This Invitation to Bid (ITB #1860) is issued by the City of Milford, Connecticut, for construction of a truck wash bay at the City of Milford Public Works Building located at 83 Ford Street, Milford, Connecticut. The project involves furnishing and erecting a pre-engineered steel building measuring 85 feet wide by 24 feet long with a 24-foot eave height and 1/12 roof pitch on existing foundations and anchor bolts. The building specifications include a 24-gauge standing seam roof with 9.5 inches of fiberglass insulation, 3-inch foam-filled insulated wall panels, epoxy-painted structural steel, one steel pass door (36" x 72"), two galvanized overhead door frames (14' x 14'), gutters, downspouts, and flashing. The contractor must provide all drawings stamped by a Connecticut Licensed Professional Engineer and complete all debris removal upon project completion. Sealed bids are due by 3:00 PM EDT on Wednesday, November 18, 2026, at the Purchasing Agent's Office, 70 West River Street, Milford, CT 06460. A non-mandatory pre-bid meeting is scheduled for 10:00 AM on Friday, November 6, 2026, at 83 Ford Street. Contract execution must occur within 15 days of the Notice of Award, and work must be substantially completed within 90 days of the Notice to Proceed.
Bidders must submit one original and four copies of sealed bids accompanied by a 5% bid bond, with bids evaluated on a lump sum basis. The successful bidder must provide 100% Performance Bond and 100% Labor and Materials Payment Bond, Certificate of Insurance naming the City as additional insured on a primary, non-contributory basis, and proof of compliance with prevailing wage requirements under Connecticut General Statutes § 31-53 et seq. The City of Milford is exempt from state and local taxes and will not accept faxed or emailed bids. Liquidated damages are assessed at $500 per calendar day for work not completed by the contractual substantial completion date. The contract is subject to Connecticut law and jurisdiction, requires compliance with non-discrimination and affirmative action requirements, and mandates compliance with the Immigration Reform and Control Act. Non-resident contractors must furnish a 5% Guarantee Bond to the Department of Revenue Services within 120 days of contract commencement. Retainage is set at 5% until final completion, with payment due within 30 days of invoice submission based on percentage of work completed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Legal Notice
CITY OF MILFORD
Office of the Purchasing Agent
70 West River Street - Milford, CT 06460
Tel (203) 783-3225
Invitation to bid
ITB # 1860
Notice is hereby given that an Invitation to Bid for the
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut will be received in the Purchasing Agent's Office until
3:00 P.M. on Wednesday, November 18, 2026 when they will be publicly opened and read aloud.
Bid packages may be obtained from the Purchasing Agent or downloaded from www.milfordct.us/863/Current-Bids .
If you download Bid packages it is your responsibility to ensure that you have current information. Check for any applicable addenda prior to submitting a Bid.
The City of Milford is not responsible for data or transmission errors.
A Non-Mandatory pre-bid meeting between prospective bidders will convene at 83 Ford Street, Milford, CT 06461
10:00 a.m., Friday, November 6, 2026 when project details will be discussed and questions answered.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 1/46 tel:+12037833225 http://www.milfordct.us/863/Current-Bids
A Bid Bond of 5% for the total base bid is required and must accompany each bid. The Successful Bidder must provide a 100% Performance Bond, a 100% Labor and Materials
Payment Bond, Certificate of Insurance, and Insurance Endorsements upon Notice of Award.
The City of Milford reserves the right to reject any and all Bids or any part thereof, or to waive defects or informalities in same, to seek clarification and/or additional information, or to accept any Bid deemed to be in the best interests of the City of Milford.
Bidders’ attention is called to the requirements as to conditions of employment to be observed, minimum state wage rates to be paid pursuant to Conn. Gen. Stat. § 31-53, et seq., and payroll submission requirements under the contract.
The City of Milford is an equal opportunity employer. All bidders shall comply with Conn. Gen.
Stat. § 4a-60.
Fred Bialka
Purchasing Agent
Notice of invitation to bid Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
ITB # 1860
The City of Milford, Connecticut is requesting written, sealed Bids from interested parties for construction of a truck wash bay at the City of Milford Public Works Building located at 83 Ford Street, Milford, Connecticut.
One (1) original and four (4) copies of all Bids shall be submitted in a sealed envelope clearly labeled with your name and address in the upper left-hand corner and the name of the bid, in the lower left-hand corner, in the format provided below:
ITB # 1860
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut November 18, 2026 @ 3 P.M.
Bids shall be submitted to the Purchasing Agent at 70 West River Street, Milford, CT, by mail or hand delivered, and must be received no later than 3:00 PM EDT on Wednesday, November 18, 2026, when they will be publicly opened and read aloud. Bids must be printed in ink or typewritten. No erasures will be permitted. Contract execution shall be within fifteen (15) days of Notice of Award. No faxed or e-mailed bids will be considered. The City will not accept or consider bids, withdrawals, or amendments received after the date and time specified and shall be returned unopened. No responsibility will be attached to any City representative or employee for the premature opening of a Bid not properly addressed and identified.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 2/46
The City, in its sole discretion, will evaluate all Bids and make an award, if at all, to the lowest responsible and qualified bidder whose bid offers the lowest price among those who possess the necessary skill, ability, and integrity to faithfully perform the work. The Invitation to Bid (ITB) may be obtained from the City of Milford’s website: www.milfordct.us/863/Current-Bids or by contacting:
Frederick Bialka, Purchasing Agent City of Milford
70 West River Street Milford, CT 06460
Telephone (203) 783-3225 Facsimile (203) 876-1960
E-Mail: fbialka@ci.milford.ct.us
Interested parties should provide Mr. Bialka with contact information, including names, telephone numbers and email address, so that additional information, if any, concerning the ITB can be provided to interested parties.
If tie bids are received which are equal as to price, quality, and service, a bid received from a business which submits a drug free workplace certification with the bid form will be given preference in accordance with Milford's Code of Ordinances, Article V, Division 2.
No interpretation of the meaning of the plans, specifications or other contract documents will be made to any Bidder orally. Every request for such interpretation should be in writing, addressed to Mr. Bialka at the address above, and to be given consideration must be received no later than 4:00 PM EDT on Monday, November 9, 2026. Any and all such interpretations and any supplementary instructions will be in the form of written addenda to the specifications which, if issued, will available on the City of Milford’s website: www.milfordct.us/863/Current-Bids not later than three (3) days prior to the date fixed for the opening of Bids. Bidders shall check the City’s website prior to submitting a Bid. Failure of any Bidder to receive such addenda or interpretation shall not relieve any Bidder from any obligations under his/her Bid as submitted. It is the bidder’s responsibility to ensure that they have all current information. The City is not responsible for data of transmission error.
No other official or employee of the City may be contacted with respect to this ITB, except as approved by the Purchasing Agent.
**REMAINDER OF PAGE INDENTIALLY LEFT BLANK**
ITB-3
General conditions and instructions to bidders
City of Milford Purchasing Department
General conditions and instructions to bidders
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 3/46 http://www.milfordct.us/863/Current-Bids tel:+12037833225 tel:+12038761960 mailto:fbialka@ci.milford.ct.us http://www.milfordct.us/863/Current-Bids
The general rules and conditions outlined below apply to all purchases authorized by the City of Milford. The conditions outlined become a formal part of each Invitation to Bid unless otherwise specified. All Bidders are expected to fully inform themselves as to the conditions, requirements and specifications before submitting Bids. Failure to do so will be at the Bidder’s own risk.
The terms and conditions outlined in the Invitation to Bid become part of the formal contract following award, unless specified otherwise.
Conditions of bids:
Bid forms: The Bidder shall maintain one (1) copy for its files and submit one (1) original and four (4) signed copies of all Bids shall be submitted in a sealed envelope clearly labeled with the Bidders name and address in the upper left-hand corner and the name of the bid clearly marked, in the lower left-hand corner, in the format provided below:
ITB # 1860
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut November 18, 2026 @ 3 P.M.
Addendums: It shall be the Bidder’s responsibility to check for any Addendums added to the original bidding documents.
Late bids: Formal bids, addenda to Bids or requests to withdraw a Bid received after the date and time specified for opening will not be considered.
Withdrawal of bids: Bids may be withdrawn by written request of the Bidder only, and must be received prior to specified time of Bid opening.
Mailing of bids: All Bids are to be mailed or hand delivered in an envelope marked as set forth above and directed to Frederick Bialka, Purchasing Agent, City of Milford, 70 West River Street, Milford, CT 06460. Bidders are encouraged to allow sufficient time for mailing of Bids. The City of Milford assumes no responsibility for postal delays. All Bids received will be stamped with the date and time received by the Purchasing Office. This date of receipt will prevail over postmark date.
Non-mandatory pre-bid meeting: A non-mandatory pre-bid meeting for prospective bidders will be conducted with the City of Milford Public Works Director, or his designee, at the Public Works Building located at 83 Ford Street, Milford at 10:00 a.m. on Friday, November 6, 2026. Attendance is not required but is highly encouraged as the meeting will include a discussion of the project scope and an opportunity for questions.
Opening of bids: The Bids will be opened publicly and read aloud. Bidders are welcome and are encouraged to attend Bid openings. Bid openings will be listed by Bidder name, address and
ITB-4
Bid amount only. Bid tabulation will be done at a separate time following Bid opening and will be available to interested parties at a later time.
Bidders in default to city: The Purchasing Agent shall not accept the Bid of a Bidder who is in default on the payment of taxes, licenses or other monies to the City.
Reserved rights: The City shall award a contract, if at all, to the lowest responsible and qualified Bidder whose bid offers the lowest price among those who possess the necessary skill, ability, and integrity to faithfully perform the work The City of Milford reserves the right to reject any or all bids, or any
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 4/46 part of a Bid or to waive defects and/or informalities in Bids, and to seek clarification or additional information from any Bidder if in the best interest of the City of Milford.
All formal Bids submitted shall be binding and subject to the City’s acceptance for ninety (90) calendar days following bid-opening date. The Bidder may agree to hold its Bid open for acceptance more than 90 calendar days at the request of the Purchasing Agent. All extensions are to be documented in writing by the Bidder and the City.
Error in bids: Any mistake in a Bid which is obviously a clerical error such as a price extension, or decimal point error may be corrected by the Purchasing Agent, following Bidder verification. Clerical errors detected at the Bid opening will be corrected and initialed by the Purchasing Agent, Bidder and a witness, if present. If an error exists in the extension of prices, the unit price shall prevail. Words shall prevail over numerical figures.
Taxes: The City of Milford is exempt from all State and Local taxes - do not include these taxes in your Bid.
Bid bond, certified check, or cashier’s check: The Bid shall be accompanied by a Bid bond signed by a surety company authorized to do business in Connecticut or by a cashier’s check or certified check made payable to the City of Milford, Connecticut. The amount of the Bid deposit will be 5% of the total base Bid unless otherwise specified.
Performance bond and labor and materials payment bond: The Successful Bidder must supply a performance bond and labor and materials payment bond for the full amount of the Bid. The performance bond and labor and materials payment bond shall be made out in favor of the City of Milford as obligee. The performance bond will be required as security by the Successful Bidder for faithful performance of its contract and the labor and materials payment bond shall be required to ensure the Successful Bidder pays its obligations and for the protection of those persons and entities supplying labor, materials, equipment and services for the project. This performance bond and labor and materials payment bond will be required within ten (10) days of the award notification. The performance bond and labor and materials payment bond must be written by a surety company licensed to transact business in the State of Connecticut. Upon failure or refusal to furnish the required performance bond and labor and materials payment bond within this ten (10) day period, the Successful Bidder shall forfeit the Bid deposit to the City of Milford as liquidated damages.
Prevailing wages. The Contractor shall include the costs of such wages including all yearly adjustments in the Contract Price. The wages paid on an hourly basis to any mechanic, laborer or workman employed upon the work herein contracted to be done and the amount of payment or contribution paid or payable on behalf of each such employee to any employee welfare fund, as defined in subsection (i) of this section, shall be at a rate equal to the rate customary or
ITB-5
prevailing for the same work in the same trade or occupation in the town in which such project is being constructed. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such employees to any such employee welfare fund shall pay to each employee as part of his wages the amount of payment or contribution for his classification on each pay day.
Debarment: A Bidder cannot be currently debarred from submitting Bids or Bids on contracts by any agency or political subdivision of the State of Connecticut, or any other state, native American body or other governmental entity within the United States, nor can a Bidder be an agent of any person or entity that is currently debarred from submitting Bids or Bids on contracts by any agency or political subdivision of the State of Connecticut or any other state, native American body or other governmental entity within the United States.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 5/46
Non-discrimination: The City of Milford is an equal opportunity employer. The Bidder shall comply with Conn. Gen. Stat. § 4a-60.
Form of contract: By submitting a Bid, the Bidder warrants and agrees that it shall execute the form of contract, attached hereto as Exhibit A, without alteration, exception, condition, or modification. Bidders are encouraged to review the form of contract for insurance, indemnity and other requirements.
**Reminder of page indentially left blank**
Specifications
Trade names: In cases where an item is identified by a manufacturer’s name, trade name, catalog number or reference it is understood that the Bidder proposes to furnish the item so identified or an item that is equal in performance, aesthetics, warranty, utility requirements, and size in every way.
The City reserves the right to approve as an equal or to reject as not being equal any article the Bidder proposes to furnish which contains major or minor variations from the specification requirements.
The Bidder shall comply with the true intent of the specifications and not take advantage of any unintentional error or omission but shall fully complete every part of any and all specification or drawings whenever mention is made of any article, material or workmanship to be in accordance with laws, ordinances, building codes, ASTM standards, other applicable standards, or similar expressions. These shall be considered to be the minimum requirements of the drawings, specifications and other contract documents.
Insurance requirement: The Successful Bidder shall maintain insurance from companies licensed to write business in Connecticut, with an A.M. Best rating of no less than A VII or higher, and acceptable to the City of Milford, of the kinds and minimum amounts specified in the Contract attached hereto as Exhibit A, and all other requirements contained therein. The City reserves the right, in its sole discretion, to require higher limits of insurance coverage.
The City shall be named as an additional insured on the Bidder’s policies on a primary and non-contributory basis as specified in their form of contract.
The Successful Bidder must be in compliance with C.G.S. §31-286a insurance requirements for contractors on projects and renewals of State business licenses.
Drawings and specifications for the work: Attached hereto as Schedule A.
Remainder of page intentionally left blank
Note about transcribed forms: this format exists to remove accessibility barriers, but some recipients prefer the original printed format. If you'd like help moving your entries into the original form, please use the live assistance options in the sidebar or contact the author.
ITB #1860
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Bid form
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 6/46
City of Milford Purchasing Department 70 West River Street Milford, CT 06460
We wish to submit our bid on the above-referenced ITB. We have enclosed our bid surety in the amount of 5% of our bid. We have read and understand your specifications, Invitation to Bid, General Information to Bidders, and are submitting our bid in full compliance with all of the stated conditions.
Following award, we will provide the required Certificate of Insurance and Insurance Endorsements from the following insurance company:
Insurance company for certificate and endorsements
Following award, we will provide the required Performance Bond and Labor and Materials Payment Bond from the following insurance company:
Insurance company for bonds
We hereby submit the following bid for the project identified below, or for both projects if submitting for both, as indicated herein:
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Lump sum bid
Amount in words Amount in dollars ($)
Addenda received
Enter the number and date of each addendum received for this contract. Leave unused rows blank.
Number Date mm/dd/yyyy mm/dd/yyyy mm/dd/yyyy mm/dd/yyyy
The undersigned bidder certifies that their bid is made independently and without collusion, agreement, understanding, or planned course of action with any other bidder and that the contents of their bid shall not be disclosed to anyone other than their employees, agents, or sureties prior to the official bid opening.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 7/46
BF-1
Name of company: Address: Address, continued:
Name and title of agent submitting bid: Phone: Fax:
Signature:
The following documents are required to be submitted with this bid page:
1. Non-Collusive Affidavit
2. Affirmative Action Statement
3. W-9 Form
4. Bid Bond
5. Labor and Materials Payment Bond
6. Performance Bond
7. Statement of Bidder’s Qualifications
8. Drug Free Workplace Certificate
9. Certificate of Insurance, together with endorsements, for the following will be required upon award of contract and must remain in effect during the term of the contract:
a. Identify the City of Milford as a certificate holder.
b. Name the City of Milford, its Governing Board, Officials, Agents and Employees as additional insureds.
c. Include the language “on a primary, non-contributory basis” and “waiver of subrogation applies in favor of the City of Milford and all other required parties.”
d. Workers Compensation – Statutory Limits
BF-2
ITB #1860
Construction of a Truck Wash Bay at the City of Milford Public Works Building
83 Ford Street, Milford, Connecticut
Non-collusive affidavit of bidders
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 8/46
The undersigned Bidder, having fully informed itself regarding the accuracy of the statements made herein, certifies that:
1. The Bid has been arrived at by the Bidder independently and has been submitted without collusion with, and without any agreement, understanding, or planned common course of action with, any other Bidder for the construction project described in the Invitation to Bid, designed to limit independent competition; and
2. The contents of the Bid have not been communicated by the Bidder or his/her employees or agents to any person not an employee or agent of the Bidder or his/her surety on any surety furnished with the Bid, and will not be communicated to any such person prior to the official opening of the Bid.
The undersigned Bidder further certifies that this statement is executed for the purpose of inducing the City of Milford to consider the Bid and make an award in accordance therewith.
Bidder certification Name of Bidder Duly authorized signature Title
Date mm/dd/yyyy
Notarial acknowledgment
Subscribed and sworn to before me this:
Day Month
Notary Public signature My commission expires mm/dd/yyyy
Must be notarized and returned with Bid
NC-1
ITB # 1860
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Affirmative action statement
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 9/46
Any vendor or Bidder seeking to do business with the City of Milford must, upon request, supply the Purchasing Office with any information concerning the affirmative action equal employment practices of the vendor/Bidder. Failure to supply such information, when requested, will result in the termination of any further transactions between the vendor/Bidder and the City of Milford.
All vendors/Bidders with more than ten (10) employees shall be required to complete the affirmative action/equal opportunity employment requirements statement on an annual basis except as noted below:
1. All vendors or Bidders with less than ten (10) employees are exempt from this requirement;
2. All vendors/Bidders that have completed this form within the last year.
If either of the above applies, check the appropriate box below:
Less than 10 employees Indicate number:
Completed this form within the last year Indicate date completed: mm/dd/yyyy
All Bidders submitting a sealed Bid will be required to complete the affirmative action statement. If the form has been completed in the past year, please include a photocopy of the initial form with Bid. If significant changes have taken place in the past year, please update the changes on this form.
Company name & address: Type of business:
Type of organization (please check one):
Corporation Partnership Individual
AA-1
Reporting unit, branch agent, or representative
Complete this section if the vendor/bidder filing this application is not the above-named company.
Name Address Telephone number
Equal employment opportunity
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 10/46
The vendor/bidder is instructed to complete the following:
1.
Does the company have a written policy statement regarding Equal Employment Opportunity?
Yes No If yes, attach a copy of the policy Choose File No file chosen
2.
In recruiting employees, are all sources of recruitment notified that all qualified applicants will receive equitable consideration?
Yes No
If yes, briefly describe the methods employed
3.
Do all recruitment advertisements state that you are an Equal Opportunity Employer?
Yes No
4. List the names and contact persons of any local community agents or other groups providing minority and female placement services that you have contacted in the last 12 months. If none, state “None.”
5. If additional means are employed to advertise or solicit minority and female applicants for employment opportunities within your company, please indicate them
AA-2
Affirmative action
1.
Does your company maintain a written affirmative action plan for the employment of females and minorities?
Yes No
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 11/46
If yes, attach a copy of the policy.
Policy attachment Choose File No file chosen
2. Please indicate the name and address of the company official(s) responsible for carrying out the equal opportunity/affirmative action program for your company:
3. If a written affirmative action plan for your company is not in place, please estimate the number of vacancies expected during the next twelve months and indicate the numerical or percentage goals you have set for the employment of minority people and females to make your labor force reflective of the labor market in which you operate:
The vendor is hereby notified that failure to complete the above form in a satisfactory manner will preclude such vendor from being actively considered to contract with the City of Milford. The vendor is further advised the affirmative action statement included with the Bid document will become part of the contract and that any breach of such statements will constitute a breach of contract subject to such remedies as provided by law.
I certify that there are no misrepresentations, omissions or falsifications in the foregoing statements and answers, and that all entries above are true, complete and correct to the best of my knowledge and belief.
Date mm/dd/yyyy Signature of agent Title of agent
Notarization
Subscribed and sworn to before me this day day of month , 2026.
Notary public My commission expires mm/dd/yyyy
**Must Be Notarized and Returned With Bid**
AA-3
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 12/46
Bid bond Know all men by these presents, that we, the undersigned Principal
, as Principal, and Surety
, as Surety, are hereby held and firmly bound unto the City of Milford in the penal sum of Penal sum for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.
Signed, this day of the month in 2026 Day Month Select month
The condition of the above obligation is such that whereas the Principal has submitted to the City of Milford a certain Bid, attached hereto and hereby made a part hereof to enter in a contract in writing, for the:
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
In the event the Principal fails to complete and execute the Agreement to the said Bid and to complete the other requirements of said Bid, then the Surety shall pay over to the City the penal sum set forth above.
Now, therefore,
a. If said Bid shall be rejected, or in the alternate,
b. If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a Bond for its faithful performance of said contract, and for the payment of all persons performing labor or furnishing material in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the City of Milford may accept such Bid; and said Surety does hereby waive notice of any such extension.
BB-1
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 13/46
In witness whereof, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
Principal
(L.S.)
Surety
By (authorized representative)
Important: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the state where the project is located.
BB-2
Statement of bidder’s qualifications
Bidder shall complete this statement and submit it with its bid.
All questions must be answered, and the information given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The bidder may submit any additional information it desires.
1. Name of bidder
2. Bidder’s Internal Revenue Service I.D. number
3.
Permanent main office address and telephone number
Permanent main office address Telephone number
4. When organized
5. If an entity, what type and where organized?
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 14/46
6. How many years has your company been engaged in construction/demolition under its present firm or trade name?
BQ-1
7. Describe the general character of work performed by you.
8. Has your company ever failed to complete any work awarded to you? If so, give dates, project names, and reasons therefor.
9. Has your company ever defaulted on a contract? If so, where and why?
BQ-2
10. List the construction experience of the principal individuals of your organization.
Individual’s name Years of construction experience
Present position and years of experience
Previous position and years of experience
Dollar volume responsibility
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 15/46
Individual’s name Years of construction experience
Present position and years of experience
Previous position and years of experience
Dollar volume responsibility
BQ-3
11. Has any officer, director, stockholder, partner or member, as applicable, of your organization ever been an officer, director, stockholder, partner or member of some other organization that failed to complete a construction contract?
Response
If so, state the name of the individual, other organization, dates, projects, and reasons therefor.
12. Has any officer, director, stockholder, partner, or member of your organization ever failed to complete a construction contract handled in its own name?
Response
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 16/46
If so, state the name of the individual and reason therefor.
13. In what other business do you or your entity have a financial interest?
BQ-4
14. List contracts that will show the various types of work completed by your organization in the past 5 years and/or presently under construction.
Name and address of owner
Address must be adequate to assure reply to inquiry and verification
Name and location of project—kind of work
Name of prime contractor, if you are a subcontractor
Contract price
Was contract completed on time? If no, explain why under No. 16
Were there any penalties imposed?
If yes, give amount and explain under
No. 16
Were there any liens, claims, or stop notices filed against job? If yes, explain under No.
Select Select Select
Select Select Select
Select Select Select
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 17/46
Name and address of owner
Address must be adequate to assure reply to inquiry and verification
Name and location of project—kind of work
Name of prime contractor, if you are a subcontractor
Contract price
Was contract completed on time? If no, explain why under No. 16
Were there any penalties imposed?
If yes, give amount and explain under
No. 16
Were there any liens, claims, or stop notices filed against job? If yes, explain under No.
Select Select Select
BQ-5
15. Plant and equipment
List equipment owned and indicate those available for this contract. Also list separately equipment under lease or otherwise available to you, with an attached explanation of the arrangements.
The list of equipment should be identical to that shown in your Financial Statement and must be shown below to be credited in the technical evaluation of your application.
Quantity Item Size or capacity Condition Years of service
BQ-6
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 18/46
16. Explanation of details in connection with non-completion of contracts; penalties imposed;
liens, claims and stop notices filed against contracts under No. 14.
If you are a parent organization and desire to do business in Connecticut through branch offices, indicate below the official name and address of each branch:
Branch office name Branch office address
17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City?
Response
18. Authorization
The undersigned hereby authorizes and requests any persons, firm, or corporation to furnish any information requested by the City in verification of the recitals comprising this Statement of Bidder’s Qualifications.
Date and signature
Dated at the place and on the day and month entered below, 2026.
Dated at Day Month Select month
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 19/46
Year: 2026
Name of bidder By (signature or name of authorized representative)
Title
BQ-7
Jurisdiction and acknowledgment
State of County of Day of acknowledgment
Month of acknowledgment
State and county: ss. Acknowledged on the day and month entered above, 2026.
Sworn statement
Before me, the undersigned officer, personally appeared:
Name of person appearing Position or capacity Organization
The person appearing, being duly sworn, deposes and says that they hold the position or capacity entered above with the organization entered above, and that the answers to the foregoing questions and all statements therein are true and correct and sworn under penalties of perjury.
Notarial attestation
Subscribed and sworn to before me this:
Day sworn Month sworn
Year: 2026
Notary public signature My commission expires mm/dd/yyyy
BQ-8
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 20/46
Drug free workplace certificate
I hereby certify that this company:
1. Has a published statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and that this statement specifies the actions which will be taken against employees for violations of such prohibition.
2. Has a written policy informing employees about the dangers of drug abuse in the workplace, the firm's policy of maintaining a drug free workplace, any available counseling, rehabilitation, and employee assistance programs, and the penalties which may be imposed upon employees for drug use violations.
3. Each employee engaged in providing the commodities or contractual services which are being bid was given a copy of the statements specified in paragraphs 1 and 2, above.
4. In the statement specified in paragraph 1, the employees have been notified that, as a condition of working on the commodities or contractual services which are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of “guilty” or “nolo contendere” to, any violation of any controlled substance law of the United States or of any state, for a violation occurring in the workplace no later than five (5) days after such conviction or plea.
5. This firm will impose a sanction on or require the satisfactory participation in a drug abuse assistance program or a rehabilitation program, if such are available in the employee’s community, by any employee who is so convicted.
6. This firm will make a good faith effort to continue to maintain a drug free workplace.
As the person authorized to sign this statement, I certify that this firm fully complies with the above requirements.
Company: Signature:
Print name: Dated: mm/dd/yyyy
DFC-1
Notice of award
To:
Project: Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 21/46
The City has considered the Bid submitted by you for the above-described work in response to its Advertisement for Bids dated mm/dd/yyyy and its Instructions and Information for Bidders.
You are hereby notified that your Bid has been accepted for the total lump sum (complete) amount of:
Written figure (amount in words) Dollars and cents ($)
You are required by the Instructions and Information for Bidders to execute the Agreement and furnish the required Contractor’s Performance Bond, Payment Bond and certificates of insurance within ten (10) calendar days from the date of this Notice to you.
If you fail to execute said Agreement and to furnish said Bonds within ten (10) days from the date of this Notice, said City will be entitled to consider all your rights arising out of the City’s acceptance of your Bid as abandoned and as a forfeiture of your Bid Bond. The City will be entitled to such other rights as may be granted by law.
You are required to return an acknowledged copy of this Notice of Award to the City.
Notice date
Dated this day of , 2026.
City of Milford
By:
Fred Bialka Purchasing Agent
Acceptance of notice of award
Receipt of the above Notice of Award is hereby acknowledged by
, this day of , 2026.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 22/46
Signed Title
NA-1
Labor and materials payment bond
Know all men by these presents: that
Principal (contractor)
Name of contractor Address of contractor Type of contractor Select type
Hereinafter called Principal, and
Surety
Name of surety Address of surety
Hereinafter called Surety, are held and firmly bound unto the City of Milford, 70 West River Street, Milford, CT 06460, hereinafter called the City, in the penal sum of:
Penal sum Amount in words (dollars) Amount in figures ($)
In lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
The condition of this obligation is such that whereas, the Principal entered into a certain contract with the City, dated:
Contract date Day Month Select month Year
A copy of which is hereto attached and made a part hereof for:
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 23/46
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Now, therefore, if the Principal fails to make any payments as set forth below or as described in or related to said contract, it will be the responsibility of the said Surety to pay for the said promptly, to the satisfaction of the City, and if said Principal shall promptly make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such contract, and any authorized extension or modification thereof, including, but not limited to, all amounts due for materials, lubricants, oil, gasoline, diesel fuel, repairs on machinery, equipment and tools consumed or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor performed in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
LMPB-1
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.
PROVIDED, FURTHER, that no final settlement between the City and the Contractor shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in four (4) counterparts, each one of which shall be deemed an original, this the day day of month , 2026.
Attestation
Principal secretary
(SEAL)
Witness as to Principal
Witness signature
Name
Address, first line
Principal
By: signature
Signer's name
Address, first line
Address, second line
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 24/46
Address, second line
LMPB-2
Attest
Surety secretary
(Seal)
Witness as to surety Witness signature
Name
Address
Address continuation
Surety
Surety
Attorney-in-fact signature
Attorney-in-fact name
Attorney-in-fact address
Address continuation
Note: Date of bond must not be prior to date of Contract. If Contractor is Partnership, all partners should execute bond.
Important: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.
LMPB-3
Performance bond
Know all men by these presents: that
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 25/46
Principal (contractor)
Name of contractor Address of contractor Entity type Select entity type
The contractor identified above is hereinafter called the Principal.
Surety
Name of surety Address of surety
The surety identified above, hereinafter called Surety, and the Principal are held and firmly bound unto the City of Milford, 70 West River Street, Milford, CT 06460, hereinafter called the City, in the penal sum of:
Penal sum
Amount in words (dollars) Amount in figures ($) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
The condition of this obligation is such that whereas, the Principal entered into a certain contract with the City, dated:
Contract date, 2026
Day Month Additional date entry
A copy of the contract is hereto attached and made a part hereof for:
Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Now, therefore, if the Principal fails to complete the required work, undertakings, covenants, terms, conditions, and agreements described in the said Contract, the Surety will be responsible to arrange for the completion of all the Work, as defined in said Contract, and other undertakings, covenants, terms, conditions, and agreements in the said Contract, to the satisfaction of the City, and if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the City, with or without notice to the Surety and during the respective guaranty periods, and if it shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the City from all costs and damages which it may suffer by reason of failure to
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 26/46 do so, and shall reimburse and repay the City all outlay and expense which the City may incur in making good any default, then its obligation shall be void; otherwise to remain in full force and effect.
Provided, further, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its
PRB-1
Obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.
Provided, further, that no final settlement between the City and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
In witness whereof, this instrument is executed in four (4) counterparts, each one of which shall be deemed an original, this the day day of month , 2026.
Attest
Principal secretary signature
(Seal)
Witness as to principal
Signature
Name
Address
Address, continued
Principal
By (signature)
Name
Address
Address, continued
PRB-2
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 27/46
Attest
Surety secretary
(Seal)
Witness as to surety
Witness name
Witness address
Witness address, continued
Surety
Surety name
Attorney-in-fact signature
Attorney-in-fact name
Surety address
Surety address, continued
Note: Date of bond must not be prior to date of Contract. If Contractor is Partnership, all partners should execute bond.
Important: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.
PRB-3
Notice to proceed
Dated:
To:
Recipient, line 1 Recipient, line 2 Recipient, line 3
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 28/46
Project description: Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut
Contract for:
Dollars ($
You are hereby notified to commence work in accordance with the Agreement dated Agreement date
2026 on or before Commencement deadline
2026 and you are to complete the work within sixty (60) consecutive calendar days thereafter. The date of completion of all work is therefore Completion date , 2026.
City of Milford
By
Duly Authorized
Acceptance of notice
Receipt of the above NOTICE TO PROCEED is hereby acknowledged by Acknowledging party
Additional acknowledging party or organization , this
Day day of Month
2026.
Signed Title
NP-1
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 29/46
Note about this form: this form is shown as a record of what was originally submitted. The fields display the recorded entries and are not interactive.
ACORD® Certificate of liability insurance Date (MM/DD/YYYY): 03/01/2011
This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not affirmatively or negatively amend, extend or alter the coverage afforded by the policies below. This certificate of insurance does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder.
Important: If the certificate holder is an additional insured, the policy(ies) must be endorsed. If subrogation is waived, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
Producer
Producer name and address:
ABC Insurance Company 123 Main Street Milford, CT 06460
Contact name:
John Smith
Phone (A/C, No, Ext):
203-777-8910
Fax (A/C, No):
203-888-1098
E-mail address:
Insurer(s) affording coverage
Insurer Name NAIC
Insurer A
Travelers Charter Oak Fire Ins. 25615
Insurer B
Travelers Property Casualty Co.
Insurer C
Farmington Casualty Company 41483
Insurer D
Insurer E
Insurer F
Insured
Insured name and address:
XYZ Contracting, LLC 789 Center Street New Haven, CT 06510
Certificate number: Revision number:
Coverages
This is to certify that the policies of insurance listed below have been issued to the insured named above for the policy period indicated. Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions and conditions of such policies. Limits shown may have been reduced by paid claims.
11/6/26, 4:50 PM Print - Construction of a Truck Wash Bay at the City of Milford Public Works Building, 83 Ford Street, Milford, Connecticut about:blank 30/46
Insr ltr Type of insurance and selections
Addl insr Subr wvd Policy number Policy eff
(MM/DD/YYYY)
Policy exp
(MM/DD/YYYY) Limits
A
General liability
Commercial general liability
Claims-made
Occur
Gen'l aggregate limit applies per:
Policy Project Loc
Y Y DTC02640R004C
OF10
03/01/2011 02/28/2012
Each occurrence:
$1,000,000;
damage to rented premises (Ea occurrence):
$300,000; med exp (Any one person): $5,000;
personal & adv injury:
$1,000,000;
general aggregate:
$2,000,000;
products -comp/op agg:
$2,000,000; other:
A…