PRICING SCHEDULE_GUTTERING & DOWNSPOUT REPLACEMENT AND ROOF REPAIR.pdf
PDF 40 KB Posted
- Solicitation number
- 79629
- Issued by
- Washington County, Virginia
About this file
This document is a Pricing Schedule for a Guttering & Downspout Replacement and Roof Repair project for a government agency. The project includes the removal and replacement of approximately 153 linear feet of guttering and associated downspouts along the back wall of the main garage building, as well as the repair of existing roof leaks on various areas of the garage and auxiliary buildings. The project also includes the removal and replacement of approximately 72 linear feet of guttering and associated downspouts on 2 sidewalls of the auxiliary building. Bidders are required to provide unit prices and total bid prices for the identified line items.
The Pricing Schedule emphasizes the importance of accurate pricing, stating that the Total Bid Price will be used for determining the award amount and that unit prices will govern in the case of pricing errors. The document also specifies that any bidder who enters $0 as a unit price or leaves the unit price blank will be considered non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL_IFB_GUTTERING & ROOF REPAIR FOR GARAGE FACILITY BUILDINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Line
Item No. Quantity Units Unit Price Total Price
1 1 Lump Sum
2 1 Lump Sum
3 1 Lump Sum d.) Base of Chimney of Boiler Room e.) Coal Storage Room
Removal and Replacement of approximately 72 linear feet of guttering and associated downspouts on
2 sidewalls of auxiliary building.
Repair of existing roof leaks:
a.) Back wall of main Garage Building b.) Back wall of Mechanics Tool
Storage Room c.) Above entrance doorway to Boiler
Room
PRICING SCHEDULE
Total Bid Price
(Firm)
GARAGE BUILDING GUTTERING & DOWNSPOUT REPLACEMENT AND ROOF REPAIR
Item Name
(Date)
Removal and Replacement of approximately 153 linear feet of guttering and associated downspouts along back wall of main garage building.
"The Total Bid Price will be utilized for determining the Amount of Bid and to establish a contract award value for the successful
Bidder. Payment will be made on actual units used and verified in the field. Correct pricing is extremely important and price should be double checked before submitting a bid. In case of errors in the extension of prices, Unit Price shall govern." Any bidder who enters
$0 as a Unit Price or leaves the Unit Price blank shall be considered a nonresponsive bidder.
(Signature) (Title)
File details come from the government source that posted it. Updated .