Price_Schedule_-_Lift_Station_Repair.pdf

PDF 146 KB Posted

Attached to
Lift Station Repair @ INDU
Solicitation number
140P6425Q0055
Issued by

About this file

The document is a Price Schedule for a Lift Station Repair project at Indiana Dunes National Park's West Beach Bathhouse. The price schedule is structured with line items for Mobilization/Demobilization, Removal and Disposal of Existing Plumbing System, and Installation of New Plumbing System, each broken down by Materials, Equipment, and Labor categories. The schedule uses Lump Sum (LS) as the unit of measurement, with a quantity of 1 for each line item, but currently shows no specific pricing amounts.

The price schedule includes sections for Subtotal, Overhead, Profit, and Bonds, with a note emphasizing that the contractor is responsible for verifying quantities and measurements to provide a comprehensive firm fixed price for the entire project. This aligns with the related federal contract opportunity details, which indicate the project is a small business set-aside with a project magnitude between $25,000 and $50,000, involving removal and installation of a new plumbing system at Indiana Dunes National Park in Gary, Indiana.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

- Materials

Construction Items

National Park Service U.S. Department of Interior

Indiana Dunes National Park

West Beach Bathhouse

PRICE SCHEDULE

PROJECT: Lift Station Repair

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Removal and disposal of the existing plumbing system and all associated work/items

- Equipment

Install: Drain existing lift station, installation of new plumbing system (including final pressure test) and all associated work/items

- Equipment

- Labor

** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **

- Materials

Grand Total

Overhead

Subtotal

Bonds Profit

Sheet1