PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- Volusia County Window Blinds and Installation
- Solicitation number
- 25-B-118JJ
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Volusia County, Florida in connection with Contract No. C-2014 and ITB No. 25-B-##XX for Window Blinds and Installation services. The form requires all bidders to identify and list every subcontractor proposed to perform work on the project, with the prime contractor bearing responsibility for verifying that all subcontractors maintain appropriate licensing. Any changes to proposed subcontractors during project completion require prior written approval from the County Project Manager, though such changes cannot alter the total submitted base bid price. The form will also be used to determine local preference eligibility as outlined in the solicitation documents.
Bidders must complete designated green-shaded cells on the form to allocate dollar values and percentages of work to both the prime contractor and all proposed subcontractors, with all other cells automatically calculating to ensure the total reaches 100 percent. The total bid amount listed on this form must match the total bid price shown on the formal Bid Form or Bid Price Sheet, inclusive of any performance or payment bond requirements. The form includes sections for identifying subcontractor disciplines such as electrical, HVAC, plumbing, and landscaping, with additional rows available for disciplines not explicitly listed. Failure to complete and return this form may result in the bid being deemed non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Volusia_County_Window_Blinds_and_Installation.pdf | ||
| 25-B-118JJ_Insurance_Requirements.pdf | ||
| Blinds_Scope.docx | DOCX document | |
| Price_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .