Price_Schedule_Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- GRSM HAZARD TREE REMOVAL AND BRUSHING Federal contract opportunity
- Solicitation number
- 140P5324Q0030
About this file
This document is a Contractor Bid Sheet for the Great Smoky Mountains National Park FY 2024 Tree Contract. It outlines the required services, including hazard tree removal, brushing, tree trimming, and clearing along various roads and vistas within the park.
The contract includes 4 base bid items and 10 bid option items, with pricing per mile or acre for each location. The work is located in Blount and Sevier Counties, Tennessee and Swain County, North Carolina. The government intends to award a firm-fixed price commercial services contract based on the best value proposal. This is a 100% Small Business Set-Aside with a NAICS code of 561730 Landscaping Services. Proposals are due by 9/11/2024 at 12pm EDT. No site visit is offered as all locations have public access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5324Q0030.pdf | ||
| SOW_Final.pdf | ||
| DOL_Wage_Rate_TN.pdf | ||
| DOL_Wage_Rate_NC.pdf | ||
| Maps_HAZ_Tree__Vistas__Area.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2024 Contractor Bid Sheet Great Smoky Mountains National Park FY 2024 Tree Contract Proposed Schedule Sheet Contractor Bid Sheet
| Base Bid Items | ||||||
| Item # | Description | Location | Road miles | Acres | Price per mile/acre | Total price |
| 1 | Hazard Tree | Gatlinburg Spur, MP 0 to 4.32 (4 lane divided highway) | 8.64 | |||
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. |
| 2 | Hazard Tree | Newfound Gap Road, TN&NC Sides, MP 0 to 8.5 (Gatlinburg boundary to Chimney tops tunnel) Includes all roads/ramps at intersection with Gatlinburg Bypass and MP 20-31.5 (Old 441 to Cherokee boundary) | 20 |
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. |
| 3 | Hazard Tree | Laurel Creek Road | 7.7 |
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. |
| 4 | Hazard Tree Brushing Tree Trimming Clearing | Cades Cove Loop Road | 9.91 |
| Brushing tree trimming, clearing 15 ft. horizontal clearance average along right and left sides. |
Includes clearing of all Hazard trees 100 feet from tree line. One way section of road may be closed for up to 2 weeks total Monday through Friday at noon during December, January or February in coordination with COR and minimum one month advance notice
Great Smoky Mountains National Park FY 2024 Tree Contract Proposed Schedule Sheet Contractor Bid Sheet (continued)
| Bid Option Items | ||||||
| Item # | Description | Location | Road miles | Acres | Price per mile/acre | Total price |
| 5 | Hazard Tree | Cherokee Orchard Road, MP 0 to 3.62 | 3.62 | |||
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. One way section of road may be closed for up to 2 weeks during December, January or February in coordination with COR and minimum one month advance notice | ||||||
| 6 | Hazard Tree | Newfound Gap Road, TN&NC Sides, MP 8.5 to MP 20 | 11.5 | |||
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. | ||||||
| 7 | Hazard Tree | Foothills Parkway West (old section) | 16.62 | |||
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. | ||||||
| 8 | Hazard Tree | Rich Mountain Road | 6.7 | |||
| Includes clearing of all Hazard Trees within 100’ horizontal clearance from tree line along roadway and/or any hazard tree that will hit the road unless otherwise specified. |
| 9 | Brushing Tree Trimming Clearing | Gatlingburg Bypass Road Vistas | 1.1 |
| Brushing, tree trimming, and clearing. BYPS-1 (.2 Acres), BYPS-2 (.4 Acres), BYPS-4 (.5 Acres) |
| 10 | Brushing Tree Trimming Clearing | Cataloochee Entrance Road Vistas | 0.9 |
| Brushing, tree trimming, and clearing. CATA-1 (.2 Acres), CATA-2 (.6 Acres), CATA-4 (.08 Acres) | |||
| 11 | Brushing Tree Trimming Clearing | Foothills Parkway East Road Vistas | 4.1 |
| Brushing, tree trimming, and clearing. FHPE-1 (.8 Acres), FHPE-2 (1.8 Acres), FHPE-3 (.7 Acres), FHPE-4 (.8 Acres) | |||
| 12 | Brushing Tree Trimming Clearing | Foothills Parkway West Road Vistas | 5.2 |
| Brushing, tree trimming, and clearing. FHPW-B (.7 Acres), FHPW-F (1.4 Acres), FHPW-H (.7 Acres), FHPW-L (.7 Acres), FHPW-M3 (.9 Acres) FHPW-Q (.8 Acres) | |||
| 13 | Brushing Tree Trimming Clearing | Rich Mountain Road Vistas | 0.6 |
| Brushing, tree trimming, and clearing. RICH-1 (.3 Acres), RICH-2 (.1 Acres), RICH-3 (.2 Acres) |