Price Sheet.docx

DOCX document 27 KB Posted

Attached to
Protective Breakers
Solicitation number
FY26r5201028
Issued by

About this file

This is a Price Sheet for a Request for Quote (RFQ) solicitation numbered FY26R5201028 issued by the International Boundary and Water Commission (IBWC) for protective breakers and related equipment at two hydroelectric power plants. The solicitation is a 100% small business set-aside with a NAICS code of 541380 (Testing Laboratories and Services) and a small business size standard of $19.0 million. Offers are due by 3:00 PM Mountain Time on May 15, 2026, and must be submitted via email to angelica.baca@ibwc.gov with the completed price sheet and active UEI number. The contract structure includes a one-year base period and two optional years, with all pricing due on this sheet.

The price sheet itemizes 30 CLINs across three contract periods (base year plus two option years) for equipment and services at the Amistad Power Plant and Falcon Power Plant. Required items include 33KW/13.5KV and 10.5KW/6.9KV hydro generators, 138KV power transformers at varying specifications, 138KV protective circuit breakers, testing equipment, final reports, and other miscellaneous expenses. Each CLIN specifies the quantity in each accounting unit (EA for each), with quantities ranging from 1 to 3 units per line item. Offerors are encouraged to schedule site visits prior to May 8, 2026, with contacts provided for each facility. All contractors must comply with personal protective equipment requirements to access IBWC facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26r5201028 Breakers clin structure

CLIN
Description
Qty
Unit
Unit Price
Total Price
001
Base Year (POP One Year from Time of Award)

33KW/13.5 KV Hydro Generators (Amistad Power Plant)

2
EA
$
$
002
Base Year (POP One Year from Time of Award)

138KV/13.5 KV Power Transformers (Amistad Power Plant)

2
EA
$
$
003
Base Year (POP One Year from Time of Award)

138KV OCB Breaker (Amistad Switch Yard)

1
EA
$
$
004
Base Year (POP One Year from Time of Award)

10.5KW/6.9 KV Hydro Generators (Falcon Power Plant)

3
EA
$
$
005
Base Year (POP One Year from Time of Award)

138KV/6.9 KV Power Transformers (Falcon Power Plant)

3
EA
$
$
006
Base Year (POP One Year from Time of Award)

138KV Protective Breakers (Falcon Switch Yard)

3
EA
$
$
007
Base Year (POP One Year from Time of Award)

Testing Equipment and Final Report (Falcon Power Plant)

1
EA
$
$
008
Base Year (POP One Year from Time of Award)

Other Expenses (Falcon Power Plant)

1
EA
$
$
009
Base Year (POP One Year from Time of Award)

Testing Equipment and Final Report (Amistad Power Plant)

1
EA
$
$
010
Base Year (POP One Year from Time of Award)

Other Expenses (Amistad Power Plant)

1
EA
$
$
011
Option Year One

33KW/13.5 KV Hydro Generators (Amistad Power Plant)

2
EA
$
$
012
Option Year One

138KV/13.5 KV Power Transformers (Amistad Power Plant)

2
EA
$
$
013
Option Year One

138KV OCB Protective Breaker (Amistad Switch Yard)

1
EA
$
$
014
Option Year One

10.5KW/6.9 KV Hydro Generators (Falcon Power Plant)

3
EA
$
$
015
Option Year One

138KV/6.9 KV Power Transformers (Falcon Power Plant)

3
EA
$
$
016
Option Year One

138KV Protective Breakers (Falcon Switch Yard)

3
EA
$
$
017
Option Year One

Testing Equipment and Final Report (Falcon Power Plant)

1
EA
$
$
018
Option Year One

Other Expenses (Falcon Power Plant)

1
EA
$
$
019
Option Year One

Testing Equipment and Final Report (Amistad Power Plant)

1
EA
$
$
020
Option Year One

Other Expenses (Amistad Power Plant)

1
EA
$
$
021
Option Year Two

33KW/13.5 KV Hydro Generators (Amistad Power Plant)

2
EA
$
$
022
Option Year Two

138KV/13.5 KV Power Transformers (Amistad Power Plant)

2
EA
$
$
023
Option Year Two

138KV Protective Breaker (Amistad Switch Yard)

1
EA
$
$
024
Option Year Two

10.5KW/6.9 KV Hydro Generators (Falcon Power Plant)

3
EA
$
$
025
Option Year Two

138KV/6.9 KV Power Transformers (Falcon Power Plant)

3
EA
$
$
026
Option Year Two

138KV Power Transformers Protective Breakers (Falcon Switch Yard)

3
EA
$
$
027
Option Year Two

Testing Equipment and Final Report (Falcon Power Plant)

1
EA
$
$
028
Option Year Two

Other Expenses (Falcon Power Plant)

1
EA
$
$
029
Option Year Two

Testing Equipment and Final Report (Amistad Power Plant)

1
EA
$
$
030
Option Year Two

Other Expenses (Amistad Power Plant)

1
EA
$
$
GRAND TOTAL
$