Printing_Services_for_Solid_Waste_&_Recycling.pdf
PDF 390 KB Posted
- Attached to
- Printing Services for Solid Waste & Recycling
- Solicitation number
- 2026.104-ITB
- Issued by
- Washington County, Oregon
About this file
This is an Invitation to Bid (ITB No. 2026.104-ITB) issued by Washington County, Oregon for printing services to support the Solid Waste & Recycling program's outreach and education efforts across unincorporated Washington County and ten municipalities including Hillsboro, Tigard, and Tualatin. The county seeks a comprehensive printing services contractor to produce full-color, multi-fold materials on recycled content paper with FSC certification. Required print materials include brochures, booklets, posters, fliers, rack cards, door hangers, perforated materials, magnets, stickers, and mailed postcards across sixteen example projects (Projects A through P) with varying quantities ranging from 50 to 25,000 units per job type. The deadline for questions is December 1, 2026 at 5:00 PM, with responses due electronically by December 3, 2026 at 2:00 PM through the county's procurement portal. The contract term is one year with an option to renew for up to four additional years (five years total). The estimated contract value is $200,000.
The bidder must respond to new project requests within five business days and existing project inquiries within three business days, maintaining a primary contact and backup person. All work must be performed within Oregon per ORS 282.210 public printing requirements, completed in-house without subcontractors, and include free pick-up and delivery to the Solid Waste & Recycling office in Hillsboro. Bidders must provide estimates at no charge for specialty jobs not specifically addressed in specifications, with estimates valid for 30 days. Rush fees must be indicated separately for each job type. The county reserves the right to award by groups of items if in its best interest and will award to the lowest responsive responsible bidder. Bidders must submit all required documentation including the Vendor Questionnaire and confirm compliance with Oregon tax laws, resident bidder status, and ORS 282.210 public printing requirements. No bid bond is required. The county may reject any bids not meeting prescribed procedures and reserves the right to reject all bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_SWR_AttachementA.pdf | ||
| GOOD-REQUIREMENTS.pdf | ||
| 2022-Insurance_Requirements_Sample.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
undefined
PRINTING SERVICES FOR SOLID WASTE & RECYCLING
(NO. 2026.104-ITB)
FOR
Washington County, Oregon
RELEASE DATE: November 13, 2026 DEADLINE FOR QUESTIONS: December 1, 2026
RESPONSE DEADLINE: December 3, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/washington-county-or
Printing Services for Solid Waste & Recycling
1. Introduction
2. Legal Advertisement
3. Scope of Work
4. Pricing Proposal
5. Instructions to Bidders for ITB
6. Special Instructions
7. Vendor Questionnaire
Attachments:
A - Statement_of_Work_SWR_AttachementA B - Good Requirements Sample C - Insurance Requirements Sample
Printing Services for Solid Waste & Recycling
1. 1. Introduction
1. 1.1. Summary
The Washington County Solid Waste & Recycling program (SWR) provides outreach and education on recycling programs to residents and businesses located in unincorporated Washington County as well as in the cities of Banks, Cornelius, Durham, Forest Grove, Hillsboro, King City, North Plains, Sherwood, Tigard and Tualatin.
SWR requires various printing services to support its programs that provide outreach to residents and businesses throughout the county and is requesting bids for a one-year, with the option to renew for up to five years, printing services contract for Washington County Department of Health and Human Services.
2. 1.2. Contact Information
Danielle Howard Procurement Analyst II 155 North First Ave
MS-28
Hillsboro, OR 97124 Email: danielle_howard@washingtoncountyor.gov Phone: (503) 846-8757 Department:
HHS
3. 1.3. Timeline
Release Project Date November 13, 2026
Question Submission Deadline December 1, 2026, 5:00pm
Proposal Submission Deadline December 3, 2026, 2:00pm mailto:danielle_howard@washingtoncountyor.gov tel:(503)846-8757
Printing Services for Solid Waste & Recycling
2. 2. Legal Advertisement
WASHINGTON COUNTY, OREGON INVITATION TO BID
No. 2026.104-ITB Printing Services for Solid Waste & Recycling
The Invitation to Bid (“ITB”) documents will be available at www.WashCoPurch.com/biz
Bidders are responsible for checking the site for any addenda to the ITB documents before submitting their bids to the site.
Bid are due no later than 2:00 pm on Thursday, December 3, 2026 late bids are unable to be entered.
The estimated expense for this contract will be $200,000
Bids must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120(1)(b).
All work must be performed in accordance with ORS 282.210 PUBLIC PRINTING. ORS 282.210 states, in part, that unless otherwise exempted, all public printing, binding and stationery work shall be performed within the State of Oregon.
The County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the County it is in the public interest to do so.
Washington County reserves the right to reject any and all bids and to waive any and all informalities in the best interest of the County.
Bidders are solely responsible for ensuring receipt of their bid by the Procurement Division, including but not limited to successfully uploaded documents.
Bidders must conform to the requirements of these bid documents and all related, applicable laws.
The County does not intend to pre-qualify any bidders for this project. All bids submitted for this project will be considered provided that they meet the criteria set forth in the bid documents with respect to submission in a timely manner, bonding, and all other applicable requirements.
Dated this 13 day of November, 2026
Danielle Howard
Procurement Analyst II
(503) 846-8757
Posted to: Friday, November 13, 2026 Oregon Buys http://www.washcopurch.com/biz
Printing Services for Solid Waste & Recycling
3. 3. Scope of Work
1. 3.1. GENERAL INSTRUCTIONS TO RESPONDERS
A. The following instructions, terms and conditions apply to all bids or other such offers to provide services to Washington County.
B. All work must be performed in accordance with ORS 282.210 PUBLIC PRINTING. ORS
282.210 states, in part, that unless otherwise exempted, all public printing, binding and stationery work shall be performed within the State of Oregon.
C. The County intends to award one contract for all items. Bidder must bid all items listed to be considered responsive. Determination of lowest bid will be based on the Total Bid Price.
D. County reserves the right to award contracts by groups of items, if it is determined solely by the County to be in the best interest of the County.
2. 3.2. SPECIFICATIONS AND SCOPE OF WORK
A. GENERAL INFORMATION
1. The Washington County Solid Waste & Recycling program provides outreach and education on recycling programs to residents and businesses located in unincorporated Washington County as well as in the cities of Banks, Cornelius, Durham, Forest Grove, Hillsboro, King City, North Plains, Sherwood, Tigard and Tualatin.
2. The Solid Waste & Recycling program requires various printing and mailing services to support its programs that provide outreach to residents and businesses throughout the county.
3. The printing requirements include full color, multi-fold materials. Original documents consist of double-sided content and are provided in Adobe Acrobat PDF format.
Contains photos, builds, tight registration, and reverse text. All images must be crisp, clean and clear and ink coverage consistent and even throughout the run. Paper 100 percent post-consumer recycled content (PC-100) and is Forest Stewardship Council (FSC) Certified. See Attachment A for detailed specifications
4. Printing requirements are divided into four Job Types consisting of:
a. Brochures and booklets
b. Posters, fliers and cards
c. Bound, perforated and cut
d. Mailed postcards and multifold brochures
e. Magnets and stickers
B. PAPER
1. Paper stock will be designated by the County at the time of the work request. The
County would prefer the paper stock with the highest amount of recycled content. If
Printing Services for Solid Waste & Recycling the budget does not allow for that paper stock the County will choose the paper stock with the highest content of recycled material that the budget will allow.
C. PRE-PRESS MATERIALS
1. All original artwork (reflective and digital), negatives, and non-disposable printing plates are the property of Washington County, and must be returned with completed work.
D. PACKAGING
1. Printing orders shall include box packaging unless otherwise instructed. Bidder shall not add this service as an additional charge.
2. Each box shall be clearly labeled and marked with contents.
E. GENERAL REQUIREMENTS
1. Bidder must respond to new project requests within five business days and respond to questions about an existing project within three business days.
a. Bidder must have a point of contact AND a backup person to respond to County requests within the aforementioned timelines.
2. Contractor must have the ability to complete all tasks in house without the use of subcontractors.
3. Most work orders received by the successful bidder(s) will fall within the specifications of this ITB. However, for those orders that are primarily within the specifications, but contain elements that do not conform, the County will receive specific contract pricing on all portions of the order that does qualify.
4. Some jobs in digital format may require minor typesetting which the vendor will provide at no cost to the County.
3. 3.3. SPECIAL INSTRUCTIONS TO RESPONDERS
A. SPECIALTY PRINTING JOBS
1. Contractor will provide estimates at no charge for job types and quantities not specifically addressed in the specifications. Estimates will be valid for 30 days and subject to change only if the job specifications differ from those stated in the initial quote.
2. The County reserves the right to add similar services or product or delete similar services specified in this requirements contract as needs change during the term of the contract. Cost of services to be added to the contract will be mutually agreed to by the County and the Contractor.
B. PRINTING SAMPLES
1. Washington County may request working samples of certain jobs.
C. RUSH CHARGES
1. For each job for which a bidder submits a bid, please indicate the fee for services that require faster than standard timelines for production and/or delivery.
4. 3.4. SAMPLE JOBS/QUANTITIES
A. The job types listed are an approximation only of the printing and mailing services the County may require over the term of this requirements contract. The actual needs of the
Printing Services for Solid Waste & Recycling
County in terms of variety and quantity may vary from that indicated in the sample job types.
B. Samples of all job types are available for review at the Reception Desk for the Purchasing Division in the Public Services Building, 155 North First Avenue, Suite 270, Hillsboro, Oregon.
5. 3.5. PICK-UP AND DELIVERY REQUIREMENTS
A. Contractor shall provide pick-up of all work orders and related materials and delivery of all completed work and all related materials to the Solid Waste & Recycling program, 155 North First Avenue, Suite 160, Hillsboro, Oregon, unless otherwise noted on the work order. The cost of this service is to be included in the bid price for each specified service.
Additional pick-up and delivery services may be added at the County’s discretion.
B. Turn-around time will be noted on the individual work order and will be considered firm unless Contractor advises the County it is not reasonable.
C. The contractor’s failure to deliver goods or services on time shall be a material breach of the contract. If the contractor fails to deliver services on time, the County, at its discretion, may procure those goods and services from another source. If the price paid by the County for goods and services from another source under this paragraph is higher than the price under this contract, the contractor shall pay the County the difference between those prices. The County may deduct that difference from the amount the County owes the contractor.
D. The contractor bears the risk of damage to materials between the time the contractor picks them up from the County to the time the contractor delivers them as directed by the Solid Waste & Recycling program. The contractor shall reimburse the County for the actual cost of replacing or repairing materials lost or damaged as a result of the errors and omissions of the contractor or its employees, subcontractors or agents
Printing Services for Solid Waste & Recycling
4. 4. Pricing Proposal
All items must have a price or percentage in order to be seen as responsive. The County considers a line marked as $0 to be the price bid for that line item.
EXAMPLE PROJECT A - BROCHURE - SINGLE FAMILY RECYCLE GUIDE
Refer to Scope of Work for exact specifications. Price at the following quantities.
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Brochure 250 Each
2 Brochure 500 Each
3 Brochure 1,000 Each
4 Brochure 5,000 Each
5 Brochure 10,000 Each
6 Brochure 25,000 Each
7 Brochure - Additional Quantities in increments of 5000
5,000 Each
TOTAL
RUSH FEE - FOR THE ABOVE PRICING
This is for information only and does not affect the outcome of the quote.
Line Item Description Unit of Measure Unit Cost
1 Rush Fee for Processing the job above Lump Sum
EXAMPLE PROJECT B - BROCHURE - MULTIFAMILY RECYCLE GUIDE
Refer to Scope of Work for exact specifications. Price at the following quantities.
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Brochure 250 Each
2 Brochure 500 Each
3 Brochure 1,000 Each
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
4 Brochure 5,000 Each
5 Brochure 10,000 Each
6 Brochure 25,000 Each
7 Brochure - Additional Quantities in increments of 1000
1,000 Each
EXAMPLE PROJECT C - BROCHURE - FOOD SCRAPS COLLECTION GUIDE
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Brochure 250 Each
2 Brochure 500 Each
3 Brochure 1,000 Each
4 Brochure 5,000 Each
5 Brochure 10,000 Each
6 Brochure 25,000 Each
7 Brochure - Additional Quantities in increments of 1000
Printing Services for Solid Waste & Recycling
EXAMPLE PROJECT D - BOOKLET - PROPERTY MANAGER GUIDE
Refer to Scope of Work for exact specifications. Price at the following quantities:
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Brochure 50 Each
2 Brochure 100 Each
3 Brochure 250 Each
4 Brochure 500 Each
5 Brochure 750 Each
6 Brochure 1,000 Each
7 Brochure - Additional Quantities in increments of 100
100 Each
EXAMPLE PROJECT E - POSTER - MIXED RECYCLING POSTER
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Poster 50 Each
2 Poster 100 Each
3 Poster 250 Each
4 Poster 500 Each
5 Poster 750 Each
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
6 Poster 1,000 Each
7 Poster - Additional Quantities in increments of 100
EXAMPLE PROJECT F - FLIER - FOOD STORAGE GUIDE
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Flier 50 Each
2 Flier 100 Each
3 Flier 250 Each
4 Flier 500 Each
5 Flier 750 Each
6 Flier 1,000 Each
7 Flier - Additional Quantities in increments of 100
EXAMPLE PROJECT G - RACK CARD – HALF-PAGE RECYCLING DAY APP
Printing Services for Solid Waste & Recycling
Refer to Scope of Work for exact specifications. Price at the following quantities:
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Rack card 100 Each
2 Rack card 250 Each
3 Rack card 500 Each
4 Rack card 1,000 Each
5 Rack card 2,500 Each
6 Rack card 5,000 Each
7 Rack card - Additional Quantities in increments of 500
500 Each
EXAMPLE PROJECT H - RACK CARD – BATTERY INFO CARD
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Rack card 100 Each
2 Rack card 250 Each
3 Rack card 500 Each
4 Rack card 1,000 Each
5 Rack card 2,500 Each
6 Rack card 5,000 Each
7 Rack card - Additional Quantities in increments of 500
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
EXAMPLE PROJECT I - FLIER - BILINGUAL MULTIFAMILY ROLES
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Flier 50 Each
2 Flier 100 Each
3 Flier 250 Each
4 Flier 500 Each
5 Flier 1,000 Each
6 Flier 2,000 Each
7 Flier - Additional Quantities in increments of 500
EXAMPLE PROJECT J - MULTI-PAGE PAD - MEAL PLANNER AND SHOPPING LIST
Line Item Description Quantity Unit of Measure
Unit Cost Total
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Multi-page Pad 100 Each
2 Multi-page Pad 250 Each
3 Multi-page Pad 500 Each
4 Multi-page Pad 1,000 Each
5 Multi-page Pad 2,500 Each
6 Multi-page Pad 5,000 Each
7 Multi-page Pad - Additional Quantities in increments of 500
EXAMPLE PROJECT K - DOOR HANGER - INCORRECT PREPARATION NOTICE
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Door hanger 250 Each
2 Door hanger 500 Each
3 Door hanger 1,000 Each
4 Door hanger 2,500 Each
5 Door hanger 5,000 Each
6 Door hanger 10,000 Each
7 Door hanger - Additional Quantities in increments of 500
Printing Services for Solid Waste & Recycling
RUSH FEE - FOR THE ABOVE PRICING
This is for information only and does not affect the outcome of the quote.
EXAMPLE PROJECT L - PERFORATED FLIER - PLEDGE FORM
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Perforated flier 100 Each
2 Perforated flier 250 Each
3 Perforated flier 500 Each
4 Perforated flier 1,000 Each
5 Perforated flier 2,500 Each
6 Perforated flier 5,000 Each
7 Perforated flier - Additional Quantities in increments of 500
EXAMPLE PROJECT M - BROCHURE - SPECIAL RECYCLING COLLECTION (MAILED
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Brochure (Mailed) 250 Each
2 Brochure (Mailed) 500 Each
3 Brochure (Mailed) 1,000 Each
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
4 Brochure (Mailed) 5,000 Each
5 Brochure (Mailed) 10,000 Each
6 Brochure (Mailed) 25,000 Each
7 Brochure (Mailed) - Additional Quantities in increments of 1000
EXAMPLE PROJECT N - POSTCARD - SPECIAL REUSE COLLECTION (MAILED)
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Postcard (Mailed) 100 Each
2 Postcard (Mailed) 250 Each
3 Postcard (Mailed) 500 Each
4 Postcard (Mailed) 1,000 Each
5 Postcard (Mailed) 2,500 Each
6 Postcard (Mailed) 5,000 Each
7 Postcard (Mailed) 10,000 Each
8 Postcard (Mailed) - Additional Quantities in increments of 500
Printing Services for Solid Waste & Recycling
EXAMPLE PROJECT O - MAGNET - FOOD STORAGE MAGNET
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Postcard (Mailed) 100 Each
2 Postcard (Mailed) 250 Each
3 Postcard (Mailed) 500 Each
4 Postcard (Mailed) 1,000 Each
5 Postcard (Mailed) 2,500 Each
6 Postcard (Mailed) 5,000 Each
7 Postcard (Mailed) 10,000 Each
8 Postcard (Mailed) - Additional Quantities in increments of 500
EXAMPLE PROJECT P - STICKER - EAT THIS FIRST STICKER
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Postcard (Mailed) 100 Each
2 Postcard (Mailed) 250 Each
3 Postcard (Mailed) 500 Each
4 Postcard (Mailed) 1,000 Each
5 Postcard (Mailed) 2,500 Each
6 Postcard (Mailed) 5,000 Each
7 Postcard (Mailed) 10,000 Each
Printing Services for Solid Waste & Recycling
Line Item Description Quantity Unit of Measure
Unit Cost Total
8 Postcard (Mailed) - Additional Quantities in increments of 500
Printing Services for Solid Waste & Recycling
5. 5. Instructions to Bidders for ITB
1. 5.1. Deadline Disclaimer
A. It is the responsibility of the responder to upload and submit their electronic response before the deadline date and time approaches as posted on the County's Procurement Portal. Allow for a sufficient amount of time for the bid entry/document upload process in order to ensure timely submission.
B. Make sure that all documents are uploaded as soon as possible well in advance of the deadline. The County's Procurement Portal will close promptly at the deadline date and time. All responses must be submitted, not in process, by that time…no exceptions are allowed.
C. Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.
2. 5.2. Overview
The following instructions, terms and conditions apply to all bids or other such offers to provide construction services, services, or goods to Washington County.
3. 5.3. Precedence of Documents
The order of precedence of documents is as follows:
A. Instructions to Bidders B. Specifications/Scope of Work C. Pricing Proposal D. Special Instructions
4. 5.4. Copies of Bid Documents
Documents obtained from sources (such as directly from other bidders) other than www.WashCoPurch.com/biz are not valid solicitation documents. It is the bidder’s responsibility to insure they are listed as an interested party on the County's Procurement Portal website for a particular project in order to receive notification of all addenda as well as additional relevant information.
5. 5.5. Bidder's Requirements
All items must have a price or percentage in order to be seen as responsive. The County considers a line marked as $0 to be the price bid for that line item. If there is a NO BID column then choosing that option is acceptable.
The bidder further agrees to the following:
Printing Services for Solid Waste & Recycling
A. To examine all specifications, instructions, terms and conditions thoroughly.
B. To provide for appropriate insurance, bid guaranties, and performance bonds as required.
C. To comply fully with specifications as attached for the agreed bid and/or contract, especially where materials and work are involved.
D. To clean up all debris and remove debris from the site as specified.
E. All equipment replaced or removed by the bidder shall remain the property of the
County unless otherwise noted in the specifications or special instructions.
F. Upon completion of the contract and/or delivery and installation, to pass a good, free and clear title for goods and services rendered to the County. Such goods and services shall be free of all claims, mechanic’s liens, subcontractor judgments and other encumbrances which might cloud the County’s title to said goods and services.
G. That they have met any and all registration requirements where required for contractors as set forth in the Oregon Revised Statutes. As required, bidders shall furnish a valid contractor's license number at the time of bid opening.
H. To accept any claims, liens and demands to indemnify the County and hold harmless the County and preserve the property the entire time of equipment installation and/or contract duration.
6. 5.6. Substitution Requests
A. The materials, products and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution. Any request for substitutions must be submitted for consideration no later than Tuesday, December 1, 2026 by5:00 pm. Substitution requests shall be submitted via the question and answer section of the solicitation.
B. A statement setting forth changes in other materials, equipment or other portions of the Work, including changes in the work of other contracts that incorporation of the proposed substitution would require, shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer.
C. The project manager's decision of approval or disapproval of a proposed substitution shall be final. If the project manager approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner. No substitutions will be considered after the Contract award unless specifically provided for in the Contract documents.
7. 5.7. Samples
A. Samples of a similar shape, size, color and type may be requested. If requested, they shall be submitted for each item listed in the Specifications, Scope of Work or Details Section no later than the quote closing time and date.
B. Samples will be retained until award of bids. Samples shall fully represent the quality of produced items that can be expected.
C. All samples will be returned at responder's expense, if responder requests them be returned.
Printing Services for Solid Waste & Recycling
8. 5.8. Specification Protest or Suggested Change Process
Delivery: Any protest of the specifications must be delivered to the County in writing no later than seven (7) calendar days prior to the bid closing date, a postmark is not sufficient, as follows:
Specification Protest Bid #:2026.104-ITB Washington County Procurement Division ATTN: Procurement Manager 155 North First Avenue, Suite 270 MS 28 Hillsboro, Oregon 97124-3072
A. Content: A written protest must include:
1. Sufficient information to identify the solicitation that is the subject of the protest;
2. The grounds that demonstrate how the procurement process is contrary to law or how the solicitation document is unnecessarily restrictive, is legally flawed or improperly specifies a brand name;
3. Evidence or supporting documentation that supports the grounds on which the protest is based; and
4. The relief sought; and
5. A statement of the desired changes to solicitation document that the prospective bidder believes will remedy the conditions upon which the prospective bidder based its protest.
B. County Response: The County may reject without consideration a bidder’s protest after the deadline established for submitting protest. The County shall provide notice to the applicable protestor if it entirely rejects a protest. If the County agrees with the protest, in whole or in part, the County shall either issue an addendum reflecting its determination or cancel the solicitation.
C. Extension of Closing: If the County receives a written protest in accordance with this Section the County may extend closing if the County determines an extension is necessary to consider the protest and to issue addenda, if any, to the solicitation document.
D. Judicial review of the County’s decision relating to a specification protest shall be in accordance with ORS 279B.405.
9. 5.9. Bid Guaranty Form and Bid Bond
The County has decided that the requirement of Bid Guaranty Form and Bid Bond will be waived for this project.
10. 5.10. Bid Submission
A. All bids must be submitted through our electronic Procurement Portal.
B. Email, phone, fax and paper bids will not be accepted.
C. It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on the County's Procurement Portal.
D. It is the sole responsibility of the bidder to ensure receipt of bids and success of uploaded documents or bid modifications by the County by the specified time.
Printing Services for Solid Waste & Recycling
E. Bidders are required to use the bid forms or tables posted on www.WashCoPurch.com/biz.
F. Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.
11. 5.11. Unit Prices
If the bid document includes a schedule of unit prices for labor and materials or other items to establish a cost basis for unforeseen contract changes, Washington County reserves the right to reject, without impairing the balance of the bid, any or all such predetermined unit prices, and negotiate such unit prices during the term of the award.
12. 5.12. Bid Opening
A. All bids received will be publicly opened immediately after the bid closing date and time.
All bidders and other persons who may be interested in this matter are invited to attend online through Microsoft Teams.
B. Bids shall contain all required documents and descriptive literature. The Vendor Questionnaire must be complete in order to submit your response. Any statement accompanying and tending to qualify a bid may cause rejection unless the statement is required or permitted.
C. Microsoft Teams Bid Opening Link Join Microsoft Teams Meeting
+1 971-337-3439 United States, Portland (Toll)
Conference ID: 522 346 32#
13. 5.13. Liquidated Damages
The Contractor agrees that work under this contract shall be completed in accordance with the specified contract time. In the event Contractor fails to complete work within the time as herein mentioned, or in the extended time agreed upon, liquidated damage shall be enforced.
14. 5.14. Oregon Corporate Activity Tax (“CAT”)
A. In 2019 Oregon adopted a Corporate Activity Tax (“CAT”) applicable to all types of business entities. The legislation accomplishes the following:
1. Establishes a "Fund for Student Success" that is separate and distinct from the state's general fund
2. Adopts a new Corporate Activity Tax (CAT) imposed on all types of business entities
B. The CAT is in addition to the state's current corporate income tax. The CAT is imposed on businesses for the privilege of doing business in this state. It is measured on a business's commercial activity, which is the total amount a business realizes from transactions and activity in Oregon. The CAT is applied to taxable Oregon commercial activity in excess of https://www.washcopurch.com/biz https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWJmZjlmNzUtZGQ5NC00MjY1LTk4YzgtZGYzYjJkYzY4NGE0%40thread.v2/0?context=%7b%22Tid%22%3a%2240d27439-4752-4445-a1f9-bb649e5f3042%22%2c%22Oid%22%3a%22e52c78da-3539-4e4f-a9e3-a4a48dcdfd9a%22%7d
Printing Services for Solid Waste & Recycling
$1 million. Any costs relating to Oregon’s Corporate Activity Tax will not be reimbursable under Cost of the Work.
15. 5.15. Contract Award
The County reserves the right to award this bid based on the following:
Lowest responsive responsible bidder.
16. 5.16. Execution of Contract
A. The successful bidder(s) shall within fifteen (15) business days from the date of receiving from the County the contract prepared and ready for execution, furnish the County the corporate performance and payment surety bonds specified herein if required and enter into a contract with the County.
B. If the successful bidder fails to comply with any of the requirements herein, the County may, at its option, determine that the bidder has abandoned the contract and the security accompanying this bid shall be forfeited and the same shall become the property of the County.
C. Successful bidder(s) will be held to all County policies and procedures.
17. 5.17. Substantial Completion
Work to be performed under this contract must be completed within the specified number of days from the date the Notice to Proceed is received by the contractor, and, subject to authorized adjustments, Substantial Completion of the Work shall be achieved within the time frame indicated in the construction schedule as submitted by the successful contractor.
18. 5.18. Form of Contract
A. A copy of the County's contract that the County expects the successful firm or individual to execute is attached. The contract will incorporate the terms and conditions from this document, attachments provided, and the successful response documents.
B. Firms taking exception to any of the contract terms should indicate the same by uploading in the Vendor Submission or their exceptions will be deemed waived.
Printing Services for Solid Waste & Recycling
6. 6. Special Instructions
1. 6.1. Laws and Regulations
A. The bidder shall be familiar with all Federal, State, County and /or City laws and regulations, which in any manner affect those engaged or employed in the work or the materials or equipment used or which in any way affect the conduct of the work, and no pleas of misunderstanding will be considered on account of ignorance thereof. If the bidder discovers any provision in the specifications or project information, plans or contract documents that is contrary to or inconsistent with any law or regulations, they shall report it to Washington County in writing via the County’s e-Procurement portal .
B. All work performed by the contractor shall be in compliance with all Federal, State, County and local laws, regulations and ordinances. Unless otherwise specified, the contractor shall be responsible for applying for applicable permits and licenses.
2. 6.2. Recycled Materials and Sustainable Products and Processes
A. To the extent practicable and economically feasible, suppliers shall provide a competitive preference for products and services that conserve natural resources and protect the environment and are energy efficient.
B. Examples of such products may include, but are not limited to, products described in U.S.
Environmental Protection Agency (U.S. EPA) guidelines at 40 C.F.R. Parts 247-253, implementing section 6002 of the Resource Conservation and Recovery Act, as amended, 42 U.S.C. § 6962. Suppliers shall include this provision in all its subcontracts, with the requirement that it shall flow down to all subcontracts regardless of tier.
C. These efforts must be consistent with maintaining a satisfactory level of competition unless the supplier determines that such items: (1) are not reasonably available in a reasonable period of time; (2) fail to meet reasonable performance standards, which shall be determined on the basis of the guidelines of the National Institute of Standards and Technology, if applicable to the item; or (3) are only available at an unreasonable price.
3. 6.3. Discrimination in Subcontracting
A. A contractor who contracts with a public contracting agency shall not discriminate against minority, women or emerging small business enterprises in the awarding of subcontracts. The contractor shall certify by signing the Certification and Contract Offer that the contractor has not discriminated against minority, women or emerging small business enterprises in obtaining any required subcontracts. ORS 279A.110
B. The public contracting agency may disqualify any person as a bidder on a public contract if the agency finds that the person has violated this section in a contract between the person and the agency.
Printing Services for Solid Waste & Recycling
C. If the person wishes to appeal the disqualification, the appeal procedure shall be pursuant to ORS 279C.450.
4. 6.4. The Rights of the County
The County expressly reserves the following rights:
A. To waive any irregularities in the bids submitted.
B. To base awards with due regard to price, delivery, compliance with specifications, and other such factors as may be necessary and in the public interest in the circumstances.
C. To make awards to any bidder whose bid, in the opinion of management and the Board, is the lowest responsible bid.
D. To cancel the procurement or reject any or all bids, or selected portions thereof, in accordance with ORS 279B.100. Under no circumstances shall the County be responsible for, nor shall it reimburse, any costs associated providing a bid for this solicitation.
E. To negotiate final contract terms and conditions to the fullest extent allowed by the law and as in the best interests of the County.
Acceptance of an offer is subject to budget approval and budgetary constraints as determined by the County.
5. 6.5. Qualifications of Bidders
Qualifications of bidders may be evaluated when determining the award. Bidders may be required to produce acceptable personal, business, and credit references and completed examples of previous work of a similar nature.
The County reserves the right to investigate references and to consider the past performance of any bidder with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of services on schedule, and its lawful payment of employees and workers whether or not specifically listed by the bidder.
6. 6.6. Low Tie Bids
A. Low tie bids are subject to the Oregon preference as provided by ORS279A.120: “For purposes of awarding a public contract, a contracting agency shall give preference to goods or services that have been manufactured or produced in this state if price, fitness, availability and quality are otherwise equal.”
B. Low tie bids that remain after application of the statutory Oregon preference shall be awarded according to the following sequence:
1. Award shall be made by drawing lots among any tied Oregon bidders. Such bidders shall be given notice and an opportunity to be present when lots are drawn.
2. If none of the tied bidders is located in Oregon, award of the contract shall be made by drawing lots among all tied bidders. Such bidders shall be given notice and an opportunity to be present when lots are drawn.
Printing Services for Solid Waste & Recycling
7. 6.7. Award Recommendation / Intent to Award
A Notice of Intent to Award will be posted on the www.WashCoPurch.com/biz web site at least seven (7) days before the award of the contract.
8. 6.8. Contract Term
A. The term of the contract will be Initial contract term will be one year, with the option to renew for up to a total of five years.. Changes in the term of the contract are allowed if agreed upon by both parties and not to exceed 5 years.
B. The maximum term of the contract will be five years.
C. The estimated expenditure for the contract is approximately $200,000. Actual expenditures may be more or less depending on actual requirements.
9. 6.9. Form of Contract
A. A copy of the County's contract that the County expects the successful firm or individual to execute is attached. The contract will incorporate the terms and conditions from this RFP document, attachments provided, and the successful proposer's response documents.
B. Firms taking exception to any of the contract terms should indicate the same by uploading in the Vendor Submission or their exceptions will be deemed waived.
10. 6.10. Bid Files
A completed bid file for each project will be available, by appointment only, for public inspection at the Washington County Procurement Division Office.
11. 6.11. Protest and Judicial Review of Award
A. Purpose. The award by the Washington County Board of Commissioners of the contract shall constitute a final decision of the County to award the contract if no written protest of the award is filed. A bidder may protest the award of a contract, or the intent to award of a contract, whichever occurs first, if the conditions set forth in ORS 279B.410(1) are satisfied. A bidder must file a written protest with the County and exhaust all administrative remedies before seeking judicial review of the County's contract award decision.
B. Delivery. A bidder must deliver a written protest to the Washington County Procurement Manager within seven (7) days after issuance of the notice of intent to award the contract. Protests must be physically received by 5:00 PM on the 7th day. A postmark is not sufficient.
C. Content of Protest. A bidder’s written protest shall specify the grounds for the protest to be considered pursuant to ORS 279B.410(2). Bidder may not protest the content of Specifications, nor shall the County consider any such grounds, in an award protest.
Bidders may protest only deviation for laws, rules, regulation or procedures, including
Printing Services for Solid Waste & Recycling procedures set out in the ITB. Protests must specify the grounds for protest including the specific citation or law, rule, regulation, or procedure upon which the protest is based.
D. County Response. The Board or its designee shall not consider a bidder’s contract award protest submitted after the timeline established for submitting such protest has expired per B above. The County shall issue a written disposition of the protest in a timely manner as set forth in ORS 279B.410(4). If the protest is upheld, in whole or in part, the Board or its designee may in its sole discretion either award the contract to the successful protestor or cancel the procurement or solicitation.
E. Judicial Review. Judicial review of the Board’s or its designee’s decision relating to a contract award protest shall be in accordance with ORS 279B.415.
12. 6.12. Contractor's Responsibility
It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work. The contractor assumes the entire responsibility for the method of performing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods, or the lack thereof, shall not affect the contractor's liability, or status as an independent contractor under this contract.
13. 6.13. Performance
Contractor shall perform all services required by this contract within the time specified.
Contractor shall provide all services in accordance with the highest industry standard prevalent in the industry or business most closely related to the construction industry. Unless the means or methods of performing a task are specified elsewhere in the contract, contractor shall employ methods that are generally accepted and used by the industry. Any performance that is found unacceptable will be documented and the contractor will be given written notice to correct the problem within a specified period. If the problem continues beyond the specified period the contractor may be found in breach of this contract, and the contract may be terminated.
14. 6.14. Non-Performance
In the event of nonperformance under the resulting contract the County will have the right to obtain from other sources such equipment, supplies, and/or services as may be required to fulfill the contract. It is agreed that the difference in cost, if any, for said equipment, supplies and/or services shall be borne by the contractor awarded this contract.
15. 6.15. Drug and Alcohol Testing for Public Works Contracts
Contractor shall demonstrate that an employee drug and alcohol testing program is in place and that the employees who are engaged in the construction, reconstruction or maintenance of a project (all public works projects) that have tested negative for drugs and alcohol or have entered a rehabilitation program. By signing the certification and contract offer the contractor is certifying that they have a program in place. ORS 279C.505(2)
Printing Services for Solid Waste & Recycling
16. 6.16. Guarantee
Contractor agrees to repair any failures due to inferior workmanship and/or materials without additional expense to the County.
17. 6.17. Damage Clause
A. Contractor shall be responsible for renovating, restoring, or otherwise repairing any portion of the County's premises, facilities, or any County owned properties or right-of-ways which are damaged by the contractor and its agents in the case of any work related to its obligation under this contract.
B. Contractor agrees to repair any avoidable damage to existing materials, surfaces and equipment caused during the execution of the work, without additional expense to the County.
18. 6.18. Product Safety
A. In accordance with all applicable laws and generally accepted practices, the contractor will be solely and completely responsible for conditions of the job site, including the safety of all persons and property during the performance of the work. This requirement will apply continuously and not be limited to normal working hours.
B. Performance, or other, reviews conducted by the County’s representative are not intended to include review of the adequacy of the contractor’s safety measures in, on, or near the project.
19. 6.19. OSHA
During the performance of this contract, the Contractor is required to comply with the conditions of the Federal Occupational Safety and Health Act of 1972 (OSHA) and the standards and regulations issued there under. The bidder shall further agree to hold the County, its employees, agents, commissioners, and assigns harmless and free from liability for failure to comply with said standards and regulations by the bidder. It shall be the sole responsibility of the bidder to remain familiar with said standards and regulations and maintain their enforcement.
20. 6.20. Hazardous Materials
A. All materials that include solvents, paints, cleaning agents, chemicals, reagents or other hazardous materials shall be labeled in accordance with Oregon law with the name(s) of the hazardous ingredient(s), the hazard(s) of the material(s) and the appropriate precautions. Materials for which toxicological or hazard data are unavailable shall carry a label stating: “Toxicological and other hazards unknown. Handle as extremely hazardous.”
B. Environmentally Preferred Products/Material Safety Data Sheets. Whenever possible, the Contractor should use environmentally preferable products which present a lesser impact to the public health and the environment than competing products. Contractor agrees, upon execution of this contract, to submit a copy of the relevant material safety
Printing Services for Solid Waste & Recycling data sheet(s) for any chemical substance the Contractor will bring on to the County’s premises and use as part of the work described in this contract.
21. 6.21. Patent or Franchise Infringement
The Contractor agrees to protect the County against all claims for patent or franchise infringement arising from the purchase, installation, or use of the material(s) or service(s) ordered from this solicitation, and to assume all expense and damage arising from such claims.
22. 6.22. Assignment to the County
A. By entering into a contract under this solicitation, the contractor irrevocably assigns to Washington County any claim or cause of action which the contractor now has or which may accrue in the future, including, at the option of Washington County, the right to control any such litigation, by reason of any violation of 15 USC 15 §1-15 or ORS 646.725 or ORS 646.730, in connection with any goods or services provided to the contractor by any person which are used, in whole or in part, for the purpose of carrying out the contractor's obligations under such contract.
B. Contractor shall require any subcontractor to irrevocably assign to Washington County, as a third party beneficiary, any right, title or interest that has accrued or may accrue to the subcontractor by reason of any violation of 15 USC 15 §1-15, ORS 646.725 or ORS 646.730, including, at the option of Washington County, the right to control any litigation arising there under, in connection with any goods or services provided to the subcontractor by any person, in whole or in part, for the purpose of carrying out the subcontractor's obligations as agreed to by the contractor in pursuance of the completion of this contract.
C. In connection with this assignment, it is an express obligation of the contractor that it will take no action that any way diminishes the value of the rights conveyed or assigned hereunder to the County. It is an express obligation of the contractor to advise the Office of County Counsel for Washington County:
1. In advance of its intention to commence any action on its own behalf regarding such claims or causes of action;
2. Immediately, upon becoming aware of the fact that an action has been commenced on its own behalf by some other person or persons, of the dependency of such action; and
3. The date on which it notified the obligor(s) of any such claims for relief or causes of action of the fact of its assignment to the County.
23. 6.23. Price Adjustment
A. Revised Published Price Lists will be used as a means of price increases. However, all bids are to be firm for a period of 180 calendar days after the bid closing date and Revised Price Lists will not be accepted by the County until after that date. Revised Published Price Lists will be accepted only in the event of an industry-wide price change, as
Printing Services for Solid Waste & Recycling evidenced by the issuance of revised price lists by the manufacturer. Price adjustments will not be made for changes in freight.
B. Price increases will not become effective until revised list(s) are submitted to the County Contract Administrator under Contractor’s cover letter identifying the applicable requirements contract number. Contractor cover letter and pricing list(s) must be dated, signed and submitted at least thirty (30) days prior to the date the increase becomes effective. The County reserves the right to accept or reject any proposed changes in prices or discounts. If the price changes are accepted, they shall become effective upon completion of the contract amendment process.
C. If price increases are necessary, the County must receive the same or better percentage discount from list as was reflected in the original bid prices.
D. All price decreases and store specials shall be passed through in total to the County on the effective date of the price decrease.
E. The County reserves the right to determine the acceptability of price verification documentation. Increases shall apply to orders issued on or after the effective date of the increase request once approved by the County. In the event of price increases(s), the County reserves the right to audit Contractor’s books and records relating to cost or pricing data.
24. 6.24. Purchasing by Contractor
Contractor shall make all purchases in its own name and not in any way attempt to bind the County in Contractor’s contractual agreements. Delivery of goods to County facilities will be at contractor’s own risk and expense.
25. 6.25. Contact Persons
The contractor shall designate one or more person(s) as the contact person for this contract. The contractor should provide to the County the names, addresses and telephone numbers of such person(s) and shall keep this information current at all times.
26. 6.26. Payment
A. Payment shall be made upon submission of invoice and any required supporting documentation after final acceptance of each phase and/or monthly progress payments.
B. Contractor shall invoice the County no later than thirty (30) days following completion of work.
C. The County will pay the invoice within 30 days after approval of the invoice by the contract administrator.
27. 6.27. Public Contracting Statutes
The provisions of Oregon Revised Statutes 279C.500 through 279C.870, Public Contracts, as applicable are incorporated herein by reference. Any bidder accepting a purchase order from the
Printing Services for Solid Waste & Recycling
County and/or executing a contract with the County for the delivery of materials and/or services agrees to comply with said provisions.
28. 6.28. Bidder Responsibility Form Questions
A. The Apparent Low Bidder may be sent a link to respond to the Bidder Responsibility Form. Bidder must respond by the due date which shall be no more than 2 business days after the bid due date. Failure to do so will result in the low bidder being found non-responsive.
B. The Bidder Responsibility Form addresses the following standards of responsibility:
1. Evidence of projects of similar scope undertaken and completed by the bidder for local government agencies within the last five (5) years. Previous project information should include: examples of scope of work similar to this project, the name of the project, the bidder's role on the project (general contractor or subcontractor), the date completed, the project engineer or architect, and the name of the public agency (include the public agency's address, phone number and contact person). To be considered for acceptance a bidder must demonstrate a minimum of three (3) consecutive years' experience in successfully executing work of the types specified.
2. Evidence of a satisfactory record of performance during the last five (5) years;
3. Evidence of sufficient financial, material, equipment, facility and expertise, necessary to meet all contractual responsibilities;
4. Evidence that the key subcontractors, installers and personnel supervisory proposed for this contract are qualified for the type of work specified; and
5. Evidence of a satisfactory record of integrity. A bidder may be determined to lack integrity if the County determines the bidder demonstrates a lack of business ethics such as violation of state environmental laws or false certifications made to an agency.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .