Longshore Park, 260 Compo Road South, Water Main Installation
Solicitation number
#27-189T
Issued by
Fairfield County, Connecticut

About this file

This is a Specifications and Specimen Contract Documents file for the Town of Westport, Connecticut, involving the Longshore Park water main installation project at 260 Compo Road South. The project consists of furnishing and installing approximately 7,110 linear feet of 12-inch HDPE water main, 345 linear feet of 12-inch ductile iron water main, 15 hydrant assemblies, water service connections, and related appurtenances across Old Cuttings Lane, Cuttings Lane, Herbert Baldwin Road, and Julian Brodie Road. Sealed bids are due by 11:00 a.m. on Thursday, December 10, 2026, at the Westport Town Hall Controller's Office, Room 313, 110 Myrtle Avenue, Westport, CT 06880. The bid opening will occur via Zoom at 11:15 a.m. the same day. The contract award is scheduled for December 16, 2026, with a Notice to Proceed expected January 13, 2027, or as soon as feasible. The completion time is 160 consecutive calendar days from issuance of the Notice to Proceed. The bid items include various pipe sizes and materials, valves, hydrants, service connections, excavation, backfill, rock removal, concrete restoration, loam and seed, and traffic control, with a cash allowance of $35,200 for traffic control.

Bidders must submit a 15 percent bid bond, with performance and payment bonds each equal to 100 percent of the contract price required upon award. The low bidder must provide evidence of qualifications and subcontractor information within ten days of bid opening. All work must comply with prevailing wage rates as determined by Connecticut's Labor Commissioner and applicable safety regulations including OSHA standards. The contractor is responsible for all permits, including a Road Opening Permit from the Town of Westport with waived fees, and must coordinate with the Aquarion Water Authority and multiple utilities including Eversource Energy, Verizon, Cablevision/Altice, Kinder Morgan, Metro-North Railroad, and Southern Connecticut Gas Company. Insurance requirements include workers' compensation with $500,000 employer's liability limits, commercial general liability with $2,000,000 aggregate limits, $1,000,000 commercial automobile coverage, and $5,000,000 umbrella liability coverage. The contractor must provide a one-year guarantee on all materials and work performed and maintain a 5 percent retainage through the one-year maintenance period following final completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment Information

This document contains tracked changes. Inserted text is marked with blue underlines. Use the toolbar buttons to hide insertions or deletions and read only the final or original text.

Specifications and specimen contract documents for: Longshore Park, 260 Compo Road South, water main installation Bid #27-189T

November 2026

Town of Westport logo: stylized white W on a blue square, with WESTPORT and CONNECTICUT beneath it.

Town of Westport Board of Selectman

Kevin Christie, First Selectman

Department of Public Works

Larry Roberts, Director of Public Works

Water Pollution Control Authority

Bryan H. Thompson, WPCA General Manager

Engineering Division 110 Myrtle Avenue, Room #210 Tel: (203)-341-1120

Town of Westport, Connecticut seal

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 1/329 tel:+12033411120

Westport, Connecticut Office of the Controller Town Hall, 110 Myrtle Ave.

Westport, Connecticut 06880

(203) 341-1080

Town of Westport, Connecticut

Notice to bidders

Bid number: #27-189T

Sealed bids for:

Longshore Park, 260 Compo Road South, Water Main Installation will be received by the Town of Westport until 11:00 A.M., Thursday, December 10, 2026 at:

Westport Town Hall, Controller’s Office, Room 313, 110 Myrtle Avenue, Westport, CT 06880

No bids will be received after said hour. Copies of the bid documents may be obtained by downloading the information from the Town’s website:

www.westportct.gov/bids

The Bid Opening will take place via ZOOM at 11:15 AM after the bid deadline. Bidders may request a ZOOM invitation by e-mailing Berit Watson, Westport Purchasing Officer, at bwatson@westportct.gov for the link.

The Town of Westport reserves the right to waive any defects and informality in the bidding or in any bid, to reject any or all bids for any reason whatsoever and to accept that bid deemed to be in the best interest of the Town of Westport.

Gary Conrad Finance Director

Town of Westport, Connecticut Department of Public Works Bid 27-189T

Longshore Park, 260 Compo Road South, Water Main Installation

Specifications

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 2/329 tel:2033411080 http://www.westportct.gov/bids mailto:bwatson@westportct.gov

00003 Table of contents

Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract

00200 Information for Bidders 00300 Proposal 00400 Forms 00500 General Conditions 00700 Special Provisions 00800 State Wage Rates

Technical Specifications

Division 1 – General Requirements

01010 Summary of Work 01013 Facility Interference with Proposed Work 01019 Drawings 01021 Cash Allowances 01025 Measurement and Payment 01026 Schedule of Values 01027 Application for Payment 01028 Change Orders 01050 Field Engineering 01092 Abbreviations & Definitions 01200 Project Meetings 01300 Submittals 01310 Construction Schedules 01350 Health and Safety Plan 01385 Pre-Construction Video Recording 01410 Testing Laboratory Services 01505 Mobilization 01510 Temporary Facilities

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 3/329

01545 Protection of Property 01567 Environmental Protection 01570 Traffic Regulations 01572 Trafficmen 01610 Product Handling 01700 Contract Closeout

Division 2 – Site Work

02160 Support of Excavation 02222 Earthwork for Water Distribution Systems 02227 Rock Removal 02240 Site Drainage and Dewatering 02511 Temporary Water Service

02513 Bituminous Concrete Pavement 02514 Concrete Pavement 02515 Curbing 02516 Remove and Reset Existing Curbing 02611 Ductile Iron Pipe and Fittings 02612 HDPE Pipe and Fittings 02640 Buried Valves and Appurtenances 02645 Hydrants 02650 Joint Restraints 02660 Service Connections 02675 Disinfection of Water Mains 02676 Testing Piping Systems 02930 Loam and Seed

Division 3 – Concrete

03300 Cast-In-Place Concrete

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 4/329

Appendices

Appendix A: Aquarion Standard Details Appendix B: Aquarion Valve and Hydrant Information by Town Appendix C: Aquarion Hydrant Specifications Appendix D: Aquarion List of Approved Materials Appendix E: Boring Information

00200 - Information for Bidders

Bids will be received by The Town of Westport (herein called the "Owner"), at the Office of the Controller, Room 313 Town Hall - 110 Myrtle Avenue, Westport, Connecticut, 06880 until:

11:00 AM, Thursday, December 10, 2026

No bids will be received after the hour specified above. The Bid Opening will take place via ZOOM at 11:15 AM after the bid deadline. Bidders may request a ZOOM invitation by e-mailing Berit Watson, Westport Purchasing Officer, at bwatson@westportct.gov, (203) 341-1047.

Each Bid must be submitted in a sealed envelope, addressed to The Town of Westport, Office of the Controller, Room 313 at 110 Myrtle Avenue, Westport, Connecticut. Each sealed envelope containing a Bid must be plainly marked on the outside as:

Bid 27-189T Longshore Park, 260 Compo Road South, Water Main Installation

The bid envelope should also bear on the outside the name of the Bidder, the Bidder's address, and license number if applicable. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed to the Owner at the Office of the Controller, Room 313, Town Hall, 110 Myrtle Avenue, Westport, Connecticut, 06880.

All Bids must be made on the required Bid form. All blank spaces for Bid prices must be filled in, in ink or typewritten, and the Bid form must be fully completed and executed when submitted. Only ONE hard (paper) copy of the Bid form is required, and ONE electronic copy (CD or memory stick).

The Owner may waive any informalities or minor defects or reject any and/or all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No Bidder may withdraw a Bid within 90 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 5/329 mailto:bwatson@westportct.gov tel:+12033411047

Bidders must satisfy themselves of the accuracy of estimated quantities in the Bid Schedule by an examination of the site and a review of the Contract Drawings and Specifications including Addenda. After Bids have been submitted, the Bidder shall not assert that there was a misunderstanding concerning the quantities of Work or of the nature of the Work to be done.

Purchases made by the Town of Westport are exempt from payment of Federal Taxes and Connecticut Sales and Use Taxes, and such tax must not be included in the bid price of any items or materials permanently incorporated into the work or furnished to the Town under the contract.

The Contract Documents contain the provisions required for the construction of the Project. Information obtained from an officer, agent, or employee of the Owner or any other person shall not affect the risks or obligations assumed by the Contractor or relieve the Bidder from fulfilling any of the conditions of the contract.

00200

Information for Bidders

Each Bidder must include completed Qualifications of Bidder and Non-Collusive Bid Statement forms with his Bid. The low Bidder is required to submit completed Qualifications of Subcontractors, and non-collusion Affidavit of Subcontractor forms within ten (10) days of the Bid.

Each Bid must be accompanied by a Bid Bond payable to the Owner for fifteen (15) percent of the total amount of the Bid, including both the base bid amount and all alternates. As soon as the Bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible Bidders. When the Agreement is executed the bonds of the two remaining unsuccessful Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned. The surety on the Bid Bond must be a corporate surety licensed to sign surety bonds in the State of Connecticut and also listed by the United States Treasury Department in its latest list as a qualified surety acceptable to the United States Government. No bid bond will be accepted if the amount is less than 15% of the total estimated bid, including both the base bid and all alternates, or if the amount exceeds the limit for which the United States Treasury Department has qualified the surety for any one bond. A certified check may be used in lieu of a Bid Bond.

A Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract Price, with a corporate surety approved by the owner, will be required for the faithful performance of the contract. The surety on the bond must meet the requirements stated under Bid Security except that the amount of the bond may exceed the limit for which the United States Treasury Department has qualified the surety if the excess is reinsured with surety companies that are qualified on the United States Treasury Department list for an amount equal to the amount of the reinsurance. Written evidence of how any excess suretyship has been placed by the surety signing the bond must accompany the bond.

Attorneys-in-fact who sign the Bid Bonds or Payment Bonds and Performance Bonds must file with each bond a certified and effective dated copy of their power of attorney.

The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond and Payment Bond within ten calendar days from the date when Notice of Award is delivered to the Bidder. The Notice of Award shall be accompanied by the necessary Agreement and bond forms. In case of failure of the Bidder to execute the Agreement, the Owner may at his option consider the Bidder in default, in which case the Bid Bond accompanying the proposal shall become the property of the Owner.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 6/329

The Owner, upon receipt of acceptable Performance Bond, Payment Bond, and Agreement signed by the Contractor shall sign the Agreement and return to the Contractor an executed duplicate of the Agreement within a 10-day period. The returned executed Agreement by the Owner to the Contractor shall be accompanied with a Notice to Proceed.

The completion time for all work under this contract is 160 consecutive calendar days AFTER ISSUANCE OF THE NOTICE TO PROCEED based on the following work schedule:

Contract Award – December 16, 2026 Notice to Proceed – January 13, 2027, or as soon as is feasible.

This will be the required schedule, unless otherwise approved in writing by the Director of Public Works, (reference Article 16, "Time for Completion and Liquidated Damages" in the General Conditions).

00200 Information for Bidders

The Owner may make such investigation as he deems necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the Work contemplated therein.

A conditional or qualified Bid will not be accepted.

The Owner reserves the right to reject the use of the Bidders subcontractor if the evidence submitted by, or investigation of, such subcontractor fails to satisfy the Owner that such subcontractor is properly qualified to complete the work contemplated herein. Rejection of the Bidders subcontractor shall not relieve the Bidder of any requirements of the Bid or this Contract nor provide grounds for the Bidder to request compensation for his use of an alternate qualified subcontractor.

All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout.

Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in respect to his Bid.

The low Bidder must supply the name and addresses of major material suppliers and subcontractors when requested to do so by the Owner.

Procedure for determining the lowest responsible, qualified bidder:

The Town shall determine the “Lowest Responsible Qualified Bidder” on the basis of the Bidder’s submission of the lowest “Total Bid”; responsiveness of the Bidder’s proposal; demonstration of a history of ability and integrity necessary to perform the required work; and certification of the Bidder’s performance of the required work in accordance with the contract documents.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 7/329

In the event of any discrepancies between this Information for Bidders and other sections of the contract documents, this Information for Bidders shall govern.

- End of Section -

Note about transcribed forms: this format exists to remove accessibility barriers, but some recipients prefer the original printed format. If you'd like help moving your entries into the original form, please use the live assistance options in the sidebar or contact the author.

00300 Proposal (Bid Form)

The Board of Selectmen Town Hall Westport, Connecticut

PROJECT:

BID NO. 27-189T

LONGSHORE PARK, 260 COMPO ROAD SOUTH,

WATER MAIN INSTALLATION

The undersigned declares he/she has carefully examined the Information for Bidders, Form of Proposal, Plans, Specifications and any other contract documents and site of work for above project and hereby proposes to furnish all plant, labor, materials and equipment and perform all work necessary to complete the project in strict accordance with the requirements of the contract documents. The Proposal (Bid Form) is based on the herein attached schedule of estimated quantities and is as follows:

TOTAL BID $

Accompanying this proposal is security for 15% of the contract bid upon, in the form of a bid bond in the amount of:

The names and addresses of all partners, officers or parties interested in the foregoing bid are follows:

NAME ADDRESS

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 8/329

The undersigned hereby designates at his/her office to which all notices and letters may be delivered or mailed.

SIGNATURE OF BIDDER

(Corporation, Firm or Individual)

- THIS PROPOSAL IS NOT TO BE SEPARATED FROM THIS DOCUMENT -

00300

Proposal (bid form)

Item No. Estimated Quantity Description and Bid Price In Words

Bid Price In Figures Total In Figures

1 36 LF

Furnish and Install 6-Inch Ductile Iron Water Main and Appurtenances dollars and cents

2 20 LF

Furnish and Install 10-Inch Ductile Iron Water Main and Appurtenances dollars and cents

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 9/329

Item No. Estimated Quantity Description and Bid Price In Words

Bid Price In Figures Total In Figures

3 345 LF

Furnish and Install 12-Inch Ductile Iron Water Main and Appurtenances dollars and cents

4 36 LF

Furnish and Install 6-Inch HDPE Water Main and Appurtenances dollars and cents

5 15 LF

Furnish and Install 8-Inch HDPE Water Main and Appurtenances dollars and cents

6 7,110 LF

Furnish and Install 12-Inch HDPE Water Main and Appurtenances dollars and cents

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 10/329

Bid Price In Figures Total In Figures

7 2 EA

Furnish and Install 4-Inch Gate Valves dollars and cents

- This proposal is not to be separated from this document -

00300

Proposal (bid form)

Item No. Estimated Quantity Description and Bid Price In Words Bid Price In Figures Total In Figures

8 3 EA

Furnish and Install 6-Inch Gate Valves dollars and cents

9 1 EA

Furnish and Install 8-Inch Gate Valves dollars and cents

10 19 EA Furnish and Install 12-Inch Gate Valves

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 11/329

Bid Price In Figures Total In Figures dollars and cents

11 15 EA

Furnish and Install Hydrant Assemblies dollars and cents

12 21 EA

Furnish and Install 2-Inch Blow-Off / Air Vents dollars and cents

13 7 EA

Furnish and Install 1-Inch Water Service Connection and Appurtenances dollars and cents

14 7 EA Furnish and Install 2-Inch Water Service Connection and Appurtenances dollars

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 12/329

Bid Price In Figures Total In Figures and cents

- This proposal is not to be separated from this document -

00300

Proposal (bid form)

Item No. Estimated Quantity Description and Bid Price In Words

Bid Price In Figures Total In Figures

15 525 LF

Furnish and Install 1-Inch Water Service Tubing dollars and cents

16 1,215 LF

Furnish and Install 2-Inch Water Service Tubing dollars and cents

17 460 CY Additional Backfill Material dollars and

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 13/329

Bid Price In Figures Total In Figures cents

18 500 CY

Rock Excavation dollars and cents

19 380 CY

Test Pits and Additional Excavation dollars and cents

20 40 SY

Permanent Concrete Driveway and Sidewalk Restoration dollars and cents

21 715 SY

Loam and Seed dollars and cents

- This proposal is not to be separated from this document -

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 14/329

00300

PROPOSAL (BID FORM)

Item No. Estimated Quantity Description and Bid Price In Words Bid Price In Figures Total In Figures

22 Allowance

Traffic Control Thirty-Five Thousand Two- Hundred dollars and 0 cents

$- $35,200.00

23 14 EA

Install New Meter Pit dollars and cents

TOTAL OF COMPETITIVE BID ITEM NUMBERS 1 THROUGH 30 OF THIS PROPOSAL, AS COMPUTED BY THE BIDDER USING THE

ESTIMATED QUANTITIES INDICATED ABOVE:

Price in Words Price in Figures

It is understood that the various unit prices bid will control in any contract which may be awarded arising from this Proposal; that the estimated quantities above are approximate only and used only for the comparison of bids; and that the products obtained by multiplication of the above unit prices by estimated quantities, and the total thereof, have been inserted only for the convenience of the Bidder and to facilitate consideration of this and other Proposals.

- THIS PROPOSAL IS NOT TO BE SEPARATED FROM THIS DOCUMENT -

Forms

00400

Table of contents

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 15/329

00401 Bid Bond 00402 Qualifications of Bidder 00403 Non-Collusive Bid Statement 00404 Agreement 00405 Payment Bond 00406 Performance Bond

00401

Bid bond Town of Westport Connecticut

Know all men by these presents

That we, of the Town of

County of , and

State of , as

Principal, and , a corporation organized and existing under the laws of the State of , and duly authorized to transact a surety business in the State of Connecticut (hereinafter called the “Surety”), as Surety, are held and firmly bound unto the Town of Westport, as Obligee, in the sum of:

lawful money of the United States of America, for the payment of which, well and truly to be made to the Obligee, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 16/329

The condition of this obligation is such that, whereas the Principal has submitted herewith to the Town of Westport, a Proposal Dated mm/dd/yyyy attached, which is: in Westport, Connecticut.

Bid No. 27-189T Longshore Park, 260 Compo Road South, Water Main Installation

Now therefore,

(a) if such Proposal is rejected, or in the alternative,

(b) if such Proposal is accepted and the contract is awarded to the Principal, and the Principal enters into a written agreement when required by the Obligee, with such surety bonds as shall be acceptable to the agreement and for the payment of all labor and material used in the performance of the work, then this obligation shall be null and void; otherwise the same shall remain in full force and effect, and the Principal and Surety hereto agree to pay to the Obligee all damages sustained by the agreement, including, but without limiting the generality of the foregoing, the difference between the amount of the Principal’s Proposal submitted herewith and the amount for which the Obligee may contract with another party to perform the work covered by such Proposal if the latter amount be in excess of the former, subject, however, to the following conditions:

00401

Bid bond

1. The liability of the Principal to pay to the Obligee the damages sustained by the Obligee as a consequence of the principal's failure to enter into the agreement is not limited to the amount of this bond, and

2. The obligation of the surety hereunder shall be the full amount of the Principal's liability, reduced by any amount paid by the Principal on account of such liability, but not more than the amount of this bond in any event.

3. The surety, for value received, hereby stipulates and agrees that the obligation of said Surety and its bond shall in no way be impaired or affected by any extension of the time within which the Town of Westport may accept such bid; and such Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, WE HAVE SET our hands and seals this

Day of A.D. 2026

WITNESS PRINCIPAL

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 17/329

(L.S.)

WITNESS By:

(L.S.)

(If the Principal is a Corporation or Partnership, so indicate, as well as title of officer signing this bond on its behalf.)

WITNESS SURETY

(L.S.)

WITNESS By:

(L.S.)

Note: If an individual signs as agent for a Surety Company, he must also submit a Power of Attorney enabling him to act on behalf of the Surety Company, as well as a statement of its financial condition, and a copy of the corporate resolution authorizing the issuance of bonds.

00401

Bid bond Acknowledgment of principal

State of County of SS:

Personally appeared

, for signer(s) and sealer(s) of the foregoing instrument and acknowledged the same to be free act and deed, before me.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 18/329

Commissioner of the Superior Court Notary Public My Commission Expires mm/dd/yyyy

Acknowledgment of surety

State of County of SS:

Personally appeared

, for signer(s) and sealer(s) of the foregoing instrument, he is being thereunto duly authorized, and acknowledged the same to be his free act and deed, and the free act and deed of said corporation, before me.

Commissioner of the Superior Court Notary Public My Commission Expires mm/dd/yyyy

00402

Bid No. 27-189T Longshore Park, 260 Compo Road South, Water Main Installation

The Bidder is required to submit on the following pages the information required in regard to qualifications for the Work.

(Use back of this sheet if necessary)

Qualifications of bidder

A. The location, character, cost, date and names of engineers or officials of similar work previously constructed by the undersigned are as follows:

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 19/329

B. The equipment which will be available for performing the work under this contract is as follows:

Own Equipment

Rented Equipment:

C. The undersigned has failed to complete satisfactorily the following contracts, including also those in which the surety has participated. (If there have been no contracts which the bidder has failed to complete satisfactorily, including also those in which the surety has participated, the bidder shall definitely so state.)

Name of Bidder Address

00403

Non-collusive bid statement All bidders are required to sign a Non-Collusive Bid Statement with all public bids as follows:

1. The bid has been arrived at by the bidder independently and has been submitted without collusion with, and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment, or services described in the Advertisement for Bids, designed to limit independent bidding or competition, and

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 20/329

2. The contents of the bid have not been communicated by the bidder or its employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished with the bid, and will not be communicated to any such person prior to the official opening of the bid.

Name of Bidder Address

Signature Print Name Title

00404

Agreement Bid No. 27-189T

Longshore Park, 260 Compo Road South, Water Main Installation

THIS AGREEMENT, made this day of , 20 , by and between THE TOWN OF WESTPORT, a municipal corporation in the COUNTY OF FAIRFIELD and the STATE OF CONNECTICUT (hereinafter called the "Owner") and doing business as a (an individual), or (a partnership), or (a Corporation) (hereinafter called the "Contractor") organized and existing under the laws of the State of Connecticut.

1. The Contractor will commence and complete the pipeline installation, hydrant installations, disinfection, testing, connection to existing water mains, service connections, and temporary paving portion of:

within 160 consecutive calendar days of receipt of the Notice to Proceed.

2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the project described herein.

3. The Contractor agrees to perform all of the Work described in the Contract Documents for the sum arrived at by multiplying the Unit Prices of the respective items in the Bid Schedule by the total quantities of the items completed and accepted, subject to additions and deductions as provided in the General Conditions.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 21/329

4. The term "Contract Documents" means and includes the following:

Advertisement for Bids Information for Bidders Proposal Agreement General Conditions Special Provisions Specifications Contract Drawings

00404 Agreement Addenda as herein enumerated:

No. , dated , 2026

No. , dated , 2026

No. , dated , 2026

5. The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions such amounts as required by the Contract Documents.

6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.

IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, 4 copies of this Agreement, each of which shall be deemed an original on the date first above written.

CONTRACTOR

Witnesses: By: (L.S.)

Print Name Title

TOWN OF WESTPORT

Witnesses: By: (L.S.)

Kevin Christie First Selectman

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 22/329

00404

Agreement State of Connecticut

SS: Town of Westport

County of Fairfield

PERSONALLY APPEARED, Kevin Christie as First Selectman of the Town of Westport, a corporation, Signer and Sealer of the foregoing instrument, being duly authorized, he acknowledged the same to be his free act and deed and free act and deed of the corporation, before me.

Commissioner of the Superior Court Notary Public

My Commission Expires: mm/dd/yyyy

State of Connecticut

SS: Town of Westport

County of Fairfield

PERSONALLY APPEARED, Kevin Christie as First Selectman of the Town of Westport, a corporation, Signer and Sealer of the foregoing instrument, being duly authorized, he acknowledged the same to be his free act and deed and free act and deed of the corporation, before me.

Commissioner of the Superior Court Notary Public

My Commission Expires: mm/dd/yyyy

00405

Payment bond Town of Westport

Westport, Connecticut

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 23/329

Know all men by these presents That we, of the Town of

County of

, and State of Connecticut as PRINCIPAL, and

, as SURETY, are held and firmly bound onto the Town of Westport, hereinafter called OWNER in the sum of:

, in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents.

The condition of this obligation is such that, whereas the Principal has entered into a certain written contract with the Owner, dated the day of , A.D., 2026, a copy of which is hereto attached and made a part hereof for the construction of:

Bid No. 27-189T Longshore Park, 260 Compo Road South, Water Main Installation

Now therefore, if the Principal and each of its Subcontractors shall promptly make payment to persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor, performed in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.

00405

Payment bond

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 24/329

PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.

PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

Every person furnishing material or performing labor in the performance of the contract, either as an individual, as a subcontract to, or otherwise, shall have the right to sue on this bond.

IN WITNESS WHEREOF, WE HAVE SET our hands and seals this day of A.D., 2026.

Witness Principal

(L.S.)

Witness Surety

(L.S.)

By:

(L.S.)

NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership, all partners should execute bond.

IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Connecticut.

00406

Performance bond

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 25/329

Town of Westport Westport, Connecticut

Know all men by these presents That we, of the Town of

County of and State of

; as PRINCIPAL, and as SURETY, are held and firmly bound unto the TOWN OF WESTPORT, hereinafter called OWNER in the sum of:

), in

Lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents.

The condition of this obligation is such that, whereas the Principal has entered into a certain written contract with the Owner, dated the day of , A.D., 2026, a copy of which is hereto attached and made a part hereof for the construction of:

Bid No. 27-189T Longshore Park, 260 Compo Road South, Water Main Installation

Now therefore, if the Principal shall well and truly keep, and perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 26/329

Note about this form: this form is shown as a record of what was originally submitted. The fields display the recorded entries and are not interactive.

00406 Performance bond

PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.

PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, WE HAVE SET our hands and seals this day of A.D., 2026.

Witness (L.S.)

Principal

Witness (L.S.)

Surety (L.S.)

NOTE: Date of Bond must not be prior to date of Contract if Contractor is Partnership, all partners should execute bond.

IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Connecticut.

00500 - General Conditions

Table of contents Article title Page

1. Definitions GC-1

2. Agreement and Contract Documents GC-1

3. Shop Drawings and Submittals GC-1

4. Work Area, Materials Storage, Temporary Services and Facilities GC-2

5. Inspection, Testing and Certificates of Conformance GC-2

6. Substitutions GC-2

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 27/329

Article title Page

7. Surveys, Layout of Work GC-2

8. Permits, Ordinances, and Regulations GC-3

9. Supervision by Contractor GC-3

10. Protection of Work, Property, Persons GC-3

11. Night and Sunday Work GC-3

12. Blasting and Explosives GC-3

13. Job Meetings GC-3

14. Changes in the Work GC-3

15. Changed Conditions GC-4

16. Changes in Contract Price GC-4

17. Time for Completion and Liquidated Damages GC-4

18. Suspension of Work, Termination and Delay GC-4

19. Measurement and Payments to Contractors GC-5

20. Partial Use of Site Improvements GC-6

21. Acceptance of Final Payment as Release GC-6

22. Insurance GC-6

23. Contract Security GC-7

00500 General Conditions

24. Assignments GC-7

25. Indemnification GC-7

26. Separate Contracts GC-8

27. Private Utility Lines GC-8

28. Work by Others GC-8

29. Subcontracting GC-8

30. Engineer's Authority GC-8

31. Land and Rights of Way GC-8

32. Guaranty GC-8

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 28/329

33. Taxes GC-8

34. Provisions Required by Law Deemed Inserted GC-9

35. Safety Provisions GC-9

36. Wage Rates GC-9

00500 General Conditions

1. Definitions

ADDENDA - Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the Contract Documents, Contract Drawings and Specifications, by additions, deletions, clarifications or corrections.

AGREEMENT - The written agreement entered into between the Owner and the Contractor covering the Work to be performed, including without limitation the Contract Documents.

CHANGE ORDER - A written order to the Contractor authorizing an addition, deletion or revision in the Work within the general scope of the Contract Documents, or authorizing adjustment in the Contract Price or Contract Time.

CONTRACT – The Agreement, including without limitation the Contract Documents.

CONTRACT DOCUMENTS – The documents listed as “Contract Documents” in the Agreement.

CONTRACT DRAWINGS – A part of the Contract Documents consisting of the plans for Work.

CONTRACT PRICE - The total monies payable to the Contractor under the terms and conditions of the Contract Documents.

CONTRACT TIME - The number of calendar days stated in the Contract Documents for the completion of the Work.

CONTRACTOR - The person, firm or corporation with whom the Owner has executed the Agreement.

ENGINEER - The Westport Town Engineer.

FIELD ORDER - A written order effecting a change in the Work not involving an adjustment in the Contract Price or an extension of the Contract Time, issued by the Engineer to the Contractor during construction.

NOTICE OF AWARD - The written notice of the acceptance of the Bid from the Owner to the successful Bidder.

NOTICE TO PROCEED - Written communication issued by the Owner to the Contractor authorizing him to proceed with the Work and establishing the date of commencement of the Work.

OWNER - The Town of Westport

PROJECT - The undertaking to be performed as provided in the Contract Documents.

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 29/329

RESIDENT PROJECT REPRESENTATIVE - The authorized representative of the Owner who is assigned to the Project site or any part thereof.

SPECIAL PROVISIONS - Modifications, additions and clarifications to the Contract Documents.

SPECIFICATIONS - A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.

WORK - All labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in the Project.

WRITTEN NOTICE - Any notice to any party of the Agreement relative to any part of the Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the Work.

2. Agreement and contract documents

The Contract Documents and all addenda shall form the Agreement, and provisions thereof shall be as binding upon the parties hereto as if they were herein fully set forth.

The Owner will furnish the Contractor, without charge, five copies of the Contract Documents, including Specifications and Contract Drawings.

Additional copies will be furnished at nominal cost to the Contractor, upon request.

In case of conflict between the Contract Drawings and Specifications, the Specifications shall govern. Figure dimensions on Contract Drawings shall govern over scale dimensions, and detailed drawings shall govern over general drawings. Any discrepancies found between the Contract Drawings and Specifications and site conditions, or any inconsistencies or ambiguities in the Contract Drawings or Specifications, shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk.

The Contractor may be furnished additional instructions and detail drawings by the Engineer as necessary to carry out the Work required by the Contract Documents. The additional drawings and instructions thus supplied will become a part of the Contract Documents.

3. Shop drawings and submittals

The Contractor shall provide three (3) copies of all shop drawings and submittals as required by the Specifications. The Engineer will retain two (2) copies of all approved shop drawings and submittals, and return one to the Contractor. Shop drawings and submittals are to be submitted as detailed in the Special Provisions, and/or sufficiently in advance of requirements, to provide the Engineer time for review and correction if necessary. The Engineer's review

GC-1

00500 — General Conditions

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 30/329 of shop drawings and submittals shall not release the Contractor from responsibility for deviations from the Contract Documents. Certificates of conformance must be submitted on all material and/or equipment that will become the property of the Owner. Portions of the Work requiring shop drawings or submittals shall not begin until after review by the Engineer. Any submittals not following this procedure will be rejected.

4. Work area, materials storage, temporary services and facilities

The Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the Work within the specified time.

The Contractor shall confine his work/storage area to the limits as designated or approved and shall be responsible for the security of the work/storage area. Storage of materials or establishing temporary facilities on private property shall be solely up to the Contractor and he shall assume all responsibility and liability for same. Upon completion of the Agreement, the Contractor shall remove all equipment and materials except as otherwise specified and restore the site to its original condition.

5. Inspection, testing and certificates of conformance

The Owner reserves the right to require testing of any and all materials, equipment or samples delivered to the job site. Such testing shall be done by an independent testing laboratory at the expense of the Contractor. Any material so sampled and found not to meet the requirements of these specifications shall be rejected and the entire shipment removed from the site at the Contractor's expense. Furthermore, the Owner reserves the right to then require each material to be manufactured and tested in accordance with the standard specifications, (e.g. AWWA, ANSI, etc.), cited hereafter.

In addition to other requirements specified, the Contractor shall furnish to the Engineer, in the manner as directed, notarized certificates of conformance for all materials to be furnished under this Agreement. The notarized certificates of conformance shall state that the material to be furnished under this Agreement meets the specification requirements. When directed, each shipment of material shall be accompanied by the manufacturer's notarized certificates of conformance, certifying that the materials meet the requirements of the specifications.

All materials and equipment used in the construction of the Project shall be subject to adequate inspection in accordance with generally accepted standards. Neither observations by the Engineer nor inspections, tests or approvals by persons other than the Contractor shall relieve the Contractor from his obligations to perform the Work in accordance with the requirements of the Contract Documents.

The Engineer, the Owner and their representatives will at all times have access to the Work. The Contractor will provide proper facilities for access, inspection, and observation of the Work. If any Work is covered contrary to the written request of the Engineer, it must, if requested by the Engineer, be uncovered for his observation and replaced at the Contractor's expense.

If the Engineer considers it necessary or advisable that covered Work be re-exposed, due to suspicion of defective work, the Contractor will uncover, expose or otherwise make available for observation, inspection or testing as the Engineer may require, that portion of the Work in question, furnishing all necessary labor, materials, tools, and equipment. If it is found that such Work is defective, the Contractor will bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction. If, however, such Work is not found to be defective, the Contractor will be

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 31/329 allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and an appropriate Change Order shall be issued.

6. Substitutions

References to brand names or catalogue numbers in the Contract Documents are for the purpose of defining the performance or other salient requirements of materials and equipment. The Contractor may request to substitute materials or equipment of equal substance and function. If in the opinion of the Engineer, such material or piece of equipment is of equal substance and function to that specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential shall be deductible from the Contract Price and the Contract Documents shall be appropriately modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the Project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the Contract Price or Contract Time.

7. Surveys, layout of work

The Engineer shall furnish initial land surveys and establish all base lines for locating the principal component parts of the Work together with a suitable number of bench marks adjacent to the Work as shown on the Contract Drawings.

The Contractor shall perform all layout work necessary for the satisfactory execution of the construction as shown on the Contract Drawings and all costs in connection therewith shall be included in the Contract Price(s).

The Contractor shall be held responsible for protecting and safeguarding all control points and bench marks set by the Engineer and his own forces. Any replacement or re-establishment of control points and bench marks set by the Engineer, shall be at the expense of the Contractor.

GC-2

00500 General conditions

8. Permits, ordinances, and regulations

Permits and licenses of a temporary nature necessary for the prosecution of the Work shall be secured and paid for by the Contractor. The Contractor will be required to obtain a Road Opening permit from the Town of Westport. All fees will be waived.

Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Owner, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn and specified.

9. Supervision by contractor

11/22/26, 7:06 PM Print - Specifications and Specimen Contract Documents for: Longshore Park, 260 Compo Road South, Water Main Installation about:blank 32/329

The Contractor will supervise and direct the Work. He will be solely responsible for the means, methods, techniques, sequences and procedures of construction. Except where the Contractor is an individual and gives his personal superintendence to the Work he will employ and maintain on the Work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor as the Contractor's representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be as binding as if given to the Contractor. The supervisor shall be present on the site at all times to provide adequate supervision and coordination of the Work.

10. Protection of work, property and persons

The Contractor will be responsible for…