Principal Work Items.pdf

PDF 98 KB Posted

Attached to
ND FLAP 704(1) AND 795(1) Magpie & Whitetail Crossings
Solicitation number
6982AF23SS0031
Issued by

About this file

This document outlines the principal work items and quantities for a federal highway construction project. Key work items include roadway excavation, aggregate surfacing, precast concrete box culverts, embankment construction, riprap installation, steel pipe piles, structural concrete, reinforcing steel, bridge railings, guardrails, and placing topsoil. The related federal contract opportunity is for projects ND FLAP 704(1) and 795(1) to construct crossings at Magpie Creek and Whitetail Creek. The solicitation is a pre-solicitation posted by the Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRINCIPAL WORK ITEMS

Line Item Unit

Estimated

Quantity

ROADWAY EXCAVATION CU YD 1630

ROADWAY AGGREGRATE, METHOD 2, SURFACE COURSE TON 740

CONCRETE, HEADWALL (HEADWALLS AND WINGWALLS, DOUBLE BARREL) EACH 2

12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX

CULVERT LN FT 68

PLACING CONSERVED TOPSOIL, 4‐INCH DEPTH ACRE .7

CLEARING AND GRUBBING ACRE 2.5

EMBANKMENT CONSTRUCTION CU YD 10.2

PLACED RIPRAP, METHOD B, CLASS 3 CU YD 600

ROADWAY AGGREGRATE, METHOD 2, SURFACE COURSE TON 1230

STEEL PIPE PILE, IN PLACE (24” DIA x ¾”) LN FT 240

STELL PIPE PILE, IN PLACE (18” DIA x ½”) LN FT 200

DYNAMIC PILE LOAD TEST EACH 4

STRUCTURAL CONCRETE, CLASS A (AE) CU YD 186

REINFORCING STEEL, EPOXY COATED LB 33,000

BRIDGE RAILING, STEEL, TWO RAIL LN FT 250

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LN FT 175

TERMINAL SECTION, TYPE MGS TANGENT EACH 4

STRUCTURAL TRANSITION RAILING LN FT 100

PLACING CONSERVED TOPSOIL, 4‐INCH DEPTH ACRE 1.20

STRUCTURAL BACKFILL CU YD 30