This is a Project Manual and bidding document package for the Old Saybrook Public Works Addition and Renovation project located at 497 Middlesex Turnpike, Old Saybrook, Connecticut, administered by the Town of Old Saybrook with Carl Fortuna serving as the First Selectman (Owner's Representative). The project consists of renovations and additions to an existing municipal Public Works facility, including construction of a new staff and administrative area featuring locker rooms, showers, a laundry room, combined conference and lunchroom, and offices, plus a substantial addition to the existing vehicle storage garage to accommodate additional municipal vehicles and equipment. The contract will be awarded as a single prime stipulated sum agreement under AIA Document A101-2017. A mandatory prebid meeting is scheduled for December 1, 2026, at 1:00 p.m. at the project site, with written bidder questions due by December 7, 2026. The bid deadline is December 17, 2026, at 3:00 p.m. for hand-delivered bids only to the Selectman's Office at 302 Main Street, Old Saybrook, Connecticut. The project manual includes detailed drawings, specifications organized by division, and administrative procedures for construction operations.
Bidders must submit bid security equal to five percent of the base bid amount and acknowledge receipt of all addenda in their bid forms. Performance and payment bonds, each equal to 100 percent of the Contract Sum, are required within ten days after Notice of Intent to Award. The project is subject to Connecticut Prevailing Wage Law (Connecticut General Statutes Section 31-53) and applicable federal or state labor standards as required by the project funding source. Bidders must be properly licensed contractors in Old Saybrook, Connecticut, and must include in their bids all required fees, permits, and regulatory requirements. The bid form requires identification of major subcontractors for concrete, masonry, roofing, plumbing, HVAC, and electrical work. Contractors must submit a detailed schedule of values, construction schedule, submittal schedule, and other administrative documentation as specified. The contract includes provisions for unit prices, alternates (including a roofing system alternate), and allowances. The project requires coordination with the Owner's IT, AV, and security systems installation, which will be handled under separate contracts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment Information
This document contains tracked changes. Inserted text is marked with blue underlines. Deleted text is marked with red strikethrough. Use the toolbar buttons to hide insertions or deletions and read only the final or original text.
Old Saybrook Public Works Addition and Renovation 497 Middlesex Turnpike Old Saybrook, CT 06475
Project manual
November 11, 2026
Photograph of the Old Saybrook Public Works buildings, with a lawn, trees, an American flag, parked vehicles, and workers outside.
POA Point One Architects
Old Saybrook Public Works
November 11, 2026
Project manual table of contents
Drawing list:
00.0 Cover sheet
INFO Info CD.01 Code information C-002 General notes, abbreviations, and legend C-003 Soil erosion and sediment control notes C-101 Existing conditions plan C-201 Site preparation plan C-202 Orthophotograph plan
11/22/26, 12:50 PM Print - Old Saybrook Public Works Addition and Renovation Project Manual about:blank 1/508
C-203 General plan C-301 Details C-302 Details C-303 Details EX1.01 Existing - demolition plans EX1.02 Existing - demolition elevations A1.01 Floor dimension plan & wall types A1.02 First floor RCP with lighting A1.03 Roof plan A1.04 Finishes plan and schedule A1.05 First floor owner vehicle coordination plan A1.06 Owner coordination site plan A2.00 Exterior elevations A3.00 Building sections I A3.01 Enlarged wall sections I A3.02 Enlarged wall sections II A3.03 Enlarged wall sections III A3.04 Enlarged wall sections IV A4.01 Enlarged restroom #2 & shower #2 plans and elevations A4.02 Enlarged restroom #1 & shower #1 plans and elevations A4.03 Typical EPDM roof details A4.05 Enlarged plans - details A5.00 Enlarged breakroom elevations & millwork A5.01 Enlarged millwork details A5.02 Interior elevations - public works offices A5.03 Interior elevations - garage
Table of contents
011000 - 1
Old Saybrook Public Works about:blank 2/508
November 11, 2026
A6.00 Window schedule & details A6.01 Door schedule & details A6.02 Door details FP1.00 Fire protection first floor plan FP2.00 Fire protection notes, legends, and details FP2.01 Fire protection details FP3.00 Fire protection specifications PD1.0 Plumbing demolition first floor plan P1.00 Plumbing first floor plan P2.00 Plumbing notes, legends, and schedules & specifications P2.01 Plumbing details P2.02 Plumbing details P3.00 Plumbing specifications MD1.0 Mechanical demolition first floor plan M1.00 Mechanical first floor plans M2.00 Mechanical details, schedules & diagrams M2.01 Mechanical details, schedules & diagrams M2.02 Mechanical details & schedules M2.03 Mechanical sequence of operations M3.00 Mechanical specifications ED1.0 Electrical demolition floor plans E1.00 Electrical first floor plans E1.01 Electrical- mechanical power first floor plan E2.00 Electrical notes, legend, &details E2.01 Electrical details E3.00 Electrical specifications E3.01 Electrical fire alarm specifications and diagram S1. General notes S2 Typical details about:blank 3/508
S3 Foundation plan and details S4 Roof framing plan and details SP.01 Proposed landscape plan
Table of contents
011000 - 2
Old Saybrook Public Works
November 11, 2026
Specifications
Section I 00 – Procurement and contracting requirements the Town of Old Saybrook
Document 004113 - Bid form - stipulated sum (single-prime contract from owner)
Section 002213 - Supplementary instructions Section 002513 - Prebid meetings Section 004113 - Bid form Section 004313 - Bid security forms Section 011000 - Summary Section 012200 - Unit prices Section 012300 - Alternates Section 012500 - Substitution procedures Section 012600 - Contract modification procedures Section 012900 - Payment procedures Section 013100 - Project management and coordination Section 013200 - Construction progress documentation Section 013233 - Photographic documentation Section 013300 - Submittal procedures Section 014000 - Quality requirements Section 014100 - Special inspections and structural testing Section 014200 - References Section 015000 - Temporary facilities and controls Section 016000 - Product requirements Section 017300 - Execution Section 017419 - Construction waste management and disposal about:blank 4/508
Section 017700 - Closeout procedures Section 017823 - Operation and maintenance data Section 017839 - Project record documents Section 017900 - Demonstration and training
Section 024119 - Selective demolition
Section 033000 - Cast-in-place reinforced concrete Section 033543 - Polished and sealed concrete finishing
Section 042000 - Unit masonry
Section 051200 - Structural steel framing Section 053100 - Steel decking Section 054000 - Cold-formed metal framing Section 054000 - Cold-formed metal trusses
Section 064116 - Plastic-laminate-faced architectural cabinets Section 066500 - Simulated wood trim
Table of contents
011000 - 3
Old Saybrook Public Works
November 11, 2026
Section 072100 Thermal insulation Section 072500 Weather barriers Section 072729 Air barriers Section 074113 Standing seam metal roof panels Section 075323 EPDM roofing Section 076200 Sheet metal flashing and trim Section 077100 Roof specialties Section 077253 Snow guards Section 078413 Penetration firestopping Section 078446 Fire-resistive joint systems Section 079200 Joint sealants about:blank 5/508
Section 074213 Insulated metal wall panels Section 081113 Hollow metal doors and frames Section 081213 Hollow metal frames Section 081416 Flush wood doors Section 083113 Access doors and frames Section 084113 Aluminum frames and storefront Section 085113 Aluminum windows Section 088000 Glazing Section 088300 Mirrors Section 093100 Ceramic tile Section 095110 Acoustical panel ceilings Section 096510 Resilient floor tile Section 096530 Resilient wall base and accessories Section 092216 Non-structural metal framing Section 092900 Gypsum board Section 096813 Tile carpeting Section 097200 Wall coverings Section 099113 Exterior painting Section 099123 Interior painting Section 108010 Toilet and bath accessories Section 101423 Panel signage Section 105113 Metal lockers Section 113100 Residential appliances Section 122413 Roller window shades Section 123530 Casework Section 123661 Simulated stone countertops Section 123623 Plastic-laminate-clad countertops Section 13 Special construction - not used Section 14 Conveying equipment - not used Section 22 Plumbing and fire protection – specifications on drawings about:blank 6/508
Table of contents
011000 - 4
Old Saybrook Public Works
November 11, 2026
Section 23 heating ventilating and air conditioning – Specifications on drawings Section 26 – Electrical – Specifications on drawings
Civil engineering specifications:
Division 01 General Requirements Section No.
01 00 00 Specification Format 01 55 26 Maintenance and Protection of Traffic 01 57 26 Dust Control 01 71 13 Mobilization and Demobilization 01 71 23 Field Engineering
Division 02 Existing Conditions Section No.
02 41 00 Site Preparation
Division 03 Concrete Section No.
03 30 00 Cast-in-Place Concrete
Division 31 Earthwork Section No.
31 00 00 Earthwork 31 05 19 Geotextiles 31 11 00 Clearing and Grubbing 31 23 16 Trench Excavation and Backfill 31 23 19 Dewatering, Control and Diversion of Water 31 25 00 Soil Erosion and Sediment Control about:blank 7/508
Division 32 Exterior Improvements Section No.
32 12 16 Paving 32 13 13 Concrete Sidewalks 32 16 13 Precast Concrete Curb 32 17 13 Pavement Markings 32 30 03 Site Improvements 32 92 19 Seeded Lawns
Table of contents
011000 - 5
Old Saybrook Public Works
November 11, 2026
Table of contents
011000 - 6
Old Saybrook Public Works
November 11, 2026
Document 002213 - Supplementary instructions to bidders
1.1 Instructions to bidders
A. Instructions to Bidders for Project consist of the following:
1. AIA Document A701, "Instructions to Bidders"
2. The following Supplementary Instructions to Bidders that modify and add to the requirements of the Instructions to Bidders.
1.2 Supplementary instructions to bidders, general
A. The following supplements modify AIA Document A701, "Instructions to Bidders." Where a portion of the Instructions to Bidders is modified or deleted by these Supplementary Instructions to Bidders, unaltered portions of the Instructions to Bidders shall remain in effect.
about:blank 8/508
B. The Contractor shall comply with all applicable prevailing wage requirements, certified payroll reporting, and labor compliance provisions contained in the Contract Documents.
C. By submitting a bid, the bidder agrees to execute the attached form of contract, which includes modified versions of the AIA A101-2017, A101- 2017, Exhibit A, and AIA A201-2017 without alteration, condition, exception, or modification
Article 2 - Bidder's representations
1.3
A. Add Section 2.1.3.1:
1. 2.1.3.1 - The Bidder has investigated all required fees, permits, and regulatory requirements of authorities having jurisdiction and has properly included in the submitted bid the cost of such fees, permits, and requirements not otherwise indicated as provided by Owner.
B. Add Section 2.1.5:
1. 2.1.5 - The Bidder is a properly licensed Contractor according to the laws and regulations of <State of Connecticut> and meets qualifications indicated in the Procurement and Contracting Documents.
C. Add Section 2.1.6:
1. 2.1.6 - The Bidder has incorporated into the Bid adequate sums for work performed by installers whose qualifications meet those indicated in the Procurement and Contracting Documents.
Article 3 - Bidding documents
Supplementary instructions to bidders — 002213 - 1
Old Saybrook Public Works
November 11, 2026
1.4
A. 3.2 - Interpretation or Correction of Procurement and Contracting Documents:
1. Add Section 3.2.2.1:
a. 3.2.2.1 - Submit Bidder's Requests for Interpretation using form [furnished with electronic bid forms and submitted via email].
B. 3.4 - Addenda:
1. Delete Section 3.4.3 and replace with the following:
a. 3.4.3 - Addenda may be issued at any time prior to the receipt of bids.
2. Add Section 3.4.4.1:
a. 3.4.4.1 - Owner may elect to waive the requirement for acknowledging receipt of 3.4.4 Addenda as follows:
1. 3.4.4.1.1 - Information received as part of the Bid indicates that the Bid, as submitted, reflects modifications to the Procurement and Contracting Documents included in an unacknowledged Addendum.
about:blank 9/508
2. 3.4.4.1.2 - Modifications to the Procurement and Contracting Documents in an unacknowledged Addendum do not, in the opinion of Owner, affect the Contract Sum or Contract Time.
1.5 Article 4 - Bidding procedures
A. 4.1 - Preparation of Bids:
1. Add Section 4.1.1.1:
a. 4.1.1.1 - Printable electronic Bid Forms and related documents are available from [Architect]
2. Add Section 4.1.8:
a. 4.1.8 - The Bid shall include unit prices when called for by the Procurement and Contracting Documents. Owner may elect to consider unit prices in the determination of award. Unit prices will be incorporated into the Contract.
3. Add Section 4.1.9:
a. 4.1.9 - Owner may elect to disqualify a bid due to failure to submit a bid in the form requested, failure to bid requested alternates or unit prices, failure to complete entries in all blanks in the Bid Form, or inclusion by the Bidder of any alternates, conditions, limitations or provisions not called for.
Supplementary instructions to bidders — 002213 - 2
Old Saybrook Public Works
November 11, 2026
B. 4.3 - Submission of Bids:
1. Add Section 4.3.1.2:
a. 4.3.1.2 - Include Bidder's Contractor License Number applicable in Project jurisdiction on the face of the sealed bid envelope.
C. 4.4 - Modification or Withdrawal of Bids:
1. Add the following sections to 4.4.2:
a. 4.4.2.1 - Such modifications to or withdrawal of a bid may only be made by persons authorized to act on behalf of the Bidder.
Authorized persons are those so identified in the Bidder's corporate bylaws, specifically empowered by the Bidder's charter or similar legally binding document acceptable to Owner, or by a power of attorney, signed and dated, describing the scope and limitations of the power of attorney. Make such documentation available to Owner at the time of seeking modifications or withdrawal of the Bid.
b. 4.4.2.2 - Owner will consider modifications to a bid written on the sealed bid envelope by authorized persons when such modifications comply with the following: the modification is indicated by a percent or stated amount to be added to or deducted from the Bid; the amount of the Bid itself is not made known by the modification; a signature of the authorized person, along with the time and date of the modification, accompanies the modification. Completion of an unsealed bid form, awaiting final figures from the Bidder, does not require power of attorney due to the evidenced authorization of the Bidder implied by the circumstance of the completion and delivery of the Bid.
about:blank 10/508
D. 4.5 - Break-Out Pricing Bid Supplement:
1. Add Section 4.5:
a. 4.5 - Provide detailed cost breakdowns no later than two business days following Architect's request.
E. 4.6 - Subcontractors, Suppliers, and Manufacturers List Bid Supplement:
1. Add Section 4.6:
a. 4.6 - Provide list of major subcontractors, suppliers, and manufacturers furnishing or installing products no later than [two] business days following Architect's request. Include subcontractors, suppliers, and manufacturers providing work totaling [three] percent or more of the Bid amount. Do not change subcontractors, suppliers, and manufacturers from those submitted without approval of Architect.
1.6 Article 5 - Consideration of bids
A. 5.2 - Rejection of Bids:
1. Add Section 5.2.1:
Supplementary instructions to bidders — 002213 - 3
Old Saybrook Public Works
November 11, 2026
a. 5.2.1 - Owner reserves the right to reject a bid based on Owner's and Architect's evaluation of qualification information submitted following opening of bids. Owner's evaluation of the Bidder's qualifications will include: status of licensure and record of compliance with licensing requirements, record of quality of completed work, record of Project completion and ability to complete, record of financial management including financial resources available to complete Project and record of timely payment of obligations, record of Project site management including compliance with requirements of authorities having jurisdiction, record of and number of current claims and disputes and the status of their resolution, and qualifications of the Bidder's proposed Project staff and proposed subcontractors.
1.7 Article 6 - Postbid information
A. 6.1 - Contractor's Qualification Statement:
1. Add Section 6.1.1:
a. 6.1.1 - Submit Contractor's Qualification Statement no later than [two] business days following Architect's request.
B. 6.3 - Submittals:
1. Add Section 6.3.1.4:
a. 6.3.1.4 - Submit information requested in Sections 6.3.1.1, 6.3.1.2, and 6.3.1.3 no later than [two] business days following Architect's request.
about:blank 11/508
1.8 Article 7 - Performance bond and payment bond
A. 7.1 - Bond Requirements:
1. Add Section 7.1.1.1:
a. 7.1.1.1 - Both a Performance Bond and a Payment Bond will be required, each in an amount equal to 100 percent of the Contract Sum.
B. 7.2 - Time of Delivery and Form of Bonds:
1. Delete the first sentence of Section 7.2.1 and insert the following:
a. The Bidder shall deliver the required bonds to Owner no later than [10] after the date of Notice of Intent to Award and no later than the date of execution of the Contract, whichever occurs first. Owner may deem the failure of the Bidder to deliver required bonds within the period of time allowed a default.
2. Delete Section 7.2.3 and insert the following:
a. 7.2.3 - Bonds shall be executed and be in force on the date of the execution of the Contract.
Supplementary instructions to bidders — 002213 - 4
Old Saybrook Public Works
November 11, 2026
1.9 Article 8 - Form of agreement between owner and contractor
A. □ A101 – Agreement (project-specific terms) B. □ A201 – General Conditions of the Contract for Construction.
1.10 Article 9 - Execution of the contract
A. Add Article 9:
1. 9.1.1 - Subsequent to the Notice of Intent to Award, and within [10] days after the prescribed Form of Agreement is presented to the Awardee for signature, the Awardee shall execute and deliver the Agreement to Owner through [Architect] in such number of counterparts as Owner may require.
2. 9.1.2 - Owner may deem as a default the failure of the Awardee to execute the Contract and to supply the required bonds when the Agreement is presented for signature within the period of time allowed.
3. 9.1.3 - Unless otherwise indicated in the Procurement and Contracting Documents or the executed Agreement, the date of commencement of the Work shall be the date of the executed Agreement[or the date that the Bidder is obligated to deliver the executed Agreement and required bonds to Owner].
4. 9.1.4 - In the event of a default, Owner may declare the amount of the Bid security forfeited and elect to either award the Contract to the next responsible bidder or re-advertise for bids.
about:blank 12/508
End of document 002213
Supplementary instructions to bidders — 002213 - 5
Old Saybrook Public Works
November 11, 2026
Document 002513 - Prebid meetings
1.1 Prebid meeting
A. [Owner] [Architect] [General Contractor] will conduct a Prebid meeting as indicated below:
1. Meeting Date: 12-01-2026
2. Meeting Time: 1:00 p.m. local time.
3. Location: Project Site.
B. Attendance:
1. Prime Bidders: Attendance at Prebid meeting is [mandatory].
2. Subcontractors: Attendance at Prebid meeting is recommended.
3. Notice: Bids will only be accepted from prime bidders represented on Prebid Meeting sign-in sheet.
C. Bidder Questions: Submit written questions to be addressed at Prebid meeting minimum of [two] business days prior to meeting. Deadline of Bidder questions is December 7th 2026.
D. Agenda: Prebid meeting agenda will include review of topics that may affect proper preparation and submittal of bids, including the following:
1. Procurement and Contracting Requirements:
a. Advertisement for Bids.
b. Instructions to Bidders.
c. Bidder Qualifications.
d. Bonding.
e. Insurance.
f. Bid Security.
g. Bid Form and Attachments.
h. Bid Submittal Requirements.
i. Bid Submittal Checklist.
j. Notice of Award.
2. Communication during Bidding Period:
a. Obtaining documents.
b. Access to Project Web site.
about:blank 13/508
c. Bidder's Requests for Information.
d. Bidder's Substitution Request/Prior Approval Request.
e. Addenda.
3. Contracting Requirements:
a. Agreement.
b. General Conditions.
c. The Supplementary Conditions.
Prebid meetings 002513 - 1
Old Saybrook Public Works
November 11, 2026
Additional content from previous item (D):
d. Other Owner requirements.
4. Construction Documents:
a. Scopes of Work.
b. Temporary Facilities.
c. Use of Site.
d. Work Restrictions.
e. Alternates, Allowances, and Unit Prices.
f. Substitutions following award.
5. Separate Contracts:
a. Work by Owner.
b. Work of Other Contracts.
6. Schedule:
a. Project Schedule.
b. Contract Time.
c. Liquidated Damages.
d. Other Bidder Questions.
7. Site/facility visit or walkthrough.
8. Post-Meeting Addendum.
E. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes to attendees. Minutes of meeting are issued as Available Information and do not constitute a modification to the Procurement and Contracting Documents. Modifications to the Procurement and about:blank 14/508
Contracting Documents are issued by written Addendum only.
1. Sign-in Sheet: Minutes will include list of meeting attendees.
2. List of Plan holders: Minutes will include list of plan holders.
End of document 002513
Prebid meetings 002513 - 2
Note about transcribed forms: this format exists to remove accessibility barriers, but some recipients prefer the original printed format. If you'd like help moving your entries into the original form, please use the live assistance options in the sidebar or contact the author.
Old Saybrook Public Works
November 11, 2026
Document 004113 - Bid form - stipulated sum (single-prime contract)
1.1 Bid information
A. Bidder:
B. Project Name: Old Saybrook Public Works C. Project Location: <497 Middlesex Turnpike, Old Saybrook CT >.
D. Owner: <Town of Old Saybrook, CT>.
E. Owner Project Number: < F. Architect: <Point One Architects + Planners>.
G. Architect Project Number: <985 >.
H. Bid Deadline: December 17th 2026, 3:00pm. Hand-delivered bids to Selectman's Office
302 Main Street, Old Saybrook, CT
1.2 Certifications and base bid
A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by <Point One Architects + Planners > and Architect's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services, including all scheduled allowances, necessary to complete the construction of the above-named project, according to the requirements of the Procurement and Contracting Documents, for the stipulated sum of:
about:blank 15/508
1.
Dollars ($
2. The above amount may be modified by amounts indicated by the Bidder on the attached Document 004322 "Unit Prices Form" and
Document 004323 "Alternates Form."
1.3 Bid guarantee
A. The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within [10] days after a written Notice of Award, if offered within [60] days after receipt of bids, and on failure to do so agrees to forfeit to Owner the attached cash, cashier's check, certified check, U.S. money order, or bid bond, as liquidated damages for such failure, in the following amount constituting five percent (5%) of the Base Bid amount above:
1.
Dollars ($
B. In the event Owner does not offer Notice of Award within the time limits stated above, Owner will return to the undersigned the cash, cashier's check, certified check, U.S. money order, or bid bond.
Bid form - stipulated sum (single-prime contract) 004113 - 1
Old Saybrook Public Works November 11, 2026
C. Prevailing Wage Acknowledgment. The Bidder acknowledges that this Project is subject to the requirements of the Connecticut Prevailing Wage Law (Connecticut General Statutes Section 31-53, as amended), and any other applicable federal or state labor standards required by the Project funding source. The Bidder certifies that the Bid Price includes all labor costs, payroll burdens, taxes, and other costs necessary to comply with all applicable prevailing wage requirements and that the Bidder and its subcontractors will comply with such requirements throughout the performance of the Work.
D.
1.4 Subcontractors and suppliers
A. The following companies shall execute subcontracts for the portions of the Work indicated:
1. Concrete Work:
about:blank 16/508
2. Masonry Work:
3. Roofing Work:
4. Plumbing Work:
5. HVAC Work:
6. Electrical Work:
1.5 Time of completion
A. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract Documents on a date specified in a written Notice to Proceed to be issued by Architect, and shall fully complete the Work within calendar days.
1.6 Acknowledgement of addenda
A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:
1. Addendum No. 1, dated mm/dd/yyyy
2. Addendum No. 2, dated mm/dd/yyyy
3. Addendum No. 3, dated mm/dd/yyyy
4. Addendum No. 4, dated mm/dd/yyyy
1.7 Bid supplements
A. The following supplements are a part of this Bid Form and are attached hereto.
1. Bid Form Supplement - Alternates.
2. Bid Form Supplement - Unit Prices.
about:blank 17/508
3. Bid Form Supplement - Allowances.
4. Bid Form Supplement - Bid Bond Form (AIA Document A310).
Bid Form - Stipulated Sum (Single-Prime Contract) 004113 - 2
Old Saybrook Public Works
November 11, 2026
1.8 Contractor's license
A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in Old Saybrook, CT and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.
1.9 Document continues
1.10 Submission of bid
Respectfully submitted by December 17th 2026 at 3:00pm, Hand-delivered bids only.
Submitted By:
(Name of bidding firm or corporation)
Authorized Signature:
(Handwritten signature)
Signed By:
(Type or print name)
Title:
(Owner/Partner/President/Vice President)
Witness By:
(Handwritten signature)
Attest:
(Handwritten signature)
By:
(Type or print name)
Title:
(Corporate Secretary or Assistant Secretary)
Street Address:
City, State, Zip Phone: License No.:
Federal ID No.:
about:blank 18/508
Bid form - stipulated sum (single-prime contract) 004113 - 3
Old Saybrook Public Works November 11, 2026
(Affix Corporate Seal Here)
Old Saybrook Public Works
Detailed Bid Form / Schedule of Values
Contractor: Date: mm/dd/yyyy
GENERAL REQUIREMENTS
No. Description Bid Amount
1 Mobilization
2 Bonds & Insurance
3 Temporary Facilities
4 Temporary Utilities
5 Temporary Protection
6 Project Supervision
7 Construction Layout
8 Closeout Documents / O&M Manuals about:blank 19/508
No. Description Bid Amount
Subtotal General Requirements
SELECTIVE DEMOLITION
No. Description Bid Amount
9 Interior Demolition
10 Exterior Demolition
11 Utility Removal / Relocation
12 Hazardous Materials Coordination
Subtotal Selective Demolition
SITEWORK
No. Description Bid Amount
13 Earthwork
14 Site Utilities
15 Storm Drainage
16 Concrete Walks
17 Asphalt Paving
18 Landscaping about:blank 20/508
19 Site Furnishings
Subtotal Sitework
CONCRETE
No. Description Bid Amount
20 Footings
21 Foundation Walls
22 Slab-on-Grade
23 Equipment Pads
Subtotal Concrete
STRUCTURAL
No. Description Bid Amount
24 Structural Steel
25 Miscellaneous Steel
26 Light Gauge Metal Framing
27 Roof Framing
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113 - 4
about:blank 21/508
Old Saybrook Public Works November 11, 2026
Subtotal Structural
BUILDING ENCLOSURE
No. Description Bid Amount
28 Masonry
29 Air Barrier
30 Continuous Insulation
31 Exterior Insulated Metal Panel Siding
32 Roofing
33 Flashing
34 Sealants
Subtotal Building Enclosure
WINDOWS & DOORS
No. Description Bid Amount
35 Aluminum Windows
36 Reglazing Existing Windows
37 Aluminum Storefront about:blank 22/508
38 Hollow Metal Doors & Frames
39 Fiberglass/Wood Doors
40 Finish Hardware
41 Glass & Glazing
Subtotal Windows & Doors
INTERIOR CONSTRUCTION
No. Description Bid Amount
42 Metal Stud Framing
43 Gypsum Board
44 Acoustical Ceilings
45 Painting
46 Flooring
47 Ceramic Tile
48 Architectural Millwork
49 Toilet Accessories about:blank 23/508
50 Signage
Subtotal Interior Construction
MECHANICAL
No. Description Bid Amount
51 HVAC Equipment
52 Ductwork
53 Controls
54 Testing & Balancing
Subtotal Mechanical
PLUMBING
No. Description Bid Amount
55 Domestic Water
56 Sanitary Waste
57 Plumbing Fixtures
58 Gas Piping
Subtotal Plumbing about:blank 24/508
FIRE PROTECTION
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113 - 5
Old Saybrook Public Works November 11, 2026
No. Description Bid Amount
59 Fire Sprinkler System
Subtotal Fire Protection
Electrical
No. Description Bid Amount
60 Electrical Service
61 Distribution
62 Interior Lighting
63 Exterior Lighting
64 Fire Alarm
65 Data/Communications
66 Security/Access Control
Subtotal Electrical about:blank 25/508
Special project items
Allowances
Description Amount
Allowance No. 1
Allowance No. 2
Allowance No. 3
Alternates
Alternate Add Deduct
Alternate No. 1
Alternate No. 2
Alternate No. 3
Total base bid: $
End of document 004113
Bid form - stipulated sum (single-prime contract) 004113 - 6
Old Saybrook Public Works
November 11, 2026
Document 004313 - Bid security forms
1.1 Bid form supplement
about:blank 26/508
A. A completed bid bond form is required to be attached to the Bid Form.
1.2 Bid bond form
A. AIA Document A310, "Bid Bond," is the recommended form for a bid bond. A bid bond acceptable to Owner, or other bid security as described in the Instructions to Bidders, is required to be attached to the Bid Form as a supplement.
B. Copies of AIA standard forms may be obtained from The American Institute of Architects; www.aia.org/contractdocs/purchase/index.htm; email:
docspurchases@aia.org; (800) 942-7732.
End of document 004313
Bid security forms — 004313 - 1
Old Saybrook Public Works
November 11, 2026
Section 011000 - Summary
Part 1 - General
1.1 Summary
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction.
4. Work under separate contracts.
5. Access to site.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and drawing conventions.
9. Miscellaneous provisions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.2 Project information
11/22/26, 12:50 PM Print - Old Saybrook Public Works Addition and Renovation Project Manual about:blank 27/508 mailto:docspurchases@aia.org tel:+18009427732
A. Project Identification: Old Saybrook Public Works Project Location: 497 Middlesex Turnpike, Old Saybrook, CT 06475
B. Owner: Old Saybrook CT
1. Owner's Representative: Carl Fortuna, First Selectman
C. Architect: <Gregory E. Nucci AIA Point One Architects + Planners 101 Shore Road, Old Lyme CT. 06371 860-434-7707 info@pointonearchitects.com>.
D. Project Web Site: A project Web site administered by General Contractor will be used for purposes of managing communication and documents during the construction stage.
1. See Section 013100 "Project Management and Coordination." for requirements for [establishing] [administering] [and] using Project Web site, ProCore.
1.3 Work covered by Contract Documents
A. The Work of Project is defined by the Contract Documents and consists of the following:
Summary
011000 - 1
Old Saybrook Public Works
November 11, 2026
Part 2 - The project consists of renovations and additions to an existing municipal Public Works facility to improve and expand its operational capabilities.
The scope of work includes the construction of a new staff and administrative area featuring locker rooms, showers, a laundry room, a combined conference and lunchroom, and offices. The project also includes a substantial addition to the existing vehicle storage garage to accommodate additional municipal vehicles and equipment, along with associated building improvements and modifications necessary to integrate the new construction with the existing facility.
A. Type of Contract.
1. Project will be constructed under a single prime contract.
a. AIA contract A101-2017 Standard form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
2.2 Work under separate contracts
A. Concurrent Work: Owner [will award] separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.
1. Installation of all IT, AV, security and owner supplied systems.
11/22/26, 12:50 PM Print - Old Saybrook Public Works Addition and Renovation Project Manual about:blank 28/508 tel:8604347707 mailto:info@pointonearchitects.com
2.3 Access to site
A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.
1. Limits: Confine construction operations to the areas described on the Civil Engineering Plans within the Contract Documents.
Maintain all access to adjoining buildings.
2. Driveways, Walkways and Entrances: Keep driveways loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
Summary
011000 - 2
Old Saybrook Public Works
November 11, 2026
2.4 Coordination with occupants
A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work.
2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Owner occupancy.
3. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work.
4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work.
2.5 Work restrictions
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
about:blank 29/508
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7 a.m. to 5 p.m., Monday through Friday, unless otherwise indicated.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner not less than [two] 2 days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
D. Nonsmoking Building: Smoking is not permitted within the building or within 100 feet of entrances, operable windows, or outdoor-air intakes.
E. Controlled Substances: Use of tobacco products and other controlled substances Project site is not permitted.
2.6 Specification and drawing conventions
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
Summary
011000 - 3
Old Saybrook Public Works
November 11, 2026
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations [published as part of the U.S. National CAD Standard] [and]
[scheduled on Drawings].
3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project
Manual.
Part 3 - Products (Not Used)
Part 4 - Execution (Not Used) about:blank 30/508
End of Section 011000
Summary
011000 - 4
Old Saybrook Public Works
November 11, 2026
Section 012200 - Unit prices
Part 1 - General
1.1 Summary
A. Section includes administrative and procedural requirements for unit prices.
B. Related Requirements:
1. Section 012600 "Contract Modification Procedures" for procedures for submitting and handling Change Orders.
1.2 Definitions
A. Unit price is[ an amount incorporated in the Agreement, applicable during the duration of the Work as] a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 Procedures
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, [applicable taxes,] overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
Part 2 - Products (Not Used) about:blank 31/508
Part 3 - Execution
3.1 Schedule of unit prices
Unit prices
012200 - 1
Old Saybrook Public Works
November 11, 2026
3.1 Schedule of unit prices
Item Unit Description UP-1 Rotted Roof
Sheathing Replacement
S F
Remove and dispose of deteriorated existing roof sheathing and provide new sheathing matching existing thickness and type.
Include cutting, fitting, fastening, minor blocking required at panel edges, and coordination with roofing work. Unit price shall include all labor and materials.
UP-2 Masonry Repointing
S F
Remove deteriorated mortar and repoint existing masonry. Include preparation, cleaning, new mortar matching existing, and tooling of joints.
UP-3 Duplex Receptacle – New
E A
Furnish and install new commercial-grade duplex receptacle, device box, cover plate, wiring, connectors, and all accessories.
Include connection to nearest available branch circuit/panel and up to 25 LF of concealed wiring/conduit. Include cutting and patching of minor finishes.
UP-4 Data Outlet and Box
E A
Furnish and install new data outlet location consisting of recessed device box, cover plate, and conduit with pull string to accessible ceiling space. Data cabling by Owner/others unless otherwise indicated.
UP-5 Data Conduit to Accessible Ceiling
E A
Furnish and install recessed data box with minimum 1-inch conduit extended from box to accessible ceiling space, including pull string, bushings, fittings, supports, and blank/data cover plate.
UP-6 Additional Electrical
Conduit/Wiring
L F
Additional branch circuit conduit and conductors beyond quantities included in individual unit prices. Include conduit, conductors, fittings, supports, pulling, connections, and testing.
UP-7 New LED Light Fixture
E A
Furnish and install additional LED light fixture comparable to specified fixture type, including mounting, wiring, switching connection, supports, and accessories. Identify fixture type to be used for unit pricing.
UP-8 Additional Fire Alarm Device
E A
Furnish and install additional code-compliant fire alarm notification or initiating device, including box, wiring, conduit, programming, testing, and connection to existing/new fire alarm system.
UP-9 Additional Sprinkler Head
E A
Furnish and install additional sprinkler head, including branch piping, fittings, supports, coordination, testing, and required ceiling modifications.
about:blank 32/508
Unit prices
012200 - 2
Old Saybrook Public Works
November 11, 2026
Item Unit
Descript ion
UP-10 Concrete Slab Repair SF Remove deteriorated or damaged concrete slab and provide new concrete matching existing thickness. Include saw cutting, removal, preparation, reinforcement/dowels where required, placement, finishing, and curing.
UP-11 Concrete Slab
Trenching and Patching
LF
Sawcut and remove existing slab for new underground piping/conduit and restore slab following installation. Include excavation, backfill, compaction, doweling, reinforcing, and concrete patching. Underground utility work priced separately.
UP-12 Existing Wall Opening / Patch
SF Patch abandoned openings in existing construction with materials and finishes matching adjacent construction, including framing, blocking, substrate, and finish work.
UP-13 Door/Frame Replacement
EA Remove existing door and frame and provide new door/frame assembly comparable to specified type, including hardware preparation, anchors, installation, patching, and painting. Hardware priced as indicated.
End of section 012200
Unit prices
012200 - 3
Old Saybrook Public Works
November 11, 2026
Section 012300 - Alternates
Part 1 - General
1.1 Summary
A. Section includes administrative and procedural requirements for alternates.
about:blank 33/508
1.2 Definitions
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.3 Procedures
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
Alternates
012300 - 1
Old Saybrook Public Works
November 11, 2026
Part 2 - Products (Not Used)
Part 3 - Execution
3.1 Schedule of alternates
A. Alternate No. <1>: Roofing
1. Base Bid: Standing Seam Metal Roof system as shown.
2. Alternate: Add Alternate No. _1 – Sika Sarnafil Décor Simulated Standing Seam Roofing System about:blank 34/508
3. Description of Alternate:
4. Provide an alternate price to furnish and install a complete Sika Sarnafil Décor Roofing System, consisting of a thermoplastic PVC roofing membrane with raised decorative profiles designed to simulate the appearance of a traditional standing seam metal roof.
5. The alternate shall include all roofing materials, insulation, cover boards, attachment systems, accessories, and associated sheet metal work necessary to provide a complete, watertight, manufacturer-warranted roofing assembly over the structural metal roof deck.
6. The roofing assembly shall include the following components, installed from the structural metal deck upward:
7. 1. Structural Metal Roof Deck: Existing or new structural metal roof decking as indicated on the drawings, prepared to receive the roofing assembly.
8. 2. Air/Vapor Retarder: Provide a compatible air/vapor retarder over the metal deck where required by the approved roof assembly and project-specific moisture analysis, including sealed laps, penetrations, and perimeter transitions.
9. 3. Rigid Roof Insulation: Provide multiple layers of rigid polyisocyanurate roof insulation, with staggered joints, to achieve the required thermal resistance in accordance with the Connecticut State Building Code and applicable energy conservation requirements. Include tapered insulation, crickets, and saddles where necessary to establish positive drainage.
10. 4. Roof Cover Board: Provide a high-density roof cover board compatible with the specified Sarnafil roofing system, installed in accordance with the manufacturer's requirements.
11. 5. PVC Roofing Membrane: Provide Sika Sarnafil PVC roofing membrane of the appropriate type and thickness for the specified Décor system, fully adhered to the approved substrate, with heat-welded seams and all required membrane flashings.
12. 6. Decorative Standing Seam Profiles: Provide factory-manufactured Sika Sarnafil Décor raised PVC profiles, heat-welded to the roofing membrane to simulate traditional standing seam metal roofing. Profile size, spacing, layout, and color shall be selected by the Architect.
13. 7. Flashing and Sheet Metal Accessories: Provide all associated perimeter edge metal, copings, fascia, gravel stops where applicable, drip edges, counterflashings, termination bars, roof-to-wall flashings, curb flashings, pipe penetration flashings, expansion joint assemblies, and other miscellaneous sheet metal components required for a complete installation. Exposed metal finishes and colors shall be selected by the Architect.
Alternates
012300 - 2
Old Saybrook Public Works
November 11, 2026
14. 8. Roof Drainage: Provide all required roof drains, scuppers, overflow drainage components, gutters, downspouts, conductor heads, and related accessories as indicated on the drawings, coordinated with the proposed roofing system.
15. 9. Fasteners and Accessories: Include all required insulation fasteners, plates, adhesives, primers, sealants, welding materials, blocking, nailers, attachment components, and miscellaneous accessories necessary for a complete roofing assembly.
about:blank 35/508
16. 10. Warranty: Provide the manufacturer's specified roofing system warranty, including the membrane, decorative profiles, and applicable approved roofing system components.
17. Basis of Design: Sika Sarnafil Décor Roofing System, or approved equal, subject to the Architect's approval.
18. Additional requirements
19. The alternate shall include removal or adjustment of any base-bid roofing components affected by the substitution, coordination with adjoining roof systems, and all labor, materials, equipment, and incidental work necessary for a complete installation.
20. Provide a complete roof assembly meeting applicable building code, wind uplift, fire classification, energy code, and manufacturer warranty requirements. The contractor shall submit product data, roof assembly details, insulation thicknesses, fastening patterns, decorative rib layout, and proposed flashing details for the Architect's review prior to installation.
21. Suggested specification reference: Section 07 54 19 – Polyvinyl-Chloride (PVC) Roofing, with related work under Section 07 62 00 – Sheet Metal Flashing and Trim.
EBD OF SECTION 012300
Alternates
012300 - 3
Old Saybrook Public Works
November 11, 2026
Section 012500 - Substitution procedures
Part 1 - General
1.1 Summary
A. Section includes administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.
1.2 Definitions
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
about:blank 36/508
1.3 Action submittals
A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced.
Include Specification Section number and title and Drawing numbers and titles.
1. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.
b. Coordination information, including a list of changes or revisions needed to other parts of the Work and to construction performed by
Owner and separate contractors, that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners.
h. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
Substitution procedures
012500 - 1
Old Saybrook Public Works
November 11, 2026
i. Research reports evidencing compliance with building code in effect for Project, from [ICC-ES] <Current State of CT Building and Fire Codes, LedgeLight Health District Regulations>.
j. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of…