must include as applicable the following:

(1) Name and address of the contractor.

(2) Invoice date.

(3) Contract number or other authorization for supplies delivered, services performed (including order number and contract line item number).

(4) Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed.

(5) Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government/NAFI bills of lading.

(6) Name and address of contractor official to whom payment is to be sent (must be the same as that on the contract or on a proper notice of assignment).

(7) Name (where applicable), title, phone number, mailing address of person to be notified in event of defective invoice.

(8) Any other information or documentation required by the contract (such as evidence of shipment). Invoices shall be prepared and submitted in duplicate (one copy shall be marked "original") unless otherwise specified.

(b) For purposes of determining if interest begins to accrue under the Prompt Payment Act (Public Law 97-177, as amended).

(1) A proper invoice will be deemed to have been received when it is received by the office designated in the contract for receipt of invoices and acceptance of the supplies delivered or services rendered has occurred;

(2) Payment shall be considered made on the date on which check for such payment is dated;

(3) Payment terms (e.g., "net 20") offered by the contractor will not be deemed a "required payment date"; and

(4) The following periods of time will not be included:

(i) after receipt of an improper invoice and prior to notice of any defect or impropriety, but not to exceed 7 days (3 days on contracts for meat food products, and 5 days on contacts for perishable agricultural commodities, dairy products, edible fats or oils and food products prepared from edible fats or oils); and

(ii) between the date of a notice of any defect or impropriety and the date a proper invoice is received. When the notice is in writing, it shall be considered made on the date shown on the notice.

(End of clause)

(5) If the NAFI makes payment by Electronic Funds Transfer (EFT) (see applicable contract clause). In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purposes of computing the discount earned, payment shall be considered to have been made on the date, which appears on the payment check, or the specified payment date if an electronic funds transfer payment is made.

(End of clause)

BI.011 EXAMINATION OF RECORDS (NOV 2005)

(a) The Contractor agrees that the Contracting Officer or the Contracting Officer's duly authorized representative shall have the right to examine and audit the books and records of the Contractor directly pertaining to the contract during the period of the contract and until the expiration of three years after the final payment under the contract.

(b) The Contractor agrees to include the clause in (a) above, in all subcontracts.

(End of clause)

BI.013 ORDER OF PRECEDENCE (NOV 2004)

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(a) The Schedule (excluding the specifications);

(b) Representations and other instructions;

(c) Contract clauses;

(d) Other documents, exhibits, and attachments; and

(e) The specifications.

(End of clause)

BI.055 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (DEC 2010)

(a) Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC's implementing regulations at 31 CFR Chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States.

(b) Except as authorized by OFAC, most transactions involving Cuba, Iran, and Sudan are prohibited, as are most imports from Burma or North Korea, into the United States or its outlying areas. Lists of entities and individuals subject to economic sanctions are included in OFAC's List of Specially Designated Nationals and Blocked Persons at http://www.treas.gov/offices/enforcement/ofac/sdn/. More information about these restrictions, as well as updates, is available in the OFAC's regulations at 31 CFR Chapter V and/or on OFAC's website at http://www.treas.gov/offices/enforcement/ofac.

(c) The Contractor shall insert this clause, including this paragraph (c), in all subcontracts. (End of clause)

BI.056 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT (NOV 2004)

In the event of inconsistency between any terms of this contract and any translation thereof into another language, the English language meaning shall control.

(End of clause)

BI.068 PAYMENTS (NOV 2004)

The NAFI will pay the Contractor, upon the submission of proper invoices or vouchers, the prices stipulated in this contract for supplies delivered and accepted or services rendered and accepted, less any deductions provided in this contract. Unless otherwise specified in this contract, payments will be made on partial deliveries accepted by the NAFI if-

(a) The amount due on the deliveries warrants it, or

(b) The Contractor requests it and the amount due to the deliveries is at least $1,000 or 50 percent of the total contract price.

(End of clause)

BI.070 DISCOUNTS FOR PROMPT PAYMENT (NOV 2004)

(a) Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a prompt payment discount in conjunction with the offer, offerors awarded contracts may include prompt payment discounts on individual invoices.

(b) In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice. If the Contractor has not placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date. When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and NAFI financial management activities are not expected to be conducted, payment may be made on the following business day.

(End of clause)

BI.073 EXTRAS (NOV 2004)

Except as otherwise provided in this contract, no payment for extras shall be made unless the Contracting Officer has authorized such extras and the price in writing.

(End of clause)

BI.079 DISPUTES (NOV 2004)

(a) This contract is subject to the rules and regulations promulgated by the Secretary of Defense and Secretary of the Army for NAF contracting.

(b) The contract is not subject to the Contract Disputes Act of 1978 (41 U.S.C. 60I-613).

(c) All disputes arising under or relating to this contract shall be resolved under this clause.

(d) "Claims," as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract forms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under this clause. The submission may be converted to a claim under this clause, by complying with the submission requirements of this clause. if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(e) (1) A claim by the Contractor shall be made in writing and submitted to the Contracting Officer for a written decision. A claim by the NAFI against the Contractor shall be subject to a written decision by the Contracting Officer.

(2) For Contractor claims exceeding $100,000, the Contractor shall submit with the claim a certification that-

(i) The claim is made in good faith;

(ii) Supporting data are accurate and complete to the best of the Contractor's knowledge and belief; and

(iii) The amount requested accurately reflects the contract adjustment for which the contractor believes the NAFI is liable.

(3) (i) If the Contractor is an individual, the certification shall be executed by that individual.

(ii) If the Contractor is not an individual, the certification shall be executed by-

(A) A senior company official in charge at the Contractor's plant or location involved, or

(B) An officer or general partner of the Contractor having overall responsibility for the conduct of the Contractor's affairs.

(f) For contract claims of $100,000 or less, the Contracting Officer must, if requested in writing by the Contractor, render a decision within 60 days of the request. For Contractor-certified claims over $100,000, the Contracting Officer must, within 60 days, decide the claim or notify the Contractor of the date by which the decision will be made.

(g) The Contracting Officer's decision shall be final unless the contractor appeals as provided in paragraph (h) of this clause.

(h) The Contracting Officer's decision on claims may be appealed by submitting a written appeal to the Armed Services Board of Contract Appeals within 90 days of receipt of the Contracting Officer's final decision. Decisions of the Armed Services Board of Contract Appeals are final and are not subject to further appeal.

(i) The Contractor shall proceed diligently with performance of this contract, pending final resolution of any request for relief, claim, appeal, or action arising under the contract, and comply with any decision of the Contracting Officer.

(End of clause)

BI.104 CHANGES (NOV 2004)

(a) The Contracting Officer may at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract in any one or more of the following:

(1) Drawings, designs, or specifications when the supplies to be furnished are to be specially manufactured for the NAFI in accordance with the drawings, designs, or specifications.

(2) Method of shipment or packing.

(3) Place of delivery.

(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract.

(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.

(d) If the Contractor's proposal includes the cost of property made obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.

(e) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

(End of clause)

BI.111 COMMERCIAL WARRANTY (NOV 2004)

The Contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such supplies or services and that the rights and remedies provided herein are in addition to and to not limit any rights afforded to the NAFI by any other clause of this contract.

(End of clause)

BI.118 TERMINATION FOR CONVENIENCE (NOV 2004)

The Contracting Officer, by written notice, may terminate this contract, in whole or in part, when it is in the best interest of the NAFI, in accordance with AR 215-4. In the event of such termination, the Contractor shall immediately stop all terminated work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work on the terminated portion(s) of the contract. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the NAFI, using its standard record keeping system, have resulted from the termination. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(End of clause)

BI.119 NO-FAULT TERMINATION (NOV 2004)

This contract may be terminated in whole or in part by either party upon [insert number] days written notice to the other party.

(End of clause)

BI.120 DEFAULT(FIXED PRICE SUPPLY AND SERVICE) (NOV 2004)

(a) (1) The NAFI may, subject to paragraphs (c) and (d) below, through written notice of default to the Contractor, terminate this contract for default in whole or in part if the Contractor fails to-

(i) Deliver the supplies or to perform the services within the time specified in this contract or any extension;

(ii) Make progress, so as to endanger performance of this contract (but see subparagraph (a)(2) below), or

(iii) Perform any of the other provisions of this contract (but see subparagraph (a)(2) below).

(2) The NAFI's right to terminate this contract for default under subdivisions (i)(ii) and (i)(iii) above may be exercised if the Contractor does not cure such failure within 10 days (or as authorized in writing by Contracting Officer) after receipt of the notice from the Contracting Officer specifying the failure.

(b) If the NAFI terminates this contract for default in whole or in part, it may acquire, under the terms and in the manner the Contracting Officer considers appropriate supplies or services similar to those terminated, and the Contractor will be liable to the NAFI for any excess costs for those supplies or services. However, the Contractor shall continue the work not terminated.

(c) Except for defaults of subcontractors at any time, the Contractor shall not be liable for any excess costs if the failure to perform the contract arises from causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include (1) acts of God or the public enemy, (2) acts of the Government/NAFI in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance the failure to perform must be beyond the control and without the fault or negligence of the Contractor.

(d) If the failure to perform is caused by the default of a subcontractor at any tier, and if the cause of the default is beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either, the Contractor shall not be liable for any excess costs for failure to perform, unless the subcontracted supplies or services were obtained from other sources in sufficient time for the Contractor to meet the required delivery schedule.

(e) If this contract is terminated for default, the NAFI may require the Contractor to transfer title and deliver to the NAFI, as directed by the Contracting Officer, any

(1) Completed supplies, and

(2) Partially completed supplies and materials, parts, tools, dies, jigs, fixtures, plans, drawings, information, and contract rights (collectively referred to as "manufacturing materials" in this clause) that the Contractor has specifically produced or acquired for the terminated portion of this contract. Upon direction of the Contracting Officer, the Contractor shall also protect and preserve property in its possession in which the NAFI has an interest.

(f) The NAFI shall pay contract price for completed supplies delivered and accepted. The Contractor and Contracting Officer shall agree on the amount of payment for manufacturing materials delivered and accepted and for the protection and preservation of the property. Failure to agree will be a dispute under the Disputes Clause. The NAFI may withhold from these amounts any sum the Contracting Officer determines to be necessary to protect the NAFI against loss because of outstanding liens or claims of former lien holders.

(g) If, after termination, it is determined that the Contractor was not in default, or that the default was excusable, the rights and obligation of the parties shall be the same as if the termination had been issued for the convenience of the NAFI.

(h) The rights and remedies of the NAFI in this clause are in addition to any other rights and remedies provided by law or under this contract.

BI.124 ASSIGNMENT OF CLAIMS (NOV 2004)

The contractor cannot assign any right or delegate any obligations under this contract without the prior written permission of the Contracting Officer.

(End of clause)

BI.125 NONWAIVER OF DEFAULTS (NOV 2004)

Any failure by the NAFI at any time, or from time to time, to enforce or require strict performance of any terms or conditions of this contract will not constitute waiver thereof and will not affect or impair such terms or conditions in any way or the NAFI's right at any time to avail itself or such remedies as it may have for any breach or breaches of such terms and conditions.

(End of clause)