Pricing_Worksheet.xls
XLS spreadsheet 46 KB Posted
- Attached to
- ROCK HOUSE VC WATERLINE CONSTRUCTIION
- Solicitation number
- 140L6422Q0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6422Q0002_Amd_0001.pdf | ||
| Construction_Documents_40557717.pdf | ||
| Sol_140L6422Q0002.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Domestic Water
| PRICING WORKSHEET | |||||||||||
| PROJECT: BLM Rock House Visitor Center | PROJ.No.: | 20049.03 | OPINION OF PROBABLE CONSTRUCTION COST | ||||||||
| Waterline Construction | DATE: NOV 2021 | BASIS FOR ESTIMATE | |||||||||
| DEPT: Civil | CODE A (No design completed) | ||||||||||
| SHEET No.: Domestic Water | CODE B (Preliminary design) | ||||||||||
| COMPUTED BY: NSH | CODE C (Finished design) | ||||||||||
| CHECKED BY: DCM | OTHER (Change Order) | ||||||||||
| SUMMARY | QUANTITY | UNIT COST | MEANS | LABOR | EQUIP | TOTAL COST | NOTES | ||||
| # UNITS | MEAS. | PER UNIT | TOTAL | HRS PER | PER UNIT | TOTAL | PER UNIT | ||||
| GENERAL AND DEMOLITION | |||||||||||
| Mobilization and Site Control | 1 | LS | $0.00 | $0.00 | $0.00 | ------------ | Includes pressure testing, disinfection, Bac-T testing. | ||||
| Field Survey | 1 | LS | $0.00 | $0.00 | $0.00 | ------------ | |||||
| Dust Control | 1 | LS | $0.00 | $0.00 | $0.00 | ------------ | |||||
| TOTAL | $0.00 | ------------ | Does not include permits & inspection fees. | ||||||||
| ------------ | |||||||||||
| CONSTRUCTION | ------------ | ||||||||||
| 1" PE 80 HDPE Water | 270 | LF | $0.00 | $0.00 | $0.00 | ------------ | Pipe includes fittings, trench, bedding & backfill | ||||
| 2" PE 80 HDPE Water | 1114 | LF | $0.00 | $0.00 | $0.00 | ------------ | Pipe includes fittings, trench, bedding & backfill | ||||
| 1" Ball Valve, Box & Cover | 5 | EA | $0.00 | $0.00 | |||||||
| 2" Ball Valve, Box & Cover | 2 | EA | $0.00 | $0.00 | ------------ | ||||||
| 1" X 2" X 2" TEE | 5 | EA | $0.00 | $0.00 | |||||||
| 2" X 2" x 2" TEE | 2 | EA | $0.00 | $0.00 | |||||||
| 2" Coupler | 2 | EA | $0.00 | $0.00 | ------------ | ||||||
| 2" 45° Bend | 5 | EA | $0.00 | $0.00 | |||||||
| 1" Cap | 1 | EA | $0.00 | $0.00 | ------------ | ||||||
| 2" Blowoff Valve, Box & Cover | 1 | EA | $0.00 | $0.00 | ------------ | ||||||
| Single Brass Hose Bib | 2 | EA | $0.00 | $0.00 | |||||||
| Double Brass Hose Bib (2 Hose Bib & HDPE 1" TEE) | 2 | EA | $0.00 | $0.00 | ------------ | ||||||
| 2" Backflow Preventer | 1 | EA | $0.00 | $0.00 | |||||||
| Rain Bird ESP-ME3 Controller with Wires | 1 | EA | $0.00 | $0.00 | |||||||
| TOTAL | $0.00 | ------------ | |||||||||
| ------------ | |||||||||||
| Total | $0.00 | $0.00 | $0.00 | ||||||||
| ESTIMATED CONSTRUCTION COST | $0.00 |