PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- Masonry, Concrete, and Related Products
- Solicitation number
- 25-B-167JS
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for an Invitation to Bid (ITB No. 25-B-##XX) issued by the County of Volusia, Florida, related to a solicitation for masonry, concrete, and related products. The document is a standardized form requiring bidders to comprehensively list all proposed subcontractors and their scope of work for the project, with a mandate to disclose the dollar value and percentage of work each entity will perform. The form emphasizes that prime contractors are responsible for ensuring subcontractors hold appropriate licenses and that any subcontractor changes must receive prior approval from the County Project Manager.
The form includes provisions for local bid preference determination and requires bidders to complete green-shaded areas specifying dollar values for prime and subcontractor work. Notably, the total listed work must equal 100%, and the document warns that failure to complete and return this form may result in a non-responsive bid. While specific project details are not fully detailed, the form serves as a critical compliance document for potential contractors bidding on the County of Volusia's masonry and concrete product procurement opportunity, with an emphasis on transparency in subcontractor relationships and work allocation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Masonry,_Concrete,_and_Related_Products.pdf | ||
| Exhibit_C-_Insurance_Requirements,_25-B-167JS.pdf | ||
| Volusia_Required_Types_and_Limits_of_Insura..(492424).docx | DOCX document | |
| Masonry_Concrete_and_Related_Products_Pricing_Sheet_Sept_2025.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |