Price_Schedule__Tuba_City_OU1_OU2_OU3_b.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- TUBA CITY OU2 & 3 - EXCAVATION & BIO-REMEDIATION
- Solicitation number
- 140A0925R0003
About this file
This is a price schedule spreadsheet for the Tuba City Operational Unit 2 and Operational Unit 3 (BIA Roads Maintenance Yard) remediation project. The document outlines the cost structure for environmental cleanup services across five main task areas: Task 1 covers pre-work submittals including health and safety plans, work plans, soil excavation plans, and quality assurance sampling plans for both operational units. Task 2 addresses mobilization and labor costs encompassing site setup, equipment rental, materials/supplies, initial soil sampling, and laboratory fees.
Tasks 3 through 5 focus on the remediation work itself, with Task 3 covering soil excavation, disposal, and transportation for Operational Unit 2 involving 2,300 cubic yards of asbestos-containing material (ACM) plus backfill soil. Task 4 involves remedial design/build work including in-situ bioremediation for both operational units and chemical injections using Petro fix treatment. Task 5 encompasses groundwater monitoring removal for 37 wells pending evaluation and final reporting requirements including draft reports, professional engineer certification, and final documentation. This pricing structure supports the Department of the Interior Bureau of Indian Affairs Navajo Region's solicitation 140A0925R0003 for excavation and bio-remediation services at the Tuba City site.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICE SCHEDULE |
| Tuba City Operational Unit 2 and Operational Unit 3 (BIA Roads Maintenance Yard) |
| TASK I | Pre-Work Submittals |
| 1 | Health and Safety Plan |
| 2 | Work Plan/Schedule/Traffic Plan |
| 3 | Soil Excavation Plan & Ground Water Plan OU-2 & OU-3 |
| 4 | Soil Sampling Plan OU-2 & OU-3 |
| 5 | QA/QC Soil and Groundwater Sampling Plan |
| Task 2 | Mobilization and Labor |
| 1 | Mobilization/Transportation/Site setup |
| 2 | Equipment Owned/Rental |
| 3 | Materials/Supplies |
| 4 | Initial Soil Sampling |
| 5 | Laboratory Fee |
| Task 3 | Soil Excavation/Disposal/Transportation |
| 1 | Operational Unit - 2 (500 CY) + (1,800 CY) = 2,300 ACM |
| 2 | Backfill Soil OU-2 |
| TASK 4 | Remedial Design/Build OP-3 |
| 1 | In-Situ Bioremediation OU-2 & 3 |
| 2 | Chemical Injections/application Petro fix |
| TASK 5 | Ground water monitoring removal OU2 and OU3 |
| 37 GW wells pending for removed based on evaluation | |
| TASK 5 | Reports |
| 1 | Draft of Final Report |
| 2 | PE Certification |
| 3 | Final Report |
TOTAL
Sheet2
Sheet3
File details come from the government source that posted it. Updated .